Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Reliable machine prognostic health management in the presence of missing data

Prognostics and health management enables the prediction of future degradation and remaining useful life (RUL) for in-service systems based on historical and contemporary data, showing promise for many practical applications. One major challenge for prognostics is the common occurrence of missing values in time-series data, often caused by disruptions in sensor communication or hardware/software failures. Another major concern is that the sufficient prior knowledge of critical component degradation with a clear failure threshold is often not readily available in practice. These issues can significantly hinder the application of advanced signal and data analysis methods and consequently degrade the health management performance. In this article, we propose a novel data-driven framework that is capable of providing accurate and reliable predictions of degradation and RUL. In this approach, one-hot health state indicators are appended to the historical time series so that the model learns end-of-life automatically. A modified gate recurrent unit based variational autoencoder is employed in generative adversarial networks to model the temporal irregularity of the incomplete time series. Furthermore, experiments on multivariate time-series datasets collected from real-world aeroengines verify that significant performance improvement can be achieved using the proposed model for robust long-term prognostics.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

2019 Site Sustainability Plan (Narrative)

Clean energy and sustainability, long at the core of the United States (U.S.) Department of Energy (DOE) mission and championed at Sandia National Laboratories (SNL), are reinforced in Executive Order (EO) 13834, Efficient Federal Operations. Though no longer in effect as of May 2018, EO 13693, Planning for Federal Sustainability in the Next Decade, is referenced throughout this document. DOE's Strategic Sustainability Performance Plan (SSPP) embodies the Department's sustainability commitment and establishes the foundation for DOE to meet the objectives of the EO. The SNL Site Sustainability Plan (SSP) is prepared annually to support DOE's Strategic Sustainability Performance Plan (SSPP) and the National Nuclear Security Administration's (NNSA) sustainability goals and broader sustainability program. Accordingly, the content of this SSP covers the SNL contributions toward meeting the DOE sustainability goals, including the DOE requirement to comply with EO 13834. This SSP fulfills the contractual requirement for National Technology & Engineering Solutions of Sandia, LLC (NTESS), the management and operating (M&O) contractor for SNL, to deliver an annual sustainability plan to the NNSA and Sandia Field Office (SFO). The SNL Environmental Management System (EMS) implements sustainable practices for enhancing environmental, energy, and transportation management performance. SNL's EMS is a quality-based system modeled on the Plan-Do-Check-Act structure for continuous improvement. The EMS is a part of SNL's Integrated Safety Management System and functions within the overall Laboratory Operating System. The SNL EMS is International Organization for Standardization (ISO) 14001 certified and incorporates all relevant federal, state, local, and DOE requirements. The EMS is coordinated and implemented through 20 environmental programs, five of which are included within the scope of this SSP: Air Quality Compliance (AQC); Materials; Sustainability & Pollution Prevention; Energy and Water; Fleet Services; and, Waste Management.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Exploration Systems Development (ESD) Approach to Enterprise Risk Management

The National Aeronautics and Space Administration (NASA) Exploration Systems Development (ESD) Division has implemented an innovative approach to Enterprise Risk Management under a unique governance structure and streamlined integration model. ESD's mission is to design and build the capability to extend human existence to deep space. The Enterprise consists of three Programs: Space Launch System (SLS), Orion, and Ground Systems Development and Operations (GSDO). The SLS is a rocket and launch system that will be capable of powering humans, habitats, and support systems to deep space. Orion will be the first spacecraft in history capable of taking humans to multiple destinations within deep space. GSDO is modernizing Kennedy's spaceport to launch spacecraft built and designed by both NASA and private industry. ESD's approach to Enterprise Risk Management is commensurate with affordability and a streamlined management philosophy. ESD Enterprise Risk Management leverages off of the primary mechanisms for integration within the Enterprise. The Enterprise integration approach emphasizes delegation of authority to manage and execute the majority of cross-program activities and products to the individual Programs, while maintaining the overall responsibility for all cross-program activities at the Division. The intent of the ESD Enterprise Risk Management approach is to improve risk communication, to avoid replication and/or contradictory strategies, and to minimize overhead process burden. This is accomplished by the facilitation and integration of risk information within ESD. The ESD Division risks, Orion risks, SLS risks, and GSDO risks are owned and managed by the applicable Program. When the Programs have shared risks with multiple consequences, they are jointly owned and managed. When a risk is associated with the integrated system that involves more than one Program in condition, consequence, or mitigation plan, it is considered an Exploration Systems Integration (ESI) Risk. An ESI risk may require visibility and risk handling by multiple organizations. The Integrated Risk Working Group (IRWG) is a small team of Risk experts that are responsible for collaborating and communicating best practices. In addition, the forum facilitates proper integration of risks across the Enterprise. The IRWG uses a Continuous Risk Management approach for facilitating the identification, analysis, planning, tracking, and controlling of ESI Risks. The ESD Division, Programs, and Integrated Task Teams identify ESI Risks. The IRWG maintains a set of metrics for understanding Enterprise Risk process and the overall Risk Posture. The team is also actively involved in the modeling of risk for Enterprise Performance Management. With the Enterprise being constrained in Schedule and Budget, and with significant technical complexity, the appropriate use of Risk Management techniques is crucial to the success of the Enterprise. The IRWG achieves this through the modified approach, providing a forum for collaboration on risks that cross boundaries between the separate entities.

Bauder, Stephen P.↗

Interference Mitigation Using Cyclic Autocorrelation and Multi-Objective Optimization

Radio frequency interference on space-to-ground communications links can degrade performance and disrupt the transfer of critical data. These interference events become increasingly likely as more users enter the spectrum, due in part to shared spectrum allocations and scheduling conflicts. If this interference could be detected and mitigated by an automated system, then link performance and reliability in these scenarios could be improved. This report describes the implementation and evaluation of an automated interference mitigation system that provides this functionality. The system uses Cyclic Autocorrelation (CAC) signal processing techniques to monitor the spectrum and detect interfering signals, and it applies a multi-objective optimization approach to mitigate interference by changing link parameters to continuously optimize the link. The implementation was evaluated to characterize its signal detection capabilities for various link qualities and to compare its link management performance to Adaptive Coding and Modulation (ACM) and Constant Coding and Modulation (CCM) when in the presence of randomized interference. In the latter evaluation, the interference mitigation system achieved the highest average throughput in each tested scenario. With these results, the proposed solution provides the groundwork for further automated link management capabilities and continued investigation into interference mitigation approaches.

Interference mitigation↗

Integrated Work Management: Overview, Course 31881

Integrated work management (IWM) is the process used for formally implementing the five-step process associated with integrated safety management (ISM) and integrated safeguards and security management (ISSM) at Los Alamos National Laboratory (LANL). IWM also directly supports the LANL Environmental Management System (EMS). IWM helps all workers and managers perform work safely and securely and in a manner that protects people, the environment, property, and the security of the nation. The IWM process applies to all work activities at LANL, from working in the office to designing experiments to assembling and detonating explosives. The primary LANL document that establishes and describes IWM requirements is Procedure (P) 300, Integrated Work Management.

99 GENERAL AND MISCELLANEOUS↗

An MPI/OpenACC implementation of a high-order electromagnetics solver with GPUDirect communication

We present performance results and an analysis of a message passing interface (MPI)/OpenACC implementation of an electromagnetic solver based on a spectral-element discontinuous Galerkin discretization of the time-dependent Maxwell equations. The OpenACC implementation covers all solution routines, including a highly tuned element-by-element operator evaluation and a GPUDirect gather–scatter kernel to effect nearest neighbor flux exchanges. Modifications are designed to make effective use of vectorization, streaming, and data management. Performance results using up to 16,384 graphics processing units of the Cray XK7 supercomputer Titan show more than 2.5× speedup over central processing unit-only performance on the same number of nodes (262,144 MPI ranks) for problem sizes of up to 6.9 billion grid points. We discuss performance-enhancement strategies and the overall potential of GPU-based computing for this class of problems.

Computer Science↗

Low-temperature fuel cell systems for commercial airplane auxiliary power.

This presentation briefly describes the ongoing study of fuel cell systems on-board a commercial airplane. Sandia's current project is focused on Proton Exchange Membrane (PEM) fuel cells applied to specific on-board electrical power needs. They are trying to understand how having a fuel cell on an airplane would affect overall performance. The fuel required to accomplish a mission is used to quantify the performance. Our analysis shows the differences between the base airplane and the airplane with the fuel cell. There are many ways of designing a system, depending on what you do with the waste heat. A system that requires ram air cooling has a large mass penalty due to increased drag. The bottom-line impact can be expressed as additional fuel required to complete the mission. Early results suggest PEM fuel cells can be used on airplanes with manageable performance impact if heat is rejected properly. For PEMs on aircraft, we are continuing to perform: (1) thermodynamic analysis (investigate configurations); (2) integrated electrical design (with dynamic modeling of the micro grid); (3) hardware assessment (performance, weight, and volume); and (4) galley and peaker application.

30 DIRECT ENERGY CONVERSION↗

From Here to There - Bird's Eye Perspective on Grant Lifecycle and Administration

“What gets measured gets done ”or “measure it to manage it”. The statements have become matter of fact. However, measurement (and even metrics) alone cannot fully communicate an organization’s story without the point of accountability. As a dynamic org, we must measure what is necessary, using the appropriate lenses to analyze the most relevant information that allows robust decision-making. A key function of Program Planning and Control (PP&C) is to assist HRP in the development of such strategy that ensures the proper execution of program research goals. With introspection of the Technical Officer role as defined by 2 CFR(i.e., Part 200, Part 1800)and subsequent governance under the NASA Grant and Cooperative Agreement Manual (GCAM), we’ve realized an obvious disconnect among Principal Investigator’s (PI),technical communication with the elements and some of the administrative/fiduciary requirements that should run parallel to the science work. This find has introduced new program risks as evidenced through incomplete deliverables or other less-than-successful requirements through the lifecycle for work we fund. One solution the Grants Technical Officer proposes is for PP&C to share in the communication with stakeholders of grants administration much earlier in the award process in attempt to reduce programmatic risks; particularly in data, reporting and performance management. As such, the planned IWS 2022 session will focus on(plenary) topics that include (1) definition of the grant lifecycle, (2) anatomy of a grant(NF1687 the award document), and (3)performance measurement/post-award monitoring. As HH&P pursues its strategic objectives to evolve the directorate into a data rich and knowledge rich organization, it has become increasingly important to develop the multiple levels of insight across the program to ensure data and other reporting(qualitative/quantitative), alongside proper administration. And the desired outcome is to make certain HRP meets/exceeds the accountability standard that our research information is received, maintained and accessible in posterity.

Lucy D Barnes-Moten↗

Summary of the Hanford Site Environmental Report for Calendar Year 2008

This summary booklet summarizes the "Hanford Site Environmental Report for Calendar Year 2008." The Hanford Site environmental report, published annually since 1958, includes information and summary data that provide an overview of activities at the U.S. Department of Energy's (DOE) Hanford Site. The Hanford Site environmental report provides an overview of activities at the site; demonstrates the status of the site’s compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2009 information is included where appropriate.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hanford Site Environmental Report for Calendar Year 2008

The Hanford Site environmental report is prepared annually for the U.S. Department of Energy (DOE) in accordance with regulatory requirements. The report provides an overview of activities at the Hanford Site; demonstrates the status of the site’s compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2009 information is included where appropriate.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Aspen-based performance and energy modeling frameworks

Now with the anticipation of exascale architectures, energy consumption is becoming one of the critical design parameters, especially in light of the energy budget of 20-30 Megawatts set by the U.S. Department of Energy. Understanding an application’s execution pattern and its energy footprint is critical to improving application operation on a diverse heterogeneous architecture. Applying application-specific performance optimization can consequently improve energy consumption. However, this approach is only applicable to current systems. As we enter a new era of exascale architectures that is projected to contain more complex memory hierarchies, increased levels of parallelism, heterogeneity in hardware, and complex programming models and techniques, energy and performance management is getting more cumbersome. We therefore propose techniques that predict the energy consumption beforehand or at runtime to enable proactive tuning. Such energy prediction approaches must be generic and adapt themselves at runtime to changing application and hardware configurations. Most existing energy estimation and prediction approaches are empirical in nature and thus tied to current systems. To overcome this limitation, we propose two energy estimation techniques: ACEE (Algorithmic and Categorical Energy Estimation), which uses a combination of analytical and empirical modeling techniques; and AEEM (Aspen’s Embedded Energy Estimation), a system-level analytical energy estimation technique. Both of these models incorporate the Aspen domain specific language for performance modeling. We present the methodologies of these two models and test their accuracy using five proxy applications. We also describe three use cases.

79 ASTRONOMY AND ASTROPHYSICS↗

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2023

Pacific Northwest National Laboratory (PNNL), one of the U.S. Department of Energy (DOE) Office of Science’s 10 national laboratories, provides innovative science and technology development in the areas of energy and the environment, fundamental and computational science, and national security. There are three DOE offices within the Richland area. Two are responsible for the Hanford Site, whereas the Pacific Northwest Site Office oversees PNNL. PNNL prepares an Annual Site Environmental Report to meet the requirements of DOE Order 231.1B, Environment, Safety and Health Reporting, and DOE Order 458.1, Radiation Protection of the Public and the Environment, thus assuring that the public is informed of any PNNL-Richland campus or PNNL-Sequim campus event that could adversely affect the health and safety of the public, site staff, or the environment. The report provides a synopsis of ongoing environmental management performance and compliance activities for operations that occur at the PNNL-Richland campus in Richland, Washington, and at the PNNL-Sequim campus near Sequim, Washington. It describes the location of and background for each facility; addresses compliance with applicable DOE, federal, state, and local regulations, and site-specific permits; documents environmental monitoring efforts and their status; presents potential radiation doses to staff and the public in the surrounding areas; and describes DOE-required data quality assurance methods used for data verification. The ASER report describes Compliance with Federal, State, and Local Laws and Regulations in 2023, Environmental Sustainability, Environmental monitoring and dose assessment, Natural and Cultural Resource Management, and Quality Assurance activities that took place during Calendar Year 2023.

40 CFR 61 Subpart H↗

Modeling Deicing Operations in Departure Scheduling Using Fast Time Simulation

In winter snow conditions, aircraft need inspection for deicing service before takeoff. Deicing service is a procedure to remove frost, ice, slush, or snow from aircraft for safe operation. Deicing operations vary by airport in many ways. Some airports have designated deicing zones, whereas some use a closed runway or terminal area to perform the procedure. Nonetheless, deicing operations add extra workloads to controllers, and cause increased taxi traffic on the ground. NASA and Korea Aerospace Research Institute (KARI) have been collaborating to model deicing operations at Incheon International Airport (ICN). This paper describes the deicing model and the study of deicing operations in departure scheduling using fast time simulations. The deicing model uses a heuristic algorithm for deicing zone assignment. In the fast time simulations, the model uses probability distributions derived from actual operation data to model deicing request and deicing zone time. It is envisioned that such a deicing model can be useful in airport surface scheduling to provide decision support and improve traffic management performance in winter snow operations.

modeling and simulation↗

Modeling Deicing Operations in Departure Scheduling using Fast Time Simulation

In winter snow conditions, aircraft need inspection for deicing service before takeoff. Deicing service is a procedure to remove frost, ice, slush, or snow from aircraft for safe operation. Deicing operations vary by airport in many ways. Some airports have designated deicing zones, whereas some use a closed runway or terminal area to perform the procedure. Nonetheless, deicing operations add extra workloads to controllers, and cause increased taxi traffic on the ground. NASA and Korea Aerospace Research Institute (KARI) have been collaborating to model deicing operations at Incheon International Airport (ICN). This paper describes the deicing model and the study of deicing operations in departure scheduling using fast time simulations. The deicing model uses a heuristic algorithm for deicing zone assignment. In the fast time simulations, the model uses probability distributions derived from actual operation data to model deicing request and deicing zone time. It is envisioned that such a deicing model can be useful in airport surface scheduling to provide decision support and improve traffic management performance in winter snow operations.

surface operation↗

Workplace Charge Management with Aggregated Building Loads

This paper describes a workplace charge management system developed to control plug-in electric vehicle charging stations based on aggregated building loads. A system to collect information from drivers was also developed for better charge management performance since the present AC charging station standard does not provide battery state of charge information. First, simulations with uncontrolled charging data were conducted to investigate several scenarios and control methods, and then one method with the most power curtailment during peak load was selected for verification tests. This paper illustrates load reduction test results for 36 charging stations and real-time campus net load data.

25 ENERGY STORAGE↗

Preliminary Results of an Experimental Investigation of the Qu Superconducting Heat Pipe

This note on preliminary results of our evaluation of the so-called Qu Tube is prompted in part by recent concerns expressed to the authors by some researchers regarding the performance characteristics of the superconducting, solid-state heat pipe as described in the patents, or on the company's websites. Briefly, the company's claims include: a new type of heat transfer mechanism that is a form of solid state thermal superconductivity, which results in an effective thermal conductivity of the order of tens of thousands of times that of an equivalent solid silver bar, or, tens to hundreds of times that of liquid - vapor heat pipes. The company's website also refers to tests conducted by Stanford Research Institute that substantiate these claims, but the report is apparently not publicly available. We are conducting an investigation of the Qu Tube under a NASA Grant, and in general find that these claims have merit, but our study is not yet complete. We present some of our preliminary results in part to show that it would not be imprudent to conduct such studies, especially for possible future applications requiring exceptional thermal management performance capabilities. Working with HiTek Services, we originally acquired several Qu Tubes, including 17" long, 5/16" diameter copper tubes, one that is 7 7/8" long, 3/16" diameter, and one that is 4" long, 1" diameter. We subjected the smaller tubes to various exploratory tests, including a transient test with electrical band heaters, boiling water tests, and a series of steady state tests with electrical band heaters heating one end with free convective cooling along the remainder of the length. All results indicate a very high thermal conductivity, but the length of these tubes limited our ability to obtain accurate data on temperature gradients, necessary to determine the effective thermal conductivity. We then acquired nine Qu Tubes that are 10' long, 5/16" diameter, and we have recently conducted initial tests, which further support the claims of exceptional thermal conductivity.

Blackmon, James B.↗

Idaho National Laboratory Quarterly Performance Analysis - 1st Quarter FY2015

This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 73 reportable events (27 from the 1St Qtr FY-15 and 46 from the prior three reporting quarters), as well as 38 other issue reports (including nine not reportable events and Significant Category A and B conditions reported during the1st Qtr FY-15) identified at INL during the past 12 months.

99 GENERAL AND MISCELLANEOUS↗