Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Assessing Tactical Scheduling Options for Time-Based Surface Metering

This paper presents a parametric analysis of the most recent tactical scheduler design for NASA’s Airspace Technology Demonstration 2 (ATD-2) sub-project, committed to demonstrating time-based surface metering at Charlotte Douglas International Airport (CLT). The tactical scheduler design is implemented in a fast-time simulation model of CLT using NASA’s Surface Operations Simulator and Scheduler. The tactical scheduler is supported by three basic functions: trajectory prediction, runway scheduling, and advisory generation. A key parameter of the advisory generation function is the taxi time delay buffer used when calculating target gate pushback times from runway schedule. Multiple simulations that varied the amount of taxi time delay buffer were analyzed to determine the effect on tactical scheduler performance. The results show an improvement in tactical scheduler performance when the buffer is made sufficiently large to release departures from their gates early enough to maintain scheduler predicted runway throughput.

Zelinski, Shannon↗

A Stochastic Scheduler for Integrated Arrival, Departure and Surface Operations in Los Angeles

In terminal airspace, integrating arrivals, departures, and surface operations with competing resources provides the potential of improving operational efficiency by removing barriers between different operations. This work develops a centralized stochastic scheduler for operations in a terminal area including airborne and surface operations using Non-dominated sorting genetic algorithm and Monte Carlo simulations. The scheduler handles completing resources between different flows, such as runway allocations, runway crossing, departure fixes, and other interaction way points between arrivals and departures. Meanwhile, the scheduler also takes time-varied uncertainties into account when optimizing schedules. The scheduler is run sequentially to identify the best and robust schedule for the next planning window. Resulting schedules decide the routes, speed or delays, and runway assignments with separation constraints at mergingdiverging waypoints in the air and crossing and separations on runways. The Los Angels terminal area was used as an example. The implementation of this stochastic scheduler for integrated arrival, departure and surface operations is completed. And several preliminary runs are finished for over 1,200 flights in LAX in a typical day. Sensitivity studies on various planning window sizes are presented, which shows that trade-off exits between planning window size and achievable minimum delay. Preliminary results on runway usage are also presented in this abstract. Because arrivals on the outer runways have to be followed by crossings on the inner runways, algorithmic runway allocation prefers inner runways for arrivals and outer runways for departures. More results will be presented in the final paper. And current terminal arrival and departure procedures based on first-come-first-serve procedure will also be set up and used as a baseline for comparison.

integrated scheduler↗

Coordination between Federated Scheduling and Conflict Resolution in UAM Operations

This work proposes a federated scheduling algorithm and explores two mechanisms for coordinating federated scheduling and conflict resolution functions - two core traffic management functions in urban air mobility operations. A federated scheduling algorithm is first developed, together with data that needs to be shared among schedulers. Two mechanisms for coordinating scheduling and conflict resolution functions are then introduced and studied as conflicts in high-density operations may not be completely resolved by conflict resolution function alone. The first coordination mechanism is constructed based on the arrival scheduler at the destination and another one utilizes the departure scheduler at the origin. Experiments and trade space studies are conducted to compare these two mechanisms using fast-time traffic simulations. Results show that both mechanisms perform well in coordinating scheduling and conflict resolution functions and helping resolve all potential conflicts. Experiments also show that with proper parameter selection, both mechanisms can achieve better efficiency (less delay) while maintaining zero losses of separation.

Federated scheduling↗

Coordination between Federated Scheduling and Conflict Resolution in UAM Operations

This work proposes a federated scheduling algorithm and explores two mechanisms for coordinating federated scheduling and conflict resolution functions - two core traffic management functions in urban air mobility operations. A federated scheduling algorithm is first developed, together with data that needs to be shared among schedulers. Two mechanisms for coordinating scheduling and conflict resolution functions are then introduced and studied as conflicts in high-density operations may not be completely resolved by conflict resolution function alone. The first coordination mechanism is constructed based on the arrival scheduler at the destination and another one utilizes the departure scheduler at the origin. Experiments and trade space studies are conducted to compare these two mechanisms using fast-time traffic simulations. Results show that both mechanisms perform well in coordinating scheduling and conflict resolution functions and helping resolve all potential conflicts. Experiments also show that with proper parameter selection, both mechanisms can achieve better efficiency (less delay) while maintaining zero losses of separation.

Federated scheduling↗

Locality-aware and load-balanced static task scheduling for MapReduce

Task scheduling for MapReduce jobs has been an active area of research with the objective of decreasing the amount of data transferred during the shuffle phase via exploiting data locality. In the literature, generally only the scheduling of reduce tasks is considered with the assumption that scheduling of map tasks is already determined by the input data placement. However, in cloud or HPC deployments of MapReduce, the input data is located in a remote storage and scheduling map tasks gains importance. Here, we propose models for simultaneous scheduling of map and reduce tasks in order to improve data locality and balance the processors’ loads in both map and reduce phases. Our approach is based on graph and hypergraph models which correctly encode the interactions between map and reduce tasks. Partitions produced by these models are decoded to schedule map and reduce tasks. A two-constraint formulation utilized in these models enables balancing processors’ loads in both map and reduce phases. The partitioning objective in the hypergraph models correctly encapsulates the minimization of data transfer when a local combine step is performed prior to shuffle, whereas the partitioning objective in the graph models achieve the same feat when a local combine is not performed. Here, we show the validity of our scheduling on the MapReduce parallelizations of two important kernel operations – sparse matrix–vector multiplication (SpMV) and generalized sparse matrix–matrix multiplication (SpGEMM) – that are widely encountered in big data analytics and scientific computations. Compared to random scheduling, our models lead to tremendous savings in data transfer by reducing data traffic from several hundreds of megabytes to just a few megabytes in the shuffle phase and consequently leading up to 2.6x and 4.2x speedup for SpMV and SpGEMM, respectively.

97 MATHEMATICS AND COMPUTING↗

Methodology and analytical approach to investigate the impact of building temperature setpoint schedules

This work presents a method for generating a large set of stochastically varying temperature setpoint schedules for building performance simulations. It analyses tradeoffs resulting from specific changes to those schedules in terms of three quantities: total electricity consumption per day; maximum hourly electricity consumption per day and predicted percentage dissatisfied (occupant thermal comfort). The method for generating schedules requires a single base schedule as the starting point and, using a few clearly defined parameters, transforms it into a set of schedules that can be used for modelling an existing building stock or for performing parametric studies. Temperature setpoint schedules are generated and simulated for a small office building in a cool-dry climate in three different case studies pertaining to changing temperature setpoint schedules. Tradeoffs between the three output metrics are significant and vary based on the temperature setpoint schedules and the time of the year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

An Optimizing Space Data-Communications Scheduling Method and Algorithm with Interference Mitigation, Generalized for a Broad Class of Optimization Problems

NASA's space data-communications infrastructure-the Space Network and the Ground Network-provide scheduled (as well as some limited types of unscheduled) data-communications services to user spacecraft. The Space Network operates several orbiting geostationary platforms (the Tracking and Data Relay Satellite System (TDRSS)), each with its own servicedelivery antennas onboard. The Ground Network operates service-delivery antennas at ground stations located around the world. Together, these networks enable data transfer between user spacecraft and their mission control centers on Earth. Scheduling data-communications events for spacecraft that use the NASA communications infrastructure-the relay satellites and the ground stations-can be accomplished today with software having an operational heritage dating from the 1980s or earlier. An implementation of the scheduling methods and algorithms disclosed and formally specified herein will produce globally optimized schedules with not only optimized service delivery by the space data-communications infrastructure but also optimized satisfaction of all user requirements and prescribed constraints, including radio frequency interference (RFI) constraints. Evolutionary algorithms, a class of probabilistic strategies for searching large solution spaces, is the essential technology invoked and exploited in this disclosure. Also disclosed are secondary methods and algorithms for optimizing the execution efficiency of the schedule-generation algorithms themselves. The scheduling methods and algorithms as presented are adaptable to accommodate the complexity of scheduling the civilian and/or military data-communications infrastructure within the expected range of future users and space- or ground-based service-delivery assets. Finally, the problem itself, and the methods and algorithms, are generalized and specified formally. The generalized methods and algorithms are applicable to a very broad class of combinatorial-optimization problems that encompasses, among many others, the problem of generating optimal space-data communications schedules.

ground stations↗

Contribution of Schedule Delays to Cost Growth: How to Make Peace with a Marching Army

Numerous research papers have shown that cost and schedule growth are interrelated for NASA space science missions. Although there has shown to be a strong correlation of cost growth with schedule growth, it is unclear what percentage of cost growth is caused by schedule growth and how schedule growth can be controlled. This paper attempts to quantify this percentage by looking at historical data and show detailed examples of how schedule growth influences cost growth. The paper also addresses a methodology to show an alternate approach for assessing and setting a robust baseline schedule and use schedule performance metrics to help assess if the project is performing to plan. Finally, recommendations are presented to help control schedule growth in order to minimize cost growth for NASA space science missions.

schedule↗

Development and Evaluation of HVAC Operation Schedule Detection Algorithm

Small- and medium-sized (<50,000 sf) commercial buildings (SMBs) represent over 94% of the U.S. commercial building stock and consume over 1018 kJ (~1015 Btus) of total site energy. Many of these buildings use rudimentary controls that are mostly manual, with limited scheduling capability and no monitoring or failure management. Therefore, many of them are operated inefficiently and consume excess energy. SMBs typically use packaged rooftop units (RTUs) that are controlled by an individual thermostat. Studies have shown that managing set points and schedules of the RTUs will result in up to 20% energy/cost savings. This paper is focused only on the detection of the occupancy schedule using the zone temperature. The paper describes the methodology to detect the occupancy schedule, the metric used to validate the algorithm and the validation results. The algorithm has been tested and validated using field data from a number of RTUs from six buildings in different climate locations. Overall, the algorithm was successful in detecting the occupancy schedule using a symbolic aggregate approximation (SAX) technique. The results showed that the occupancy schedule detection algorithm using the SAX method performs well under summer (hot) and winter (cold) weather conditions when energy use is the highest. The algorithm can also distinguish different schedules and generate clusters of occupancy scheduling based on zone temperature measurements alone.

Kim, Woohyun↗

Occupancy schedule development and its effect on OpenStudio prototype college building model

College buildings have unique characteristics compared with school buildings. Therefore, defining the realistic occupancy schedule in a prototype college building has significant research opportunities. In this study, the actual operating schedules of each space type were collected and generated based on the class reservation schedule and compared with the previous reference schedule (primary/secondary school). Here, the schedules were analyzed for their effect on the OpenStudio prototype college building model. The findings highlight that the use of a typical school building schedule in a college building impairs the granularity of information. The analysis shows significant differences between the previous occupancy schedule and the updated occupancy schedule of the college building, leading to a considerable decrease in occupancy density. Furthermore, the effect of these occupancy pattern changes on the prototype building model is examined. The variations were observed in minimum ventilation requirements, the average mechanical ventilation rate, and energy consumption attributed to changes in occupancy density.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Scheduling strategies for the ESPRESSO follow-up of TESS targets

ABSTRACT Radial-velocity follow-up of stars harbouring transiting planets detected by TESS is expected to require very large amounts of expensive telescope time in the next few years. Therefore, scheduling strategies should be implemented to maximize the amount of information gathered about the target planetary systems. We consider myopic and non-myopic versions of a novel uniform-in-phase scheduler, as well as a random scheduler, and compare these scheduling strategies with respect to the bias, accuracy and precision achieved in recovering the mass and orbital parameters of transiting and non-transiting planets. This comparison is carried out based on realistic simulations of radial-velocity follow-up with ESPRESSO of a sample of 50 TESS target stars, with simulated planetary systems containing at least one transiting planet with a radius below 4R⊕. Radial-velocity data sets were generated under reasonable assumptions about their noise component, including that resulting from stellar activity, and analysed using a fully Bayesian methodology. We find the random scheduler leads to a more biased, less accurate, and less precise, estimation of the mass of the transiting exoplanets. No significant differences are found between the results of the myopic and non-myopic implementations of the uniform-in-phase scheduler. With only about 22 radial velocity measurements per data set, our novel uniform-in-phase scheduler enables an unbiased (at the level of 1 per cent) measurement of the masses of the transiting planets, while keeping the average relative accuracy and precision around 16 per cent and 23 per cent, respectively. The number of non-transiting planets detected is similar for all the scheduling strategies considered, as well as the bias, accuracy and precision with which their masses and orbital parameters are recovered.

Cabona, L.↗

Multi-Timescale Integrated Dynamics and Scheduling for Solar (MIDAS-Solar) (Final Technical Report)

Solar photovoltaic (PV) installations have experienced unprecedented growth in the United States. PV will become not only an energy producer but also a necessary provider of ancillary services at multiple timescales. Conventional methods to simulate power systems operations - such as long-term production simulation (which typically considers schedules from hours to minutes by using an optimization framework) and short-term transient studies (which simulate dynamics from seconds to sub-seconds using state variables and differential equations) - are not sufficient for studying the multiple-timescale variation of solar generation and its impact on system reliability. Long-term system economics and short-term system dynamics are highly coupled, particularly when the penetration level of renewable generation is extremely high, because the uncertainty and variability of solar generation will impact both power system steady-state and dynamic performance. This project helps meet and exceed the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Solar Energy Technologies Office goal of systems integration by directly addressing this stability and reliability challenge for power grid planning and operation. We have developed a temporally comprehensive, closed-loop simulation model, named Multi-timescale Integrated Dynamics and Scheduling (MIDAS), that seamlessly simulates power system operations from economic scheduling (day-ahead to hours) to dynamic response analysis (seconds to sub-seconds). For schedules with very high levels of inverter-based resources (IBRs), up to and including 100%, the stability of grid controls has been evaluated through electromagnetic transient (EMT) simulations and power-hardware-in-the-loop (PHIL) simulations of key transient events at key schedule points. Specifically, MIDAS provides: 1) a closed-loop simulation framework for simulating timescales from economic scheduling to dynamic stability analysis; 2) machine learning-based stability assessment; 3) EMT modeling and analysis for large-scale power systems; 4) MIDAS PHIL test bed. We worked with Hawaii Electric Companies to apply the MIDAS study framework to a Maui grid study. The entire island's transmission system was modeled in detail - from a yearly scheduling model, to a second-level frequency dynamic model, down to a sub-second-scale EMT model to address critical stability issues. The project demonstrated how MIDAS can help system planners and operators assess system reliability and stability while the power grid is marching toward a high-renewable, high-IBR future. In this Maui grid study, we found that 100% instantaneous IBR operation is achievable in EMT simulation and PHIL testing, and grid planners and operators might need new analysis/simulation tools to assess grid reliability and stability in the scheduling stage. MIDAS will bring Maui and other systems closer to 100% clean and stable energy futures. (In this study, we examined transient stability. Other topics necessary for 100% IBR operation, such as protection and resource adequacy, were not examined.)

100% Renewables↗

Are accidents scheduled

Two major sets of safety problems associated with project scheduling are examined. The first set involves problems resulting from the improper scheduling of the safety tasks. The second involves problems which result from inadequate attention to scheduling of those project tasks which lead to tests and operations and includes condensed schedules, modified schedules, schedule workarounds, eliminated portions of the schedules and strung out schedules.

Childs, C.↗

Scheduling spacecraft operations

A prototype scheduling system named MAESTRO currently under development is being used to explore possible approaches to the spacecraft operations scheduling problem. Results indicate that the appropriate combination of heuristic and other techniques can provide an acceptable solution to the scheduling problem over a wide range of operational scenarios and management approaches. These can include centralized or distributed instrument or systems control, batch or incremental scheduling, scheduling loose resource envelopes or exact profiles, and scheduling with varying degrees of user intervention. Techniques used within MAESTRO to provide this flexibility and power include constraint propagation mechanisms, multiple asynchronous processes, prioritized transaction-based command management, resource opportunity calculation, user-alterable selection and placement mechanisms, and maintenance of multiple schedules and resource profiles. These techniques and scheduling complexities requiring them are discussed.

Britt, Daniel L.↗

Expert system for on-board satellite scheduling and control

An Expert System is described which Rockwell Satellite and Space Electronics Division (S&SED) is developing to dynamically schedule the allocation of on-board satellite resources and activities. This expert system is the Satellite Controller. The resources to be scheduled include power, propellant and recording tape. The activities controlled include scheduling satellite functions such as sensor checkout and operation. The scheduling of these resources and activities is presently a labor intensive and time consuming ground operations task. Developing a schedule requires extensive knowledge of the system and subsystems operations, operational constraints, and satellite design and configuration. This scheduling process requires highly trained experts anywhere from several hours to several weeks to accomplish. The process is done through brute force, that is examining cryptic mnemonic data off line to interpret the health and status of the satellite. Then schedules are formulated either as the result of practical operator experience or heuristics - that is rules of thumb. Orbital operations must become more productive in the future to reduce life cycle costs and decrease dependence on ground control. This reduction is required to increase autonomy and survivability of future systems. The design of future satellites require that the scheduling function be transferred from ground to on board systems.

Barry, John M.↗

Analysis of sequencing and scheduling methods for arrival traffic

The air traffic control subsystem that performs scheduling is discussed. The function of the scheduling algorithms is to plan automatically the most efficient landing order and to assign optimally spaced landing times to all arrivals. Several important scheduling algorithms are described and the statistical performance of the scheduling algorithms is examined. Scheduling brings order to an arrival sequence for aircraft. First-come-first-served scheduling (FCFS) establishes a fair order, based on estimated times of arrival, and determines proper separations. Because of the randomness of the traffic, gaps will remain in the scheduled sequence of aircraft. These gaps are filled, or partially filled, by time-advancing the leading aircraft after a gap while still preserving the FCFS order. Tightly scheduled groups of aircraft remain with a mix of heavy and large aircraft. Separation requirements differ for different types of aircraft trailing each other. Advantage is taken of this fact through mild reordering of the traffic, thus shortening the groups and reducing average delays. Actual delays for different samples with the same statistical parameters vary widely, especially for heavy traffic.

Neuman, Frank↗

Analysis of gain scheduled control for nonlinear plants

Gain scheduling has proven to be a successful design methodology in many engineering applications. In the absence of a sound theoretical analysis, these designs come with no guarantees of the robustness, performance, or even nominal stability of the overall gain-scheduled design. An analysis is presented for two types of nonlinear gain-scheduled control systems: (1) scheduling on a reference trajectory and (2) scheduling on the plant output. Conditions which guarantee stability, robustness, and performance properties of the global gain schedule designs are given. These conditions confirm and formalize popular notions regarding gain-scheduled designs, such as that the scheduling variable should vary slowly and capture the plant's nonlinearities.

Shamma, Jeff S.↗

Distributed scheduling with COMPASS

COMPASS (COMPuter Aided Scheduling System) is a sophisticated, interactive scheduling tool used within NASA. Like most existing tools, however, COMPASS is a single-user application. There is a large class of scheduling problems which may be better solved by allowing several people at various locations to build separate schedules with shared resources. DISCORS (DIStributed COmputer Resource Scheduling) is a set of services which support a distributed version of COMPASS. This architecture naturally accommodates the integration of user-defined resource models without modifying COMPASS. DISCORS services include the ability to establish and manage communications, to code messages in efficient formats, to provide fault detection and recovery, and to configure schedulers across a network. In its present form, DISCORS effectively supports distributed COMPASS, but fails to run fast and to guarantee efficient schedules. Further enhancements may allow several users to simultaneously and interactively work together to create complex schedules while COMPASS detects and coordinates the resolution of conflicting requests.

Rufat-Latre, Jorge↗