Issue Resolution During the Development of the Performance Assessment for the Savannah River Site Saltstone Disposal Facility - 20125
In 2019, Savannah River Remediation developed a revision to the performance assessment (PA) on behalf of the U.S. Department of Energy (DOE) Savannah River Operations Office (SR) for the near-surface disposal of low-level waste at the Savannah River Site (SRS) Saltstone Disposal Facility (SDF). Soluble waste from SRS Tank Farms undergoes salt processing to remove cesium and other high-activity constituents. The low-activity decontaminated salt solution (DSS) is then immobilized by mixing it into a cementitious waste form known as saltstone. After mixing, the saltstone is poured into leak-tight concrete vaults, known as saltstone disposal units (SDUs), where the waste form cures. By the time of facility closure, the SDF is expected to consist of 15 SDUs with a combined capacity of 1.06 E+09 L (280 Mgal) of cured saltstone. The facility operates under a Disposal Authorization Statement from DOE and a permit from the South Carolina Department of Health and Environmental Control (SCDHEC). Since the start of operations in 1990, the SDF has received almost 6.7 E+07 L (18 Mgal) of DSS, resulting in the safe disposal of 2.7 E+16 Bq (7.3 E+05 Ci) of activity. Due to the radioactive decay of short-lived contaminants, the total remaining activity in the disposed waste is estimated to be approximately 1.4 E+16 Bq (3.9 E+05 Ci), as of September 2018. The Disposal Authorization Statement requires a demonstration that the system of engineered and natural features of the disposal facility will limit releases from the facility and be protective of human health and the environment for at least the next 1,000 years. The long-term performance of the facility was evaluated under the requirements of the DoE's Radioactive Waste Management Manual (US DOE Manual 435.1-1). Simulations were performed to demonstrate that the disposal facility would meet performance objectives specified in the manual. The evaluation was based on numerical models that simulate the releases of contaminants from the saltstone waste form. Contaminants were transported through groundwater and air pathways to points of assessment to evaluate compliance (i.e., 100 m from the SDUs). In addition, the potential consequences of an inadvertent human intrusion (IHI) were also evaluated. A number of issues were overcome during the development of these simulations. These issues were identified as part of internal technical reviews. Simulations are developed by people and people make mistakes, so the internal technical review process is a vital step in PA development. Specific examples of resolved issues include a unit-conversion error, an inappropriate definition for a model boundary condition, a model time-stepping issue, and an error in the calculation for the buildup of contaminants in soil. Actions taken to address these issues resulted in an improved product with a better supported technical basis and more defensible results. The identification and correction of these issues are discussed. By understanding these issues, model developers and technical reviewers working on PAs in the future may avoid repeating these types of mistakes. Transparency with respect to these mistakes builds trust between waste management sites, regulators, and stakeholders. (authors)