ASPIRE Aerodynamic Models and Flight Performance

The Advanced Supersonic Parachute Inflation Research Experiments (ASPIRE) project waslaunched to develop the capability for testing supersonic parachutes at Mars-relevant conditions.Three initial parachute tests, targeted as a risk-reduction activity for NASA's upcoming Mars2020 mission, successfully tested two candidate parachute designs and provided valuable data onparachute inflation, forces, and aerodynamic behavior. Design of the flight tests depended onflight mechanics simulations which in turn required aerodynamic models for the payload, andthe parachute. Computational Fluid Dynamics (CFD) was used to generate these models preflightand they are compared against the flight data after the tests. For the payload, thereconstructed aerodynamic behavior is close to the pre-flight predictions, but the uncertaintiesin the reconstructed data are high due to the low dynamic pressures and accelerations duringthe flight period of comparison. For the parachute, the predicted time to inflation agrees wellwith the pre-flight model; the peak aerodynamic force and the steady state drag on the parachuteare within the bounds of the pre-flight models, even as the models over-predict the parachutedrag at supersonic Mach numbers. Notably, the flight data do not show the transonic dragdecrease predicted by the pre-flight model. The ASPIRE flight tests provide previouslyunavailable valuable data on the performance of a large full-scale parachute behind a slenderleading body at Mars-relevant Mach number, dynamic pressure and parachute loads. TheASPIRE results are used to propose a new model for the parachute drag behind slender bodiesto aid future experiments.

Muppidi, Suman↗

Intelligent industrial demand response to increase grid flexibility and reliability: A review

The rapid transition toward renewable energy has introduced challenges in grid stability due to the intermittency of non-dispatchable sources like solar and wind. Industrial Demand Response (IDR) offers a promising, cost-effective solution that adjusts energy consumption patterns to align with supply, increases renewable utilization, and reduces costs. This review provides an updated analysis of IDR, sorting technologies into five categories: energy storage, scheduled energy usage, operational flexibility, on-site generation, and intelligent operations. Energy storage solutions, while requiring little flexibility, often have the longest payback periods. While slightly better, on-site generation also has longer payback periods, ranging from 5 to 20 years or more. Scheduled energy usage, operational flexibility, and intelligent operations allow significant peak reduction at lower capital costs but require greater flexibility. While 15–20 % peak reduction is within the range of all five categories, scheduled energy use and on-site energy generation are shown to have reductions of up to 70–80 % in select scenarios. Combining multiple IDR strategies from these five categories maximizes both financial and operational benefits. Synergistic approaches are shown to enhance grid stability while reducing costs. As the grid evolves, IDR will enable a more flexible, renewable-powered future that will benefit industrial facilities and the broader energy system.

Demand flexibility↗

Preliminary Assessment for the Electric Load Shifting Potential of Integrating Thermal Energy Storage with Heat Pumps in Residential Buildings in Texas of United States

The widespread adoption of electric-driven heat pumps for heating and cooling is expected to significantly increase electric demand. Cooling electric demand will result in an increase in peak hours electric loads, placing additional strain on the grid during peak hours. This challenge, combined with the current rapidly increasing demand from data centers, exacerbates the electric demand duck curve problem. Integrating thermal energy storage (TES) with heat pump can shift electric use for heating and cooling from peak to off-peak hours of the electric grid, which can help flatten the daily electric demand profile of a building. This paper presents a novel design that integrates heat pump with TES (HP-TES), which uses phase change materials (PCM). Heat pump charges TES by melting or freezing PCM during off-peak hours when there is no thermal demand from the building. TES is then discharged (i.e., by freezing or melting PCM) during peak hours to provide a more favorable heat source or heat sink for the heat pump to meet the thermal demand of the building with lower electricity use than conventional air-source heat pumps. Computer simulations were developed to predict the performance of HP-TES applied to a typical single-family house in the US. The building-level simulation results were scaled up to preliminarily assess the aggregated impacts of deploying HP-TES across all single-family houses in Texas of the United States, including reduction of peak demand of the electric grid.

Anees, Fady [ORNL]↗

Coupled Aerosol-Chemistry-Climate Twentieth-Century Transient Model Investigation: Trends in Short-Lived Species and Climate Responses

The authors simulate transient twentieth-century climate in the Goddard Institute for Space Studies (GISS) GCM, with aerosol and ozone chemistry fully coupled to one another and to climate including a full dynamic ocean. Aerosols include sulfate, black carbon (BC), organic carbon, nitrate, sea salt, and dust. Direct and BC snow-albedo radiative effects are included. Model BC and sulfur trends agree fairly well with records from Greenland and European ice cores and with sulfur deposition in North America; however, the model underestimates the sulfur decline at the end of the century in Greenland. Global BC effects peak early in the century (1940s); afterward the BC effects decrease at high latitudes of the Northern Hemisphere but continue to increase at lower latitudes. The largest increase in aerosol optical depth occurs in the middle of the century (1940s-80s) when sulfate forcing peaks and causes global dimming. After this, aerosols decrease in eastern North America and northern Eurasia leading to regional positive forcing changes and brightening. These surface forcing changes have the correct trend but are too weak. Over the century, the net aerosol direct effect is -0.41 Watts per square meter, the BC-albedo effect is -0.02 Watts per square meter, and the net ozone forcing is +0.24 Watts per square meter. The model polar stratospheric ozone depletion develops, beginning in the 1970s. Concurrently, the sea salt load and negative radiative flux increase over the oceans around Antarctica. Net warming over the century is modeled fairly well; however, the model fails to capture the dynamics of the observedmidcentury cooling followed by the late century warming.Over the century, 20% of Arctic warming and snow ice cover loss is attributed to the BC albedo effect. However, the decrease in this effect at the end of the century contributes to Arctic cooling. To test the climate responses to sulfate and BC pollution, two experiments were branched from 1970 that removed all pollution sulfate or BC. Averaged over 1970-2000, the respective radiative forcings relative to the full experiment were +0.3 and -0.3 Watts per square meter; the average surface air temperature changes were +0.2 degrees and -0.03 C. The small impact of BC reduction on surface temperature resulted from reduced stability and loss of low-level clouds.

Koch, Dorothy↗

Energy impacts of nationwide window upgrades in commercial buildings

This report presents comprehensive estimates of the energy impacts of nationwide commercial building window upgrades in the United States, using a conservative approach. Windows play a substantial role in determining building energy use and occupant experience. Estimates point to commercial building windows impacting loads that represent more than 6 quads (approximately 6%) of annual primary energy use in the U.S. (Harris, 2022). Beyond heating and cooling loads, windows also have effects on lighting and occupant comfort. The fastest route to improving the energy efficiency of windows in U.S. buildings is upgrading or replacing windows in existing buildings. This is due to poor performance of windows in older existing buildings compared to most new construction, low levels of window replacement, and long window service life compared to energy-using building components. Nationwide window upgrades were considered using the following technologies: • Secondary glazing systems • Double pane (clear and tinted) • Triple pane (clear and tinted) • Electrochromic glazing Nationwide upgrades provide on the order of 4%–6% site energy savings in typical buildings, or up to 26% in buildings with the highest savings potential. Electrochromic windows, with their ability to adapt dynamically to environmental conditions, can provide additional benefits, ranging from median savings of 7.2% in buildings with window to wall ratio (WWR) greater than 10% and up to 28% for some buildings. Savings increase substantially for buildings with higher WWR. This study’s approach focused on isolating the direct energy benefits from improvement in window performance, and does not take into account the following additional benefits from window retrofits, which are likely to be substantial: • Managing peak demand and enabling HVAC equipment downsizing. • Energy savings from customizing upgrades to building type and climate. • Energy savings and comfort improvements resulting from post-retrofit reductions in air leakage. • Non-energy benefits, such as occupant comfort and resilience during extreme weather.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

An Online Tool for Preliminary Design and Techno-Economic Analysis of District Geothermal Heating and Cooling Systems

District geothermal heating and cooling systems (DGHCS) have significant benefits for reducing energy consumption as well as building- and grid-level peak electric demand. Currently, no publicly available tools are available to effectively design and conduct techno-economic analysis of DGHCS. GeoWISE was originally developed for preliminary design and techno-economic analysis of geothermal heating and cooling systems in an individual commercial or residential building. This paper introduces recent upgrades of GeoWISE that allow users to design and conduct techno-economic analysis of DGHCS. Several new features are implemented in GeoWISE to allow selection and specification of multiple new or existing buildings. A database of information for over 125 million existing U.S. buildings was used in GeoWISE that allows users easily locate existing buildings of interest based on street addresses, and optionally edit information of the buildings (e.g., footprint, vintage, principal functions, number of floors, window-to-wall ratio). Unique energy simulation models of the selected buildings are then automatically created using the Automatic Building Energy Modeling (AutoBEM) and EnergyPlus simulations are performed to predict thermal loads of the buildings. A simplified DGHCS is then designed and simulated to predict its energy use. A central borehole heat exchanger (BHE) of the DGHCS is sized using the RowWise algorithm of GHEDesigner to meet the thermal loads within user-specified land areas for installing BHE. The upgraded GeoWISE reports the needed capacity of heating and cooling equipment in each building, design of the central BHE, energy consumption reduction, and energy cost saving resulting from using DGHCS compared with conventional HVAC systems. A case study is showcased using the upgraded GeoWISE to design and conduct techno-economic analysis of a simplified DGHCS.

Prem Anand Jayaprabha, Jyothis Anand [ORNL] (ORCID↗

Latent heat thermal energy storage performance maps enabling fast & accurate building energy simulations

Thermal energy storage (TES) using phase change materials (PCMs) has gained attention as an effective approach to manage energy demand fluctuations and shift peak building loads. PCM embedded heat exchangers (PCM-HXs) offer high energy storage density and low temperature variation during phase change, being suitable for load-shifting applications. However, this component is typically evaluated using computationally expensive methods, which present significant challenges when the ultimate goal is to assess the performance of PCM-HX integrated thermal energy storage systems in the full building context. In this paper, we present a methodology to generate highly accurate and computationally efficient PCM-HX performance maps which can be easily integrated into building energy simulation tools to analyze the feasibility of space conditioning systems with latent heat PCM-based TES. The performance maps are generated using a computationally efficient PCM-HX simulation tool based on a Generalized Resistance-Capacitance Model (GRCM) which can simulate arbitrary PCM-HXs with high accuracy and significantly less computational effort compared to full CFD simulations. The methodology was verified for a case study considering a 5-ton (~17.5 kW) air-to-water heat pump-thermal energy storage system (HP-TES), which was co-simulated in Modelica for a DOE prototype small-office building in Vienna, Austria, using Spawn of EnergyPlus™. The TES performance maps provided accurate predictions of PCM-HX behavior when used as Modelica component, with deviations within 2-4% while also achieving at least 103 computational time reduction. Leveraging this faster prediction capability, four PCMs with different melting temperatures for cooling (12°C, 16°C) and heating (31°C, 36°C) were assessed to investigate their impact on system performance. This work highlights the importance of robust PCM-HX models for efficient and high-fidelity building-level simulations, presenting new opportunities for advanced control strategy development and parametric analysis of TES configurations in a computationally efficient manner

Modelica Building Simulations↗

Tactility as a function of grasp force: Effects of glove, orientation, pressure, load, and handle

One of the reasons for reduction in performance when gloves are donned is the lack of tactile sensitivity. It was argued that grasping force for a weight to be grasped will be a function of the weight to be lifted and the hand conditions. It was further reasoned that the differences in grasping force for various hand conditions will be a correlate of the tactile sensitivity of the corresponding hand conditions. The objective of this experiment, therefore, was to determine the effects of glove type, pressure, and weight of load on the initial grasping force and stable grasping force. It was hypothesized that when a person grasps an object, he/she grasps very firmly initially and then releases the grasp slightly after realizing what force is needed to maintain a steady grasp. This would seem to be particularly true when a person is wearing a glove and has lost some tactile sensitivity and force feedback during the grasp. Therefore, the ratio of initial force and stable force and the stable force itself would represent the amount of tactile adjustment that is made when picking up an object, and this adjustment should vary with the use of gloves. A dynamometer was fabricated to measure the grasping force; the tests were performed inside a glove box. Four female and four male subjects participated in the study, which measured the effects of four variables: load effect, gender effect, glove type, and pressure variance. The only significant effects on the peak and stable force were caused by gender and the weight of the load lifted. Neither gloves nor pressure altered these forces when compared to a bare-handed condition, as was suspected before the test. It is possible that gloves facilitate in holding due to coefficient of friction while they deter in peak grasp strength.

Bishu, Ram R.↗

Corrosion-Resistant Non-Carbon Electrocatalyst Supports for PEFCS

Insufficient durability of commercial catalysts is a persistent issue for PEFC applications.1 Herein, Pt on Nb-doped-TiO 2 is reported as a highly durable electrocatalyst on which the direct 4-electron reduction of oxygen to water is more facile compared to Pt/C. All performance metrics are reported comparing Pt/Nb-TiO2 with a 15% Pt loading, against a commercial Pt/C catalyst (46.5% Pt loading, Tanaka, K. K.). Nb-doped-TiO 2 with high surface area and high electronic conductivity was synthesized using the supercritical fluid method. Initially, the durability of the catalyst was characterized using accelerated stability tests (ASTs) involving 10,000 high potential cycles (DOE/FCCJ protocol) and the Pt/Nb-TiO 2 was found to retain 78% of its initial electrochemically active surface area (ECSA) compared to the 57.6 % retained by Pt/C. These observations were in excellent agreement with previous reports that the Pt particle size of Pt/C grew from 2nm to 8nm during the AST protocol along with severe corrosion and amorphization of the carbon surface.2, 3 TEM and XPS studies of the Pt-Nb-doped-TiO 2 catalyst showed that the Pt particle size grew from 3nm to 6nm and the Nb(IV) and Ti(III) in the support were oxidized to Nb(V) and Ti(IV) after the durability test. Thus, the improvement in Pt/Nb-TiO 2 ECSA retention was attributed to the lower extent of particle growth and lack of oxidative support loss upon oxidation as compared to Pt/C. The oxygen reduction reaction (ORR) performance was characterized by linear polarization using a rotating disk electrode (RDE). The electrochemical surface areas of Pt/Nb-TiO 2 and Pt/C were found to be 48m2·g -1 and 83m2·g -1 respectively, and the mass activity for the ORR at 0.9V vs. RHE were found to be 150 mA·mg-1Pt and 124 mA·mg-1Pt respectively. The improved mass activity on Pt/Nb-TiO 2 was attributed to strong metal support interaction (SMSI) between the Nb-TiO 2 support and the Pt catalyst based on the 625 meV decrease in the binding energy of the Pt4f x-ray photo-electron spectroscopy (XPS) peaks of Pt/Nb-TiO 2 compared to Pt/C. To quantify the impact of the SMSI, a kinetic model was applied to calculate the elementary reaction rate constants for the various steps of the ORR on both catalysts. The reaction rate constant (k1) for the direct 4-electron transfer pathway to produce H 2 O was significantly larger in Pt/Nb-TiO 2 as compared to Pt/C. Thus, the reduction in the electron binding energy as observed in the XPS was found to aid the facile filling of the higher energy 2p orbitals of O 2 thereby leading to improved 4-electron transfer kinetics and improved overall activity.

08 HYDROGEN↗

Functional and structural adaptations of skeletal muscle to microgravity

Our purpose is to summarize the major effects of space travel on skeletal muscle with particular emphasis on factors that alter function. The primary deleterious changes are muscle atrophy and the associated decline in peak force and power. Studies on both rats and humans demonstrate a rapid loss of cell mass with microgravity. In rats, a reduction in muscle mass of up to 37% was observed within 1 week. For both species, the antigravity soleus muscle showed greater atrophy than the fast-twitch gastrocnemius. However, in the rat, the slow type I fibers atrophied more than the fast type II fibers, while in humans, the fast type II fibers were at least as susceptible to space-induced atrophy as the slow fiber type. Space flight also resulted in a significant decline in peak force. For example, the maximal voluntary contraction of the human plantar flexor muscles declined by 20-48% following 6 months in space, while a 21% decline in the peak force of the soleus type I fibers was observed after a 17-day shuttle flight. The reduced force can be attributed both to muscle atrophy and to a selective loss of contractile protein. The former was the primary cause because, when force was expressed per cross-sectional area (kNm(-2)), the human fast type II and slow type I fibers of the soleus showed no change and a 4% decrease in force, respectively. Microgravity has been shown to increase the shortening velocity of the plantar flexors. This increase can be attributed both to an elevated maximal shortening velocity (V(0)) of the individual slow and fast fibers and to an increased expression of fibers containing fast myosin. Although the cause of the former is unknown, it might result from the selective loss of the thin filament actin and an associated decline in the internal drag during cross-bridge cycling. Despite the increase in fiber V(0), peak power of the slow type I fiber was reduced following space flight. The decreased power was a direct result of the reduced force caused by the fiber atrophy. In addition to fiber atrophy and the loss of force and power, weightlessness reduces the ability of the slow soleus to oxidize fats and increases the utilization of muscle glycogen, at least in rats. This substrate change leads to an increased rate of fatigue. Finally, with return to the 1g environment of earth, rat studies have shown an increased occurrence of eccentric contraction-induced fiber damage. The damage occurs with re-loading and not in-flight, but the etiology has not been established.

Review, Tutorial↗

Dual Purpose – Heating & Cooling – Thermal Battery for Flexible and Energy-Efficient Heat Pump Systems

The integration of heat pumps with thermal energy storage (HP-TES) systems is gaining attention as a viable solution for managing peak building demand driven by immense cooling and heating loads. With growing reliance on renewable energy sources, thermal energy storage offers an excellent opportunity to mitigate mismatches in thermal load between energy supply and demand. The use of phase-change material (PCM) TES is especially promising, as PCMs offer significant latent energy storage capacity with smaller temperature glides in smaller volumes compared to other TES technologies. However, challenges arise because current HP-TES architectures can load-shift only cooling or heating, not both, requiring two systems and thus doubling cost, weight, and footprint. Furthermore, current research efforts lack specific tools and techniques to advance integrated systems from concept design to end-user application, focusing on only discharge performance. To address these challenges, this research proposes a dual-mode (heating and cooling) integrated HP-TES system that uses room-temperature PCM-TES as a high-temperature heat source in heating mode and a low-temperature heat sink in cooling mode, thereby reducing temperature lifts and compressor power. Design criteria for PCM-TES heat exchangers were developed, balancing thermal-hydraulic performance with practical constraints such as available building space and weight requirements along with PCM selection considerations such as shipping conditions, moisture exposure, and number of available cycles. A detailed transient model for HP-TES systems was developed to enable rapid annual performance assessments in any US climate zone.

42 ENGINEERING↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗