Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “probabilistic reasoning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

HYPHY: Deep Generative Conditional Posterior Mapping of Hydrodynamical Physics

Generating large-volume hydrodynamical simulations for cosmological observables is a computationally demanding task necessary for next-generation observations. In this work, we construct a novel fully convolutional variational autoencoder (VAE) to synthesize hydrodynamic fields conditioned on dark matter fields from N -body simulations. After training the model on a single hydrodynamical simulation, we are able to probabilistically map new dark-matter-only simulations to corresponding full hydrodynamical outputs. By sampling over the latent space of our VAE, we can generate posterior samples and study the variance of the mapping. We find that our reconstructed field provides an accurate representation of the target hydrodynamical fields as well as reasonable variance estimates. This approach has promise for the rapid generation of mocks as well as for implementation in a full inverse model of observed data.

79 ASTRONOMY AND ASTROPHYSICS↗

Quantifying uncertainty in stable isotope mixing models

Mixing models are powerful tools for identifying biogeochemical sources and determining mixing fractions in a sample. However, identification of actual source contributors is often not simple, and source compositions typically vary or even overlap, significantly increasing model uncertainty in calculated mixing fractions. This study compares three probabilistic methods, SIAR [ Parnell et al ., 2010] a pure Monte Carlo technique (PMC), and Stable Isotope Reference Source (SIRS) mixing model, a new technique that estimates mixing in systems with more than three sources and/or uncertain source compositions. In this paper, we use nitrate stable isotope examples (δ 15 N and δ 18 O) but all methods tested are applicable to other tracers. In Phase I of a three-phase blind test, we compared methods for a set of six-source nitrate problems. PMC was unable to find solutions for two of the target water samples. The Bayesian method, SIAR, experienced anchoring problems, and SIRS calculated mixing fractions that most closely approximated the known mixing fractions. For that reason, SIRS was the only approach used in the next phase of testing. In Phase II, the problem was broadened where any subset of the six sources could be a possible solution to the mixing problem. Results showed a high rate of Type I errors where solutions included sources that were not contributing to the sample. In Phase III some sources were eliminated based on assumed site knowledge and assumed nitrate concentrations, substantially reduced mixing fraction uncertainties and lowered the Type I error rate. These results demonstrate that valuable insights into stable isotope mixing problems result from probabilistic mixing model approaches like SIRS. The results also emphasize the importance of identifying a minimal set of potential sources and quantifying uncertainties in source isotopic composition as well as demonstrating the value of additional information in reducing the uncertainty in calculated mixing fractions.

54 ENVIRONMENTAL SCIENCES↗

A Sensitivity-informed, Process Model Abstraction Implementation in GoldSim - 19276

System-level Performance Assessment (PA) models rely on specific process-level models for some inputs, such as infiltration. For probabilistic PA, the value of the process model output depends on the values of input parameters that also vary in the PA model. The simplest conceptual solution is to draw values of the input parameters from their distributions, run the process level model at these values, and then use the output where it is needed in the PA model. However, this solution is unsatisfactory for multiple reasons: (1) the PA Model should be set up such that new runs can be made and distributions can change without having to go back and run the process-level model; (2) calling the process model from the system model is possible, but technical difficulties remain in coupling the two; and (3) there is no uncertainty in the process-level model results incorporated into the PA model. Therefore, it is desirable to develop a method that maps the values of PA Model inputs to process level model outputs, in real time within the PA Model set up and using as simple of a map as possible without losing key features of the relationship. This has been termed 'model abstraction' because information about process model runs is 'abstracted' to be used with the PA model. A simple 'nearest neighbor' abstraction approach is presented to overcome these problems, in which a sensitivity-informed distance metric is used to map a system-level model realization to the most appropriate process-level model realization. (authors)

97 MATHEMATICS AND COMPUTING↗

Intent Modeling and Conflict Probability Calculation for Operations in Upper Class E Airspace

This work presents a probabilistic operational intent model for vehicles operating in upper Class E airspace. A hybrid method is developed to calculate the intent conflict probability leveraging and extending past works on probabilistic conflict computation. Simulation results verify that the probabilistic intent model can accurately encompass the uncertain positions of each vehicle type, that are a result of wind prediction errors and vehicle performance. A comparison with past methods showed that the proposed hybrid method captures the intent conflict probability with better accuracy, especially for a larger look-ahead horizon, and computational time is reasonable for real-time applications. An example is presented to illustrate the use of the intent conflict probability in strategic planning applications.

Air traffic management↗

Intent Modeling and Conflict Probability Calculation for Operations in Upper Class E Airspace

This work presents a probabilistic operational intent model for vehicles operating in upper Class E airspace. A hybrid method is developed to calculate the intent conflict probability leveraging and extending past works on probabilistic conflict computation. Simulation results verify that the probabilistic intent model can accurately encompass the uncertain positions of each vehicle type, that are a result of wind prediction errors and vehicle performance. A comparison with past methods showed that the proposed hybrid method captures the intent conflict probability with better accuracy, especially for a larger look-ahead horizon, and computational time is reasonable for real-time applications. An example is presented to illustrate the use of the intent conflict probability in strategic planning applications.

Air traffic management, operational intent, confli↗

Probabilistic inference in very large universes

Our current favored cosmological theories allow for the striking and controversial possibility that the observable universe is just a small part of a much larger universe in which parameters that describe the effective, low-energy laws of physics vary from one region to another. The controversy is largely driven by the fact that such a “very large universe” is mostly observationally inaccessible to us, so the issue arises of how we can reasonably assess a theory that describes such a universe. In this paper, we propose a Bayesian method for theory assessment based on theory-generated probability distributions for our observations. We focus on the principles that define this method, leaving aside concerns about how, in practice, one would carry out the required calculations. (One important issue that we set aside is the measure problem.) We argue that cosmological theories can be tested by the standard method of Bayesian updating, but we need to use theoretical predictions for “first-person” probabilities—that is, probabilities that we should use for our observations, taking into account all relevant selection effects. These selection effects can vary from one observer to another and can vary with time, so, in principle, first-person probabilities are defined for each observer instant—an observer at a specific instant of time. Calculations of first-person probabilities should take into account everything that the observer believes about herself and her surroundings, which we refer to as her subjective state. If the universe is very large, a theory might predict that there are many observer instants in the same subjective state; we argue that first-person probabilities should be calculated using a principle of self-locating indifference (PSLI), the assumption that any real observer should make predictions for her future as if she were chosen randomly and uniformly from the theoretically predicted observer instants that share her subjective state. We believe the PSLI is intuitively very reasonable, but we also argue that, if the theory is correct, the use of this principle maximizes the expected fraction of observers who will make correct predictions. A further complication is that cosmological theories are not expected to fully predict the detailed properties of the universe, but rather will predict a set of possible universes, each with a probability. Different possible universes will generically have different numbers of observers. We argue that, in the calculation of first-person probabilities, the probability for each possible universe should be weighted by the number of observer instants in the specified subjective state that it contains. These issues have been controversial in the literature, so we also provide a rebuttal to the claim that principles like the PSLI involve a “selection fallacy”; a rebuttal to what we dub the principle of required certainty; an argument rejecting theories that predict a preponderance of Boltzmann brains; a rebuttal to a parable about humans and Jovians used by Hartle and Srednicki to argue that assumptions of typicality can lead to absurd consequences; and, finally, a discussion about how the use of “old evidence” can be fit into a Bayesian mold.

Azhar, Feraz [University of Notre Dame, IN (United↗

Evaluating decadal predictions of northern hemispheric cyclone frequencies

Mid-latitudinal cyclones are a key factor for understanding regional anomalies in primary meteorological parameters such as temperature or precipitation. Extreme cyclones can produce notable impacts on human society and economy, for example, by causing enormous economic losses through wind damage. Based on 41 annually initialised (1961–2001) hindcast ensembles, this study evaluates the ability of a single-model decadal forecast system (MPI-ESM-LR) to provide skilful probabilistic three-category forecasts (enhanced, normal or decreased) of winter (ONDJFM) extra-tropical cyclone frequency over the Northern Hemisphere with lead times from 1 yr up to a decade. It is shown that these predictions exhibit some significant skill, mainly for lead times of 2–5 yr, especially over the North Atlantic and Pacific. Skill for intense cyclones is generally higher than for all detected systems. A comparison of decadal hindcasts from two different initialisation techniques indicates that initialising from reanalysis fields yields slightly better results for the first forecast winter (month 10–15), while initialisation based on an assimilation experiment provides better skill for lead times between 2 and 5 yr. The reasons and mechanisms behind this predictive skill are subject to future work. Preliminary analyses suggest a strong relationship of the model's skill over the North Atlantic with the ability to predict upper ocean temperatures modulating lower troposphere baroclinicity for the respective area and time scales.

MiKlip↗

Methods to Automate Assessing the Outage Risk and Technical Specification Compliance for Planned Work and Current Plant Conditions. Light Water Reactor Sustainability Program report

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and the extension of their current operating licenses. The Outage Risk Management Improvement Pilot Project seeks to improve the management of nuclear power plant outages. This is done through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and out of service equipment would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment necessary to meet the requirements of the nuclear safety plan. In addition, the operations and outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently during outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This particular report will provide a demonstration of the capabilities in the development of a predictive software platform for improving configuration control and accessing the plant risks associated with outage work protocols and illustrate how the software assists in strategies to minimize these interactions. In addition to maintaining nuclear safety, there are numerous administrative requirements that must be complied with during an outage. This report will discuss the use of logic modelling to monitor planned work against technical specification requirements for given plant conditions and to integrate these requirements with shutdown risk models, clearance order requirements and other plant condition requirements.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of Phase-Type Stochastic Petri Nets With Discrete and Continuous Timing

The Petri net formalism is useful in studying many discrete-state, discrete-event systems exhibiting concurrency, synchronization, and other complex behavior. As a bipartite graph, the net can conveniently capture salient aspects of the system. As a mathematical tool, the net can specify an analyzable state space. Indeed, one can reason about certain qualitative properties (from state occupancies) and how they arise (the sequence of events leading there). By introducing deterministic or random delays, the model is forced to sojourn in states some amount of time, giving rise to an underlying stochastic process, one that can be specified in a compact way and capable of providing quantitative, probabilistic measures. We formalize a new non-Markovian extension to the Petri net that captures both discrete and continuous timing in the same model. The approach affords efficient, stationary analysis in most cases and efficient transient analysis under certain restrictions. Moreover, this new formalism has the added benefit in modeling fidelity stemming from the simultaneous capture of discrete- and continuous-time events (as opposed to capturing only one and approximating the other). We show how the underlying stochastic process, which is non-Markovian, can be resolved into simpler Markovian problems that enjoy efficient solutions. Solution algorithms are provided that can be easily programmed.

Jones, Robert L.↗

Technologies for Detecting Interactions between Current Plant Configuration States and Component Manipulations Directed by In-Use Procedures

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and extension of their current operating licenses. A new area of LWRS research, Outage Risk Management Improvement (ORMI) seeks to improve the management of nuclear power plant outages through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and equipment out of service would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify the incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment that is being relied on to meet the requirements of the nuclear safety plan. In addition, Operations and the Outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently in outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This project will develop tools and strategies to minimize these interactions.

99 GENERAL AND MISCELLANEOUS↗

Prototype System for Detecting Interactions between Current Plant Configuration States and Component Manipulations Directed by In-Use Procedures

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and extension of their current operating licenses. The Outage Risk Management Improvement Pilot Project seeks to improve the management of nuclear power plant outages through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and equipment out of service would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify the incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment that is being relied on to meet the requirements of the nuclear safety plan. In addition, Operations and the Outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently in outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This project will develop tools and strategies to minimize these interactions. This report describes a prototype tool designed to support plant personnel in controlling work during NPP outages to prevent unintended interactions. A software application was created to manage and display important configuration information and utilize natural language processing to access the impacts of upcoming procedures and work orders. Initial industry feedback is also presented.

99 GENERAL AND MISCELLANEOUS↗

Development of a Severe Accident Analysis Engine Using Approximate Reasoning

In hypothetical severe accident scenarios, nuclear power plant safety is challenged by core degradation and release of fission products. To aid the plant operator and technical support center staff, research has been performed to develop understanding of severe accident phenomenology, assessing their risk and devise measures to mitigate accident consequences (Sehgal, 2011). Nuclear power plant accidents involve highly complex physical and chemical interactions, a large number of safety related systems, and emergency operating procedures (EOP) and severe accident management guidelines (SAMG). Large number of factors with uncertainty and stress can overwhelm the operators. The overall objective of the present research is to develop a methodology and tools that an operator can use to predict severe accident progression and make effective decisions to arrest and manage the accident under large uncertainties. Towards this goal, this study examines a novel approach that brings to bear a combined use of techniques in artificial intelligence (Russel and Norvig, 2010), including Bayesian Network (BN), Answer Set Programming (ASP) and Fuzzy Inference (FI) to achieve faster-than-real-time, yet sufficiently accurate analysis of severe accident progression. Bayesian network (BN) is a type of probabilistic graphical models that can be used to represent knowledge and conditional dependencies about an uncertain realm. It is useful for capturing the causal relationships in a complex system. It also allows prediction via Bayesian inference (Kelly and Smith, 2012). It is composed of nodes and edges, which express random variables and probabilistic relationships between the nodes, respectively. This relationship, given by conditional probability is calculated using stochastic methods. The BN is used in several systems for analysis and management of accident risk; e.g. (Knochenhauer and Frid, 2010). In those systems, the nodes or so-called 'effective factors' are presumably known within the network by system descriptions in SAMGs. There are two steps to configure the BN, namely (i) identifying compositions within the network and (ii) defining conditional dependency between nodes. The first step is performed following the spirit of ASP (Baral, 2003) using Prolog (Wielemaker, 2005). Knowledge representation is used to build databases required for processing by ASP. Knowledge representation is defined as the expression of knowledge in a way that is understandable to both human and computers. Originally knowledge indicates data, information and facts. To focus, knowledge should be formed to achieve a goal. In a severe accident, key physics and safety related components status are defined according to a failure mode. The conditional dependencies between nodes are generated by approximate reasoning using Fuzzy inference (Zadeh, 1995). Fuzzy logic is a multiple-valued logic to treat ambiguous features such as linguistic description. It indicates possibility, which is distinguished from probability. Fuzzy set consists of linguistic variables according to the fixed rule. In other words, even uncertain states could be expressed as not binary logic, but as many-value logic by rule-based technology. Fuzzy control system is comprised of Fuzzy inference engine that is performed based on the 'If-Then Rule'. The 'If-Then Rule' is of the following form. If Y1 is B11 and Y2 is B12 then Z is C1. If Y1 is B21 and Y2 is B22 then Z is C2. Y1 and Y2 are inputs, which indicate conditional variables. Z indicates decision-making and both B and C are linguistic variables. With this rule-based technique, the approximate reasoning can be realized by Fuzzy inference. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Improving Site-Specific Radiological Performance Assessments - 13431

An improved approach is presented for conducting complete and defensible radiological site-specific performance assessments (PAs) to support radioactive waste disposal decisions. The basic tenets of PA were initiated some thirty years ago, focusing on geologic disposals and evaluating compliance with regulations. Some of these regulations were inherently probabilistic (i.e., addressing uncertainty in a quantitative fashion), such as the containment requirements of the U.S. Environmental Protection Agency's (EPA's) 40 CFR 191, Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes, Chap. 191.13 [1]. Methods of analysis were developed to meet those requirements, but at their core early PAs used 'conservative' parameter values and modeling approaches. This limited the utility of such PAs to compliance evaluation, and did little to inform decisions about optimizing disposal, closure and long-term monitoring and maintenance, or, in general, maintaining doses 'as low as reasonably achievable' (ALARA). This basic approach to PA development in the United States was employed essentially unchanged through the end of the 20. century, principally by the U.S. Department of Energy (DOE). Performance assessments developed in support of private radioactive waste disposal operations, regulated by the U.S. Nuclear Regulatory Commission (NRC) and its agreement states, were typically not as sophisticated. Discussion of new approaches to PA is timely, since at the time of this writing, the DOE is in the midst of revising its Order 435.1, Radioactive Waste Management [2], and the NRC is revising 10 CFR 61, Licensing Requirements for Land Disposal of Radioactive Waste [3]. Over the previous decade, theoretical developments and improved computational technology have provided the foundation for integrating decision analysis (DA) concepts and objective-focused thinking, plus a Bayesian approach to probabilistic modeling and risk analysis, to guide improvements in PA. This decision-making approach, [4, 5, 6] provides a transparent formal framework for using a value- or objective-focused approach to decision-making. DA, as an analytical means to implement structured decision making, provides a context for both understanding how uncertainty affects decisions and for targeting uncertainty reduction. The proposed DA approach improves defensibility and transparency of decision-making. The DA approach is fully consistent with the need to perform realistic modeling (rather than conservative modeling), including evaluation of site-specific factors. Instead of using generic stylized scenarios for radionuclide fate and transport and for human exposures to radionuclides, site-specific scenarios better represent the advantages and disadvantages of alternative disposal sites or engineered designs, thus clarifying their differences as well as providing a sound basis for evaluation of site performance. The full DA approach to PA is described, from explicitly incorporating societal values through stakeholder involvement to model building. Model building involves scoping by considering features, events, processes, and exposure scenarios (FEPSs), development of a conceptual site model (CSM), translation into numerical models and subsequent computation, and model evaluation. These are implemented in a cycle of uncertainty analysis, sensitivity analysis and value of information analysis so that uncertainty can be reduced until sufficient confidence is gained in the decisions to be made. This includes the traditional focus on hydrogeological processes, but also places emphasis on other FEPSs such as biotically-induced transport and human exposure phenomena. The significance of human exposure scenarios is emphasized by modifying the traditional acronym 'FEPs' to include them, hence 'FEPSs'. The radioactive waste community is also recognizing that disposal sites are to be considered a national (or even global) resource. As such, there is a pressing need to optimize their utility within the constraints of protecting human health and the environment. Failing to do so will result in the need for additional sites or options for storing radioactive waste temporarily, assuming a continued need for radioactive waste disposal. Optimization should be performed using DA, including economic analysis, invoked if necessary through the ALARA process. The economic analysis must recognize the cost of implementation (disposal design, closure, maintenance, etc.), and intra- and inter-generational equity in order to ensure that the best possible radioactive waste management decisions are made for the protection of both current and future generations. In most cases this requires consideration of population or collective risk. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of Passive Safety on FHR Instrumentation Systems Design and Classification

Fluoride salt-cooled high-temperature reactors (FHRs) will rely more extensively on passive safety than earlier reactor classes. 10CFR50 Appendix A, General Design Criteria for Nuclear Power Plants, establishes minimum design requirements to provide reasonable assurance of adequate safety. 10CFR50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, provides guidance on how the safety significance of systems, structures, and components (SSCs) should be reflected in their regulatory treatment. The Nuclear Energy Institute (NEI) has provided 10 CFR 50.69 SSC Categorization Guideline (NEI-00-04) that factors in probabilistic risk assessment (PRA) model insights, as well as deterministic insights, through an integrated decision-making panel. Employing the PRA to inform deterministic requirements enables an appropriately balanced, technically sound categorization to be established. No FHR currently has an adequate PRA or set of design basis accidents to enable establishing the safety classification of its SSCs. While all SSCs used to comply with the general design criteria (GDCs) will be safety related, the intent is to limit the instrumentation risk significance through effective design and reliance on inherent passive safety characteristics. For example, FHRs have no safety-significant temperature threshold phenomena, thus enabling the primary and reserve reactivity control systems required by GDC 26 to be passively, thermally triggered at temperatures well below those for which core or primary coolant boundary damage would occur. Moreover, the passive thermal triggering of the primary and reserve shutdown systems may relegate the control rod drive motors to the control system, substantially decreasing the amount of safety-significant wiring needed. Similarly, FHR decay heat removal systems are intended to be running continuously to minimize the amount of safety-significant instrumentation needed to initiate operation of systems and components important to safety as required in GDC 20. This paper provides an overview of the design process employed to develop a pre-conceptual FHR instrumentation architecture intended to lower plant capital and operational costs by minimizing reliance on expensive, safety related, safety-significant instrumentation through the use of inherent passive features of FHRs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Technical and Licensing Considerations for Micro-Reactors

The U.S. Nuclear Regulatory Commission (NRC) has interacted with vendors pursuing the commercialization of micro-reactors (i.e., reactors capable of producing about 1 MW(th) to 20 MW(th) of energy from nuclear fission). It is envisioned that micro-reactors could be assembled and fueled in a factory and shipped to a site. Many of the sites are expected to be remote locations requiring off-grid power or in some cases military bases. The objective of this effort is to explore the technical issues and the approach required to reach a finding of "reasonable assurance of public health and safety" for this new and different class of reactors. The analysis performed here leverages available micro-reactor design and testing data available from national laboratory experience as well as commercial design information to explore technical issues. Some factors considered include source term, accidents that would need to be analyzed, and the extent of the probabilistic risk assessment (PRA). The technical evaluation was performed within the framework of the Licensing Modernization Project (LMP) to identify licensing basis events, classification of structures, systems and components, and defense-in-depth needed to provide regulatory certainty. With this framework and technical evaluation in mind, the scope and content of a micro-reactor licensing application is discussed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

MASSCLEAN-MASSIVE CLUSTER EVOLUTION AND ANALYSIS PACKAGE: DESCRIPTION AND TESTS

We present MASSCLEAN, a new, sophisticated and robust stellar cluster image and photometry simulation package. This visualization tool is able to create color-magnitude diagrams (CMDs) and standard FITS images in any of the traditional optical and near-infrared bands based on cluster characteristics input by the user, including but not limited to distance, age, mass, radius, and extinction. At the limit of very distant, unresolved clusters, we have checked the integrated colors created in MASSCLEAN against those from other simple stellar population models with consistent results. We have also tested models that provide a reasonable estimate of the field star contamination in images and CMDs. We demonstrate the package by simulating images and CMDs of well-known massive Milky Way clusters and compare their appearance to real data. Because the algorithm populates the cluster with a discrete number of tenable stars, it can be used as part of a Monte Carlo Method to derive the probabilistic range of characteristics (integrated colors, for example) consistent with a given cluster mass and age. Our simulation package is available for download and will run on any standard desktop running UNIX/Linux. Full documentation on installation and its use is also available. Finally, a Web-based version of MASSCLEAN, which can be immediately used and is sufficiently adaptable for most applications, is available through a Web interface.

79 ASTRONOMY AND ASTROPHYSICS↗

Heralded Multiplexed High-Efficiency Cascaded Source of Dual-Rail Entangled Photon Pairs Using Spontaneous Parametric Down-Conversion

Deterministic sources of high-fidelity entangled qubit pairs encoded in the dual-rail photonic basis, i.e., presence of a single photon in one of two orthogonal modes, are a key enabling technology of many applications of quantum information processing, including high-rate, high-fidelity quantum communications over long distances. The most popular and mature sources of such photonic entanglement, e.g., those that leverage spontaneous parametric down-conversion (SPDC) or spontaneous four-wave mixing, generate an entangled (so-called continuous-variable) quantum state that contains contributions from high-order photon terms that lie outside the span of the dual-rail basis, which is detrimental to most applications. One often uses low pump power to mitigate the effects of those high-order terms. However, that reduces the pair generation rate, and the source becomes inherently probabilistic. We investigate a cascaded source that performs a linear-optical entanglement swap between two SPDC sources, to generate a heralded photonic entangled state that has a higher fidelity (to the ideal Bell state) compared to a free-running SPDC source. Furthermore, with the Bell swap providing a heralding trigger, we show how to build a multiplexed source, which despite reasonable switching losses and detector loss and noise, yields a fidelity versus success probability trade-off of a high-efficiency source of high-fidelity dual-rail photonic entanglement. We find, however, that there is a threshold of 1.5 dB of loss per switch, beyond which multiplexing hurts the fidelity versus success probability trade-off.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Orientation factor and number of fibers at failure plane in ring-type steel fiber reinforced concrete

Considering the probabilistic distributions of fibers in ring-type steel fiber reinforced concrete, the orientation factor and the number of ring-type steel fibers crossing the failure plane were theoretically derived as a function of fiber geometry, specimen dimensions, and fiber volume fraction. A total number of 24 specimens were tested incorporating different fiber types, specimen geometry, and fiber volume fractions of 0.2% and 0.4%: 5 beams and 5 panels containing straight steel fibers; and 6 beams and 8 panels containing ring-type steel fibers. Measurements were made to assess the number of fibers at fractured surfaces of steel fiber reinforced concrete. The developed theoretical expressions reasonably predicted the orientation factor and the number of ring-type steel fibers at failure plane: the average and the standard deviation for the ratios of the test to theory were 1.03 and 0.26, respectively. Theoretical investigations and comparisons were made for the values of orientation factor and the number of fibers at failure plane for straight steel fibers and ring-type steel fibers.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗