Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Concept of Operations for OSIRIS-REx Optical Navigation Image Planning

Optical navigation (OpNav) is a critical subsystem of the OSIRIS-REx asteroid sample return mission, which operated in the vicinity of near-Earth asteroid (101955) Bennu from August 2018 through April 2021. A substantial amount of mission resources across multiple subsystems and institutions is required to ensure that the OpNav data are successfully acquired. The KinetX OpNav team, part of the Flight Dynamics System (FDS), is responsible for performing required analysis to develop the OpNav operations plans; requesting, reviewing and verifying the plans; and ultimately using the image data for critical navigation operations. The FDS team, responsible for the mission navigation, is operated by KinetX Aerospace with management and operations support from NASA’s Goddard Space Flight Center. The Science Processing and Operations Center (SPOC), located at the University of Arizona’s Lunar and Planetary Laboratory, is responsible for generating the planning products for all science and most OpNav data. These plans are integrated into the spacecraft sequences, tested, and commanded by the Mission Support Area (MSA) at Lockheed Martin Space. To ensure mission-critical navigation image data are successfully acquired, the plan is developed through a waterfall of planning cycles over the course of 3 months prior to onboard plan execution. During the initial strategic planning for a mission phase, detailed analysis is performed by the OpNav team to conceptualize the concept of operations (ConOps) for image data collection. This phase OpNav Narrative is included along with other strategic planning documents for the key ground segment stakeholders to review and provide feedback. The detailed OpNav plans get defined in the tactical planning cycle, which spans 8 to 3 weeks before the week-long integrated sequence is executed on-board the spacecraft. During the tactical cycle, the initial OpNav Request is submitted along with the science requests, kicking off development of the science and OpNav plans. Once the initial plan is drafted, interfaces are exercised so that the plan can be reviewed and iterated, if necessary. A rigorous schedule is followed by the planning teams during the implementation cycle, spanning the last 18 days before uplink, to ensure all the necessary integration, testing, and reviewing can occur on time. The development of the OpNav planning ConOps, including responsibilities, interfaces, timelines, and procedures, took extensive collaboration across mission elements and institutions. The process was robust throughout the 137 weeks of continuous Optical Navigation Operations at Bennu, which concluded on April 9th, 2021.

Coralie D. Adam↗

Collective Intelligence and Three Aspects of Planning in Organizations: A NASA Example

For many complex sociotechnical systems, planning seems to require explicit coordination; certainly, in executing a plan the activities of different actors must be tightly coupled. However, distributing the needed planning information can be very burdensome and error prone, because different groups need different collections of information, updated or kept current on different time cycles. Further, the information needed to form successful plans is often highly distributed, and while feedback about the success of prior plans may exist, it may not be available to those in a position of using this to improve plans or to detect and resolve other problems in the system (Weick, 1995). Tools to support various aspects of planning have been developed, and can provide a huge benefit to the individuals working on that aspect. To be tractable, most solutions address a quite bounded slice of work, isolating it from the larger context. Prospective planning takes place over multiple, nested cycles of decision making. This builds a plan that specifies activities of different granularity. "Subplans" may specify multiple parallel activities by different groups and individuals, as well as sequential, nested actions by a single actor. Planning produces valuable, sharable, external, representations: in addition to prospective use, plans support retrospective assessment and also action in the present. Viewing planning in a larger context - both temporal and organizational -- enables noticing what one does not know and generating more systemic and effective solutions. Viewing a problem as one of collective intelligence invites thinking about the larger organizational context. Many approaches to supporting collective intelligence do not support execution of highly contingent actions, distributed across many players, and hence provide incomplete support for planning. However, CI technology maybe helpful in managing the processes of gathering information for decision making in planning and of distributing plan information to various actors, needed on various time cycles.

Billman, Dorrit↗

Balancing Predictive and Reactive Science Planning for Mars 2020 Perseverance

The design of the science planning process for a space science mission needs to find a balance between operational and resource constraints and scientific decision-making. Science planning has previously been characterized as either predictive or reactive. Predictive science planning is needed when constraints drive science activities to be planned far in advance. For example, a combination of long one-way light time plus high-stakes science decisions drove the Cassini-Huygens mission to Saturn to have an extremely predictive planning process. On the other extreme, reactive science planning is needed when constraints drive science activities to be planned based on the results of the previous plan. For example, the Mars Exploration Rover mission interacted with the surface of Mars, and so the planning team needed to know the state of the rover at the end of each planning cycle before starting the next cycle. Operational and resource constraints that require management on intermediate timescales has led to the development of a science planning process between these two extremes. For example, the Mars Science Laboratory is a technically complex rover and has a parallel predictive process that allows the operations team to manage engineering constraints several days in advance while maintaining the reactive tactical planning process similar to that of MER. The Mars 2020 Perseverance rover is a technically complex rover in the MSL style, but has an added layer of science complexity: it is tasked with collecting a returnable cache of scientifically valuable samples of Mars within prime mission. Thus, the science planning process also needs to accommodate high-stakes longer-term science decisions in the style of Cassini. In order to balance the push-pull of these constraints, we have developed a science campaign-focused operational paradigm for Mars 2020 Perseverance that allows for both predictive planning to accommodate technological complexity and high-stakes science decisions as well as reactive planning to accommodate the realities of interacting with the martian surface. This paradigm influenced the design of operational processes and operational tools.

Spanovich, Nicole↗

Assessing heat resilience coordination in networks of plans

Networks of plans coordinating on hazard mitigation can limit losses. We offer a novel network analysis methodology to investigate how networks of plans explicitly coordinate, and the purpose and nature of coordination. We illustrate the method using networks of plans shaping heat resilience in seven Arizona cities. The network analysis can help planners to identify influential plans that need to be high quality, peripheral plans, and potential governance silos. Furthermore, investigation into plan roles offers an ontological lens into how plans network, consult, and share information. The nature of coordination varies by purpose. General plans are cited for goals, while hazard mitigation plans are referenced for heat fact base. Transportation plans cite goals and fact base in other transportation plans, but rarely cite other plan types. Furthermore, these findings will help planners to consider the roles and merits of different plans while integrating hazards across the next generation of networks of plans.

coordination↗

Evaluation of Crew-Centric Onboard Mission Operations Planning and Execution Tool: Year 2

Currently, mission planning for the International Space Station (ISS) is largely affected by ground operators in mission control. The task of creating a week-long mission plan for ISS crew takes dozens of people multiple days to complete, and is often created far in advance of its execution. As such, re-planning or adapting to changing real-time constraints or emergent issues is similarly taxing. As we design for future mission operations concepts to other planets or areas with limited connectivity to Earth, more of these ground-based tasks will need to be handled autonomously by the crew onboard.There is a need for a highly usable (including low training time) tool that enables efficient self-scheduling and execution within a single package. The ISS Program has identified Playbook as a potential option. It already has high crew acceptance as a plan viewer from previous analogs and can now support a crew self-scheduling assessment on ISS or on another mission. The goals of this work, a collaboration between the Human Research Program and the ISS Program, are to inform the design of systems for more autonomous crew operations and provide a platform for research on crew autonomy for future deep space missions. Our second year of the research effort have included new insights on the crew self-scheduling sessions performed by the crew through use on the HERA (Human Exploration Research Analog) and NEEMO (NASA Extreme Environment Mission Operations) analogs. Use on the NEEMO analog involved two self-scheduling strategies where the crew planned and executed two days of EVAs (Extra-Vehicular Activities). On HERA year two represented the first HERA campaign where we were able to perform research tasks. This involved selected flexible activities that the crew could schedule, mock timelines where the crew completed more complex planning exercises, usability evaluation of the crew self-scheduling features, and more insights into the limit of plan complexity that the crew could effectively self-schedule. In parallel we have added in new features and functionality in the Playbook tool based off of our insights from crew self-scheduling in the NASA analogs. In particular this year we have added in the ability for the crew to add, edit, and remove their own activities in the Playbook tool, expanding the type of planning and re-planning possible in the tool and opening up the ability for more free form plan creation. The ability to group and manipulate groups of activities from the plan task list was also added, allowing crew members to add predefined sets of activities onto their mission timeline. In addition we also added a way for crew members to roll back changes in their plan, in order to allow an undo like capability. These features expand and complement the initial self-scheduling features added in year one with the goal of making crew autonomous planning more efficient. As part of this work we have also finished developing the first version of our Playbook Data Analysis Tool, a research tool built to interpret and analyze the unobtrusively collected data obtained during the NASA analog missions through Playbook. This data which includes user click interaction as well as plan change information, through the Playbook Data Analysis Tool, allows us to playback this information as if a video camera was mounted over the crewmember's tablet. While the primary purpose of this tool is to allow usability analysis of crew self-scheduling sessions used on the NASA analog, since the data collected is structured, the tool can automatically derive metrics that would be traditionally tedious to achieve without manual analysis of video playback. We will demonstrate and discuss the ability for future derived metrics to be added to the tool. In addition to the current data and results gathered in year two we will also discuss the preparation and goals of our International Space Station (ISS) onboard technology demonstration with Playbook. This technology demonstration will be preformed as part of the CAST payload starting in late 2016.

onboard planning↗

Maintaining consistency between planning hierarchies: Techniques and applications

In many planning and scheduling environments, it is desirable to be able to view and manipulate plans at different levels of abstraction, allowing the users the option of viewing and manipulating either a very detailed representation of the plan or a high-level more abstract version of the plan. Generating a detailed plan from a more abstract plan requires domain-specific planning/scheduling knowledge; the reverse process of generating a high-level plan from a detailed plan Reverse Plan Maintenance, or RPM) requires having the system remember the actions it took based on its domain-specific knowledge and its reasons for taking those actions. This reverse plan maintenance process is described as implemented in a specific planning and scheduling tool, The Mission Operations Planning Assistant (MOPA), as well as the applications of RPM to other planning and scheduling problems; emphasizing the knowledge that is needed to maintain the correspondence between the different hierarchical planning levels.

Zoch, David R.↗

Demonstration of a Spoken Dialogue Interface for Planning Activities of a Semi-autonomous Robot

Planning and scheduling in the face of uncertainty and change pushes the capabilities of both planning and dialogue technologies by requiring complex negotiation to arrive at a workable plan. Planning for use of semi-autonomous robots involves negotiation among multiple participants with competing scientific and engineering goals to co-construct a complex plan. In NASA applications this plan construction is done under severe time pressure so having a dialogue interface to the plan construction tools can aid rapid completion of the process. But, this will put significant demands on spoken dialogue technology, particularly in the areas of dialogue management and generation. The dialogue interface will need to be able to handle the complex dialogue strategies that occur in negotiation dialogues, including hypotheticals and revisions, and the generation component will require an ability to summarize complex plans. This demonstration will describe a work in progress towards building a spoken dialogue interface to the EUROPA planner for the purposes of planning and scheduling the activities of a semi-autonomous robot. A prototype interface has been built for planning the schedule of the Personal Satellite Assistant (PSA), a mobile robot designed for micro-gravity environments that is intended for use on the Space Shuttle and International Space Station. The spoken dialogue interface gives the user the capability to ask for a description of the plan, ask specific questions about the plan, and update or modify the plan. We anticipate that a spoken dialogue interface to the planner will provide a natural augmentation or alternative to the visualization interface, in situations in which the user needs very targeted information about the plan, in situations where natural language can express complex ideas more concisely than GUI actions, or in situations in which a graphical user interface is not appropriate.

Dowding, John↗

Using Correlation to Compute Better Probability Estimates in Plan Graphs

Plan graphs are commonly used in planning to help compute heuristic "distance" estimates between states and goals. A few authors have also attempted to use plan graphs in probabilistic planning to compute estimates of the probability that propositions can be achieved and actions can be performed. This is done by propagating probability information forward through the plan graph from the initial conditions through each possible action to the action effects, and hence to the propositions at the next layer of the plan graph. The problem with these calculations is that they make very strong independence assumptions - in particular, they usually assume that the preconditions for each action are independent of each other. This can lead to gross overestimates in probability when the plans for those preconditions interfere with each other. It can also lead to gross underestimates of probability when there is synergy between the plans for two or more preconditions. In this paper we introduce a notion of the binary correlation between two propositions and actions within a plan graph, show how to propagate this information within a plan graph, and show how this improves probability estimates for planning. This notion of correlation can be thought of as a continuous generalization of the notion of mutual exclusion (mutex) often used in plan graphs. At one extreme (correlation=0) two propositions or actions are completely mutex. With correlation = 1, two propositions or actions are independent, and with correlation > 1, two propositions or actions are synergistic. Intermediate values can and do occur indicating different degrees to which propositions and action interfere or are synergistic. We compare this approach with another recent approach by Bryce that computes probability estimates using Monte Carlo simulation of possible worlds in plan graphs.

Bryce, Daniel↗

Determining the Appropriate Emergency Planning Attributes for Microreactors

Micro-reactor designs incorporate design features that provide very low reactor decay heat power at 24 hours after shutdown that is manageable in comparison with larger reactors. This attribute translates into a low probability of core damage negligible offsite dose. This paper provides the conceptual framework for appropriately structuring emergency planning requirements for micro-reactors while ensuring the U.S. Nuclear Regulatory Commission’s (NRC) commitment to safety is met. Due to the diversity in reactor designs comprising the micro-reactor community, this paper identifies the necessary concepts that should be considered to ensure emergency plans for micro-reactors are appropriate for the risk. This paper does not mandate specific design features for micro-reactors but provides reactor designers a conceptual framework for a scalable, graded approach to Emergency Planning Standards that should be considered in their individual designs in order to support simplified emergency plans. Given that accident source terms associated with micro-reactors are essentially negligible when compared with those for large light water reactors, revisions to emergency planning standards are justified. A graded approach to implementing emergency planning guidance can be used to appropriately structure micro-reactor emergency plans and reduce the size of the emergency planning zone and plume exposure pathway. Appropriately structuring emergency planning requirements will better optimize licensee and offsite agencies emergency planning resources and reduce the resources associated with emergency planning.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Galileo mission planning for Low Gain Antenna based operations

The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include quantifying resource or capabilities to be allocated, prioritizing science observations and estimating resource needs for each, working inter-and intra-orbit trades of these resources among the Project elements, and planning real-time science activity. The first major mission planning activity, a high level, orbit-by-orbit allocation of resources among science objectives, has already been completed; and results are illustrated in the paper. To make efficient use of limited resources, Galileo mission planning will rely on automated mission planning tools capable of dealing with interactions among time-varying downlink capability, real-time science and engineering data transmission, and playback of recorded data. A new generic mission planning tool is being adapted for this purpose.

Gershman, R.↗

Robustness via Run-Time Adaptation of Contingent Plans

In this paper, we discuss our approach to making the behavior of planetary rovers more robust for the purpose of increased productivity. Due to the inherent uncertainty in rover exploration, the traditional approach to rover control is conservative, limiting the autonomous operation of the rover and sacrificing performance for safety. Our objective is to increase the science productivity possible within a single uplink by allowing the rover's behavior to be specified with flexible, contingent plans and by employing dynamic plan adaptation during execution. We have deployed a system exhibiting flexible, contingent execution; this paper concentrates on our ongoing efforts on plan adaptation, Plans can be revised in two ways: plan steps may be deleted, with execution continuing with the plan suffix; and the current plan may be merged with an "alternate plan" from an on-board library. The plan revision action is chosen to maximize the expected utility of the plan. Plan merging and action deletion constitute a more conservative general-purpose planning system; in return, our approach is more efficient and more easily verified, two important criteria for deployed rovers.

Bresina, John L.↗

Identifying Executable Plans

Generating plans for execution imposes a different set of requirements on the planning process than those imposed by planning alone. In highly unpredictable execution environments, a fully-grounded plan may become inconsistent frequently when the world fails to behave as expected. Intelligent execution permits making decisions when the most up-to-date information is available, ensuring fewer failures. Planning should acknowledge the capabilities of the execution system, both to ensure robust execution in the face of uncertainty, which also relieves the planner of the burden of making premature commitments. We present Plan Identification Functions (PIFs), which formalize what it means for a plan to be executable, md are used in conjunction with a complete model of system behavior to halt the planning process when an executable plan is found. We describe the implementation of plan identification functions for a temporal, constraint-based planner. This particular implementation allows the description of many different plan identification functions. characteristics crf the ~xec~~tieonfvii r~nm-enft,h e best plan to hand to the execution system will contain more or less commitment and information.

Bedrax-Weiss, Tania↗

Development of Waypoint Planning Tool in Response to NASA Field Campaign Challenges

Airborne real time observations are a major component of NASA's Earth Science research and satellite ground validation studies. For mission scientists, planning a research aircraft mission within the context of meeting the science objectives is a complex task because it requires real time situational awareness of the weather conditions that affect the aircraft track. Multiple aircrafts are often involved in NASA field campaigns. The coordination of the aircrafts with satellite overpasses, other airplanes and the constantly evolving, dynamic weather conditions often determines the success of the campaign. A flight planning tool is needed to provide situational awareness information to the mission scientists, and help them plan and modify the flight tracks. Scientists at the University of Alabama-Huntsville and the NASA Marshall Space Flight Center developed the Waypoint Planning Tool, an interactive software tool that enables scientists to develop their own flight plans (also known as waypoints) with point -and-click mouse capabilities on a digital map filled with real time raster and vector data. The development of this Waypoint Planning Tool demonstrates the significance of mission support in responding to the challenges presented during NASA field campaigns. Analysis during and after each campaign helped identify both issues and new requirements, and initiated the next wave of development. Currently the Waypoint Planning Tool has gone through three rounds of development and analysis processes. The development of this waypoint tool is directly affected by the technology advances on GIS/Mapping technologies. From the standalone Google Earth application and simple KML functionalities, to Google Earth Plugin and Java Web Start/Applet on web platform, and to the rising open source GIS tools with new JavaScript frameworks, the Waypoint Planning Tool has entered its third phase of technology advancement. The newly innovated, cross ]platform, modular designed JavaScript ]controlled Way Point Tool is planned to be integrated with NASA Airborne Science Mission Tool Suite. Adapting new technologies for the Waypoint Planning Tool ensures its success in helping scientists reach their mission objectives. This presentation will discuss the development processes of the Waypoint Planning Tool in responding to field campaign challenges, identify new information technologies, and describe the capabilities and features of the Waypoint Planning Tool with the real time aspect, interactive nature, and the resultant benefits to the airborne science community.

He, Matt↗

Integrating equity in transportation scenario planning: A systematic review

To address the growing uncertainties in the future transportation industry, planners and engineers have identified and implemented scenario planning, a multi-step and strategic approach, in long-range transportation planning. A comprehensive examination of how equity is envisioned, planned, and analyzed during this process remains absent, despite several key guidelines of scenario planning exercises. This paper conducts a systematic literature review focusing on how equity has been considered and evaluated in scenario planning. The resources include academic papers, agency reports, and materials from the recent scenario planning conference, the 2nd Conference on Scenario Planning in Transportation hosted by the Transportation Research Board. This paper examines equity in scenario planning in three important ways: 1) the ways equity has been integrated across steps; 2) how equity analysis has evolved; and 3) when it is necessary to consider equity. This work adds value to the existing body of knowledge by presenting the policy implications based on the review of the current scenario planning research and practices. Early policy recommendations include the need for more vertical equity evaluations, the construction of robustness and justice indicators, and the adoption of a flexible mindset of planning for rather than being fixated on a single scenario.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

U.S. Department of Energy-National Lab Equity Summit: Grid Planning and Operations (Workshop Report)

This report summarizes the U.S. DOE and national laboratories equity summit that was held on February 5, 2024, and focused on grid planning and operations. The objectives of the summit were to connect DOE and lab researchers working on grid-related equity issues, share information on current and planned grid-related equity projects and initiatives, and inspire and educate participants by hearing from our panelists about solutions and challenges to integrating equity in grid planning and operations. The summit included two panels of industry leaders. The first was a state and community perspectives panel that included representatives from a state public utility commission (Oregon Public Utility Commission), a state energy office (Washington Department of Commerce), a state utility consumer advocate (Connecticut Consumer Counsel), and industry consultants (Elevated Engagement and ArkSpring Consulting). Panelists shared successes they have seen, critical challenges related to equity and grid planning and operations, and other considerations. The second panel addressed utility perspectives and included representatives from two utilities (Commonwealth Edison and Tacoma Power), the National Rural Electric Cooperative (NRECA), and a former utility employee and legal consultant. Panelists discussed the role of the utility concerning equity, the most significant technical and data modeling needs and opportunities, and the role the labs could help advance equity in grid planning and operations. There was also a session on partner organization presentations. Argonne National Laboratory made a short presentation on the Grid Modernization Laboratory Consortium (GMLC) project they are leading on equity-informed power system planning. NARUC, NASEO, and the Clean Energy States Alliance, as partners of the GMLC project also shared updates on relevant activities and resources. During the summit, there were two rounds of lightning presentations by national labs and DOE highlighting research that addresses equity and grid planning and operations (Tables 5 and 6 and slides in the Appendix). The goal of the lightning rounds was to share information between participants to encourage collaboration and leverage ongoing research at labs and DOE. The summit included two interactive exercises where summit participants shared their perspectives on relevant equity projects and initiatives (Table 2), key challenges regarding equity and grid planning and operations (Table 3), and promising innovations or progress (Table 4). At the end of the session, participants were asked to share essential insights from the event (Table 7) and an action they plan to take as a result of the event. Participants agreed that the event was useful in helping them share and learn from each other. The project team plans to use the information from the summit as a starting point to help inform future research and technical assistance. In 2026, another Equity Summit will be held (virtually or in person) as part of the same project to help raise awareness and disseminate research and resources completed during the project's duration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Underground Test Area (UGTA) Sampling Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada National Security Site, Nevada

The purpose of this groundwater sampling plan (referred to herein as “the Plan”) is to describe the approach for collecting and analyzing groundwater samples to meet the objectives of the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity. The Plan is focused on the Central and Western Pahute Mesa corrective action units (CAUs 101 and 102). The remaining UGTA CAUs are in the final stage of the UGTA strategy (Closure Report [CR] stage), and monitoring requirements for these CAUs are described in their respective CRs. The Plan supersedes the Nevada National Security Site Integrated Groundwater Sampling Plan and its ensuing Record of Technical Change (ROTC) (DOE/EMNV, 2019b). The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) and its ensuing ROTC (DOE/EMNV, 2018), and the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended). The Plan is implemented by the Environmental Program Services (EPS) contractor. Implementation of the Plan provides data to complete corrective actions prescribed by the FFACO to protect the public from groundwater contaminated by historical underground nuclear testing. The Plan’s scope comprises sample collection and analysis requirements for assessing the extent of groundwater contamination from underground nuclear testing. Sampling wells located in the communities surrounding the Nevada National Security Site (NNSS) is performed by other organizations (e.g., management and operating [M&O] contractor) and is therefore not included within the Plan. The results of the community sampling are presented in the annual NNSS environmental reports.

54 ENVIRONMENTAL SCIENCES↗

Multi-Stage and Multi-Timescale Robust Co-Optimization Planning for Reliable and Sustainable Power Systems. Final Report

In this project, Clarkson University, in collaboration with Southern Methodist University and University of Pittsburgh, conducted the research to model, design, and implement a sophisticated generation and transmission co-optimization planning decision tool, called Multi-stage and Multi-timescale robust Co-Optimization Planning (MMCOP). The MMCOP decision tool intends to facilitate generation and transmission co-optimization planning of emerging power systems, while mitigating risks and uncertainties in both short-term operation dynamics and long-term policy and technology changes. Long-term power system planning aims at optimizing asset utilization by investing in a proper mix of various generation technologies and transmission lines to supply the future load growth. In particular, the Clean Power Plan (CPP), which is designed to combat climate change and reduce carbon emissions by setting a national limit on carbon pollution from power plants, may dramatically change the landscape of the power industry by further promoting clean energy and phasing out emissions-intensive generation technologies. In addition, novel non-wire alternatives (e.g., demand response (DR), distributed generation (DG), energy efficiency (EE), and smart grid technologies) and the computational complexity for large-scale systems significantly complicate the system planning procedure even further. However, existing conventional planning approaches neglect short-term variability and uncertainty of renewable energy, hourly chronological operation details, and physical nonlinear characteristics of the alternating current transmission network. As a result, existing conventional planning approaches may not work properly, and power systems reliability could be in jeopardy. In observing the limitations of existing conventional planning approaches and addressing new challenges of emerging power systems, the main scope of this project to develop co-optimization planning models within a multi-stage and multi-timescale framework. In particular, random contingencies, key uncertainty factors, and AC power flows are included to derive expansion plans while considering both long-term reliability and short-term flexibility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SFWST Disposal Research R&D 5-Year Plan (FY2023 Update)

This FY2023 report is the second update to the Disposal Research (DR) Research and Development (R&D) 5-year plan for the Spent Fuel and Waste Science and Technology (SFWST) Campaign DR R&D activities. In the planning for FY2020 in the U.S. Department of Energy (DOE) NE-81 SFWST Campaign, the DOE requested development of a high-level summary plan for activities in the DR R&D program for the next five (5)-year period, with periodic updates to this summary plan. The DR R&D 5-year plan was provided to the DOE based initially on the FY2020 priorities and program structure (initial 2020 version of this 5-year plan) and provides a strategic summary guide to the work within the DR R&D technical areas (Control Accounts, CA), focusing on the highest priority technical thrusts. This 5-year plan is a living document (planned to be updated periodically) that provides review of SFWST R&D accomplishments (as seen on the 2021 revision of this 5-year plan), describes changes to technical R&D prioritization based on (a) progress in each technical area (including external technical understanding) with specific accomplishments and (b) any changes in SFWST Campaign objectives and/or funding levels (i.e., Program Direction). Updates to this 5-year plan include the DR R&D adjustments to high-priority knowledge gaps to be investigated in the near-term, as well as the updated longer-term DR R&D directions for the program activities. This plan fulfills the Milestone M2SF23SN010304083 in DR Work Package (WP) SF-23SN01030408 (GDSA - Framework Development – SNL).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗