Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “pilot learning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

A Qualitative Strategy for Fusion of Physics into Empirical Models for Process Anomaly Detection

To facilitate the automated online monitoring of power plants, a systematic and qualitative strategy for anomaly detection is presented. This strategy is essential to provide credible reasoning on why and when an empirical versus hybrid (i.e., physics-supported) approach should be used and to determine the ideal mix of these two approaches for a defined anomaly detection scope. Empirical methods are usually based on pattern, statistical, and causal inference. Hybrid methods include the use of physics models to train and test data methods, reduce data dimensionality, reduce data-model complexity, augment data, and reduce empirical uncertainty; hybrid methods also include the use of data to tune physics models. The presented strategy is driven by key decision points related to data relevance, simple modeling feasibility, data inference, physics-modeling value, data dimensionality, physics knowledge, method of validation, performance, data availability, and suitability for training and testing, cause-effect, entropy inference, and model fitting. The strategy is demonstrated through a pilot use case for the application of anomaly detection to capture a valve packing leak at the high-pressure coolant injection system of a nuclear power plant.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

HFTS-1 Natural Joint Data and Engineering Summary

This report provides an analysis of engineering and geologic data collected from the Hydraulic Fracturing Test Site #1 (HTSF-1) project in the southern Midland Basin, Reagan County, Texas. The site is being studied as part of the Science-informed Machine Learning for Accelerating Real-Time Decisions in Subsurface Applications (SMART) Initiative at the National Energy Technology Laboratory (NETL). The data collected is intended to provide a basis of understanding of the site and to construct simulation models. This report provides a summary analysis of the engineering and geologic data collected from the project to provide a basis of understanding of the site and to construct simulation models. The report examines various possible correlations in engineering properties based on natural fracture data from the program, which consisted of 11 horizontal wells, one vertical well, and one slant well. The horizontal wells are in two horizons: 1) Upper and 2) Middle Wolfcamp formations. Program data include: fracture frequency and fracture orientation data from four core runs in a slant well; fracture spacing and orientation from a vertical pilot well; laboratory triaxial testing and mineralogical determinations; and porosity results from magnetic resonance analyses from various wells, together with observations based on the data collection. In addition, available references were reviewed on the site for additional insights. As the focus of the report is on the natural system, hydraulic fracture data from the site were not examined in detail in this report. Data variability is the chief observation in examination of the database. Fracture frequency in the slant well can range from sections with values as high as five fractures per ft to sections up to 100+ ft in length with no natural observed fractures. Fracture spacing across is typically less than 10 ft, but can range up to hundreds of feet. Apparent fracturing shows the trends in two predominate orientations, E-SW and WNW-ESE, but minor variations exist. The rock units vary across the site from siliceous mudstones to calcareous mudstones, showing a general layering with depth. The laboratory properties such as strength and modulus show no apparent trend with depth, but appear to correlate with rock mineralogy with high strength and modulus values where calcium content is high. In addition, an attempt to examine variability and mineralogy on a larger scale was made using a color-coded system based on gamma ray measurements. A staged colored approach was adopted, presuming that lower gamma ray values indicate higher value of calcium content (blue scale) and that higher gamma ray values indicate higher clay mineral content (orange scale). As provided in report appendices, the system correlated well with visual examination of the slant core and the petrofabric analyses of the vertical pilot well. The results showed large variability in mineral content along the horizontal plane across the site. The change in mineral content was also rapid, on a scale less than that of the average hydraulic fracture stage length of about 180 ft.

42 ENGINEERING↗

pvcracks: trained VAE model

The resulting model weights for the variational autoencoder for solar cell crack parametrization to be loaded into the python code for other to use

14 SOLAR ENERGY↗

MW-Class SOFC Pilot System Development

The overall objective of this project is to develop a low-cost, efficient, and reliable MWe-class Solid Oxide Fuel Cell (SOFC) power system towards commercial deployment in natural-gas fueled distributed generation applications. This report details the successful completion of all project objectives. The main goals of the project were to develop the conceptual design of a MWe-class SOFC power system, and to complete a techno-economic analysis (TEA) to determine system costs at low-volume production levels of >100MW per year. The combination of the BoP equipment cost and SOFC stack module factory cost provided the net fabrication cost of the selected 1MW SOFC system configuration. The results of the study showed that the cost target of less than $6000/kW is achievable for a FOAK 1MW SOFC system, exclusive of the first-time engineering cost. Also, the project included an exploratory analysis of the factory cost of next generation stack technology based on the Compact Solid-oxide Architecture (CSA) design at a high annual manufacturing rate of one-GW produced in a giga-factory. The BoP capital cost for one giga-watt power production was estimated using learning-curve analysis based on the historical manufacturing cost data related to similar high temperature Molten Carbonate fuel cell systems built by FuelCell Energy (FCE). The giga-factory manufactured SOFC cost estimate combined with the BoP cost at high production rates led to the estimation of entire system capital cost. Ultimately, a Cost of Electricity (COE) analysis was performed including natural gas fuel prices, installation and O&M costs, and stack replacement cost. The results of the techno-economic analysis were summarized by parametric estimation of COE for 1MW SOFC NOAK (Nth-of-a-Kind) system with natural gas prices as a variable parameter.

08 HYDROGEN↗

DECOVALEX-2023: Task E Final Report

This is the Task E final report for DECOVALEX-2023. Task E is focused on understanding thermal, two-phase hydrological, and mechanical (TH2M) processes, especially related to predicting brine migration in the excavation damaged zone around a heated excavation in salt. Salt is attractive as a disposal medium for radioactive waste because it is self-healing and is essentially impermeable and essentially non-porous in the far field (away from excavations). Investigation of the short-term (days to years) near-field (centimeters to tens of meters) behavior of salt is important for radioactive waste disposal because this early period strongly controls the amount of brine in a salt repository. Brine leads to corrosion of waste forms and waste packages, and possible dissolution of radionuclides with brine transport being a potential transport vector to the accessible environment. The main test case used in Task E is the ongoing Brine Availability Test in Salt (BATS) heater test located underground at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, USA. The Task was divided into a series of Steps. Step 0 was an introduction to processes in salt, that included matching historical unheated brine inflow data from boreholes at WIPP and matching temperature observations during BATS heater test 1a. Step 1 included validation of models against a thermo-poroelastic analytical solution relevant to heated boreholes in salt, and two-phase flow around an excavation in salt. Step 2 required all the individual components covered in steps 0 and 1 to come together to match observed brine inflow behavior during the BATS 1a heater test. There were a range of approaches from the teams, from mechanistic to prescriptive. Given the uncertainties in the problem, some teams used one- or two-dimensional models of the processes, while other teams included more geometrical complexity in three-dimensional models. The key learning points from Task E have been: • Heat conduction through salt typically requires non-linear thermal conductivity (as a function of temperature), but most models do a good job matching observations, given appropriate adjustments to the applied power and some thermocouple locations. • Thermal pressurization requires coupled thermal-hydrological-mechanical (THM) responses that consider the thermal expansion of the fluid and solid phases. • Initialization of two-phase flow models around a borehole or excavation in salt are more realistically represented as “wetting up”, rather than “drying down” (i.e., the initial state after excavation is mostly dry, rather than mostly wet). • The BATS 1a heater test includes a significant release of brine after the end of heating, which requires a large increase in permeability to recreate. Task E has been a great learning experience for all the teams involved, and feedback from the modeling teams has led to changes in the design of follow-on BATS experiments, which are now ongoing underground at WIPP. There was a balance throughout the task between freedom to model phenomena how each team saw fit, and prescriptiveness in problem design to bring the modeling teams closer together to allow attribution of smaller differences between models to different modeling choices. The modeling approaches seem to go through two phases: an early phase of discovery or testing, and a later phase of refinement and improvement. In future modeling efforts, different field data could be used (e.g., BATS 2) and more time should be included in the processes for teams to make multiple model refinement or even significant changes to their conceptual model or setup, based on lessons learned from the modeling exercise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demonstration of Electrolyzer Operation at a Nuclear Plant to Allow for Dynamic Participation in an Organized Electricity Market and In-House Hydrogen Supply

This document details the execution of Cooperative Agreement DE-EE0008849, “demonstration of electrolyzer operation at a nuclear plant to allow for dynamic participation in an organized electricity market and in-house hydrogen supply” during the performance period of 10/1/2019 – 9/30/2024. The project was funded by the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE). Constellation Energy Generation, LLC (formerly Exelon Generation Company, LLC) is the prime recipient of the award. Other members of the project team are INL, NREL, ANL and Nel Hydrogen. The main project objective was to demonstrate an end-to-end integrated grid-scale carbon-free H 2 production, storage and utilization pilot plant at a nuclear generating facility. The project also aimed to evaluate market opportunities and regulatory requirements related to the participation of integrated hydrogen production and nuclear plant facilities in organized power markets, by demonstrating dynamic control and operation of the electrolyzer and assessing the economics of dynamic participation combined with the revenue streams from hydrogen production. On March 7th , 2023 Constellation started hydrogen production at it’s Nine Mile Point Nuclear Plant in Oswego, New York. The PEM electrolyzer operating at Nine Mile Point uses 1.25 megawatt of nuclear electricity to produce 560 kilograms of clean hydrogen per day, more than enough to meet the plant’s operational hydrogen use. It will also help set the stage for possible large-scale deployments at other clean energy centers in Constellation’s fleet that would couple clean hydrogen production with storage and other on-site uses. Employing the lessons learned from the 1.25 MW demonstration-scale, nuclear-powered clean hydrogen production facility at Nine Mile Point, Constellation was a major participant in the MachH2 hydrogen hub recently selected for up to $\$$1 billion by the Department of Energy (DOE) as part of the bipartisan Infrastructure Investment and Jobs Act. Constellation will use a portion of the hub funding to build the world’s largest nuclear-powered clean hydrogen production facility at its LaSalle Clean Energy Center in Illinois. The project was featured in a number of news articles and press releases and received 2 awards. At the 2023 DOE HFTO’s Annual Merit Review meeting, the P.I. Dr. Uuganbayar Otgonbaatar and project manager Robert Beaumont were recognized for “outstanding achievements in the development and demonstration of a first-of-a-kind clean hydrogen production facility, powered by carbon-free nuclear energy, at the Nine Mile Point Nuclear Station in Oswego, New York.” The project was also awarded 2023 Nuclear Energy Institute’s Top Innovative Practice award.

08 HYDROGEN↗

Field Validation of MVA Technology for Offshore CCS: Novel Ultra-High-Resolution 3D Marine Seismic Technology (P-Cable) (Final Report)

The objectives of the proposed study were to deploy and validate a specific monitoring technology, high-resolution 3D marine seismic (HR3D), appropriate for large-demonstration and commercial-scale offshore CCS sites. The project accomplished successful acquisition two HR3D seismic surveys. The first HR3D dataset was over the offshore injection site of the Tomakomai, Japan integrated pilot CCS project, which at the time of survey acquisition was actively injecting CO 2 . The first survey also represented a successful international collaboration between the DOE NETL program and Japan’s national CCS program and was the first successful acquisition and use of HR3D over an active CO 2 injection site (Meckel, Feng et al. 2019). The Tomakomai HR3D survey successfully tested a novel 4-streamer HR3D system array in which, for the first time, no cross-cable (aka “P-Cable”) was utilized and only four GeoEel streamers were used instead of the standard 12-streamer configuration. Consequently, this was not, strictly speaking, a deployment of the “P-Cable” system of (Planke and Berndt 2004) but rather a modified version, thereof, and it is the first known demonstration of the modified system configuration. One very positive outcome from the Japanese collaboration earlier in the project was the ability to learn from the Japanese how they used tail buoys with GPS to determine the position of the seismic source and receivers in time and space. Based on that experience, GCCC designed and built six GPS receivers that could be used to position the streamer receivers and the seismic source via tail buoys. A fundamental advance that was made on the original design, was the ability to directly power the tail buoy GPS units and transfer data through the streamers (i.e., vs. the batteries used at Tomakomai). The bulkiness of the GPS batteries caused drag and episodic surging of the buoys, which affected data quality by lifting up the tail end of the streamers so the receivers were not at the same depth. The units were tested onshore for accuracy and functionality, and the design was subsequently and successfully tested in marine acquisition mode during the SLP survey acquisition. The marine acquisition test and survey satisfied Subtasks 2.2.2, Novel Positioning Technology Selection and Subtask 2.2.3, Novel Positioning Technology Deployment. Results of the novel positioning technology selection (Subtask 2.2.2) were considered successful and will be incorporated in future HR3D seismic acquisition projects to reduce costs, improve deployment safety at sea, and integrate both seismic and data recording via a single data transfer through the streamers to the recording system. The project also established a permitting process through NETL NEPA compliance, which included an Environmental Assessment in a marine setting and is required for conducting these types of surveys using Federal funding. The permitting process charted a “boilerplate,” which can allow future surveys related to other funded projects to move forward more expeditiously. Future improvements that could be considered are more robust seals on the GPS module and stronger materials (especially joints) on tail buoy fabrication. These would increase fixed costs, but would be advisable and probably more economic long-term if multiple HR3D surveys are planned. Project Accomplishments include: • Pre-survey Sensitivity Study • Marine geochemistry methods and data analysis • Successful HR3D seismic dataset acquired @ Tomakomai active CO 2 injection marine site • Developed advanced seismic processing techniques • No NRMS anomalies detected in overburden; Demonstration of containment • Repeatability study • Second survey collected @ San Luis Pass, TX • 4D application using positioning techniques developed in the project for monitoring were successful

3D seismic GPS positioning↗

DIII-D research advancing the physics basis for optimizing the tokamak approach to fusion energy

DIII-D physics research addresses critical challenges for the operation of ITER and the next generation of fusion energy devices. This is done through a focus on innovations to provide solutions for high performance long pulse operation, coupled with fundamental plasma physics understanding and model validation, to drive scenario development by integrating high performance core and boundary plasmas. Substantial increases in off-axis current drive efficiency from an innovative top launch system for EC power, and in pressure broadening for Alfven eigenmode control from a co-/counter-I p steerable off-axis neutral beam, all improve the prospects for optimization of future long pulse/steady state high performance tokamak operation. Fundamental studies into the modes that drive the evolution of the pedestal pressure profile and electron vs ion heat flux validate predictive models of pedestal recovery after ELMs. Understanding the physics mechanisms of ELM control and density pumpout by 3D magnetic perturbation fields leads to confident predictions for ITER and future devices. Validated modeling of high-Z shattered pellet injection for disruption mitigation, runaway electron dissipation, and techniques for disruption prediction and avoidance including machine learning, give confidence in handling disruptivity for future devices. For the non-nuclear phase of ITER, two actuators are identified to lower the L–H threshold power in hydrogen plasmas. With this physics understanding and suite of capabilities, a high poloidal beta optimized-core scenario with an internal transport barrier that projects nearly to Q = 10 in ITER at ~8 MA was coupled to a detached divertor, and a near super H-mode optimized-pedestal scenario with co-I p beam injection was coupled to a radiative divertor. The hybrid core scenario was achieved directly, without the need for anomalous current diffusion, using off-axis current drive actuators. Also, a controller to assess proximity to stability limits and regulate β N in the ITER baseline scenario, based on plasma response to probing 3D fields, was demonstrated. Finally, innovative tokamak operation using a negative triangularity shape showed many attractive features for future pilot plant operation.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Technology Integration to Gain Commercial Efficiency for the Urban Goods Delivery System, Meet Future Demand for City Passenger and Delivery Load/Unload Spaces, and Reduce Energy Consumption

This three-year project supported by the U.S. Department of Energy Vehicle Technologies Office has the potential to radically improve the urban freight system in ways that help both the public and private sectors. Working from 2018-2021, project researchers at the University of Washington’s Urban Freight Lab and collaborators at the Pacific Northwest National Laboratory have produced key data, tested technologies in complex urban settings, developed a prototype parking availability app, and helped close major knowledge gaps. All the fruits of this project can be harnessed to help cities better understand, support and actively manage truck load/unload operations and their urban freight transport infrastructure. Project learnings and tools can be used to help make goods delivery firms more efficient by reducing miles traveled and the time it takes to complete deliveries, benefitting businesses and residents who rely on the urban freight system for supplies of goods. And, ultimately, these project learnings and tools can be used to make cities more livable by minimizing wasted travel, which, in turn, contributes to reductions in fuel consumption and emissions. Cities today are challenged to effectively and efficiently manage their infrastructure to absorb the impacts of ever-increasing e-commerce-fueled delivery demand. All delivery trucks need to park somewhere to unload and load. Yet today’s delivery drivers have no visibility on available parking until they arrive at a site, which may be full. That means they can wind up cruising for parking, which wastes time and fuel and contributes to congestion. Once drivers do find parking, the faster they can unload at the spot, the faster they free up space for other drivers, helping others avoid circling for parking. This makes the parking space—and thus the greater load/unload network—more productive. To this end, the research team successfully met the project’s three goals, developing and piloting strategies and technologies to: 1. Reduce parking-seeking behavior in the study area by 20%; 2. Reduce parcel truck dwell time (the time a truck spends in a spot to load/unload) in the study area by 30%; 3. Increase curb space, alley space and private loading bay occupancy rates in the study area. The research team met these goals by creating and piloting on Seattle streets OpenPark, a first-of-its-kind real-time and forecasting curb parking app customized for commercial delivery drivers—giving drivers the “missing link” in their commonly used routing tools that tell them how best to get to delivery locations, but not what parking is available to use when they get there. Installing in-ground sensors on commercial vehicle load zones (CVLZs) and passenger load zones (PLZs) in the 10-block study area in Seattle’s downtown neighbourhood of Belltown let researchers glean real-time curb parking data. The research team also met project goals by piloting three parcel lockers in public and private spaces open to any delivery carrier, creating a consolidated delivery hub that lets drivers complete deliveries faster and spend less time parked. Researchers collected and analysed data to produce the first empirical, robust, statistically significant results as to the impact of the lockers, and app, on on-the-ground operations. In addition to collecting and analyzing sensor and other real-time and historical data, researchers rode along with delivery drivers to confirm real-world routing and parking behavior. Researchers also surveyed building managers on their private loading bay operations to understand how to boost usage.

97 MATHEMATICS AND COMPUTING↗

Macroscopic trends of neoclassical tearing stability in high-field H-mode tokamak pilot plants

The neoclassical tearing mode (NTM) stability metric—minimum marginally stable island width $w$$^{*}_{m}$—was compared across 14651 inductive high-field tokamak pilot plant equilibria. Larger devices with reduced elongation and/or increased minor radius demonstrated an order-of-magnitude increase in $w$$^{*}_{m}$, primarily due to a reduction in bootstrap drive. This work is part of an ongoing effort to ensure passive NTM-stability in the ARC tokamak, in which the technology to achieve active tearing-suppression with localised electron cyclotron current drive does not yet exist. The equilibrium scenarios in the database were Monte Carlo generated and normalised to the same >400MW fusion power, minimum pressure scenario at a range of plasma currents, before tearing analysis using the modified Rutherford equation was applied for all resonant poloidal and toroidal m, n modes up to n = 4. Single-helicity toroidal Δ' calculations in resistive DCON set the minimum marginally stable island width, and a simple modal scaling proportional to –m 2 n –1 was identified for high-m Δ' values. The dominant correlates of $w$$^{*}_{m}$ and Δ' across the database were analysed using interpretable machine learning techniques.

NTM seeding↗

Construction Methodology Transformation for the Benefit of Workforce Development

Construction is a key economic engine driving both national and global economies. While manual, onsite construction methods dominate the U.S. construction industry, a major shift towards offsite methods has been underway due to its efficiency, speed, and potential cost savings. The workforce necessary for offsite construction growth does not exist in its current form because of the focus on onsite methodologies and the lack of exposure to offsite building methods at all levels of a student’s learning journey. The growth of the U.S. construction industry and competitiveness in an increasingly global construction market over the coming decades can only be supported by a dramatic increase in the use of offsite methods, which requires ramping up workforce training for certain skillsets. The goal of Construction Methodology Transformation for the Benefit of Workforce Development was to understand the opportunities and barriers in both education and industry and to identify best practices for offering curriculum and training to educators, industry, and students that would support skills needed for careers in offsite construction. Our team proposed combining three offsite construction workforce development needs: content development, exposure and training, and job placement - under a single Platform model that would increase experience and career opportunities for students and help match them with potential industry members. Through our proposed solution we expected to see: developed offsite curriculum being utilized by educators and students; an increase in the identification of construction technology and offsite construction methods; an average increase in knowledge gain of at least 25% after participation in pilots; better equipped candidates who are prepared for jobs in offsite construction; and a beta workforce development platform that helps build more pathways for students looking for careers in offsite construction. The two pilots included almost 250 students and resulted in an average knowledge gain of 37 percent. Our research has identified areas of opportunity, for both education and industry to make collaborative training programs more efficient and successful. The chosen techniques for this program are extremely effective when both the school and factory have solid processes and cultures in place to accept students into training programs. This project serves as an important stepping stone to industrywide collaboration to move workforce development for offsite construction forward across the country. With continued collaboration programs like this can provide much needed early exposure and training in offsite construction and we can begin to fill important positions for the future of construction.

99 GENERAL AND MISCELLANEOUS↗

Full-scale Demonstration of Multi-process Sensor at a Cycling PC-fired Boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

A. Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development for a PC-Fired Unit

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Real-time sensor measurements to evaluate impacts of load cycling on high-temperature fire-side corrosion in a PC boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at Coalfired Power Plants

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗