Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power outage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Cybersecurity Anomaly Detection in SCADA-Assisted OT Networks Using Ensemble-Based State Prediction Model

The cybersecurity threats of power system gradually grow due to the increased sophisticated interactions between Information Technology (IT) and Operational Technology (OT) networks. False data injection attack (FDIA) that aims to compromise the Supervisory Control and Data Acquisition (SCADA) measurement and disturb the system operation is one of such cyber threats. Such attacks can potentially lead to significant operational issues at the control centers and substations, and hence, result in severe physical consequences. To avoid catastrophic failure across the power grid resulting from these attacks, it is essential to arm the OT network with real-time vulnerability assessment tools. To this end, this paper outlines various drawbacks of the Purdue architecture model to defend against cyberattacks in the OT network. Furthermore, a novel ensemble-based state prediction model is proposed to detect cybersecurity anomalies in SCADA assisted OT networks. The proposed model uses control center level generation and load forecasts, scheduled, and forced outages, power flow solutions, and the substation level historical data. The hypothesis of the proposed scheme relies on the fact that additional control center and substation data can hardly be accessed and compromised by attackers. One of the vital features of the proposed scheme is an hour-ahead prediction of the operational feasibility of the SCADA measurement range at the control center and substation in real time helps in detecting anomalies in measurements across both substation and the control center.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Makah Tribe Strategic Energy Plan

The U.S. Department of Energy’s (DOE) Energy Transitions Initiative Partnership Project (ETIPP) connects remote and island communities, regional partners, and the DOE national laboratories to support communities as they seek to build resilience in their energy systems. The Makah Tribe faces several energy challenges, including frequent power outages and the potential for an extended outage due to an earthquake or tsunami. The Tribe joined ETIPP in 2022 to address those challenges, seeking to build energy resilience and sovereignty in the community. The Makah Tribe, Spark Northwest, the Pacific Northwest National Laboratory (PNNL), and the National Renewable Energy Laboratory (NREL) collaborated to develop a strategic energy plan as part of the second cohort of ETIPP communities. The long-term energy vision of the Makah Tribe includes increasing energy efficiency in the community, improving energy management capacity, and developing the renewable energy generation and storage sufficient to independently power the Reservation for one year. Additionally, the ETIPP team worked with Makah leadership, staff, and community members to identify a set of community priorities, values, and goals to guide energy development as the Tribe takes the incremental steps toward their vision for energy sovereignty. Those energy values include ecosystem-based management, energy sovereignty and project ownership, workforce development and capacity, economic opportunity, community wellbeing and priorities, and emergency disaster resilience. To understand what would be needed for a year for energy independence, the PNNL team conducted an assessment to determine the current energy usage of the Tribe and also modeled several scenarios for future energy use. Using the energy usage values, the team estimated how two types of renewable energy technology, specifically locally deployed solar and small-scale wind, could contribute towards the energy independence goal. The energy baseline and resource assessment produced the following key findings:

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Enhancing Distribution System Resiliency Using Grid-Forming Fuel Cell Inverter: Preprint

Legacy inverters interfacing distributed energy re-sources are traditionally grid-following (GFL) in nature. GFL assets typically follow real power and reactive power set points. Recently, inverters with grid-forming (GFM) capability are gaining attention as GFM assets can increase the resiliency of the distribution system under stressed conditions. These GFM inverters can use photovoltaics, batteries, or fuel cells as their energy source. In this paper, we present information on inverters interfacing fuel cell assets, specifically with GFM capability. By introducing a fuel cell powered GFM coupled with hydrogen production and storage, the GFM can continuously provide GFM activities during periods of low renewable resource availability, and/or during power outages exceeding typical electric battery duration. Finally, we present information on the need for updates on interconnection and interoperability standards that can be leveraged by utilities for including fuel cell inverters in their asset mix.

fuel cell inverters↗

TASTI-GRID: a holistic view of Florida's grid resilience opportunities

In December of 2025, the American Society of Civil Engineers updated Florida’s infrastructure grade to a ”C+” – reflecting overall investments in recent years. With the recommendation to further strengthen the electric grid and establish consistent building standards, extreme weather, aging infrastructure, and population in-migration are still compounding Florida’s grid vulnerabilities. Key challenges related to hurricane and other tropical & marine weather events are not unique to Florida. However, the state’s topography, location, demographics, and variation among rural and urban centers for tourism and industry, demonstrate the need for unique approaches to advancing critical infrastructure resilience, particularly for large concentrations of elderly residents or in areas of historic underinvestment. Florida’s grid asset advancements are credited with a reduction in average power outage durations. Yet, improvements since 2021 have set the stage for future resilience activities – as modernization efforts have greatly improved data collection – enabling better understanding of vulnerabilities and trends across counties and localities (particularly in Central Florida).

24 POWER TRANSMISSION AND DISTRIBUTION↗

NERC MISOPS

This investigation was commissioned by the Office of Electricity of the Department of Energy in response to reviewing the NERC State of Reliability report. The study is an attempt to proactively address electric utility industry needs. “Monitoring, analyzing, and tracking trends in Protection System Misoperations are critical to improve BES reliability. Historically, Protection System Misoperations have exacerbated the severity of most cascading power outages.” The NERC misoperations data shows that unnecessary trips are by far the leading category of reported misoperations and that a majority of misoperations are those of line protection packages. A significant number of misoperations are tied to microprocessor relays. Approximately one quarter of reported misoperations are due to incorrect settings and another one quarter of misoperations are due to relay failures/malfunctions and communication failures.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Long-Duration Energy Storage: Resiliency for Military Installations

This report provides a quantitative techno-economic analysis of a long-duration energy storage (LDES) technology, when coupled to on-base solar photovoltaics (PV), to meet the U.S. Department of Defense's (DoD's) 14-day requirement to sustain critical electric loads during a power outage and significantly reduce an installation's carbon footprint. The LDES modeled is Antora Energy's battery energy storage system (BESS). It is currently at a technology readiness level (TRL) of 7 and not ready for full-scale deployment. To support decisions on the value of near-term demonstrations, this analysis looked at the potential value of Antora Energy's BESS if deployed in the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Safe Exploration Reinforcement Learning for Load Restoration using Invalid Action Masking

This paper addresses the load restoration problem after a power outage event. Our primary proposed methodology uses a multi-agent reinforcement learning method to make the optimal sequential decisions on picking up critical loads. Typically, a negative reward is provided to discourage the agents from selecting decisions that violate physical constraints during the restoration process. However, the main disadvantage of this approach is its difficulty in applying it to large-scale systems due to the curse of dimensionality. This paper introduces the invalid action masking technique to overcome this limitation. The features of this technique include zero physical constraint violations, reduced training time, and stabilization of the explo- ration process. Simulation results are performed in IEEE 13-node and IEEE 123-node systems showing the better performance of the proposed algorithm in comparison to the conventional approaches both in terms of restored power and learning curve.

reinforcement learning, blackstart, artificial int↗

Grid Utility Asset Vulnerability Assessment (GUAVA) Software Tool

Increasing demand and changes in generation portfolios is pushing power grid to operate towards the limit. However, due to lack of analytical tools for understanding various scales of impact on grid, it is becoming more vulnerable to wide scale power outages and blackouts. A vulnerable grid operating at its limit can be easily disrupted by asset failures caused by devastating hurricanes which has been known to damage transmission and distribution lines along its track. In this direction, researchers have focused on determining these assets by conducting Monte Carlo simulations of hurricanes with uncertainties and collected a large set of simulation data. To determine the infrastructure updates necessary for mitigating wide scale impact of hurricanes on the grid, we propose a software tool named “Grid Utility Asset Vulnerability Analysis” (GUAVA) framework. GUAVA presents a novel data-driven probabilistic analytical approach to (1) post-process hurricane failure scenarios, (2) identify/rank assets that are most vulnerable and critical to failing and are associated with highest impact/risk, and (3) to inform system upgrade decisions & prioritization. Based on the observed results and employed data-driven methodology, it is expected GUAVA can be adapted to provide power system planners with a recommendation engine for making informed decisions to improve resilience of grid.

Mahapatra, Kaveri↗

Feasibility Analyses for the Microgrid of the Mountain in the Cordillera Central Region of Puerto Rico

Distributed energy resource (DER) development can benefit communities through improvement of access to reliable electricity and a resilient energy system. Many place-specific considerations must be accounted for when designing electrical systems with co-located generation and loads. This paper presents an overview of four studies focusing on different aspects for regional DER development in the Cordillera Central region of Puerto Rico, including a grid and load stability study with the introduction of solar energy generation, microgrid design based on the solar resource in the area, resilience considerations during power outage scenarios, and qualitative risk aspects for components in the microgrid. Additionally, a conceptual substation microgrid analysis is conducted using the Microgrid Design Toolkit (MDT) to evaluate trade-offs between cost and energy availability, providing insights into optimal design strategies. A microgrid resilience assessment is performed using the Resilient Nodal Cluster Analysis Tool (ReNCAT) to identify critical loads and evaluates their accessibility during outages, emphasizing the importance of community needs. Finally, a qualitative risk assessment utilizing Hazard and Operability Analysis (HAZOP) methods highlights potential hazards and mitigations for microgrid components, ensuring robust system design and operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Comfort and Safety Metrics to Evaluate Customer Centric Resilience Enhancement Strategies

As the coincident events of extreme weather and major power outages continue to rise there is an increased need to implement resilience solutions. Many of these solutions are customer-centric, requiring the flexibility of demand, and many of the standard economic evaluations of these solutions do not include the benefits of resilience that are not easily quantified and monetized. Indoor air temperature has a large impact on the comfort and safety of building occupants during an extreme weather event. This work proposes metrics that can be used to compare the performance of resilience solutions in the context of comfort and safety.

Cost benefit analysis, Demand Side Management, Pow↗

Real-Time Detection and Localization of Line Trip Event Via Relative Phase Angles

Line trip events widely exist in power systems. They can result in power outages and a huge economic loss if not promptly detected and localized. To provide a fast and precise solution, this paper presents a Complete Coverage of Voltage Measurement (CCVM)-based line trip event detection algorithm and a Relative Phase Angle (RPA)-based line trip event localization algorithm. First, frequency and relative phase angle features during a line trip event are calculated. Then, the CCVM-based algorithm is proposed from both frequency and rate of change of frequency estimation algorithm aspects. Additionally, the RPA-based algorithm is presented, and two cases are studied to demonstrate the uniqueness of the proposed algorithm. Various experiments are conducted, where the simulation results demonstrate that the proposed CCVM-based algorithm can detect a line trip event as short as 2.07 ms. In addition, the RPA-based algorithm has 1.26 times higher localization accuracy compared with the frequency magnitude-based and phase angle-based algorithms. In conclusion, the experiment results on the examples from two interconnected power systems in the U.S. verified the performance of the proposed algorithms in wide-area power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Geologic Seawater Air Conditioning (GeoSWAC) System: Resource Assessment and Techno-Economic Evaluation in Puerto Rico

Puerto Rico's hot, humid climate drives a high and persistent demand for cooling, straining an aging and fuel-dependent energy grid while increasing peak electricity loads. Much of this challenge stems from inefficient air-conditioning systems operating in buildings without passive cooling design, making cooling both costly and vulnerable to disruption - especially during hurricanes. To address these issues, researchers evaluated a new alternative called Geologic Seawater Air Conditioning (GeoSWAC), which uses inland wells connected to naturally cold, deep seawater. By avoiding long offshore pipelines and energy-intensive refrigeration cycles, GeoSWAC can cut electricity use by 75-90%, reduce environmental impacts, and operate more reliably during power outages. A case study at the University of Puerto Rico's Rio Piedras campus found that GeoSWAC could deliver significantly lower levelized costs of cooling, reduced operational expenses, and improved water conservation compared to the campus's existing chilled-water plant. The system offers key advantages - including access to a constant cold heat sink, low pumping requirements, and enhanced resilience - for coastal regions such as Puerto Rico, the broader Caribbean, and Florida. However, its effectiveness depends heavily on site-specific geological conditions, such as subsurface connectivity and aquifer characteristics, which require detailed investigation. Future research should refine hydrogeological models, conduct performance and economic analyses, and address regulatory and permitting frameworks to support broader adoption of this promising technology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Blockchain for Fault-Tolerant Grid Operations

Radial topology and vast geographic coverage make distribution systems prone to widespread power outages upon the failure of a single (or multiple) upstream component. Fault-handling algorithms depend heavily on correct estimations of the system’s state to effectively isolate the affected area and reduce the number of affected customers while maintaining operational safety. The work described here leverages the core features of distributed, consensus-based decision-making processes and the immutability of blockchain, and demonstrates their value in improving fault-tolerant grid operations. In this work, blockchain was used to create a trusted data-sharing platform that enables independent actors to reconstruct the system state; this enables distributed resources to make intelligent decisions with limited knowledge. Although the process requires data sharing, its algorithms have been designed to limit the amount of private information that is exchanged, which helps preserve business-sensitive data and maintain customer privacy. In addition, by reducing the information that must be shared, the communication requirements are also reduced; (however, an in-depth analysis of the communication requirements is beyond the scope of this project). The proposed use cases are intended to represent a foundational basis for third parties to develop functional solutions that can eventually be deployed in the field. To further provide guidance, the envisioned use cases have incorporated design requirements that consider the blockchain characteristics and a need to limit information from surrounding resources, which preserve the assumption and the possibility that such resources could belong to different entities. This report presents a detailed design of the three use cases with the tools needed to enable the analysis being tested. The implemented gross error detection method can detect mismatches when the error exceeds 3.8 times the sensor’s rated accuracy. Detection of the circuit breaker state successfully identified the correct states across all simulation tests. A distribution-system power-flow solution in the simulator OpenDSS generally possesses a convergency tolerance of 0.01% on the voltage magnitude. The evaluation of possible reconnection using voltage magnitude—preserving the data ownership—has a voltage magnitude difference smaller than 0.001% from the OpenDSS result. The results preserving data ownership have a difference within the expected power flow tolerance with full knowledge of the system, which surpasses expectations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrating Resilience Planning in Distribution System Planning

Electric utilities, regulators, and stakeholders face increasing risks of severe storms, freezes, floods, and heat waves damaging grid infrastructure and causing power outages—and increasing risks of utility equipment igniting wildfires. At the same time, customer electricity rates have risen substantially in recent years, due in part to replacing aging infrastructure and improving resilience to natural hazards and physical threats. To address these challenges, utilities are beginning to move beyond traditional, siloed planning processes to balance resilience with other fundamental grid objectives such as affordability, reliability, safety, and serving new loads. This study presents a framework for states and utilities that want to advance integration of resilience and distribution planning processes to improve planning efficiency, better prioritize cost-effective grid expenditures, and balance planning objectives. The framework includes 7 key integration points between these planning processes: -Strategy process -Data -Threat assessments -Solution identification and prioritization -Optimization opportunities -Consideration of other grid needs -Metrics Lawrence Berkeley National Laboratory reviewed utility distribution system plans and interviewed subject matter experts to identify emerging practices for each of the 7 integration points. This report presents these practices, which can be used as a guide toward more holistic planning and cohesive investment strategies. It also includes 3 case studies to provide practical examples of how utilities apply such integrated planning processes: two pole hardening programs and one microgrid planning effort. The report concludes by identifying opportunities for future research.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Natural Hazard Forecast Alert Grid Risk System

Weather events cause most power outages. Often, we even get notifications on our phones to take cover or be prepared for an imminent event. If electric grid utilities had a similar warning that also included probable scenarios and the equipment involved, they could prepare and minimize the effects. Idaho National Laboratory had a project with the U.S. Department of Energy’s Cybersecurity, Energy Security, and Emergency Response program to develop a grid alert application that receives messages from the existing emergency alert system, filters and determines components possibly affected by the emergency event, calculates probable scenarios using MASTERRI (Modeling And Simulation for Targeted Reliability and Resilience Improvement). For high-risk events, the application can then send alert links to subscribed electric distribution utility operations staff to allow them to see and evaluate the scenarios and the impact in a web based interactive map tool. This proof of concept application used data from utilities and organizations, such as the international regulatory body North American Electric Reliability Corporation, which have complied historical failure data of elements that comprise the U.S. electric grid. Nominal failure rates are obtained from this data. To make this tool possible, estimated failure rates were calculated for different component types given the alert type, severity, and location. Historic weather-related grid element failures were correlated with historic weather events from the Integrated Public Alert & Warning System. These correlated events and failures are used along with Bayesian updates from the historical norms to provide a modified failure rate for grid elements in the alert areas and calculate probable scenarios. Working with an industry collaborator, actual grid models and data were used for demonstration cases. This report outlines the work performed for this project.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

A method for assessing economic, environmental, and reliability tradeoffs of interregional transmission connecting ERCOT (the Texas grid) to the eastern and western grids

Reliable development of the power grid is an evolving concern for humanity due to extreme weather that frequently threatens power sector infrastructure. The state of Texas is a uniquely structured testbed for grid planners to study when looking for solutions to development, innovation, and overcoming such challenges. Because of its size and islanded structure, Texas is small enough to model, but big enough to matter. Texas is a global leader in energy production, energy consumption, and maintains an unusually diverse fuel mix. In addition, the state has experienced winter freezes, heat waves, wind storms, droughts and floods that have threatened power sector infrastructure or caused recent blackouts and calls for demand side conservation. One of the most devastating of these events was the North American winter storm, dubbed “Winter Storm Uri” by the Weather Channel, that froze the region in February 2021 and led to an extended power outage event that put the majority of Texan residents in darkness for days. While preparing to avoid such outage events in the future, various tools have been proposed to improve grid reliability, including energy efficiency, demand response, and distributed energy resources. An additional option would be to develop interregional transmission that connects the Texas grid to other national grids. To assess the merits of this idea, we developed a novel, universally-applicable and internationally-relevant framework to study how the Texas grid would evolve alongside access to various interregional ties. This method allows us to stress the synthetic grid structure and analyze how it would respond to the shock of a simulated winter storm event. Our method leverages open-source modeling tools, such as PowerGenome, pyGRETA, and GenX to synthesize unique zonal grid data, construct a consolidated network of model regions, and simulate different developmental pathways of capacity expansion and operational dispatch. We demonstrate our method with an analysis connecting the Electric Reliability Council of Texas (ERCOT), the grid that serves most of Texas, the Western Electricity Coordinating Council (WECC), the grid that serves the western half of the contiguous U.S., and the Eastern Interconnect, the grid that serves the eastern half of the contiguous U.S. Our results indicate that the cost-optimal capacity of interregional transmission connecting the ERCOT grid to other grids lies between 9–13 GW assuming baseline conditions. Building this amount of connecting capacity in one or multiple directions lowers the costs and emissions of development and operation by up to $16 billion and 257 million metric tonnes (MMT) respectively. Additionally, our results show that the interregional connections between ERCOT and other national grids reduce the amount of total load shed required through mild winter storm events. However, our results also show that there is a threshold of very extreme winter storm conditions, spanning multiple service areas, above which the connections exacerbate resource adequacy problems. Therefore, the results indicate that the connections need to be carefully planned alongside the rest of the grid infrastructure to avoid over-reliance on specific resources or technology options.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A digital twin platform for building performance monitoring and optimization: Performance simulation and case studies

Advancements in sensor technology, data analytics, affordable compute, and communication infrastructure have paved the way for Digital Twin technology in optimizing building operations and controls. This study presents the development of an open and interoperable web-based Digital Twin platform for integrating diverse data streams and facilitating effective user interactions. The platform utilizes modern technologies for the web framework and time-series data management, ensuring scalability and responsiveness. The backend supports seamless integration of diverse data sources and emulators, incorporating data from building sensors and meters, external weather Application Programming Interfaces, and advanced EnergyPlus simulation models of the building and its energy systems including the Distributed Energy Resources that are formulated in Functional Mockup Units. A simulation case study was conducted with FlexLab, a test facility on Lawrence Berkeley National Laboratory campus. The case study includes normal operations, Distributed Energy Resource integration, and power outage scenarios, to illustrate the Digital Twin’s ability to provide critical insights into energy performance and thermal resilience. The results demonstrated the platform’s potential as a decision-support tool for optimizing building energy performance and enhancing resilience against extreme weather events. Future work will focus on deploying the Digital Twin platform to a real building for field validation, extending its capabilities to cover more scenarios such as bidirectional Electric Vehicle interactions, and enhancing user engagement.

EnergyPlus↗

Ten questions concerning reinforcement learning for building energy management

As buildings account for approximately 40% of global energy consumption and associated greenhouse gas emissions, their role in decarbonizing the power grid is crucial. The increased integration of variable energy sources, such as renewables, introduces uncertainties and unprecedented flexibilities, necessitating buildings to adapt their energy demand to enhance grid resiliency. Consequently, buildings must transition from passive energy consumers to active grid assets, providing demand flexibility and energy elasticity while maintaining occupant comfort and health. This fundamental shift demands advanced optimal control methods to manage escalating energy demand and avert power outages. Reinforcement learning (RL) emerges as a promising method to address these challenges. Here, in this paper, we explore ten questions related to the application of RL in buildings, specifically targeting flexible energy management. We consider the growing availability of data, advancements in machine learning algorithms, open-source tools, and the practical deployment aspects associated with software and hardware requirements. Our objective is to deliver a comprehensive introduction to RL, present an overview of existing research and accomplishments, underscore the challenges and opportunities, and propose potential future research directions to expedite the adoption of RL for building energy management.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗