Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

NASA Kennedy Space Center Indian River Lagoon Health Initiative Plan

The National Aeronautics and Space Administration (NASA) Kennedy Space Center (KSC) Medical and Environmental Services Division, which includes both the Environmental Management Branch (EMB) and Environmental Assurance Branch (EAB), identified lagoon health as a high priority for the mission. This document provides NASA KSC and its partners a plan which considers the unique relationship between the approximately 140,000-acre Federal property and the Indian River Lagoon (IRL) estuary on and adjacent to KSC, and proposes projects and restoration actions that will ensure NASA KSC’s continued role as a responsible steward promoting IRL health and biodiversity. Additionally, this document provides NASA KSC a reference document to enable informed decisions regarding future IRL health projects.

Indian River Lagoon↗

Restoration and Reexamination of Data from the Apollo 11, 12, 14, and 15 Dust, Thermal and Radiation Engineering Measurements Experiments

As part of an effort by the Lunar Data Node (LDN) we are restoring data returned by the Apollo Dust, Thermal, and Radiation Engineering Measurements (DTREM) packages emplaced on the lunar surface by the crews of Apollo 11, 12, 14, and 15. Also commonly known as the Dust Detector experiments, the DTREM packages measured the outputs of exposed solar cells and thermistors over time. They operated on the surface for up to nearly 8 years, returning data every 54 seconds. The Apollo 11 DTREM was part of the Early Apollo Surface Experiments Package (EASEP), and operated for a few months as planned following emplacement in July 1969. The Apollo 12, 14, and 15 DTREMs were mounted on the central station as part of the Apollo Lunar Surface Experiments Package (ALSEP) and operated from deployment until ALSEP shutdown in September 1977. The objective of the DTREM experiments was to determine the effects of lunar and meteoric dust, thermal stresses, and radiation exposure on solar cells. The LDN, part of the Geosciences Node of the Planetary Data System (PDS), operates out of the National Space Science Data Center (NSSDC) at Goddard Space Flight Center. The goal of the LDN is to extract lunar data stored on older media and/or in obsolete formats, restore the data into a usable digital format, and archive the data with PDS and NSSDC. For the DTREM data we plan to recover the raw telemetry, translate the raw counts into appropriate output units, and then apply calibrations. The final archived data will include the raw, translated, and calibrated data and the associated conversion tables produced from the microfilm, as well as ancillary supporting data (metadata) packaged in PDS format.

McBride, Marie J.↗

The Future of Oaks in the Santa Monica Mountains: A Case Study in Using Remote Sensing Data for Species Distributions Models

The Woolsey Fire began on November 8, 2018, and lasted for almost two weeks, during which it burned almost 100,000 acres of valuable landscape and habitat, including a vast area of woodland. The persistence of key woodland species provides aesthetic, monetary, and ecological value to the landscape through carbon sequestration, air temperature moderation, and erosion mitigation, among other ecosystem services. This study investigated the impact of the Woolsey Fire on native woodland species distributions and identified areas suitable for restoration within the Santa Monica Mountains National Recreation Area. The team partnered with the Resource Conservation District of the Santa Monica Mountains; National Park Service, Santa Monica Mountains National Recreation Area; California Department of Parks and Recreation, Los Angeles County Division; County of Los Angeles Fire Department, Prevention Services Bureau, Forestry Division; County of Los Angeles Department of Regional Planning; and the University of Montana. The Earth observations used include data from Landsat 8 Operational Land Imager, NASA ER-2 Jet Airborne Visible InfraRed Imaging Spectrometer, Shuttle Radar Topography Mission, and RapidEye. The team produced maps of burn severity from the Woolsey Fire, its impact on plant species distributions, and habitat suitability projections for 2050 and 2099 to assist partners in prioritizing areas for restoration. A plant community classification was successfully created using Multiple Endmember Spectral Mixture Analysis (MESMA). Overall accuracy was assessed at 90.54% by comparing the classification to validation pixels derived from ground truth information provided by our partners.

Roger Ly↗

Status Report for the Hypervelocity Free-Flight Aerodynamic Facility

The Hypervelocity Free-Flight Aerodynamic Facility, located at Ames Research Center, is NASA's only aeroballistic facility. During 1997, its model imaging and time history recording systems were the focus of a major refurbishment effort. Specifically the model detection, spark gap (light source); Kerr cell (high speed shuttering); and interval timer sub-systems were inspected, repaired, modified or replaced as required. These refurbishment efforts have fully restored the HFFAF's capabilities to a much better condition, comparable to what it was 15 years ago. Details of this refurbishment effort along with a brief discussion of future upgrade plans are presented.

Cornelison, Charles J.↗

Update on the Ares V to Support Heavy Lift for U.S. Space Exploration Policy

When NASA's Ares V cargo launch vehicle begins flying late next decade, its capabilities will significantly exceed the 1960s-era Saturn V. It will send more crew and cargo to more places on the lunar surface than Apollo and provide ongoing support to a permanent lunar outpost that will open the Moon to greater exploration, science and adventure than ever before. Moreover, it will restore the United States heavy-lift capability, which can support human and robotic exploration for decades to come. Ares V remains in a pre-design analysis cycle stage pending a planned Authority to Proceed (ATP) in late 2010. Ares V benefits from the decision to draw from heritage hardware and its commonality with the Ares I crew launch vehicle, which completed its preliminary design review (PDR) in September 2008. Most of the work on Ares V to date has been focused on refining the vehicle design through a variety of internal studies. This paper will provide background information on the Ares V evolution, emphasizing the vehicle configuration as it exists today.

Sumrall, John P.↗

Possible environmental effects of increased coal use in California

If coal is to be utilized in California it must be made compatible with the state's drive toward restoring environmental quality. The impacts resulting from coal's mining and transportation, or from water consumption, water quality degradation and electric transmission line routing can probably be adequately mitigated through strong and early planning efforts, the use of improved control and process technologies, and sincere utility commitment. The socioeconomic impacts may prove somewhat more difficult to satisfactorily mitigate. Of greatest concern is adequate control of generated air pollutants and disposal of solid and liquid wastes since acceptable technologies or handling techniques have yet to be conclusively demonstrated.

Carey, D. L.↗

Risk to ecological resources following remediation can be due mainly to increased resource value of successful restoration: A case study from the Department of Energy's Hanford Site

Several nations are faced with the need to remediate large contaminated sites following World War II, the Cold War, and abandoned industrial sites, and to return them to productive land uses. In the United States, the Department of Energy (DOE) has the largest cleanup challenge, and its Hanford Site in the state of Washington has the most extensive and most expensive cleanup task. Ideally, the risk to ecological resources on remediation sites is evaluated before, during, and after remediation, and the risk from, or damage to, ecological resources from contaminants should be lower following remediation. In this paper, we report the risk to ecological resources before, during, and as a consequence of remediation on contaminated units requiring cleanup, and then examine the causes for changes in risk by evaluating 56 cleanup evaluation units (EUs) at the Hanford Site. In this case, remediation includes a restoration phase. In general, the risk to ecological and eco-cultural resources is currently not discernible or low at most contaminated units, increases during remediation, and decreases thereafter. Remediation often causes physical disruption to ecosystems as it reduces the risk from exposure to contaminants. Most new remediation projects at the Hanford Site include ecological restoration. Ecological restoration results in the potential for the presence of higher quality resources after remediation than currently exists on these contaminated lands and facilities. Although counter-intuitive, our evaluation of the risk to ecological resources following remediation indicated that a significant percentage of units (61%) will be at increased risk in the post-remediation period. This increased risk is due to DOE's successful remediation and restoration that results in a higher percent of native vegetation and higher ecological value on the sites in the post-remediation period than before. These newly-created resources can then be at risk from post-remediation activities. Risks to these new higher quality resources include the potential for spread of invasive species and of noxious grasses used in previous cleanup actions, disruption of ecosystems (including those with state or federally listed species and unique ecosystems), compaction of soil, use of pesticides to control invasive species, and the eventual need for continued monitoring activities. Thus, by greatly improving the existing habitat and health of eco-receptors, and maintaining habitat corridors between high quality habitats, the ecological resources in the post-remediated units are at risk unless care is taken to protect them. Many of the negative effects of both remediation and future monitoring (or other future land uses) can be avoided by planning and management early in the remediation process. We suggest DOE and other agencies convene a panel of managers, remediation scientists, regulators, environmental and ecological scientists, Native Americans, economists, and the public to develop a generic list of performance metrics for the restoration phase of remediation, including evaluation of success, which could be applied across the DOE complex.

54 ENVIRONMENTAL SCIENCES↗

Social–ecological benefits of land–sea planning at multiple scales in Mesoamerica

Deforestation impacts the ecosystem services provided by downstream coral reefs to coastal communities in multiple ways, such as through increased sedimentation and nutrification. However, connections between terrestrial and marine ecosystems are generally assessed at a single scale and from an ecological perspective alone, limiting our understanding of how watershed management affects the benefits accrued by coastal communities at different scales. Here we explore how ecological and societal benefits of watershed interventions (restoration, protection and sustainable agriculture) differ when considered regionally versus nationally in the Mesoamerican Reef region, by using linked land–sea ecosystem service models. Results from a regional approach prioritize implementing interventions in larger multinational watersheds, leading to neighbouring nations benefiting from increased sediment retention and healthy corals. For the national prioritization approach, selecting for smaller watersheds within individual countries resulted in more societal benefits, particularly increased coastal protection and nature-based tourism, at the cost of improved coral health for neighbouring nations. Finally, we demonstrate how planning at multiple scales across the region can improve ecosystem and societal benefits, resulting in win–win outcomes.

59 BASIC BIOLOGICAL SCIENCES↗

Waste Management Project Success - Regulatory Assurance Systems - 20118

Waste management (WM) and remediation projects are essential within a restorative environmental culture. Despite years of experience, challenges and obstacles associated with efficient and effective WM project execution remain. Although some obstacles are project specific, a common challenge is navigating the regulatory landscape from planning through execution, particularly with first of a kind (FOAK) and first in a while (FIAW) projects. The absence of a comprehensive regulatory assurance strategy places significant hurdles in the path of project success. To clear a path for the successful execution of increasingly complex WM projects, this paper focuses on development of a comprehensive regulatory assurance strategy and implementation plan that effectively engages stakeholders, agencies, and performers to produce project plans that fully and cost effectively integrate applicable regulatory requirements. The most reliable way to align regulatory processes and decisions needed for mission success is through a regulatory assurance system. This system establishes a healthy interface with regulatory decision makers, to work in a collaborative manner, to create a common vision for regulatory decisions on an agreed upon schedule. A regulatory assurance system consists of several elements. Although the mission may vary from cleanup to site closure to nuclear component production, the elements of a regulatory assurance system remain essentially constant and must include: 1) identifying a common vision or end state, 2) developing a long-term, integrated strategy and schedule, 3) establishing a regulatory partnering team consisting of key decision-makers, 4) regular and frequent communication with decision-makers, 5) ensuring consistent surveillance for early identification of issues and changes that may impact the project, 6) quick resolution of emerging issues to prevent schedule impact, 7) identifying core compliance functions, 8) periodically assessing progress of the project as it relates to regulatory assurance and, 9) providing constructive feedback to improve the process. A regulatory assurance system provides a living, multi-faceted approach to planning, visioning, communicating and tracking to avoid surprises and ensure smooth and timely progress to the project. The overall success measures will be whether the system produces common sense regulatory decisions supporting the vision on time without appeal. Effective regulatory frameworks rarely happen on their own. Balanced, common-sense regulatory decisions stem from teams that are trained to work together to achieve shared goals. In this paper, particular attention is placed on the importance of starting with a shared vision for a regulatory assurance and execution strategy that leverages experience to establish optimal approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Project M: Scale Model of Lunar Landing Site of Apollo 17: Focus on Lighting Conditions and Analysis

This document captures the research and development of a scale model representation of the Apollo 17 landing site on the moon as part of the NASA INSPIRE program. Several key elements in this model were surface slope characteristics, crater sizes and locations, prominent rocks, and lighting conditions. This model supports development of Autonomous Landing and Hazard Avoidance Technology (ALHAT) and Project M for the GN&C Autonomous Flight Systems Branch. It will help project engineers visualize the landing site, and is housed in the building 16 Navigation Systems Technology Lab. The lead mentor was Dr. Timothy P. Crain. The purpose of this project was to develop an accurate scale representation of the Apollo 17 landing site on the moon. This was done on an 8'2.5"X10'1.375" reduced friction granite table, which can be restored to its previous condition if needed. The first step in this project was to research the best way to model and recreate the Apollo 17 landing site for the mockup. The project required a thorough plan, budget, and schedule, which was presented to the EG6 Branch for build approval. The final phase was to build the model. The project also required thorough research on the Apollo 17 landing site and the topography of the moon. This research was done on the internet and in person with Dean Eppler, a space scientist, from JSC KX. This data was used to analyze and calculate the scale of the mockup and the ratio of the sizes of the craters, ridges, etc. The final goal was to effectively communicate project status and demonstrate the multiple advantages of using our model. The conclusion of this project was that the mockup was completed as accurately as possible, and it successfully enables the Project M specialists to visualize and plan their goal on an accurate three dimensional surface representation.

Vanik, Christopher S.↗

Does practice make perfect? Lessons learned from full-scale power system incident response exercise

While threats to the energy sector occur daily, few utilities get the opportunity to fully test out their detection and response mechanisms to advanced threats in the real world. With the high demand for reliability, few grid operators would allow execution of simulated cyber-attacks on their live systems. The DOE-funded Liberty Eclipse project offers a unique opportunity for small and large utilities and coops to practice their combined IT/OT responses to a live red team executing attacks against an isolated power system on an island in New York. Both cyber teams and power operations teams must work together to detect and respond to attacks, even restoring the power system against extreme impacts. Lessons learned from these exercises reveal key takeaways for understanding what a real attack against the electric sector will look like, gaps in execution of the best-laid plans when the pressure of a real event is bearing down, and how organizations can better prepare for advanced attacks by optimizing participation in exercises. This presentation will discuss successes and opportunities for improvement both in how utilities can prepare for and respond to events, as well as how full-scale IT/OT exercises can be coordinated.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Coastal Marsh Monitoring for Persistent Saltwater Intrusion

This viewgraph presentation reviews NASA's work on the project that supports the Gulf of Mexico Alliance (GOMA) Governors Action Plan to monitor the coastal wetlands for saltwater intrusion. The action items that relate to the task are: (1) Obtain information on projected relative sea level rise, subsidence, and storm vulnerability to help prioritize conservation projects, including restoration, enhancement, and acquisition, and (2) Develop and apply ecosystem models to forecast the habitat structure and succession following hurricane disturbance and changes in ecological functions and services that impact vital socio-economic aspects of coastal systems. The objectives of the program are to provide resource managers with remote sensing products that support ecosystem forecasting models requiring salinity and inundation data. Specifically, the proposed work supports the habitat-switching modules in the Coastal Louisiana Ecosystem Assessment and Restoration (CLEAR) model, which provides scientific evaluation for restoration management.

Hall, Callie M.↗

Astro-H/Hitomi Data Analysis, Processing, and Archive

Astro-H is the x-ray/gamma-ray mission led by Japan with international participation, launched on February 17, 2016. Soon after launch, Astro-H was renamed Hitomi. The payload consists of four different instruments (SXS, SXI, HXI, and SGD) that operate simultaneously to cover the energy range from 0.3 keV up to 600 keV. On March 27, 2016, JAXA lost contact with the satellite and, on April 28, they announced the cessation of the efforts to restore mission operations. Hitomi collected about one months worth of data with its instruments. This paper presents the analysis software and the data processing pipeline created to calibrate and analyze the Hitomi science data, along with the plan for the archive. These activities have been a collaborative effort shared between scientists and software engineers working in several institutes in Japan and United States.

Angelini, Lorella↗

Contingency maneuver strategies for the Total Ozone Mapping Spectrometer-Earth Probe (TOMS-EP)

The Total Ozone Mapping Spectrometer-Earth Probe (TOMS-EP) is a polar-orbiting spacecraft designed to measure total ozone levels in the Earth's atmosphere. The nominal mission orbit is a 955-kilometer circular Sun-synchronous orbit with an ascending node mean local crossing time (MLT) between 11:02 a.m. and 11:25 a.m. These two mean local ascending node times constitute the boundaries of the MLT box for this mission. The MLT boundaries were chosen to maintain the Sun-to-Earth-to-vehicle orbit-normal (SVN) angle within a preselected set of seasonally independent boundaries. Because the SVN angle is seasonally dependent, but the MLT is not, contingency options for correcting the MLT of orbital states that fall outside of the required MLT range become time dependent. This paper focuses on contingency orbit adjustment strategies developed at the Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) during the mission planning phase of TOMS-EP. Time-dependent delta-V strategies are presented for correcting mission orbit states lying outside of the MLT range. Typically, passive control of the MLT drift rate can be used to restore the orbit state to the required MLT before a seasonal violation of SVN angle constraints can occur. Passive control of the MLT drift rate is obtained through adjustment of the semimajor axis and/or the inclination. The time between initial arrival on orbit at an 'out-of-the box' MLT state and violation of the SVN angle constraints is always less than or equal to 1 year. The choice of which parameter(s) to adjust is dictated by the duration of this time period, the desired mission lifetime, the delta-V cost, and operational constraints.

Kestler, James↗

NASA Earth Science Data Rescue Efforts

Historically, at the end of a NASA mission, earth and space science data were stored at NASA's National Space Science Data Center (NSSDC). The original data archive consisted of both magnetic tapes and film media. As data storage technology improved, data from later missions were stored on disks and platters and higher capacity magnetic media for online accessibility. To conserve physical space at NASA archive sites and to meet disaster recovery guidelines, historical data originally stored on magnetic tapes and film were moved to the Federal Archives and Record Center (FRC) as a temporary holding area until its long-term value was determined by NASA. All records at the FRC are controlled by the NASA Records Retention Schedule (NRRS) which determines the disposal date for each record. On that date, responsible NASA parties are notified that all scheduled records should be reviewed and assessed to determine if they continue to hold significant historical, scientific or administrative value. For Earth Science data records being held at FRC, the Earth Science Data and Information System (ESDIS) Project office is the party responsible for making the value assessment that determines which records warrant preservation and which are ready for proper disposal according to NASA guidelines. Once the data's long-term value is determined, ESDIS takes definitive steps to preserve this data for future discovery and access. Deteriorating media containing historic data of value are recalled from FRC and brought back to ESDIS. Through a tedious, laborious process, digital data are recovered and restored to modern formats with improved metadata and documentation to aid discovery. The restored digital products are then incorporated into our modern online archive, and made immediately accessible to the public. In this paper, we will discuss how we identify data-at-risk, ways to minimize data loss, how we plan for recovery, how we delegate recovery activities to our archive facilities, and how we make recovered data more accessible.

Data Systems; Social and Information sciences↗

The Challenges of Troubleshooting

Troubleshooting work presents electrical and other workers with a challenging combination of physical hazards, working conditions, and time pressure, which can lead to unwanted outcomes if not carefully managed.Summaries of several incidents in which workers were injured or at risk of injury while performing troubleshooting work are presented, identifying organizational weaknesses and error precursors that contributed to each incident.The primary challenges include:Deranged equipment. Equipment that needs troubleshooting is not in a normal operating condition. Actions that are safe when the equipment is in a normal state may not be safe in the deranged state.Work planning and control. The steps taken in troubleshooting are most often determined by the results of the immediately previous diagnostic test, making effective work planning challenging.Multiple types of hazards. Most equipment will present a troubleshooting worker with several types of hazards, including hazardous energy as defined in 29 CFR 1910.147. Portions of the troubleshooting activity may be infeasible without these hazards present.Time pressure. Restoring operation of failed equipment often involves an explicit or implicit sense of urgency.Equipment design and construction. The physical construction of the equipment in large part will determine to which hazards troubleshooters may be exposed. It will also determine which hazards may be encountered while performing the servicing needed to restore the equipment or system to operation.There are effective methods for addressing each challenge, most of which require a combination of advance preparation and management commitment.

Mertz, David E.↗

Resilience-Oriented DG Siting and Sizing Considering Stochastic Scenario Reduction

In this paper, a fuel-based distributed generator (DG) allocation strategy is proposed to enhance the distribution system resilience against extreme weather. The long-term planning problem is formulated as a two-stage stochastic mixed-integer programming (SMIP). The first stage is to make decisions of DG siting and sizing under the given budget constraint. In the second stage, a post-extreme-event-restoration (PEER) is employed to minimize the operating cost in an uncertain fault scenario. In particular, this study proposes a method to select the most representative scenarios for the SMIP. First, a Monte Carlo Simulation (MCS) is introduced to generate sufficient scenarios considering random fault locations and load profiles. Then, the number of scenarios is reduced by the K-means clustering algorithm. The advantage of scenario reduction is to make a trade-off between accuracy and computational efficiency. Finally, the SMIP is solved by the progressive hedging algorithm. Here, the case studies of the IEEE 33-bus and 123-bus test systems demonstrate the effectiveness of the proposed algorithm in reducing the expected energy not served (EENS), which is a critical criterion of resilience.

42 ENGINEERING↗

The Challenges of Safe Troubleshooting Work

Troubleshooting work presents electrical and other workers with a challenging combination of physical hazards, working conditions, and time pressure, which can lead to unwanted outcomes if not carefully managed. Summaries of several incidents in which workers were injured or at risk of injury while performing troubleshooting work are presented, identifying organizational weaknesses and error precursors that contributed to each incident. The primary challenges include: Deranged equipment. Equipment that needs troubleshooting is not in a normal operating condition. Actions that are safe when the equipment is in a normal state may not be safe in the deranged state. Work planning and control. The steps taken in troubleshooting are most often determined by the results of the immediately previous diagnostic test, making effective work planning challenging. Multiple types of hazards. Most equipment will present a troubleshooting worker with several types of hazards, including hazardous energy as defined in 29 CFR 1910.147. Portions of the troubleshooting activity may be infeasible without these hazards present. Time pressure. Restoring operation of failed equipment often involves an explicit or implicit sense of urgency. There are effective methods for addressing each challenge, most of which require a combination of advance preparation and management commitment.

Mertz, David E.↗