Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “optimal scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Spacecraft-Initiated Scheduling of Commercial Communications Services

We propose a software framework enabling a spacecraft in Earth orbit to schedule its own access to space communications services via ground stations and relay satellites. All operations are automated, without a human in the loop, allowing for highly responsive service to meet time-varying needs. We describe a modular software architecture allowing the framework to interface with the scheduling systems of several providers - both government and commercial. Specifically, we present the results of an experiment with Amazon Web Services (AWS) Ground Station, an operational commercial service provider. Proposed software executed scheduling of a ground station antenna with minimal lead time (less than 20 minutes before the start of a pass). During the contact AWS cloud infrastructure was used to demodulate, process, and distribute data products from an orbiting satellite. We believe this work demonstrates the framework's ability to interface with additional providers and potential to integrate more complex decision-making in the future to schedule optimal contacts.

Scheduling↗

Aerial Vehicle Routing and Scheduling for UAS Traffic Management: A Hybrid Monte Carlo Tree Search Approach

We present the Multi-Route Weighted Package Delivery Problem (MRWPDP) and a scalable solution methodology as a major step towards enabling an airspace deconfliction service for drone delivery operations. The problem is motivated by Strategic deconfliction under the FAA’s “Unmanned Aircraft Systems Traffic Management” Concept of Operations. MRWPDP falls under a class of vehicle routing and scheduling problems, and as such is NP-Hard. In MRWPDP, a graph network is given which consists of depots, drop-off sites, and multiple routes connecting the two. In addition, routes are weighted by the associated ground risk and total travel distance for package delivery. The goal is to optimally schedule the departure time and assign routes to a known set of vehicles at the depot. We propose a heuristic solution to the problem by borrowing techniques from Mixed Integer Linear Programming (MILP), Constraint Programming, and Monte Carlo Tree Search (MCTS). The resulting hybrid framework is MCTS with Bound-and-Prune (BP) and rapid simulated updates (U), or MCTS-BP-U. This approach is able to quickly provide a feasible solution for MRWPDP, even for large problem instances up to 1000 vehicles. We provide a MILP formulation of MRWPDP and compare its performance against MCTS-BP-U in terms of solution quality. An agent-based model simulation is conducted as a final step to validate the efficacy of our approach.

air traffic scheduling↗

Aerial Vehicle Routing and Scheduling for UAS Traffic Management: A Hybrid Monte Carlo Tree Search Approach

We present the Multi-Route Weighted Package Delivery Problem (MRWPDP) and a scalable solution methodology as a major step towards enabling an airspace deconfliction service for drone delivery operations. The problem is motivated by Strategic deconfliction under the FAA’s “Unmanned Aircraft Systems Traffic Management” Concept of Operations. MRWPDP falls under a class of vehicle routing and scheduling problems, and as such is NP-Hard. In MRWPDP, a graph network is given which consists of depots, drop-off sites, and multiple routes connecting the two. In addition, routes are weighted by the associated ground risk and total travel distance for package delivery. The goal is to optimally schedule the departure time and assign routes to a known set of vehicles at the depot. We propose a heuristic solution to the problem by borrowing techniques from Mixed Integer Linear Programming (MILP), Constraint Programming, and Monte Carlo Tree Search (MCTS). The resulting hybrid framework is MCTS with Bound-and-Prune (BP) and rapid simulated updates (U), or MCTS-BP-U. This approach is able to quickly provide a feasible solution for MRWPDP, even for large problem instances up to 1000 vehicles. We provide a MILP formulation of MRWPDP and compare its performance against MCTS-BP-U in terms of solution quality. An agent-based model simulation is conducted as a final step to validate the efficacy of our approach.

air traffic scheduling↗

Space communications scheduler: A rule-based approach to adaptive deadline scheduling

Job scheduling is a deceptively complex subfield of computer science. The highly combinatorial nature of the problem, which is NP-complete in nearly all cases, requires a scheduling program to intelligently transverse an immense search tree to create the best possible schedule in a minimal amount of time. In addition, the program must continually make adjustments to the initial schedule when faced with last-minute user requests, cancellations, unexpected device failures, quests, cancellations, unexpected device failures, etc. A good scheduler must be quick, flexible, and efficient, even at the expense of generating slightly less-than-optimal schedules. The Space Communication Scheduler (SCS) is an intelligent rule-based scheduling system. SCS is an adaptive deadline scheduler which allocates modular communications resources to meet an ordered set of user-specified job requests on board the NASA Space Station. SCS uses pattern matching techniques to detect potential conflicts through algorithmic and heuristic means. As a result, the system generates and maintains high density schedules without relying heavily on backtracking or blind search techniques. SCS is suitable for many common real-world applications.

Straguzzi, Nicholas↗

Probabilistic Hydropower Flexibility Valuation: Case Studies for Boating Flow Regime

The optimal scheduling of hydropower generation holds significant importance to power system operation. The unique requirements of environmental constraints and the power system, depending on their respective objectives, demand distinct flow patterns. While power system stakeholders strive to optimize revenue in electricity markets, stakeholders from boating recreation seeks to identify flow ranges that optimize the boating experience. In pursuit of a win-win solution, this study aims to reconcile the interests of various stakeholders in hydropower scheduling. The maximum revenue from day-ahead electricity market is explored through an optimization process considering both plant operation constraints, boating flow constraints, water availability, and market prices. Results of real world case studies at a river in California show that the proposed approach can achieve dual objectives: maximizing market revenue while addressing boating recreation necessities. In addition, as the accuracy of electricity price forecasting and flow forecasting increase, the optimal revenue becomes increasingly advantageous to hydropower plant operators.

13 HYDRO ENERGY↗

WE-D-BRE-04: Modeling Optimal Concurrent Chemotherapy Schedules

Purpose: Concurrent chemo-radiation therapy (CCRT) has become a more common cancer treatment option with a better tumor control rate for several tumor sites, including head and neck and lung cancer. In this work, possible optimal chemotherapy schedules were investigated by implementing chemotherapy cell-kill into a tumor response model of RT. Methods: The chemotherapy effect has been added into a published model (Jeong et al., PMB (2013) 58:4897), in which the tumor response to RT can be simulated with the effects of hypoxia and proliferation. Based on the two-compartment pharmacokinetic model, the temporal concentration of chemotherapy agent was estimated. Log cell-kill was assumed and the cell-kill constant was estimated from the observed increase in local control due to concurrent chemotherapy. For a simplified two cycle CCRT regime, several different starting times and intervals were simulated with conventional RT regime (2Gy/fx, 5fx/wk). The effectiveness of CCRT was evaluated in terms of reduction in radiation dose required for 50% of control to find the optimal chemotherapy schedule. Results: Assuming the typical slope of dose response curve (γ50=2), the observed 10% increase in local control rate was evaluated to be equivalent to an extra RT dose of about 4 Gy, from which the cell-kill rate of chemotherapy was derived to be about 0.35. Best response was obtained when chemotherapy was started at about 3 weeks after RT began. As the interval between two cycles decreases, the efficacy of chemotherapy increases with broader range of optimal starting times. Conclusion: The effect of chemotherapy has been implemented into the resource-conservation tumor response model to investigate CCRT. The results suggest that the concurrent chemotherapy might be more effective when delayed for about 3 weeks, due to lower tumor burden and a larger fraction of proliferating cells after reoxygenation.

60 APPLIED LIFE SCIENCES↗

Rising Above the Cloud - Toward High-Rate Delay-Tolerant Networking in Low-Earth Orbit

The High Data Rate Architecture (HiDRA) project is implementing a High-rate Delay Tolerant Networking (HDTN) capability that can support Low Earth Orbit (LEO) applications and environments. The present state of the effort, future work, and other elements of the work to date are described in this paper. This implementation is intended to support applications that run at 1+ Gbps, per the requirements of modern optical and high-frequency RF links. Uniquely, this implementation is also tuned to support relay and data trunking applications, which might require support for large numbers of small bundles per second. The design for this platform is based entirely on commercial-off-the-shelf (COTS) components, and possesses buffering capabilities in the 5 TB range. This document takes results from previous individual tests and integrates them to demonstrate results in the presence of a coherent use-case: consider a network aboard the ISS which intends to utilize an upcoming optical communications capability. For this use-case, orbital analysis software is used to analyze orbital dynamics, from which a list of access times are generated that might take in to account weather, schedule competition, etc. A variant of Contact Graph Routing (CGR) is applied to these windows to determine an optimal schedule. This schedule is then loaded into the HDTN prototype and, in conjunction with various measurement tools, a complete end-to-end analysis of HDTN's performance is conducted. Various bottlenecks (including storage) are identified: these bottlenecks are expected to help us focus our future work on the elements of the system that are most likely to present issues moving forward. Finally, we discuss possible paths for evolution beyond the present rates supported by the system, including (but not limited to) hardware acceleration.

Hylton, Alan↗

Romie: A Domain-Independent Tool for Computer-Aided Robust Operations Management

Romie is a decision support tool based on AI's latest advances in the domain of robust scheduling. Unlike all its predecessors, the tool allows to (i) visually model the operational problem and context entirely (ii) optimize to find near-optimal schedules while taking uncertainty into account and deals with (iii) a combination of various {key performance indicators (KPIs). It comes with a web user interface. Part or all of the modelled activities may be associated to random variables describing their stochastic durations, in order to produce schedules that are robust w.r.t. temporal uncertainty. Hence, depending on the pursued KPIs, the schedules maximize a combination of the following terms: the probability of satisfying the problem constraints, the expected return/efficiency, the expected outcome quality, and even the operators' wellness by minimizing its expected extra-hours. Initially developed for spatial exploration and demonstration in the context of Mars analog missions, this versatile tool is here applied to operations management in both biotechnology manufacturing and robots parametrization in a cave exploration context.

Chien, Steve A.↗

Evaluating scheduling algorithms for traffic with heterogeneous performance objectives

Two types of network traffic are considered: traffic with deadlines, for which the most important performance objective is based on loss rate, and packets without deadlines, for which the most important performance objective is based on mean delay. An optimal scheduling algorithm is presented to minimize weighted loss rate and weighted mean delay in the queues that form at the switches and at the network access points of a packet-switched network, where weights reflect the relative importance of packets. Although not practical for implementation, the algorithm is intended as a standard for the comparison of the performance of other scheduling algorithms. The algorithm is more general and lower computational complexity than previously published algorithms, enabling performance evaluation of some important scenarios that could not previously have been considered. Using the optimal performance results of this algorithm, the performance of the first-come-first-served, static priority, and earliest deadline first scheduling algorithms is evaluated. The results suggest that network efficiency could be improved by using a more sophisticated heuristic scheduling algorithm rather than one of the aforementioned algorithms.

Peha, Jon M.↗

A Genetic Algorithm Tool (splicer) for Complex Scheduling Problems and the Space Station Freedom Resupply Problem

The Space Station Freedom will require the supply of items in a regular fashion. A schedule for the delivery of these items is not easy to design due to the large span of time involved and the possibility of cancellations and changes in shuttle flights. This paper presents the basic concepts of a genetic algorithm model, and also presents the results of an effort to apply genetic algorithms to the design of propellant resupply schedules. As part of this effort, a simple simulator and an encoding by which a genetic algorithm can find near optimal schedules have been developed. Additionally, this paper proposes ways in which robust schedules, i.e., schedules that can tolerate small changes, can be found using genetic algorithms.

Wang, Lui↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I -- National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Thanks to advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India's RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU's anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD $920 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment - from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India's 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India’s Electric Grid, Vol. 1. National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Using advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India’s RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (Berkeley Lab), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU’s anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD 980 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment—from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India’s 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal Operation of Grid-Tied Energy Storage Systems Considering Detailed Device-Level Battery Models

The current optimization-based algorithms to operate grid-tied battery energy storage systems (BESS) typically do not look much under the hood of the BESS, i.e., the device-level characteristics of the batteries. This is often due to modeling as well as optimization complexities. However, simplified models may significantly degrade the performance of BESS operation in practice. Therefore, in this article, we propose a new BESS scheduling optimization framework that accounts for features such as cell-to-cell variations in maximum capacity, charge level balance, and internal resistance. The proposed framework is in the form of tractable mixed integer linear programs. Our approach is to estimate and update the device-level battery model parameters continuously, without the need to interrupt BESS normal operation. We validate the performance compared to an offline approach, which is based on dedicated model testing and calibration. To assure accurate performance evaluation, this article also includes developing a power hardware-in-the-loop testbed that allows for flexible operation and detailed monitoring of BESS under different design scenarios.

25 ENERGY STORAGE↗

MES-based management of manufacturing processes

In optimal management of short-run and one-off production, the goal is simultaneous maximization of the load on the machine tools and the speed of order completion. This entails optimal scheduling of the manufacturing systems.

42 ENGINEERING↗

Aerial drone fleet deployment optimization with endogenous battery replacements for direct delivery of time-sensitive products

Aerial drones offer a distinct potential to reduce the delivery time and energy consumption for the delivery of time-sensitive and small products. However, there is still a need in the relevant industry to understand the performance of drone-based delivery under different business needs and drone operating conditions. We studied a drone deployment optimization problem for direct delivery of time-sensitive products with release dates to customers maintaining a specified time window. This paper presents a new mixed-integer programming model, new valid inequalities, a new greedy heuristic algorithm, and a Genetic algorithm to help business owners optimally schedule and route their drone fleet minimizing the required fleet size, the required number of additional batteries, and total energy consumption. A realistic feature of the optimization method is that instead of replacing the drone battery after each return to the depot, it keeps track of the remaining energy in the drone battery and decides on battery replacements accounting for the drone routing and the user-specified minimum required battery energy. Numerical results based on real data from drone flight tests and prepared food delivery industry provide insights into the effect of different practical drone operating parameters on the required fleet size, the required number of battery replacements, and energy consumption. Here, results demonstrate that the proposed heuristic algorithm substantially outperforms the accelerated CPLEX in runtime while sacrificing the solution quality by a small amount. Additionally, results show that using a mixed fleet of hexacopter and quadcopter drones reduces the total energy consumption by 48.52% compared to using a homogeneous fleet of only hexacopters.

Drone energy consumption↗

A System for Planning Ahead

A software system that uses artificial intelligence techniques to help with complex Space Shuttle scheduling at Kennedy Space Center is commercially available. Stottler Henke Associates, Inc.(SHAI), is marketing its automatic scheduling system, the Automated Manifest Planner (AMP), to industries that must plan and project changes many different times before the tasks are executed. The system creates optimal schedules while reducing manpower costs. Using information entered into the system by expert planners, the system automatically makes scheduling decisions based upon resource limitations and other constraints. It provides a constraint authoring system for adding other constraints to the scheduling process as needed. AMP is adaptable to assist with a variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction. AMP can benefit vehicle assembly plants, batch processing plants, semiconductor manufacturing, printing and textiles, surface and underground mining operations, and maintenance shops. For most of SHAI's commercial sales, the company obtains a service contract to customize AMP to a specific domain and then issues the customer a user license.

Source record↗

Agent-Based Coordination Scheme for PV Integration (ABC4PV)

Renewables and especially photovoltaics (PV) have benefitted significantly from a host of incentives and policies targeted toward enhanced integration and adoption of specific energy technologies. However, with the push to move forward into a subsidy-free market framework, behind-the-meter residential PV applications have generally struggled to retain their value (unlike utility scale and commercial projects) [1]. This project focused on developing control-theoretic solutions aimed at improving the integration and interaction of behind-the-meter residential PV with other distribution system assets (controllable and non-controllable) to enhance the integrated value of residential PV. To this end, a suite of decentralized control methodologies have been developed to enable effective coordination and control of behind-the-meter residential load customers’ PV, battery storage systems (BSS), controllable loads and other similar assets within a distribution feeder. This interaction aims at procuring energy savings and, thus, energy bill savings. The main source of savings is drawn from reducing the effect of demand charge pricing and is realized at the feeder level, assuming community level interaction and management among the aforementioned assets. Optimal control of the assets is implemented with a distributed optimization methodology, leveraging consensus-based algorithms. The results gathered from the optimal control simulations demonstrates that the savings can be duly achieved and the algorithm decision times (to dynamically control asset set points, for example) are fast. As for the overall efficiency of PV+BSS systems, to procure energy savings from curtailment of the demand charge pricing effects, the optimal control is set up so as to minimize the variance of the load for all customers, throughout a feeder and throughout time in a rolling horizon scheduling with model predictive control. The control takes into account inter-temporal electrochemical storage (battery) degradation costs: specifically, we have developed a long-term lifetime model for the BSS that weighs in the effect of the degradation factor in the dispatch formulations, thus, a considerable operating cost that affects energy decision making. The levelized cost of energy (LCOE – redefined for the purpose of quantifying asset integration effectiveness through the customers’ energy cost) is shown to be below the threshold set for the combined PV+BSS topology of $ 0.14/kWh for multiple cases of PV penetration all the way up to 50%, provided that a policy of shared ownership of and savings is in place. Further, the LCOE calculated for the case before the deployment PV+BSS systems is also achievable, i.e. the deployment of PV+BSS, if planned and scheduled optimally. will have no effect on customers’ energy costs. From the control methodology viewpoint, the developed consensus-based algorithms are shown to converge for a wide range of problem cases (spanning normal operating scenarios and contingencies), guaranteeing dispatch solutions under forecasting errors, communication break-downs and cyber-security attacks. The proposed control solutions are scalable and real-time implementable, with dispatch computations and device set-point updates converging in less than 2s in most practical instances of the above events.

14 SOLAR ENERGY↗

Latency Minimizing Tasking for Information Processing Systems

Real-time cyber-physical systems and information processing clusters require system designers to consider the total latency involved in collecting and aggregating data. For example, applications such as wild-fire monitoring require data to be presented to users in a timely manner. However, most models and algorithms for sensor networks have focused on alternative metrics such as energy efficiency. In this paper, we present a new model of sensor network aggregation that focuses on total latency. Our model is flexible and enables users to configure varying transmission and computation time on a node-by-node basis, and thus enables the simulation of complex computational phenomena. In addition, we present results from three tasking algorithms that trade-off local communication for overall latency performance. These algorithms are evaluated in simulated networks of up to 200 nodes. We've presented an aggregation-focused model of sensor networks that can be used to study the trade-offs between computational coverage and total latency. Our model explicitly takes into account transmission and computation times, and enables users to define different values for the basestation. In addition, we've presented three different tasking algorithms that operate over model to produce aggregation schedules of varying quality. In the future, we expect to continue exploring distributed tasking algorithms for information processing systems. We've shown that the gap between highly optimized schedules that use global information is quite large relative to our distributed algorithms. This gives us encouragement that future distributed tasking algorithms can still make large gains.

99 GENERAL AND MISCELLANEOUS↗