Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “outage management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Managing Critical Infrastructures C.I.M. Suite

See how a new software package developed by INL researchers could help protect infrastructure during natural disasters, terrorist attacks and electrical outages. For more information about INL research, visit http://www.facebook.com/idahonationallaboratory.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Westinghouse advanced fuel management strategies leveraging high enrichment and high burnup fuel to optimize PWR economics

In the US, nuclear power plants have been focused on increasing electricity generation for over three decades via longer operating cycles, reduced number of outages and duration, and the implementation of power up-rates. The potential for zero-carbon emission credits and other carbon-reduction initiatives further makes nuclear power utilities to focus on increasing generation capability. Longer operating cycles provide increased energy generation and enable economic savings to nuclear utilities when the increase in fuel loading required to achieve the extended cycle energy target and resulting increase in total fuel cost is offset by the savings from outage avoidance and reduced replacement power costs. For the current licensed limits of 5 w/o {sup 235}U enrichment and 62 GWd/tU peak pin burnup, higher power density PWR plants, which are prevalent in the PWR fleet, require an excessively penalizing fraction of feed fuel assemblies to operate for the extended cycle duration, with inevitably poor fuel use and fuel cycle economics that cannot be counterbalanced by the savings on outage cost avoidance. To overcome this barrier, the nuclear industry is pursuing development of high enrichment/high burnup fuel technology ({sup 235}U enrichment up to 8 w/o and peak pin burnup up to 75 GWd/tU) which increases fuel energy generation capability and can enable high power density plants to achieve positive economics on 24-month cycle of operation. This paper presents advanced fuel management strategies developed by Westinghouse to enable transition of PWR reactors from 18-month to 24-month cycle of operation, with and without a core thermal power uprate, which are then used as basis to assess the economics of a direct transition from 18 to 24-month cycles with high enrichment/high burnup fuel. The results show that these fuel management strategies, especially if coupled with thermal power up-rates, present the opportunity for substantial economic benefits to utilities. The systematic review of fuel management strategies presented can provide an illustrative reference for decision makers as they consider how to maximize nuclear energy generation economically. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Computer-based human-machine interfaces for emergency operation - 233

The Halden Reactor Project (HRP) has many years of experience in developing and evaluating principles for computer-based human-machine interfaces (HMIs). We have synthesized the lessons learned in an integrated design concept that is implemented on a boiling water reactor (BWR) simulator in the Halden Man Machine Laboratory (HAMMLAB). The design concept is intended to alert and support the operators in monitoring and controlling the plant during normal operation, emergency situations and outages. The computer-based HMIs include an alarm system, operating displays, operating procedures and large screen displays. The design concept has been tested in a simulator study in HAMMLAB. This paper describes the design and initial testing of the computer-based emergency operating procedures (EOPs) and other displays to support the operators when using the EOPs. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Managing Wildfire Risk and Promoting Equity through Optimal Configuration of Networked Microgrids

As climate change increases the risk of large-scale wildfires, wildfire ignitions from electric power lines are a growing concern. To mitigate the wildfire ignition risk, many electric utilities de-energize power lines to prevent electric faults and failures. These preemptive power shutoffs are effective in reducing ignitions, but they could result in wide-scale power outages. Advanced technology, such as networked microgrids, can help reduce the size of the resulting power outages; however, even microgrid technology might not be sufficient to supply power to everyone, thus forcing hard questions about how to prioritize the provision of power among customers. In this paper, we present an optimization problem that configures networked microgrids to manage wildfire risk while maximizing the power served to customers; however, rather than simply maximizing the amount of power served in kilowatts, our formulation also considers the ability of customers to cope with power outages, as measured by social vulnerability, and it discourages the disconnection of particularly vulnerable customer groups. To test our model, we leverage a synthetic but realistic distribution feeder, along with publicly available social vulnerability indices and satellite-based wildfire risk map data, to quantify the parameters in our optimal decision-making model. Our case study results demonstrate the benefits of networked microgrids in limiting load shed and promoting equity during scenarios with high wildfire risk.

distribution systems↗

Incorporating realistic conservatism into criticality alarm placement and emergency response: a regulatory perspective - 14425

Review of historical process plant criticality accidents shows that their consequences vary widely and are extremely difficult to predict accurately. Because of the wide variability and inherent uncertainty in estimating consequences, criticality detector placement analysis and consequence estimation for emergency response typically utilize very conservative assumptions with regard to the total fissions, time-dependent fission rate, and intervening shielding. For detector placement, a 'minimum accident of concern' is typically defined, whereas emergency consequence evaluations typically define a maximum fission source term. These require different mindsets because what is conservative for one type of analysis may be non-conservative for the other. While some conservatism is commonly practiced in both cases, excessive conservatism can result in a net increase in risk, such as resulting from inadvertent alarm activations, that can be costly to operations and counterproductive to safety. Conversely, reliance on very detailed calculational models to reduce conservatism could increase the number and complexity of controls, such as shielding for dose mitigation. Deterministic regulatory criteria have also been applied for determining where criticality detectors are to be deployed and what areas must be evacuated in the event of an accident. This paper explores several issues associated with criticality alarm placement and emergency response from a regulatory perspective. This paper will discuss insights gained from historical fuel facility accidents and significant events regarding the inherent risk of criticality, the most likely locations for criticality to occur, and the most probable characteristics of a critical excursion. This will include discussion of the previously disputed relevance of the United States Nuclear Regulatory Commission's (USNRC's) longstanding model for a critical excursion. While USNRC regulations deterministically require dual alarm coverage in all areas having greater than a 'critical mass' of fissionable material, a process is provided to grant exemptions when a risk-informed argument is technically justified. Similar risk-informed considerations have been used to justify compensatory measures allowing limited operation during periods of alarm system outage due to component failure or maintenance. This paper will explore the application of risk information and performance history to address requirements for criticality alarm system coverage, granting exemptions from deterministic criteria, allowing compensatory measures during system outages, determining evacuation areas and routes, and assessing the significance associated with alarm system issues. Finally, the impact of shielding on the USNRC's regulatory risk basis and approved subcritical margin will be reviewed. (authors)

42 ENGINEERING↗

Core design and performance of the Westinghouse lead fast reactor with UO 2 and MOX configurations

For this work, Westinghouse partnered with Argonne National Laboratory to design, model and optimize UO 2 - and MOX-fueled core designs for a medium size (950 MWt) Lead Fast Reactor that was pursued by Westinghouse. Using Argonne’s suite of reactor analysis codes together with Westinghouse fuel cost economic models, thousands of candidate cores were considered to achieve the economics-optimized cores presented in this paper. This optimization process considered detailed reactor physics, fuel performance, transient performance, and fuel economics models. The reactor performance of the resulting optimized UO 2 - and MOX-fueled core designs are described and compared in this paper. Both cores show fuel performance and transient behavior that is considered acceptable for the optimization presented herein, while further testing campaigns on material performance in high-temperature liquid lead will be required to confirm acceptability at the operating conditions chosen. A multi-batch strategy was selected for the UO 2 core for best fuel utilization with minimum fuel inventory costs. A single-batch fuel management was instead selected for the MOX core to maximize cycle length and minimize the impact of the longer refueling outage resulting from the higher decay heat of the discharged MOX fuel relative to the discharged UO 2 fuel, requiring a longer cooling time before dry-lift of discharged fuel could take place.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Simulating the Composite Propellant Manufacturing Process

There is a strategic interest in understanding how the propellant manufacturing process contributes to military capabilities outside the United States. The paper will discuss how system dynamics (SD) has been applied to rapidly assess the capabilities and vulnerabilities of a specific composite propellant production complex. These facilities produce a commonly used solid propellant with military applications. The authors will explain how an SD model can be configured to match a specific production facility followed by a series of scenarios designed to analyze operational vulnerabilities. By using the simulation model to rapidly analyze operational risks, the analyst gains a better understanding of production complexities. There are several benefits of developing SD models to simulate chemical production. SD is an effective tool for characterizing complex problems, especially the production process where the cascading effect of outages quickly taxes common understanding. By programming expert knowledge into an SD application, these tools are transformed into a knowledge management resource that facilitates rapid learning without requiring years of experience in production operations. It also permits the analyst to rapidly respond to crisis situations and other time-sensitive missions. Most importantly, the quantitative understanding gained from applying the SD model lends itself to strategic analysis and planning.

Williamson, Suzanne↗

PIPII cryoplant non thermal cycling updates

The Proton Improvement Plan-II (PIP-II) is a crucial upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) with 23 cryomodules operating at 2K. The LINAC thermohydraulic conditions are satisfied by the cryogenic subsystems: Cryogenic Distribution System (CDS), a helium refrigerator cold box (CB), a warm compression station (WCS) and a helium recovery system (RSYS). The accelerator has a strict requirement of non-thermal cycling of the LINAC cryomodules during planned and unplanned subsystem outages. This paper presents an integrated operating modes analysis of the of the LINAC/CDS thermohydraulic loads satisfied by the CB/WCS cooling system supported by the RSYS inventory management system. The study is based on latest cryoplant and CDS engineering deliverables, as well as the recent performance data from single cryomodule qualification tests performed at the Fermilab PIP-II Injector Test test s tand. The study evaluates both normal and abnormal operating modes, with a focus on identifying integrated scenarios that put subsystems components under stress. The conclusions of this study will help build redundancy to reduce the risk of thermal cycles during planned and unplanned subsystem outages.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The Corrective Maintenance Paradigm Shift at Hanford's Tank Farms - 20077

Hanford's Tank Farms facilities have been used to safely store waste for over 70 years, with the first single-shell tanks being constructed in 1943. Tank Farm facilities consist of 149 single-shell tanks, 28 double-shell tanks, an evaporator facility, and wastewater treatment facilities. Tank Farm facilities are aging, with a tremendous corrective maintenance burden on the Tank Farm contractor. The mission of Tank Farm facilities is soon changing from waste storage to waste staging for the Hanford Waste Treatment and Immobilization Plant (WTP). WTP operations will demand a significant increase in Tank Farm facility operations, in which corrective maintenance outage windows will shrink drastically. This realization has forced the Tank Farm contractor to consider a paradigm shift in Tank Farm facilities Maintenance planning, and the use of reliability Engineering tools. The Tank Farm Production Operations Engineering Cognizant System Engineering (CSE) organization has led the way in motivating this paradigm shift. This shift has been realized through the use of: 1) technical exchange with other Department of Energy (DOE) contractors to develop improvements in the CSE program, 2) a shift from the use of lagging to leading system health indicators, and 3) a Plant Health Committee to unite Engineering, Operations, and Maintenance personnel toward a productive maintenance strategy. The CSE organization has held several technical exchanges with other DOE contractors to discuss CSE concepts, and how to better maintain aging infrastructure. The technical exchange with other contractors has greatly reduced the time required to make improvements in the Tank Farm CSE program. Other DOE contractors have already faced issues surrounding aging infrastructure, and have vast experience in improving the reliability and usable life of structures and components in nuclear facilities. The past CSE program used lagging health indicators to determine the health of systems. The key lagging indicator used to determine system health was availability, which is the percentage of time that a facility was ready for operation compared to the time the facility was demanded for operation. Availability was a good indicator of health in the waste storage mission of Tank Farms, where safe storage was the most important function of the facility, and where maintenance outage windows were typically long-duration. In current and future operations, outage windows are reducing, resulting in the need for much more reliable systems. Systems that have had high availability may suddenly become inoperable due to a failed component or sub-system. In several instances, the use of availability as an indicator of system health failed to predict system/equipment failure before its occurrence. In discussions with other DOE contractors, a set of reliability tools, including leading indicators of health, has been implemented in the CSE program. This primarily involves the use of failure modes and effects analysis and the study of equipment failure to develop system monitoring plans that focus on trending data to detect oncoming equipment failure ahead of time. In addition, the use of a Plant Health Committee has added significantly to the paradigm shift from a corrective maintenance philosophy to the use of predictive and preventive maintenance. The Plant Health Committee is a chartered team consisting of Engineering, Operations, and Maintenance personnel. CSEs use this forum to present the results of their performance monitoring, including the presentation of health via leading health indicators. The most positive aspect of this committee is the communication that it creates within these critical organizations. The Operations and Maintenance organization benefit from focusing maintenance on the reliability-centered focus provided by Engineering. Engineering benefits from the operational experience of the Operations organization and from the failure data that can be provided by Maintenance personnel. The continued use of the Plant Health Committee is expected to further decrease maintenance outage times, in better support of oncoming 24/7 operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

jupyterhub-announcement v0.8

This is an announcement service for JupyterHub that JupyterHub admins can manage through a JupyterHub-styled UI. JupyterHub administrators can use it to communicate with their hub's users about status, upcoming outages, or share news. It allows admins to post a current announcement, and show previous announcements in reverse chronological order. It provides a REST API hook that admins can use to post the latest announcement on JupyterHub itself (with custom templates).

Thomas, Rollin↗

Investigations on optimization of accident management measures following a station blackout accident in a VVER-1000 pressurized water reactor

The reactor safety issues are of primary importance for preserving the health of the population and ensuring no release of radioactivity and fission products into the environment. A part of the nuclear research focuses on improvement of the safety of existing nuclear power plants. Studies, research and efforts are a continuing process at improving the safety and reliability of existing and newly developed nuclear power plants at prevention of a core melt accident. Station blackout (loss of AC power supply) is one of the dominant accidents taken into consideration at performing accident analysis. In case of multiple failures of safety systems it leads to a severe accident. To prevent an accident to turn into a severe one or to mitigate the consequences, accident management measures must be performed. The present paper outlines possibilities for application and optimization of accident management measures following a station blackout accident. Assessed is the behaviour of the nuclear power plant during a station blackout accident without accident management measures and with application of primary/secondary side oriented accident management measures. Discussed are the possibilities for operators ' intervention and the influence of the performed accident management measures on the course of the accident. Special attention has been paid to the effectiveness of the passive feeding and physical phenomena having an influence on the system behaviour. The performed simulations show that the effectiveness of the secondary side feeding procedure can be limited due to an early evaporation or flashing effects in the feed water system. The analyzed cases show that the effectiveness of the accident management measures strongly depends on the initiation criteria applied for depressurization of the reactor coolant system. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

On the use of genetic algorithm to optimize industrial assets lifecycle management under safety and budget constraints

The purpose of this paper is to describe the method and tool dedicated to optimize investments planning for industrial assets. These investments may either be preventive maintenance tasks, asset enhancements or logistic investments such as spare parts purchases. The two methodological points to investigate in such an issue are: 1. The measure of the profitability of a portfolio of investments 2. The selection and planning of an optimal set of investments 3. The measure of the risk of a portfolio of investments The measure of the profitability of a set of investments in the IPOP tool is synthesised in the Net Present Value indicator. The NPV is the sum of the differences of discounted cash flows (direct costs, forced outages...) between the situations with and without a given investment. These cash flows are calculated through a pseudo-Markov reliability model representing independently the components of the industrial asset and the spare parts inventories. The component model has been widely discussed over the years but the spare part model is a new one based on some approximations that will be discussed. This model, referred as the NPV function, takes for input an investments portfolio and gives its NPV. The second issue is to optimize the NPV. If all investments were independent, this optimization would be an easy calculation, unfortunately there are two sources of dependency. The first one is introduced by the spare part model, as if components are indeed independent in their reliability model, the fact that several components use the same inventory induces a dependency. The second dependency comes from economic, technical or logistic constraints, such as a global maintenance budget limit or a safety requirement limiting the residual risk of failure of a component or group of component, making the aggregation of individual optimum not necessary feasible. The algorithm used to solve such a difficult optimization problem is a genetic algorithm. After a description of the features of the software a test case is presented showing the influence of the optimization algorithm parameters on its efficiency to find an optimal investments planning. (authors)

97 MATHEMATICS AND COMPUTING↗

FY12 Quarter 3 Computing Utilization Report – LANL

DSW continues to dominate the capacity workload, with a focus in Q3 on common model baselining runs in preparation for the Annual Assessment Review (AAR) of the weapon systems. There remains unmet demand for higher fidelity simulations, and for increased throughput of simulations. Common model baselining activities would benefit from doubling the resolution of the models and running twice as many simulations. Capacity systems were also utilized during the quarter to prepare for upcoming Level 2 milestones. Other notable DSW activities include validation of new physics models and safety studies. The safety team used the capacity resources extensively for projects involving 3D computer simulations for the Furrow series of experiments at DARHT (a Level 2 milestone), fragment impact, surety theme, PANTEX assessments, and the 120-day study. With the more than tripling of classified capacity computing resources with the addition of the Luna system and the safety team's imminent access to the Cielo system, demand has been met for current needs. The safety team has performed successful scaling studies on Luna up to 16K PE size-jobs with linear scaling, running the large 3D simulations required for the analysis of Furrow. They will be investigating scaling studies on the Cielo system with the Lustre file system in Q4. Overall average capacity utilization was impacted by negative effects of the LANL Voluntary Separation Program (VSP) at the beginning of Q3, in which programmatic staffing was reduced by 6%, with further losses due to management backfills and attrition, resulting in about 10% fewer users. All classified systems were impacted in April by a planned 2 day red network outage. ASC capacity workload continues to focus on code development, regression testing, and verification and validation (V&V) studies. Significant capacity cycles were used in preparation for a JOWOG in May and several upcoming L2 milestones due in Q4. A network transition has been underway on the unclassified networks to increase access of all ASC users to the unclassified systems through the Yellow Turquoise Integration (YeTI) project. This will help to alleviate the longstanding shortage of resources for ASC unclassified code development and regression testing, and also make a broader palette of machines available to unclassified ASC users, including PSAAP Alliance users. The Moonlight system will be the first capacity resource to be made available through the YETI project, and will make available a significant increase in cycles, as well as GPGPU accelerator technology. The Turing and Lobo machines will be decommissioned in the next quarter. ASC projects running on Cielo as part of the CCC-3 include turbulence, hydrodynamics, burn, asteroids, polycrystals, capability and runtime performance improvements, and materials including carbon and silicone.

43 PARTICLE ACCELERATORS↗

Characterization of Days Based On Analysis of National Airspace System Performance Metrics

Days of operations in the National Airspace System can be described in term of traffic demand, runway conditions, equipment outages, and surface and enroute weather conditions. These causes manifest themselves in terms of departure delays, arrival delays, enroute delays and traffic flow management delays, Traffic flow management initiatives such as, ground stops, ground delay programs, miles-in-trail restrictions, rerouting and airborne holding are imposed to balance the air traffic demand with respect to the available capacity, In order to maintain operational efficiency of the National Airspace System, the Federal Aviation Administration (FAA) maintains delay sad other statistics in the Air Traffic Operations Network (OPSNET) and the Aviation System Performance Metrics (ASPM) databases. OPSNET data includes reportable delays of fifteen minutes ox more experienced by Instrument Flight Rule (IFR) flights. Numbers of aircraft affected by departure delays, enroute delays, arrival delays and traffic flow delays are recorded in the OPSNET data. ASPM data consist of number of actual departures, number of canceled departures, percentage of on time departures, percentage of on time gate arrivals, taxi-out delays. taxi-in delays, gate delays, arrival delays and block delays. Surface conditions at the major U.S. airports are classified in terms of Instrument Meteorological Condition (IMC) and Visual Meteorological Condition (VMC) as a function of the time of the day in the ASPM data. The main objective of this paper is to use OPSNET and ASPM data to classify the days in the datasets into few distinct groups, where each group is separated from the other groups in terms of a distance metric. The motivations for classifying the days are two-fold, 1) to enable selection of days of traffic with particular operational characteristics for concept evaluation using system-wide simulation systems such as the National Aeronautics and Space Administration's Airspace Concepts Evaluation Tool (ACES) and 2) to enable evaluation of a given day with respect to the characteristics of the classified groups. The first part of the paper is devoted to the analysis of major trends seen in the OPSNET and ASPM data. The second part of the paper is devoted to describing features or measures derived from the OPSNET and ASPM data that are suitable for characterizing days, and the classification algorithm used for grouping the days. Finally, the method for evaluating the characteristics of a given day with respect to the properties of the groups is described.

Chatterji, Gano B.↗

Incorporating Forecast Uncertainty in Utility Control Center

Uncertainties in forecasting the output of intermittent resources such as wind and solar generation, as well as system loads are not adequately reflected in existing industry-grade tools used for transmission system management, generation commitment, dispatch and market operation. There are other sources of uncertainty such as uninstructed deviations of conventional generators from their dispatch set points, generator forced outages and failures to start up, load drops, losses of major transmission facilities and frequency variation. These uncertainties can cause deviations from the system balance, which sometimes require inefficient and costly last minute solutions in the near real-time timeframe. This Chapter considers sources of uncertainty and variability, overall system uncertainty model, a possible plan for transition from deterministic to probabilistic methods in planning and operations, and two examples of uncertainty-based fools for grid operations.This chapter is based on work conducted at the Pacific Northwest National Laboratory (PNNL)

wind generation, solar generation, Energy managmen↗

Decoding Resilience by Modeling Outage and Restoration Processes in Distribution Grids: A Pittsburgh Case Study

Climate-induced extreme weather events, such as floods and heatwaves, pose significant challenges to the resilience of urban power distribution grids. This paper examines the outage and restoration dynamics of Pittsburgh's power grid during the flood event in April 2024 and three heatwaves in June, July, and August 2024. We introduce a comprehensive modeling framework that integrates outage and restoration processes, enabling the quantification of resilience metrics, including total customer-hours of power outage, maximum residual values, and restoration durations across various ZIP codes. Our analysis highlights spatial disparities in outage impacts and restoration efficiencies, with ZIP Code 15222 experiencing the highest cumulative disruptions, while ZIP Code 15217 shows lower susceptibility. By linking statistical trends with weather events, this study underscores the critical need for targeted infrastructure upgrades and advanced restoration strategies. Furthermore, the proposed framework offers valuable insights for planning and managing resilient power systems in the face of increasing climate stress.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Real-time power management technique for microgrid with flexible boundaries

In order to diminish the impacts brought by high penetration of renewable energy on the reliability of distribution systems, some distribution networks (e.g. Chattanooga electric power board system) have deployed smart switches (SSs) to island some areas to mitigate outage losses. However, due to intermittency and sharply changing rate of renewable energy, it is likely to experience insufficient or excessive power for islanded areas. Therefore, a microgrid controller featured with flexible boundaries is proposed. With proposed microgrid controller, the microgrid can not only shrink or expand its boundaries according to current renewable energy supply, but also disconnect/connect to the main grid with a designated SS. Furthermore, to ensure the microgrid controller could obtain suitable boundaries on the time scale of seconds, a real-time power management technique with alternative generating algorithm is designed to generate all possible alternative boundaries and choose the optimal one, which is scalable to any topology. In addition, in order to maintain state of charge of batteries within a desirable range, anti-overcharge/discharge strategies are designed. Four comprehensive experiments verify that the implementation of the microgrid controllers can realise flexible boundaries and deal with sharply changing rate of renewable generation or load on the time scale of seconds.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Systems engineering aspects to installation of the phased multi-year LANSCE-refurbishment project

The LANSCE Refurbishment Project (LANSCE-R) is a phased, multiyear project. The project is scheduled to start refurbishment in the 2nd quarter of fiscal year 2011. Closeout will occur during the 4th quarter of FY2016. During the LANSCE-R project, installation of project components must be scheduled during six annual 6-month maintenance-outages and not conflict with annual LANSCE operational commitments to its user facilities. The project and operations schedules must be synchronized carefully. Therefore, the scheduled maintenance outages, functional testing (with beam off, by primarily project personnel) and commissioning (with beam on, by primarily Accelerator Operation Technology (AOT) personnel) must be managed to accommodate operation. Active and effective coordination and communication between the project and AOT personnel must be encouraged to identify, as early as possible, any operational issues. This paper will report on the systems engineering approach to the integration and control of engineering activities.

42 ENGINEERING↗