Optimized dispatch in a first-principles concentrating solar power production model
Not Available
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
Not Available
With the increasing penetration of intermittent renewable energy sources into the electric grid, there is an associated need for conventional thermal power plants that are designed to operate at base-load conditions to cycle their load rapidly and frequently and operate under low-load conditions. Fast load-following operations lead to plant efficiency loss and the reduction of equipment life. A high-fidelity dynamic model of a natural gas combined cycle power plant, with rigorous equipment level submodels, is developed to capture the plant transient performance and the thermomechanical stress evolution at the high-pressure drum is computed to assess the drum life consumption. Stress evolution is modeled for the location of the edge at the drum/downcomer junction that experiences high circumferential stress amplitude during the fast load-following operation, leading to higher fatigue damage than locations considered under existing design standards. A dynamic optimization problem is solved for optimal load-following operation. Depending on the value of the stress constraint and the desired ramp rate, satisfying the desired stress constraint may be infeasible without relaxing the ramp rate. A multiobjective dynamic optimization problem is solved using a lexicographic approach that minimizes ramp rate relaxation and maximizes efficiency while satisfying stress constraints, avoiding spraying to saturation, and maintaining main steam and reheat steam temperature within bounds. It was observed that the optimal ramp rate can be highly nonlinear as opposed to the industry-standard linear ramp rate. Nonlinear optimal ramp-rate profiles not only help to avoid stress constraints that may be unavoidable by using the linear profile but also result in higher efficiency than the linear profile. Furthermore, the study shows that there is a strong tradeoff between the relaxation in the plant ramp rate and the time-average thermal efficiency.
Demand response and energy storage play a profound role in the smart grid. The focus of this paper is to evaluate benefits of coordination of flexible loads and energy storage for power grid and end user services. We present a Generalized Battery Model (GBM) to describe the flexibility of building loads and energy storage. A Model Predictive Control (MPC) approach is proposed to characterize the GBM parameters (power and energy limits) for flexible building loads. Moreover, we develop optimal coordination algorithms for them to provide ancillary and end user services such as energy arbitrage, frequency regulation, spinning reserve, as well as energy and demand charge reduction. Several case studies have been performed to demonstrate the efficacy of the GBM and coordination algorithms, and evaluate the benefits of using their flexibility to provide grid and end user services. We show that optimal coordination yields significant cost saving and revenue. Moreover, the best option for grid services is to provide energy arbitrage and frequency regulation, because spinning reserve cannot compete with regulation service. Furthermore, when coordinating flexible loads with energy storage to provide end user services, it is recommended to consider both the time-of-use (TOU) price and demand charge rather than the TOU price only in order to flat the aggregate power profile.
The over-arching project objective is to fully develop and validate optimal controls frameworks that can subsequently be applied widely to different WEC devices and concepts. Optimal controls of WEC devices represent a fundamental building block for WEC designers that must be considered as an integral part of every stage of device development. Using a building-blocks approach to optimal controls development, this effort will result in the full development of a feed-forward and feed-back control approach and a wave prediction system. Phase I focused primarily on numerical offline optimization and validation using wave tank testing of three industry partners’ WEC devices, including; CalWave, Ocean Energy, and Resolute Marine Energy. These industry partnerships allowed us to identify optimal control strategies for these different WEC topologies at different maturity levels. Phase II focused on demonstrating an integrated control system on an at-sea prototype that is to be custom-built and maturing the HW and SW required to successfully run our advanced controls code frameworks on at-sea systems. A secondary focus during phase II is to adapt our systems identification, controls and wave-prediction frameworks to become more robust and comprehensive in respect to RT capability, robustness, and reliability.
This paper examines the problem of real-time optimization of networked systems and develops online algorithms that steer the system towards the optimal trajectory without explicit knowledge of the system model. The problem is modeled as a dynamic optimization problem with time-varying performance objectives and engineering constraints. The design of the algorithms leverages the online zero-order primal-dual projected-gradient method. In particular, the primal step that involves the gradient of the objective function (and hence requires a networked systems model) is replaced by its zero-order approximation with two function evaluations using a deterministic perturbation signal. The evaluations are performed using the measurements of the system output, hence giving rise to a feedback interconnection, with the optimization algorithm serving as a feedback controller. The paper provides some insights on the stability and tracking properties of this interconnection. Finally, the paper applies this methodology to a real-time optimal power flow problem in power systems, and shows its efficacy on the IEEE 37-node distribution test feeder for reference power tracking and voltage regulation.
Hydrostatic transmission (HST) is a common hydraulic drive train transmission used in track loaders and other high power off-road vehicles. While reliable, traditional HST with fixed-displacement motors has relatively poor efficiencies. In this paper, alternative HST and series hybrid drive train architectures are proposed to replace the traditional HST to allow the implementation of optimal control and optimization methods for better vehicle fuel efficiency. Besides the optimal control methods applied to minimize fuel consumption, the proposed architectures are also optimized for the best configuration in terms of component sizing. Backward-facing (acausal) simulation models were developed to estimate the fuel efficiency of each architecture. Finally, each architecture is compared for optimized performance and fuel saving relative to the traditional HST as baseline.
This paper proposes a sequential convex optimization method to solve broader classes of optimal power flow (OPF) problems over radial networks. The non-convex branch power flow equation is decomposed as a second-order cone inequality and a non-convex constraint involving the difference of two convex functions. Provided with an initial solution offered by an inexact second-order cone programming relaxation model, this approach solves a sequence of convexified penalization problems, where concave terms are approximated by linear functions and updated in each iteration. It could recover a feasible power flow solution, which usually appears to be very close, if not equal, to the global optimal one. Two variations of the OPF problem, in which non-cost related objectives are optimized subject to power flow constraints and the convex relaxation is generally inexact, are elaborated in detail. One is the maximum loadability problem, which is formulated as a special OPF problem that seeks the maximal distance to the boundary of power flow insolvability. The proposed method is shown to outperform commercial nonlinear solvers in terms of robustness and efficiency. The other is the bi-objective OPF problem. A non-parametric scalarization model is suggested, and is further reformulated as an extended OPF problem by convexifying the objective function. It provides a single trade-off solution without any subjective preference. The proposed computation framework also helps retrieve the Pareto front of the bi-objective OPF via the e-constraint method or the normal boundary intersection method. This paper also discusses extensions for OPF problems over meshed networks based on the semidefinite programming relaxation method.
Not provided.
This paper examines the feasibility of using waste heat from wastewater treatment plants (WWTPs) for water desalination. A model was developed to utilize waste heat from the gensets at As Samra WWTP in Jordan, using real data and TRNSYS® software to calculate available waste heat. The desalination process was then modeled with ASPEN PLUS® software, focusing on multi-effect desalination (MED). Both series and parallel configurations for the MED system were compared. The study investigated the effects of system feeding flow rate, feeding pressure, and heat input on productivity, performance ratio, and recovery ratio. The study also introduces a novel optimization technique combining machine learning and modern optimization algorithms to maximize system productivity and performance. Initially, a decision tree regression (DTR) model is developed to establish relationships between key independent variables (flow rate, feed pressure, and heat input) and dependent variables (productivity, performance ratio, and recovery ratio). The Pelican Optimization Algorithm (POA) is then used to identify the optimal values of the independent variables for maximum productivity and performance. The results show that using a series configuration yields a system productivity of 3984.2 kg/hr, a performance ratio of 3.78, and a recovery ratio of 0.991 at a feed flow rate of 4000 kg/hr, feed pressure of 3 bars, and heat input of 719 kW. Optimal productivity (4421 kg/hr), performance ratio (3.81), and recovery ratio (0.851) are achieved at a feed flow rate of 5166 kg/hr, feed pressure of 3.2 bars, and heat input of 794 kW. In conclusion, the techno-economic assessment indicates a levelized cost of water of 1.63 USD/m 3 for parallel configurations and 1.65 USD/m 3 for series configurations, with a payback period of less than two years.
SUMMARY Monitoring networks increasingly aim to assimilate data from a large number of diverse sensors covering many sensing modalities. Bayesian optimal experimental design (OED) seeks to identify data, sensor configurations or experiments which can optimally reduce uncertainty and hence increase the performance of a monitoring network. Information theory guides OED by formulating the choice of experiment or sensor placement as an optimization problem that maximizes the expected information gain (EIG) about quantities of interest given prior knowledge and models of expected observation data. Therefore, within the context of seismo-acoustic monitoring, we can use Bayesian OED to configure sensor networks by choosing sensor locations, types and fidelity in order to improve our ability to identify and locate seismic sources. In this work, we develop the framework necessary to use Bayesian OED to optimize a sensor network’s ability to locate seismic events from arrival time data of detected seismic phases at the regional-scale. This framework requires five elements: (i) A likelihood function that describes the distribution of detection and traveltime data from the sensor network, (ii) A prior distribution that describes a priori belief about seismic events, (iii) A Bayesian solver that uses a prior and likelihood to identify the posterior distribution of seismic events given the data, (iv) An algorithm to compute EIG about seismic events over a data set of hypothetical prior events, (v) An optimizer that finds a sensor network which maximizes EIG. Once we have developed this framework, we explore many relevant questions to monitoring such as: how to trade off sensor fidelity and earth model uncertainty; how sensor types, number and locations influence uncertainty; and how prior models and constraints influence sensor placement.
This paper considers a collection of networked nonlinear dynamical systems, and addresses the synthesis of feedback controllers that seek optimal operating points corresponding to the solution of pertinent network-wide optimization problems. Particular emphasis is placed on the solution of semidefinite programs (SDPs). The design of the feedback controller is grounded on a dual e-subgradient approach, with the dual iterates utilized to dynamically update the dynamical-system reference signals. Global convergence is guaranteed for diminishing stepsize rules, even when the reference inputs are updated at a faster rate than the dynamical-system settling time. The application of the proposed framework to the control of power-electronic inverters in AC distribution systems is discussed. The objective is to bridge the time-scale separation between real-time inverter control and network-wide optimization. Optimization objectives assume the form of SDP relaxations of prototypical AC optimal power flow problems.
Energy harvesting with triboelectric nanogenerators is a burgeoning field, with a growing portfolio of creative application schemes attracting much interest. Although power generation capabilities and its optimization are one of the most important subjects, a satisfactory elemental model that illustrates the basic principles and sets the optimization guideline remains elusive. We use a simple model to clarify how the energy generation mechanism is electrostatic induction but with a time-varying character that makes the optimal matching for power generation more restrictive. By combining multiple parameters into dimensionless variables, we pinpoint the optimum condition with only two independent parameters, leading to predictions of the maximum limit of power density, which allows us to derive the triboelectric material and device figure of merit. We reveal the importance of optimizing device capacitance, not only load resistance, and minimizing the impact of parasitic capacitance. Optimized capacitances can lead to an overall increase in power density of more than 10 times.
The Bayesian optimal experimental design (OED) problem seeks to identify data, sensor configurations, or experiments which can optimally reduce uncertainty. The goal of OED is to find an experiment that maximizes the expected information gain (EIG) about quantities of interest given prior knowledge about expected data. Therefore, within the context of seismic monitoring, we can use Bayesian OED to configure sensor networks by choosing sensor locations, types, and fidelity in order to improve our ability to identify and locate seismic sources. In this work, we develop the framework necessary to use Bayesian OED to optimize the ability to locate seismic events from arrival time data of detected seismic phases. In order to do utilize Bayesian OED we must develop four elements:1. A likelihood function that describes the uncertainty of detection and travel times; 2. A Bayesian solver that takes a prior and likelihood to identify the posterior; 3. An algorithm to compute EIG; and, 4. An optimizer that finds a sensor network which maximizes EIG. Once we have developed this framework, we can explore many relevant questions to monitoring such as: how and what multiphenomenology data can be used to optimally reduce uncertainty, how to trade off sensor fidelity and earth model uncertainty, and how sensor types, number, and locations influence uncertainty
Systems and methods for optimizing a lattice structure design are disclosed herein. In some embodiments, a method for optimizing a lattice structure design can include (i) modeling the lattice structure with a component-wise reduced-order model (CWROM) and (ii) optimizing the CWROM based on a selected criterion using a topology optimization algorithm for lattice design. The selected criterion can include a boundary condition and a load applied to the lattice structure. By modeling the lattice structure as a CWROM, the optimization process can be very fast while still permitting the accurate computation of physical quantities of the lattice structure.
In “Recent Developments in Security-Constrained AC Optimal Power Flow: Overview of Challenge 1 in the ARPA-E Grid Optimization Competition,” we review the state of the art in practical algorithms for scheduling power-systems operations in the short term and the results of the recent competition organized by the U.S. Advanced Research Projects Agency–Energy. We explain the mixed-integer nonlinear formulation used in the competition for nonspecialists in electrical engineering, the context and organization of the competition, and the performance of competitors. We find that the collective approaches and results of competitors provide support for efforts to move nonlinear optimization techniques into industrial applications, as they have proven to be a robust and efficient alternative to current linear approximation techniques.
Explore the source record for details and available documents.