E Tunnel Wastewater Disposal System Quarterly Monitoring Report Nevada National Security Site, Nevada Water Pollution Control Permit NEV 96021, Third Quarter 2018

This report includes the results of the E Tunnel Wastewater Disposal System (ETDS) inspections and monitoring for July, August, and September 2018. Monitoring and sampling activities were performed in accordance with the requirements of Water Pollution Control Permit NEV 96021, Revision 1, effective October 1, 2013. Monthly monitoring was conducted on July 16, August 13, and September 13, 2018. Operating personnel measured the instantaneous flow rate (see Table 1), log hydrogen ion activity (pH), temperature, and specific conductance of the discharge water (see Table 2). Monthly inspections also included an assessment of the general condition of the berms, including ponding (the water levels relative to the overflow pipes); any tunneling or burrowing into the berms; soil conditions on and around the berms, including erosion or sloughing of the interior or exterior slopes of the berms; seeps at the toe of the berms; the presence of any deep-rooting botanicals on the berms; and the physical condition of fencing (see Tables 3 through 7). Monthly rainfall quantities are presented in Table 8.

54 ENVIRONMENTAL SCIENCES↗

Data Analytics for Residential PV from Permit to Interconnect (Final Technical Report)

The main objective of this research is to provide novel insights into the effects of permitting, inspection, and interconnection (PII) processes on PV system installations—and in particular, into the relationship between PII processes and adoption timelines. This research can then be used to clarify the potential effect of various process changes on reducing PII timelines, customer cancellation rates, and related costs nationwide. NREL completed this research by assembling a data set of distributed, largely residential rooftop solar systems less than 50 kilowatts in size from participating solar installers. NREL produced five publications describing the effects that PII processes can have on adoption timelines nationwide, in addition to publishing an interactive data viewer with five years of PII cycle time data. This tool can be used by stakeholders to identify potential adoption timelines by local government.

14 SOLAR ENERGY↗

Permitting Commercial Geologic CO 2 Storage Projects

Conference presentation at 2023 Rocky Mountain Section-American Association of Petroleum Geologists (RMS-AAPG) Annual Meeting, Bismarck, ND, June 4–6, 2023. Successful Carbon Capture, Utilization, and Storage (CCUS) projects depend on clear and applicable regulatory requirements that are thoroughly understood by project developers. It is evident that states are best positioned to regulate CO 2 storage through comprehensive regulations and permitting efficiencies. Further, tax incentives and an emphasis on low-carbon fuels compound to make CCUS more attractive to investors and states alike.

20 FOSSIL-FUELED POWER PLANTS↗

Residential and Small Commercial Solar Photovoltaic and Storage Permitting, Inspection, and Interconnection Timelines: A Retrospective Review (2017-2023)

This report is part of the ongoing Solar Time-Based Residential Analytics and Cycle Time Estimator (SolarTRACE) project, led by the National Renewable Energy Laboratory (NREL). The SolarTRACE project utilizes time-stamped project-level data provided by installer-partners to assess nationwide and AHJ- and utility-level PI&I and other solar PV adoption timelines since 2017. Our dataset now covers 22% of residential solar and 33% of residential storage installs in the U.S. since 2017. This report provides an update to our previous 2022 report (Cruce et al., 2022b) and includes: updated 2017 2023 project timelines for residential rooftop solar PV up to 20kW; updated tracking of permitting process changes at nearly 4,000 AHJs nationwide; and first-ever reporting of timelines for residential PV+storage projects up to 20kW.

14 SOLAR ENERGY↗

Modeling Protocol for Evaluation of Air Emissions for the Idaho National Laboratory Site-wide Permit to Construct and Facility Emission Cap (PTC/FEC)

This document outlines the methods to be used for calculating non-radiological air quality impacts from proposed emissions at the Idaho National Laboratory (INL) Site in support of applying for a renewal to a Permit to Construct with a Facility Emissions Cap (PTC/FEC). The INL Site is seeking to maintain a state enforceable limit on emissions to maintain synthetic minor status in accordance with Idaho Administrative Procedures Act (IDAPA) 58.01.01.175-181 and IDAPA 58.01.01.200-228.

54 ENVIRONMENTAL SCIENCES↗

Solar and Battery Storage Permitting and Siting Requirements - Solar Prize Round 7 (CRADA Final Report)

The purpose of this research project was to aggregate zoning and permitting data for utility-scale solar PV and battery energy storage systems. The ultimate goal of this collaboration is to lower solar and battery energy storage system soft costs by streamlining regulatory due diligence and reducing the burden of conducting feasibility assessments for solar and storage systems. The below sections describe the specific research completed by NLR (the contractor) in furtherance of the agreement with Vanox (the participant).

14 SOLAR ENERGY↗