Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “mobility as a service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Estimating Fast Charging Infrastructure Requirements to Fully Electrify Ride-Hailing Fleets Across the United States

Ride-hailing electrification is made challenging by a variety of factors, including limited driver access to overnight charging and a nascent network of public direct-current fast charging (DCFC). This article projects the DCFC infrastructure needed to electrify ride-hailing across 384 cities in the United States. Research leveraging a novel infrastructure projection tool, Electric Vehicle Infrastructure Tool for On-Demand Mobility Services model (EVI-OnDemand), estimates that 25,400 DCFC ports capable of charging vehicles at a mean power of 150 kW are required to electrify 1.45 million ride-hailing vehicles in the baseline scenario. Results show that ride-hailing vehicles require 17.5 DCFC ports per 1000 vehicles, three times that of personal electric vehicles (EVs). Infrastructure demand is also shown to vary across cities; 63% more DCFC ports are needed to support 1000 battery EVs in Chicago versus Miami. The analysis also includes sensitivity studies that explore variation in charging demand across input assumptions, finding that charging power, vehicle class, overnight charging access rates, and port utilization influence the network size needed. Projections vary from 18,600 to 41,300 DCFC ports across sensitivity scenarios, indicating that ride-hailing electrification will require significant expansion of access to fast charging even in the most optimistic scenarios, and investments into supporting assets can reduce the scale of the public charging expansion needed.

33 ADVANCED PROPULSION SYSTEMS↗

A Model for Optimally Allocating Curbside Space Among Competing Uses

The emergence of various new forms of urban mobility services in recent years is leading to new pressures on curbside space. Municipalities, the entities typically responsible for managing the curbside, are in many instances handling these growing pressures by reallocating portions of the curbside away from traditional uses (such as metered and residential parking) in favor of uses such as ridehailing, scooter and bike-share corrals. As yet, however, such actions are being undertaken on an ad-hoc basis, due to the rapidly growing complexity of the curbside and the lack of standard analytical approaches. This lack of analytical capability is due to the traditional focus of transportation network modeling being focused predominantly on the interaction of supply and demand on links and nodes, with limited focus on link edges (the curbside). In this paper we address this research need by proposing a framework for modeling inter-modal competition for curbside space, inspired by the classical Bid-Rent Model of urban land use, intended to support curb managers to move towards maximizing the aspects of economic welfare that relate to curb access. In the bi-level model, choices made by the curbside manager impact travelers’ mode choices, and vice versa. We then present a simple numerical case study to demonstrate the properties of the proposed model, showing its tractability, flexibility, and intuitive sensitivity to systematic variation in inputs. The framework demonstrates the type of adaptive and evolving approach needed to maximize benefits from increasingly dynamic curb management strategies. The paper concludes with a brief discussion of future research needs to advance this line of inquiry.

33 ADVANCED PROPULSION SYSTEMS↗

Hydrogen Infrastructure Modeling and Optimization

HyET, established in 2008, is a small business developing electro-chemical hydrogen compressors. HyET’s goals are for a low-cost, efficient, high-pressure compressor ready for market and installation into hydrogen infrastructure stations servicing mobile fuel cell applications. NLR has been working on hydrogen infrastructure research for over a decade and includes electrolyzer production via electrolysis, storage, compression, dispensing, safety, and performance validation. Accelerating technologies into the marketplace is one goal of NLR’s hydrogen research. Therefore, HyET and NLR have teamed up to provide one year of support for HyET’s modeling and small-scale experiments optimization efforts for HyET’s next-generation electro-chemical compressor.

08 HYDROGEN↗

How Improved Forecasting Can Increase the Bulk Power System Value of Price-Responsive Electric Vehicle Managed Charging

Personal light-duty vehicle (LDV) electric vehicle managed charging (EVMC) can reduce power system costs by better aligning electric vehicle (EV) charging with locations and times of low energy cost or infrastructure use. The need to coordinate charging demand across thousands to millions of vehicles while preserving mobility service is a barrier to realizing the value of EVMC. Price-responsive dispatch mechanisms like time-of-use rates (TOU) and hourly real-time prices (RTP) are attractive compared to direct load control (DLC) because they only require one-way communications and local controls. However, increasing participation in price responsive mechanisms can induce costly-to-serve spikes in load and otherwise increase, rather than decrease, production costs. We quantify the ability of improved EVMC forecasting to sustain savings from price responsive mechanisms beyond the limit of 14% of LDVs actively participating observed in previous work. Perfect forecasting of price-responsive EV load makes TOU and RTP value-competitive with a low-error DLC formulation with up to 27% (within-week flexibility) to 45% or more (within-session flexibility) of LDVs participating in EVMC in an envisioned New England power system with 84% clean energy. Additional costs of implementing DLC should be no more than tens of dollars per vehicle-year if DLC is to be value-competitive with accurately forecast price-responsive EVMC for double-digit percentage shares of LDVs participating.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ChargeX OCPI Recommendations

The Open Charge Point Interface (OCPI) is an open protocol that enables electric vehicle (EV) charging systems to work together across networks. It supports communication and data sharing between Charge Point Operators (CPOs), who manage charging stations, and e-Mobility Service Providers (eMSPs), who provide charging services to EV drivers. OCPI facilitates functions like user authorization, remote charge point control, charging session data exchange, and billing through Charge Detail Records (CDRs). This allows EV roaming, so drivers can charge at different networks without multiple accounts. As the EV market grows due to increased adoption and technological advancements, OCPI faces higher demands. This has revealed issues with CDR format consistency, timestamp standardization across regions, transmission of EV-side error codes for troubleshooting, and support for new use cases. These challenges can affect operations and user experience, particularly as the industry starts considering Vehicle-to-Grid (V2G) systems, where EVs supply energy to the grid, and Vehicle-to-Everything (V2X) technologies for broader energy interactions. Using feedback from the ChargeX Diagnostics taskforce discussions, industry 1-on-1 meetings, technical standards, and OCPI’s evolution through versions (e.g., OCPI 2.1.1, 2.2, and 2.2.1), this report identifies these issues and suggests practical recommendations. These aim to improve interoperability, streamline operations, and prepare OCPI for future trends in the EV charging ecosystem.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Optimal Operations Management of Mobility-on-Demand Systems

The emergence of the sharing economy in urban transportation networks has enabled new fast, convenient and accessible mobility services referred to as Mobilty-on-Demand systems (e.g., Uber, Lyft, DiDi). These platforms have flourished in the last decade around the globe and face many operational challenges in order to be competitive and provide good quality of service. A crucial step in the effective operation of these systems is to reduce customers' waiting time while properly selecting the optimal fleet size and pricing policy. In this paper, we jointly tackle three operational decisions: (i) fleet size, (ii) pricing, and (iii) rebalancing, in order to maximize the platform's profit or its customers' welfare. To accomplish this, we first devise an optimization framework which gives rise to a static policy. Then, we elaborate and propose dynamic policies that are more responsive to perturbations such as unexpected increases in demand. We test this framework in a simulation environment using three case studies and leveraging traffic flow and taxi data from Eastern Massachusetts, New York City, and Chicago. Our results show that solving the problem jointly could increase profits between 1% and up to 50%, depending on the benchmark. Moreover, we observe that the proposed fleet size yield utilization of the vehicles in the fleet is around 75% compared to private vehicle utilization of 5%.

Wollenstein-Betech, Salomón↗

Welding at the Kennedy Space Center.

Brief description of the nature of the mechanical equipment at a space launch complex from a welding viewpoint. including an identification of the major welding applications used in the construction of this complex. The role played by welding in the ground support equipment is noted, including the welded structures and systems required in the vehicle assembly building, the mobile launchers, transporters, mobile service structure, launch pad and launch site, the propellants system, the pneumatics system, and the environmental control system. The welding processes used at the Kennedy Space Center are reviewed, and a particularly detailed account is given of the design and fabrication of the liquid hydrogen and liquid oxygen storage spheres and piping. Finally, the various methods of testing and inspecting the storage spheres are cited.

Clautice, W. E.↗

Analysis of airborne RF measurements from U.S.A. urban areas

The paper presents in-situ, airborne survey radio-frequency measurements, which were made over the 400-1000 MHz range in May 1977 during the ASSESS-II Space Shuttle/Spacelab simulation aircraft flights. Measurements were made from altitudes of 10,000 to 33,000 feet with a downward-directed 70 deg wide, half-power beamwidth receiving antenna pattern. Channel occupancy percentages are given within a 50 MHz spectrum width, and continuous spectrum-scan measurements are presented for selected locations on the USA West Coast, showing the channel occupancy environment within the 806-890 MHz mobile-service band.

Taylor, R. E.↗

Space Station communications system design and analysis

Attention is given to the methodologies currently being used as the framework within which the NASA Space Station's communications system is to be designed and analyzed. A key aspect of the CAD/analysis system being employed is its potential growth in size and capabilities, since Space Station design requirements will continue to be defined and modified. The Space Station is expected to furnish communications between itself and astronauts on EVA, Orbital Maneuvering Vehicles, Orbital Transfer Vehicles, Space Shuttle orbiters, free-flying spacecraft, coorbiting platforms, and the Space Shuttle's own Mobile Service Center.

Ratliff, J. E.↗

A dynamic case-based planning system for space station application

We are currently investigating the use of a case-based reasoning approach to develop a dynamic planning system. The dynamic planning system (DPS) is designed to perform resource management, i.e., to efficiently schedule tasks both with and without failed components. This approach deviates from related work on scheduling and on planning in AI in several aspects. In particular, an attempt is made to equip the planner with an ability to cope with a changing environment by dynamic replanning, to handle resource constraints and feedback, and to achieve some robustness and autonomy through plan learning by dynamic memory techniques. We briefly describe the proposed architecture of DPS and its four major components: the PLANNER, the plan EXECUTOR, the dynamic REPLANNER, and the plan EVALUATOR. The planner, which is implemented in Smalltalk, is being evaluated for use in connection with the Space Station Mobile Service System (MSS).

Oppacher, F.↗

Plasma interactions monitoring system

The plasma environment around the space station is expected to be different from that environment which occurs naturally at these altitudes because of the unprecedented size of the space station, its orbital motion, and its high power distribution system. Although there are models which predict the environment around the station, they do not take into account changes in configuration, changes in the natural and induced environments, nor interactions between the different environments. There will be unique perturbations associated with the space station, which will vary as the space station is being developed. Even after the developed space station has been completed environmental conditions will change as the payloads are changed and as the station systems and materials undergo degradation and modification. Because the space station will be a point of many varied activities the environment will continually undergo perturbations from effluents resulting from operations of the reboost module, EVA, airlock operations, and vacuum venting. The use of the Mobile Service Center will cause disturbances which cannot, at this time, be predicted. Also, the natural environment will be affected by solar flares. In addition, the operations of attached payloads, (e.g., ASTROMAG) themselves will undoubtedly cause perturbations to the ambient environment. Finally, the natural environment will change as a result of natural perturbations such as solar flares and geomagnetic storms.

Roberts, William T.↗

Ada and knowledge-based systems: A prototype combining the best of both worlds

A software architecture is described which facilitates the construction of distributed expert systems using Ada and selected knowledge based systems. This architecture was utilized in the development of a Knowledge-based Maintenance Expert System (KNOMES) prototype for the Space Station Mobile Service Center (MSC). The KNOMES prototype monitors a simulated data stream from MSC sensors and built-in test equipment. It detects anomalies in the data and performs diagnosis to determine the cause. The software architecture which supports the KNOMES prototype allows for the monitoring and diagnosis tasks to be performed concurrently. The basic concept of this software architecture is named ACTOR (Ada Cognitive Task ORganization Scheme). An individual ACTOR is a modular software unit which contains both standard data processing and artificial intelligence components. A generic ACTOR module contains Ada packages for communicating with other ACTORs and accessing various data sources. The knowledge based component of an ACTOR determines the role it will play in a system. In this prototype, an ACTOR will monitor the MSC data stream.

Brauer, David C.↗

Photovoltaic module on-orbit assembly for Space Station Freedom

One of the elements of the Space Station Freedom power system is the Photovoltaic (PV) module. These modules will be assembled on-orbit during the assembly phase of the program. These modules will be assembled either from the shuttle orbiter or from the Mobile Servicing Center (MSC). The different types of assembly operations that will be used to assemble PV Modules are described.

Sours, Thomas↗

Real-time graphics for the Space Station Freedom cupola, developed in the Systems Engineering Simulator

Among the Lyndon B. Johnson Space Center's responsibilities for Space Station Freedom is the cupola. Attached to the resource node, the cupola is a windowed structure that will serve as the space station's secondary control center. From the cupola, operations involving the mobile service center and orbital maneuvering vehicle will be conducted. The Systems Engineering Simulator (SES), located in building 16, activated a real-time man-in-the-loop cupola simulator in November 1987. The SES cupola is an engineering tool with the flexibility to evolve in both hardware and software as the final cupola design matures. Two workstations are simulated with closed-circuit television monitors, rotational and translational hand controllers, programmable display pushbuttons, and graphics display with trackball and keyboard. The displays and controls of the SES cupola are driven by a Silicon Graphics Integrated Raster Imaging System (IRIS) 4D/70 GT computer. Through the use of an interactive display builder program, SES, cupola display pages consisting of two dimensional and three dimensional graphics are constructed. These display pages interact with the SES via the IRIS real-time graphics interface. The focus is on the real-time graphics interface applications software developed on the IRIS.

Red, Michael T.↗

The power and efficiency of advanced software and parallel processing

Real-time simulation of flexible and articulating systems is difficult because of the computational burden of the time varying calculations. The mobile servicing system of the NASA Space Station Freedom will handle heavy payloads by local arm manipulations and by translating along the spline of the Station, it is crucial to have real-time simulation available. To enable such a simulation to be of high fidelity and to be able to be hosted on a modest computer, special care must be made in formulating the structural dynamics. Frontal solution algorithms save considerable time in performing these calculations. In addition, it is necessary to take advantage of parallel processing be compatible to take full advantage of both. An approach is offered which will result in high fidelity, real-time simulation for flexible, articulating systems such as the space Station remote servicing system.

Singh, Ramen P.↗

Photovoltaic module on-orbit assembly for Space Station Freedom

One of the elements of the Space Station Freedom power system is the photovoltaic (PV) module. These modules will be assembled on-orbit during the assembly phase of the program. These modules will be assembled either from the Shuttle Orbiter or from the Mobile Servicing Center (MSC). The different types of assembly operations that will be used to assemble PV modules are described.

Sours, T.↗

Freedom is an international partnership

The NASA Space Station Freedom (SSF) project initiated in 1984 is a collaborative one among the U.S., Japan, Canada, and the 10 nations participating in ESA. The SSF partners have over the last six years defined user requirements, decided on the hardware to be manufactured, and constructed a framework for long-term cooperation. SSF will be composed of user elements furnished by the foreign partners and a U.S.-supplied infrastructure encompassing the truss assembly, electrical power system, and crew living quarters. The U.S. will also furnish a lab and a polar-orbit platform; ESA, a second lab and the coorbiting Free-Flying Laboratory, as well as a second polar platform. Japan's Japanese Experiment Module shall include an Exposed Facility and an Experimental Logistics module. Canada will contribute the Mobile Servicing System robotic assembler/maintainer for the whole of SFF.

Kohrs, Richard H.↗

Operations with the special purpose dextrous manipulator on Space Station Freedom

SPAR Canada is actively participating in the Space Station Freedom Program by contributing the Mobile Servicing System (MSS) which will be involved in assembly, maintenance and servicing of both the Space Station and the MSS itself. Part of the MSS is the Special Purpose Dextrous Manipulator (SPDM), a two armed dextrous robot with advanced vision and manipulative capabilities. In addition to Space Station and payload servicing activities the SPDM will be designed to perform self maintenance on the MSS itself. The majority of Space Station equipment will be on orbit for the anticipated 30 year lifespan and the maintenance philosophy will be to repair by the exchange of Orbit Replacement Units or ORUs. The present concept, configuration, and operation of the SPDM and the detailed simulations associated with the maintenance of part of the MSS are described. The Design Reference Mission is the replacement of a Joint Drive Module on the Canadian large payload manipulator, the Space Station Remote Manipulator System. Other Design Reference Missions that were investigated are briefly described, and future operations activity to support the definition of SPDM requirements are discussed.

Cox, B.↗