Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “reliablity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Reliability model generator

An improved method and system for automatically generating reliability models for use with a reliability evaluation tool is described. The reliability model generator of the present invention includes means for storing a plurality of low level reliability models which represent the reliability characteristics for low level system components. In addition, the present invention includes means for defining the interconnection of the low level reliability models via a system architecture description. In accordance with the principles of the present invention, a reliability model for the entire system is automatically generated by aggregating the low level reliability models based on the system architecture description.

McMann, Catherine M.↗

Reliability of Maximal Strength Testing in Novice Weightlifters

The one repetition maximum (1RM) is a criterion measure of muscle strength. However, the reliability of 1RM testing in novice subjects has received little attention. Understanding this information is crucial to accurately interpret changes in muscle strength. To evaluate the test-retest reliability of a squat (SQ), heel raise (HR), and deadlift (DL) 1RM in novice subjects. Twenty healthy males (31 plus or minus 5 y, 179.1 plus or minus 6.1 cm, 81.4 plus or minus 10.6 kg) with no weight training experience in the previous six months participated in four 1RM testing sessions, with each session separated by 5-7 days. SQ and HR 1RM were conducted using a smith machine; DL 1RM was assessed using free weights. Session 1 was considered a familiarization and was not included in the statistical analyses. Repeated measures analysis of variance with Tukey fs post-hoc tests were used to detect between-session differences in 1RM (p.0.05). Test-retest reliability was evaluated by intraclass correlation coefficients (ICC). During Session 2, the SQ and DL 1RM (SQ: 90.2 }4.3, DL: 75.9 }3.3 kg) were less than Session 3 (SQ: 95.3 }4.1, DL: 81.5 plus or minus 3.5 kg) and Session 4 (SQ: 96.6 }4.0, DL: 82.4 }3.9 kg), but there were no differences between Session 3 and Session 4. HR 1RM measured during Session 2 (150.1 }3.7 kg) and Session 3 (152.5 }3.9 kg) were not different from one another, but both were less than Session 4 (157.5 }3.8 kg). The reliability (ICC) of 1RM measures for Sessions 2-4 were 0.88, 0.83, and 0.87, for SQ, HR, and DL, respectively. When considering only Sessions 3 and 4, the reliability was 0.93, 0.91, and 0.86 for SQ, HR, and DL, respectively. One familiarization session and 2 test sessions (for SQ and DL) were required to obtain excellent reliability (ICC greater than or equal to 0.90) in 1RM values with novice subjects. We were unable to attain this level of reliability following 3 HR testing sessions therefore additional sessions may be required to obtain an ICC of greater than or equal to 0.90. Future resistive exercise studies should consider the reliability of specific measures to ensure that changes in strength with training are attributable to training and not learning effects associated with 1RM testing.

Loehr, James A.↗

Reliability-Based Design Optimization of a Composite Airframe Component

A stochastic design optimization methodology (SDO) has been developed to design components of an airframe structure that can be made of metallic and composite materials. The design is obtained as a function of the risk level, or reliability, p. The design method treats uncertainties in load, strength, and material properties as distribution functions, which are defined with mean values and standard deviations. A design constraint or a failure mode is specified as a function of reliability p. Solution to stochastic optimization yields the weight of a structure as a function of reliability p. Optimum weight versus reliability p traced out an inverted-S-shaped graph. The center of the inverted-S graph corresponded to 50 percent (p = 0.5) probability of success. A heavy design with weight approaching infinity could be produced for a near-zero rate of failure that corresponds to unity for reliability p (or p = 1). Weight can be reduced to a small value for the most failure-prone design with a reliability that approaches zero (p = 0). Reliability can be changed for different components of an airframe structure. For example, the landing gear can be designed for a very high reliability, whereas it can be reduced to a small extent for a raked wingtip. The SDO capability is obtained by combining three codes: (1) The MSC/Nastran code was the deterministic analysis tool, (2) The fast probabilistic integrator, or the FPI module of the NESSUS software, was the probabilistic calculator, and (3) NASA Glenn Research Center s optimization testbed CometBoards became the optimizer. The SDO capability requires a finite element structural model, a material model, a load model, and a design model. The stochastic optimization concept is illustrated considering an academic example and a real-life raked wingtip structure of the Boeing 767-400 extended range airliner made of metallic and composite materials.

Patnaik, Surya N.↗

Assessing Reliability of NDE Flaw Detection Using Smaller Number of Demonstration Data Points

The paper provides an engineering analysis approach for assessing reliability of NDE flaw detection using smaller number of demonstration data points. It explores dependence of probability of detection (POD), probability of false positive (POF), on contrast-to-noise ratio, and net decision threshold-to-noise ratio in a simulated data; and draws some generically applicable inferences to devise the approach. ASTM nondestructive evaluation standards provide requirements on signal-to-noise ratio and/or contrast-to-noise ratio in order to provide reliable flaw detection and limit false positive calls. POD analysis of inspection test data results in an estimated flaw size, denoted by 𝑎90/95. This flaw size has 90% POD and minimum 95% confidence. POF is also estimated in the analysis. POD demonstration requires specimens with flaws of known size. In many situations, it is very expensive to produce the large number of flaws required for the POD analysis. In some situations, only real flaws can truly represent the flaws for demonstration. Real flaws of correct size and location in part configuration specimen may be difficult to produce, if not impossible. Here, an engineering analysis approach is devised using simulation to assess reliability of NDE technique when a limited number of flaws are available for demonstration. In this simulation, a technique is considered reliable, if it provides flaw detectability size equal to or better than the theoretical 𝑎90𝑡ℎ used in simulation and also provides a POF less than or equal to a chosen value. The paper uses simulated signal response versus flaw size data to devise the approach. Linear correlation is used between the signal response data and flaw size. POD software mh1823 uses generalized linear model (GLM) in POD analysis after transforming the flaw size and signal response, if needed, using logarithm. Therefore, this approach is in agreement with the linear signal correlation used in mh1823. Using the POD analysis of data, generic conditions on contrast-to-noise ratio and net decision threshold-to-noise ratio are derived for reliable flaw detection. In order to assess technique reliability using the engineering approach, signal response-to-flaw size correlation about the flaw size of concern is needed. In addition, measurement of noise is also needed. If the technique meets the above requirements, assumption of linear signal-to-flaw size correlation and conditions on noise, then the technique can be assessed using this analysis as it fits the underlying POD model used here. The approach is conservative and is designed to provide a larger flaw size compared to the POD approach. Such NDE technique assessment approach, although, not as rigorous as POD, can be cost effective if the larger flaw size can be tolerated. Typically, this is a situation for all quality control NDE inspections. Here, an NDE technique needs to be reliable and 𝑎90/95 is not estimated, but the assessed flaw size is assumed to be larger than the unknown a90 due to conservative factors or margins. Applicability of the approach for assessing reliability of flaw detection in x-ray radiography and 2D imaging in general is also explored.

Koshti, Ajay M.↗

Composite Power System Reliability with Renewables and Customer Flexibility

Composite Power System Reliability is defined as the computational procedure that quantifies the probability that the power system will perform the function of delivering electric power to customers adequately, on a continuous basis and with an acceptable quality. This definition leaves many details undefined and exemplifies the ambiguity in reliability analysis. The increasing deployment of wind and PV creates additional uncertainties that make reliability analysis a rather complex issue. Because of increased uncertainty the need for composite reliability analysis and utilization of results in power system planning is critical. New approaches are emerging for dealing with these problems from the operational point of view, including demand response programs, tapping on customer and distributed resource flexibility and new control approaches. The key question to be addressed is: how the new operational paradigms affect composite power system reliability. Here, this paper presents the ongoing work of the IEEE Composite System Reliability Task Force of the IEEE PES Reliability, Risk, Probability Application (RRPA) Subcommittee.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Bayesian and HRA-Aided Method for the Novel Reliability Analysis of Software

Technological advancements and nuclear power plant modernization has inspired considerable research in the areas of safety and reliability, yet there remains a lack of consensus for the reliability assessment of digital instrumentation and control (I&C) systems. Motivated by the lack of consensus for reliability analysis methods, this work employs a novel framework that incorporates Bayesian, human reliability, and common-cause failure (CCF) modeling techniques. The novel framework allows the use of state-of-the-art or classical modeling techniques when accounting for human and CCF effects on system reliability. The Bayesian and HRA-Aided Method for the Reliability Analysis of Software (BAHAMAS) is demonstrated by a case study for the quantification of software hazards found in a previous analysis of a digital reactor trip system. The results demonstrate the ability of BAHAMAS to account for human activities during the software development life cycle and their influence on software reliability. BAHAMAS is a flexible tool for extending the coverage of conventional probabilistic risk assessments to include modernized digital I&C systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Reliability‐based layout optimization in offshore wind energy systems

Abstract Existing methods for optimizing wind array layouts typically use power or cost objectives and rarely consider reliability‐based objectives. Component and system failure rates, however, are dependent on location‐specific wind conditions, are influenced by array layout and wake interactions, and have a direct and significant impact on capital costs, operational costs, and power production. Although wind power plant models exist that calculate wind loads with sufficient resolution to capture component loading dynamics from wind conditions, they are computationally expensive and thus not suitable for research applications requiring many evaluations, particularly optimization. This study describes the development of computationally efficient, reliability‐based layout optimization methods, enabling us to explore the relationship between component reliability and layout optimization. These methods include the surrogate modeling of the planet bearing life based on varying wind conditions simulated in FAST.Farm and the formulation of reliability‐based objectives based on failure cost and power production models. Through demonstration of this method, we explore how wind conditions, objective functions, and capacity density influence reliability‐based layout optimization. Results indicate that considering reliability alongside power production can reduce failure costs associated with replacement costs and downtime while maintaining or improving power production. Our conclusions highlight the opportunity for wind power plant developers to integrate reliability and operational expenditures alongside performance and capital expenditure objectives in plant design and development to improve plant performance and costs.

17 WIND ENERGY↗

Disjunctive optimization model and algorithm for long-term capacity expansion planning of reliable power generation systems

This paper proposes a new optimization model and algorithm for long-term capacity expansion planning of reliable power generation systems. The model optimizes both investment decisions (e.g., size, location, and time to install, retire and decommission facilities) and operation decisions (e.g., on/off status, operating capacity, and expected power output). It is also able to optimize reserve systems (or backup systems), as well as the main systems, to improve power systems reliability. An impact of operational strategies of generators (i.e., participating in electricity production vs. remaining as idle units during operation) on power systems reliability is considered. Probability of equipment failures and capacity failure states are used to rigorously estimate the power systems reliability depending on design and operation strategies. The optimization model is formulated with Generalized Disjunctive Programming (GDP), which is reformulated as a mixed-integer linear programming (MILP) model using the Hull relaxation. Two reliability-related penalties, such as downtime penalty and unmet demand penalty, are included in the objective function to maximize reliability while minimizing the total net present cost. Furthermore, a bilevel decomposition with tailored cuts is developed to reduce computational times of the multi-scale optimization model. The effectiveness of the proposed model is shown by comparing the results with the results obtained from the expansion planning models that do not explicitly consider reliability. In conclusion, we also show that the proposed bilevel decomposition is computationally efficient for solving large scale problems through 5-years and 10-years planning case studies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Poor reliability of public charging stations can impede the growth of the electric vehicle market

How does the reliability of public charging infrastructure affect electric vehicle (EV) adoption? Substantial public and private investments are expanding EV charging networks, but concerns are growing about the poor reliability of existing chargers and its potential impacts on EV adoption. Using data from a nationwide survey, we employ a choice model to quantify the effects of perceived charging reliability on Americans’ intentions to purchase new or used EVs. By randomly assigning participants to receive information characterizing public charging as either very reliable or very unreliable, we show a causal effect of reliability perceptions on EV purchase intentions. In conclusion, we find that differences in perceived reliability are equivalent to changing price by 32 % of purchasing budget or changing range by 366 miles, underscoring the importance of reliable public charging.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Extending Component Lifetime And Improving Inverter Reliability (ECLAIIR)

Inverter reliability remains one of the most persistent challenges limiting the performance, availability, and economic viability of utility‑scale photovoltaic (PV) plants. Industry data consistently show that inverters account for the highest share of corrective maintenance events and unplanned outages across PV fleets. These failures result in energy losses, increased O&M costs, and reduced confidence in long‑term solar asset performance. Motivated by these challenges, this project—Extending Component Lifetime and Improving Inverter Reliability (ECLAIIR)—was undertaken to systematically investigate inverter degradation and failure mechanisms, develop predictive maintenance capabilities, and establish data‑driven pathways to improve service life and reduce the Levelized Cost of Energy (LCOE) for large‑scale PV systems. The primary goal of the project was to identify pre‑failure signatures in string inverters using both lab‑based accelerated lifetime testing and field‑based data and to develop predictive maintenance algorithms that can anticipate inverter faults before they occur. Through collaboration with inverter testing laboratory, solar PV plant owner, and failure‑analysis experts, the project advanced the technical understanding of inverter reliability. By instrumenting inverters with thermistors, humidity sensors, power‑quality meters, and acoustic sensors, the research established how multiple sensing modalities can reliably detect deviations from normal behavior hours to days before failure. These findings substantially enhance scientific understanding of inverter failure kinetics and provide the PV industry with the most comprehensive cross‑OEM characterization of early‑stage failure indicators reported to date. Technically, the project demonstrated the effectiveness of predictive maintenance by developing and validating the PreDICT (Predictive Diagnostics of PV Inverters Using Condition Monitoring and Trend Analysis) framework—a multi‑layer diagnostic architecture combining peer‑to‑peer analytics, historical trend modeling, and advanced machine‑learning techniques such as the Sequential Conditional Variational Autoencoder (SCVAE). This predictive model achieved more than 90% accuracy in detecting pre‑failure conditions and provided up to four days of lead time before inverter failure in field scenarios. Economically, the project’s LCOE analysis showed that predictive maintenance can reduce lifetime energy losses and minimize corrective maintenance interventions. Modeling indicated that, depending on inverter failure rates and replacement timelines, predictive maintenance can significantly reduce LCOE impacts associated with inverter downtime: from as high as 19.4% under conventional maintenance strategies to 0.1%–10.17% when predictive analytics are adopted. These results confirm that predictive maintenance is both technically feasible and economically advantageous for utilities and plant operators. The project’s findings also have broad public benefit. By improving inverter reliability and reducing downtime, predictive maintenance directly increases electricity generation from existing PV assets. Enhanced reliability lowers operational costs for utilities, which can translate over time into lower energy costs for consumers. Furthermore, the project’s technical publications, conference presentations, and industry workshops ensure that knowledge gained is shared broadly across the solar industry, supporting workforce development and enabling utilities of all sizes to adopt modern asset‑health monitoring practices. The retrofitting case study and service‑life prediction framework further support informed decision‑making for aging PV fleets, helping operators extend system life and reduce electronic waste. In summary, the ECLAIIR project significantly advanced the state of knowledge on inverter degradation, demonstrated the technical and economic value of predictive maintenance, and delivered actionable tools and insights that support more reliable, cost‑effective, and sustainable PV plant operation. The outcomes of this project will continue to inform utility practices, guide inverter design improvements, and strengthen the long‑term performance of solar assets nationwide.

14 SOLAR ENERGY↗

How to Characterize the Reliability of Ceramic Capacitors with Base-Metal Electrodes (BMEs)

The reliability of an MLCC device is the product of a time-dependent part and a time-independent part: 1) Time-dependent part is a statistical distribution; 2) Time-independent part is the reliability at t0, the initial reliability. Initial reliability depends only on how a BME MLCC is designed and processed. Similar to the way the minimum dielectric thickness ensured the long-term reliability of a PME MLCC, the initial reliability also ensures the long term-reliability of a BME MLCC. This presentation shows new discoveries regarding commonalities and differences between PME and BME capacitor technologies.

Ceramic Capacitors↗

How to Characterize the Reliability of Ceramic Capacitors with Base-Metal Electrodes (BMEs)

The reliability of an MLCC device is the product of a time-dependent part and a time-independent part: 1) Time-dependent part is a statistical distribution; 2) Time-independent part is the reliability at t=0, the initial reliability. Initial reliability depends only on how a BME MLCC is designed and processed. Similar to the way the minimum dielectric thickness ensured the long-term reliability of a PME MLCC, the initial reliability also ensures the long term-reliability of a BME MLCC. This presentation shows new discoveries regarding commonalities and differences between PME and BME capacitor technologies.

Reliability↗

Methods and Costs to Achieve Ultra Reliable Life Support

A published Mars mission is used to explore the methods and costs to achieve ultra reliable life support. The Mars mission and its recycling life support design are described. The life support systems were made triply redundant, implying that each individual system will have fairly good reliability. Ultra reliable life support is needed for Mars and other long, distant missions. Current systems apparently have insufficient reliability. The life cycle cost of the Mars life support system is estimated. Reliability can be increased by improving the intrinsic system reliability, adding spare parts, or by providing technically diverse redundant systems. The costs of these approaches are estimated. Adding spares is least costly but may be defeated by common cause failures. Using two technically diverse systems is effective but doubles the life cycle cost. Achieving ultra reliability is worth its high cost because the penalty for failure is very high.

deep space life support↗

Application of Orthogonal Defect Classification for Software Reliability Analysis

The modernization of existing and new nuclear power plants with digital instrumentation and control systems (DI&C) is a recent and highly trending topic. However, there lacks strong consensus on best-estimate reliability methodologies by both the United States (U.S.) Nuclear Regulatory Commission (NRC) and the industry. This has resulted in hesitation for further modernization projects until a more unified methodology is realized. In this work, we develop an approach called Orthogonal-defect Classification for Assessing Software Reliability (ORCAS) to quantify probabilities of various software failure modes in a DI&C system. The method utilizes accepted industry methodologies for software quality assurance that are also verified by experimental or mathematical formulations. In essence, the approach combines a semantic failure classification model with a reliability growth model to predict (and quantify) the potential failure modes of a DI&C software system. The semantic classification model is used to address the question: How do latent defects in software contribute to different software failure root causes? The use of reliability growth models is then used to address the question: Given the connection between latent defects and software failure root causes, how can we quantify the reliability of the software? A case study was conducted on a representative I&C platform (ChibiOS) running a smart sensor acquisition software developed by Virginia Commonwealth University (VCU). The testing and evidence collection guidance in ORCAS was applied, and defects were uncovered in the software. Qualitative evidence, such as condition coverage, was used to gauge the completeness and trustworthiness of the assessment while quantitative evidence was used to determine the software failure probabilities. The reliability of the software was then estimated and compared to existing operational data of the sensor device. It is demonstrated that by using ORCAS, a semantic reasoning framework can be developed to justify software reliability (or unreliability) while still leveraging the strength of the existing methods.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

DuraMAT Technology Scouting Report: Assessing Module Reliability Risks Associated with Projected Technological Changes

Maintaining the reliability of photovoltaic (PV) modules in the face of rapidly changing technology is critical to maximizing solar energy's contribution to global decarbonization. Our presentation describes expected changes in PV technology and their impacts on performance and reliability. We leverage PV market reports, interviews with PV researchers and other industry stakeholders, and peer-reviewed literature to narrow the multitude of possible changes into a manageable set of 11 impactful trends likely to be incorporated in near-term crystalline-silicon module designs. We group the trends into four categories (module architecture, interconnect technologies, bifacial modules, and cell technology) and explore the drivers behind the changes, their interactions, and associated reliability risks and benefits. Our analysis identifies specific areas that would benefit from accelerating the PV reliability learning cycle, to assess emerging module products and designs more accurately. We recommend that researchers continue tracking module technologies and their reliability implications so efforts can be focused on the most impactful trends. As the rapid technological turnover continues, it is also critical to incorporate fundamental knowledge into models that can predict module reliability. Predictive capabilities complete the PV reliability learning cycle-reducing the time required to assess new designs and mitigating the risks associated with large-scale deployment of new products.

bifacial↗

Bridging Equipment Reliability Data and Risk Informed Decisions in a Plant Operation Context

Industry equipment reliability and asset management programs are essential elements that help ensure the safe and economical operation of nuclear power plants. The effectiveness of these programs is addressed in several industry-developed and regulatory programs. The Risk-Informed Asset Management (RIAM) project is tasked to develop tools in support of the equipment reliability and asset management programs at nuclear power plants. These tools are designed to create a direct bridge between component health/lifecycle data and decision making (e.g., maintenance scheduling and project prioritization). The goal of this article is to provide a guide for specific use cases that the RIAM project is targeting. We have grouped uses cases into three main areas. The first area focuses on the analysis of equipment reliability data with a particular emphasis on condition-based data, such as test/surveillance reports and component monitoring data. The second area focuses on the integration of equipment reliability into system/plant reliability models to determine system/plant health and identify the components that are critical to maintain an operational system. Lastly, the third area manages plant resources, such as maintenance activities and replacement scheduling using optimization methods. Here the primary focus is on supporting typical system engineer decisions regarding maintenance activity scheduling and component aging management. This is performed in a risk-informed context where the term “risk” is broadly constructed to include both plant reliability and economics. This framework combines data analytics tools to analyze equipment reliability data with risk-informed methods designed to support system engineer decisions (e.g., maintenance and replacement schedules, optimal maintenance posture) in a customizable workflow.

97 - MATHEMATICS AND COMPUTING↗

Quantum-Inspired Power System Reliability Assessment

To enable an in-depth study of power system operation and planning, the assessment of standard reliability indices is inevitable. The Monte Carlo Simulation (MCS) approach is a broadly used method in replacing the analytical methods in reliability indices assessment. The accuracy of MCS, however, highly depends on the sampling size, and hence, a complicated system with large number of components requires a large sampling size and daunting computational effort. To address this shortcoming, we, in this paper attempt to take advantage of potentials of the quantum computing (QC) for power system reliability assessment by realizing the following contributions: 1) an innovative quantum model designed for reliability assessment; 2) a quantum circuit that achieves the quadratic speed up compared to the classical MCS method; 3) an efficient quantum amplitude estimation (QAE) algorithm to accurately evaluate the reliability indices. The accuracy and efficacy of the quantum reliability method are extensively verified and demonstrated on both radial and mesh distribution systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reliability Analysis of Power Grids Considering Component Failures of Variable Energy Resources

This paper proposes an improved model for the reliability assessment of power systems considering component failures of variable energy resources (VER). The inherent intermittency of VER such as solar photovoltaic (PV) and wind farms, along with their susceptibility to component failures, present significant challenges to reliable system operation. These issues, combined with power grid operation and network constraints, complicate the reliable operation of VER-integrated power systems. Here, to address these concerns, this paper introduces a reliability assessment framework that considers VER input variability, its impact on component availability, and their resulting impact on overall system reliability. Stochastic models based on discrete Markov processes are developed to incorporate variable irradiance, wind speeds, and their effects on PV and wind component failure rates. A next-event and state transition-based approach is then developed to integrate the stochastic models into a mixed-timing sequential Monte Carlo simulation framework for composite reliability assessment. Case studies on the RTS-GMLC system demonstrate the effectiveness of the proposed model in evaluating the reliability of VER-integrated systems.

Pandit, Dilip [Sandia National Laboratories (SNL-N↗