Anchoring Strategies for Marine Renewable Energy at the Sandia Water Impact Facility
This report documents the formulation and preliminary analysis of potential anchoring strategies for use in future WEC testing at the Sandia Water Impact Facility given the existing 5-ton and 10-ton concrete blocks at the facility. Three anchoring strategies are created that are applicable to different mooring configurations for existing WECs of interest for testing. The three anchoring strategies have a maximum allowable load of between 24.57 kN and 281.17 kN, depending on whether the 5-ton or 10-ton blocks are used, with Strategy 3 with 10-ton blocks having the highest allowable load. The AquaHarmonics and CalWave xWave WECs can be tested up to a 1:1.5 and 1:1.15 scale, respectively, while maintaining a mooring configuration very close to the one used in ocean deployment. The requirements for the mooring lines, shackles, and triplates needed to support the three strategies are also calculated, with commercially available products specified. Finally, the padeyes connected to the existing concrete blocks are assessed and determined to be satisfactory for the loading expected with these anchoring strategies.