Remote Decommissioning of the Plutonium Experimental Extraction Facility, Sellafield - 17031
A redundant suite of gloveboxes formerly used for an experimental plutonium extraction process required decommissioning to avoid further degradation and a risk to other users of the Analytical Services building on Sellafield site. Following a full option selection process, remote techniques were chosen as the most appropriate (i.e. ALARP) decommissioning method. A nearby ventilation system from a previous project was re-engineered to ventilate the laboratory. Gloveboxes in neighbouring labs were cleared to create space to install a personnel access facility. The containment was reinforced where necessary to provide adequate protection from the remote machinery. Following a campaign of manual waste removal, including approximately 21 tonnes of lead chevron bricks released as exempt waste, a Brokk{sup R} 90 remotely-operated vehicle (ROV) was deployed to perform remote size reduction of the glovebox suite. The resulting plutonium-contaminated material (PCM) was delivered to a Kraft Raptor manipulator for sorting and consignment to an on-site store in 200-litre drums. Despite indications from pre-decommissioning surveys of the presence of ILW in the shielded section, none was found. Following the successful removal of the glovebox suite, and the emergence during the project of additional redundant gloveboxes within the Analytical Services building, the Remediation team has taken the opportunity to retain the decommissioning infrastructure as a remote glovebox breakdown facility. (authors)