Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power engineering computing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Dynamic Economic Dispatch Considering Transmission–Distribution Coordination and Automatic Regulation Effect

With the rapid increase of renewable energy sources, the variability and uncertainty in power systems are significantly increased, and the power system operation is facing more and more challenges. In the traditional dynamic economic dispatch (DED) of transmission systems, the frequency and voltage regulation effects are not actively utilized. In addition, the transmission systems and distribution systems are optimized separately; the transmission–distribution coordination effect is not considered. In this article, a new DED is proposed. The optimal scheduling results are obtained by making a balance between operating cost and reliability cost. Both the automatic regulation effect and transmission–distribution coordination effect are explored and exploited in terms of the equivalent reserve, which can reduce the reserve provided by generating units, and can further enhance the security and economics of power system operation. The validity and effectiveness of the proposed model are illustrated by case studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Review on Simulation Platforms for Agent-Based Modeling in Electrified Transportation

As the use of combustion engine vehicles plays a deciding role in global warming, we can observe a trend to replace them with electric vehicles (EV) driven by new environmentally conscious policies and increasing technological capabilities. With improvements in driving range and reduction in prices come new challenges that may hamper the progress towards complete battery driven transportation. A major challenge for the increasing EV adoption is the planning of extensions to existing infrastructure or the inclusion of new infrastructure components in the planning process. This demands increasingly complex planning tools that can simulate the interplay between different stakeholders in modern transportation scenarios such as EVs, charging stations, energy providers, and general transportation participants. Simulation platforms for agent-based modeling in transportation have been developed as effective interactive tools that allow planners to explore different trade-offs across different scenarios with the ability to simulate the impact of policy or infrastructure decisions on the different stakeholders in the simulation. This article surveys several of the major simulation platforms that include modern EV-based forms of transportation and allow the simulation of relevant infrastructure components alongside the well established transportation simulations. These tools allow researchers to analyze expected traffic flow, identify possible charging station locations based on area demand, predict electrical grid demand, and more. Here this survey intends to make it easier for researchers to identify and apply a simulation platform in the context of supporting the increasing electrification of the transportation sector, enabling more efficient simulation and planning capabilities in this domain.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reinforcement Learning for Intentional Islanding in Resilient Power Transmission Systems

Intentional islanding is the process of identifying and deliberately decomposing the transmission network to form self-sustained islands from an endangered network during disruptions to improve resilience and security. Most existing intentional islanding models are offline resilience decision tools and hence do not provide outage responses in a timely manner. In this paper, a reinforcement learning (RL) based model for intentional islanding is developed, which offers real-time switching control, online deployability, and adaptability to varying system conditions. The intentional islanding process is formulated as a Markov decision process, where the optimal transmission switching policy is learned using the RL approach. The control policy is learned over an environment that encompasses a Power System Simulator for Engineering (PSS/E) model of the transmission network, facilitated by an interface to the standard openAI Gym framework. The proposed RL-based methodology aims to form stable and self-sustainable islands by ensuring voltage stability while reducing the power mismatch in the formed islands. A proximal policy optimization algorithm is designed, which is suitable for controlling the on/off status of the switches with multi-layer perceptron as value and actor networks. The effectiveness of the proposed framework in the self-recovery of the grid by island formation is applied on the modified IEEE 39-bus test network and validated by dynamic simulations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Virtual Design and Analysis of the Balancing Element of an External Gear Machine Considering Cavitation and Mixed Lubrication Effects

This report presents a simulation based approach for sizing the axial balance elements of a pressure compensated external gear machine. The reference hydraulic unit must be able to guarantee operation in two quadrants, as either a pump or a motor. It also needs to operate in a wide operating range of speed and pressure, as it is to be used as primary hydraulic unit for an electro-hydraulic actuator (EHA). The design procedure builds upon past work at the author’s center, but it extends it to the case of multiple quadrant units. Also, a unique method for modeling of both mixed lubrication and cavitation that might occur in the lubricating film is used. After describing the design procedure, the paper discusses the features of the balancing of a reference unit, along with the effects of both cavitation and mixed lubrication.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CyDER: A Cyber Physical Co-simulation Platform for Distributed Energy Resources in Smartgrids

The CyDER project aimed at developing an open-source, modular and scalable co-simulation platform for power grids with large shares of Distributed Energy Resources (DERs). The project partners are the Lawrence Berkeley National Lab (LBNL), Lawrence Livermore National Lab (LLNL), PG&E, SolarCity, and ChargePoint. The prime recipient is LBNL; SolarCity and ChargePoint were partners for the project’s first two years. Increased DER integration introduces a number of challenges in power grid operation including a more dynamic interaction between the transmission grid and distribution grids, and increased modeling complexity. Although specialized software exists to precisely model different components of the power system, it is far from trivial to integrate all various models and perform a holistic simulation. Instead of replicating all models in a common simulation program, a commonly accepted approach to tackle this model diversity is to couple third-party simulators and models through a co-simulation platform that coordinates information exchange among the various components. Following this line of research, this project’s objective was to develop a co-simulation platform based on a widely accepted industrial standard called Functional Mockup Interface (FMI). Within this process, the project developed models compliant with the FMI standard, called Functional Mockup Units (FMUs), and used them to perform various operational and planning power system analyses. Relying and building upon an industrial standard is the main differentiation of this project compared with previous or parallel efforts in the co-simulation area. Particular emphasis was put on delivering software utilities to facilitate setting up and running co-simulations by end-users. Furthermore, a strong aspect of this project is demonstrating that co-simulation techniques can be used to perform Hardware-in-the-Loop (HIL) simulations that couple software components (e.g., simulated models) with hardware components (e.g., real devices such PV systems and batteries). The long-term goal of CyDER project is to help establish FMI as a powerful standard for co-simulation and promote adoption by electric utilities and other interested stakeholders. The main accomplishments of the project include the development of several FMUs including distribution and transmission grid models, PV inverters with Volt/Var/Watt controllers, batteries, and predictive optimal controllers. Additionally, a unique software package was developed, called SimulatorToFMU, which is capable of exporting any Python-driven simulator or Python script as an FMU. This is an important contribution towards establishing FMI as one of the main co-simulation standards, because more and more third-party programs for sub-system modeling and simulation are delivered with Python APIs. The CyDER platform was used to perform PV hosting capacity analyses in real utility feeders with and without smart inverter controls, battery storage, and EV charging. Smart inverter controls include conventional Volt/Var/Watt controls for reactive power support and active power curtailment, but also predictive controls that optimize the charging and discharging profile of the battery connected on the DC side in order to minimize the customer’s economic benefit. Finally, an important result of this project is delivering an experimental setup that consists of residential-scale PV inverters with battery storage, a real-time grid simulator with an ideal voltage source as grid emulator, and micro Phasor Measurement Units (PMUs). All these components and additional software modules are coupled to one another using the FMI standard and can be co-simulated with the CyDER platform.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cambium Documentation: Version 2020

This is the documentation for the 2020 version of Cambium. Cambium is a tool that assembles structured data sets of simulated hourly cost and operational data for modeled futures of the U.S. electric sector with metrics designed to be useful for long-term decision-making. In this documentation, we define the metrics reported in Cambium databases and document the Cambium-specific methods for calculating those metrics.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Validation and Demonstration of Control System Functional Capabilities within the IES Plug-and-Play Simulation Environment

The concept of an integrated energy system (IES) is meant to combine different energy technologies in synergistic ways to achieve a more secure and economical energy supply. The RAVEN-based HYBRID framework is used to find the optimal installed capacity and the optimal economical dispatch of each component of the IES. The new RAVEN plugin for grid and capacity optimization (HERON) only addresses the limits that affect the production variables and the corresponding rates of variation (explicit constraints). However, other variables are subject to constraints, and the associated limits should be accounted for (implicit constraints). In particular, for the power dispatch problem, the optimization algorithm takes into account the limits on the electrical power output and the corresponding hourly power variations but does not consider other constraints on process variables whose response affects the service life of the IES. This report describes a scheme that allows accounting for implicit constraints without increasing the size of the optimization problem. To obtain a more accurate approximation of the nonlinear dynamic behavior, a parametric version of the dynamic mode decomposition with control (DMDc) algorithm was developed to derive the state-space representation matrices of the IES components at different scheduling parameter. Thanks to this approach, a more accurate approximation of the system response can be obtained, the limits imposed by thermal mechanical implicit constraints can be translated into power dispatch limits, and the feedbacks to HERON power dispatcher can be provided. To assess the developed methodology, a power dispatching test case composed of three power generating and storage units (Balance of Plant, Secondary Energy Source, Thermal Energy Storage) was developed. The power output of each one of the three units was optimized to meet the imposed time-dependent load demand trajectory and to maximize the IES profitability by meeting both the explicit and implicit constraints.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Tempus Project (Final Report)

This final technical report tracks the accomplishments of the Tempus Project to the statement of project objectives and resulting deliverables. The objective of the Tempus project was to develop and demonstrate the capabilities of a secure, modular, and customizable time synchronization platform that provides layers of protection from GPS spoofing attacks and other vulnerabilities. These vulnerabilities present a challenge to power system operators utilizing GPS-based time synchronization, as time synchronization increasingly plays a critical role in the efficient and reliable operation of power systems. The Tempus project addressed these concerns through the development of a secure, customizable time synchronization platform. The Tempus platform applies a layered approach to time security that protects from manipulation of timing systems used by power utilities. The Tempus platform consists of a component framework utilizing modularized time sources and customizable manipulation detection algorithms. With multiple time sources, and comparisons between sources and tracking sudden or subtle changes to the timing phase and time information, the Tempus system can detect and mitigate compromised timing sources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

gollnlp and magos (Final Scientific/Technical Report)

In 2018, the Advanced Research Project Agency – Energy (ARPA-E) launched the Grid Optimization Competition (GOC), a series of competitive challenges intended to accelerate innovation in decision support software used to schedule power grid operations, making them as efficient as possible, while respecting operational constraints of power equipment and operational security. This report covers the participation of teams led by the Lawrence Livermore National Laboratory (LLNL) in Challenge 1 and Challenge 2 of the competition.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling Communication Infrastructures of Cyber Physical Systems

This effort explores modeling cyber infrastructure, including communication devices like switches, routers, sensors, and controllers, and physical media attributes like propagation of radio signals, in coordination with power distribution system model layouts. To do this, the project studies real-world configurations to define axioms of how different communication media is deployed with control equipment. These axioms will be used to develop tools to generate realistic cyber infrastructure models from starting power system models. This effort leverages and builds on the co-simulation platform developed by the other RD2C projects. The axioms and tools will be validated and demonstrated with the NS3 simulation tool as part of a co-simulation to show the behavior/impacts of cyber infrastructure on control operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Privacy-preserving Information Security for the Energy Grid of Things

Smart grid infrastructure relies on information exchange between multiple actors in order to ensure system reliability. These actors include but are not limited to smart loads, grid control, and energy management technologies. Further, as information exchange between these actors is susceptible to cyber-attacks, security and privacy issues are indispensable to ensure a reliable and stable grid. This position paper proposes a privacy-preserving, trust-augmented secure scheme for a smart grid implementation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quantum self-authenticating timing system

An improved method of distributing timing information is provided. The method includes transmitting encrypted timing signals from two or more beacons at different locations. The encrypted timing signals are transmitted at regular intervals and are received by a receiver. The receiver then performs a logic operation on the encrypted timing signals and validates, based on the logic operation, the authenticity of the timing signals. The logic operation also results in a decrypted message from the beacons, which can contain additional information, for example, data to be sent back to the beacons to verify receipt.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Language-Theoretic Data Analysis to Support ICS Protocol Baselining

Critical infrastructure stakeholders need to baseline their systems to understand expected protocol communications. Baseline behaviors may vary based on operational context. Expected operations during a maintenance window, for example, may be different from normal operations. Furthermore, constructing system baselines for Industrial Control Systems (ICS) is difficult and time-consuming. ICS processes generate artifacts expressed across heterogeneous data sources such as network traffic and device logs. This paper explores the hypothesis that such ICS artifacts form a language in the language-theoretic sense. From a theoretical perspective, the variety of implementations of ICS protocols and constrained environment of OT networks provide a rich application domain for language-theoretic approaches. We present several use cases related to the practical construction of system baselines: grammars for data fusion, language dialects for device fingerprinting, and security automata for system baselining

24 POWER TRANSMISSION AND DISTRIBUTION↗

JPype

JPype is a Python module to provide full access to Java from within Python. It allows Python to make use of Java only libraries, exploring and visualization of Java structures, development and testing of Java libraries, scientific computing, and much more. By gaining the best of both worlds using Python for rapid prototyping and Java for strong typed production code, JPype provides a powerful environment for engineering and code development. This is achieved not through re-implementing Python, as Jython has done, but rather through interfacing at the native level in both virtual machines. This shared memory based approach achieves decent computing performance, while providing the access to the entirety of CPython and Java libraries.

Nelson, KarlE.↗

Convex Optimization of Integrated Power-Gas Energy Flow Model With Applications to Probabilistic Energy Flow

Energy flow calculation is a fundamental problem of the integrated power and gas system (IPGS) operation and planning. However, the nonlinear gas flow model introduces major challenges to the energy flow calculation. In this paper, we propose a tractably convex optimization model to solve the energy flow problem in IPGSs. It is demonstrated that the proposed optimization model has the same optimal solution as the original nonlinear steady energy flow model. Also, piecewise linearization is adopted to tightly linearize the nonlinear objective function of the model, which transforms the formulated convex optimization into a linear program one. Thus, the computation complexity of the proposed energy flow model is significantly reduced as compared with the existing methods. In addition, the proposed model can be extended to probabilistic energy flow estimation. Extensive case studies are conducted to validate the effectiveness of the proposed energy flow model using three IPGSs.

42 ENGINEERING↗

Wind Power as a Virtual Synchronous Generator (WindVSG)

This project investigated the theory, implemented it in hardware, and validated the Wind as a Virtual Isochronous Generator (WindVSG) concept by combining the advantages of modern dynamic inverter technologies with static, dynamic, and transient electromechanical properties of synchronous machines. During this project we demonstrated how to control the inverters of wind turbine generators (wind alone or in parallel with other GFM sources, such battery energy storage) so that wind power behaves like a synchronous machine-based power plant with a conventional prime mover. For this purpose, testing was conducted at NLR ARIES facility with real 2.5 MW wind-turbine generator operating in GFM mode under dynamic and transient conditions. The team also developed models and conducted simulations for GFM wind power to evaluate stability impacts of GFM operation on power grid. This report describes efforts by the NLR team working in collaboration GE Vernova during 3-year project.

17 WIND ENERGY↗