Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “managed charging”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Creating Portfolio Management Concepts for Highly Agile and Innovative Government Research Programs Using Design Thinking and Lean Startup Methodologies

Managing a research and development (R&D) portfolio presents numerous challenges, such as prioritizing research areas, remaining agile, strategic workforce planning, and measuring return on investment, impact, and innovation. One government R&D program is charged with producing a high degree of innovative, transformational breakthroughs in aviation technology. A practical, structured methodology for strategically prioritizing emerging aviation R&D in such an environment is lacking. The existing multi-criteria decision aid tools are primarily utilized at an enterprise level, take months to set up and collect data, require large teams of experts, are used on an infrequent basis, and are not conducive to a highly innovative, high-risk portfolio. Prior to audaciously creating a new portfolio prioritization process, the exact challenges with portfolio management for R&D projects were identified using the design thinking and lean start-up methods. A key part of this discovery process was interviewing stakeholders, as well as other managers of organizations charged with producing innovative portfolios. These interviews, as well as additional techniques, were used to develop a deeper understanding of the challenges and, subsequently, lay the foundation for development of an effective portfolio prioritization process. Four potential concepts that represent key findings emerged: carefully selected criteria for portfolio assessment and selection, targeted portfolio turnover rate, dynamic portfolio prioritization framework, and streamlined transition or commercialization of R&D. Acting on any one of the resulting portfolio management concepts will increase the transparency and confidence in portfolio decisions and, ideally, result in a greater degree of transformational breakthroughs in aviation technology.

project portfolio management↗

Pharmacy in a New Frontier - The First Five Years at the Johnson Space Center Pharmacy

A poster entitled "Space Medicine - A New Role for Clinical Pharmacists" was presented in December 2001 highlighting an up-and-coming role for pharmacists at the Johnson Space Center (JSC) in Houston, Texas. Since that time, the operational need for the pharmacy profession has expanded with the administration s decision to open a pharmacy on site at JSC to complement the care provided by the Flight Medicine and Occupational Medicine Clinics. The JSC Pharmacy is a hybrid of traditional retail and hospital pharmacy and is compliant with the ambulatory care standards set forth by the Joint Commission. The primary charge for the pharmacy is to provide medication management for JSC. In addition to providing ambulatory care for both clinics, the pharmacists also practice space medicine. A pharmacist had been involved in the packing of both the Space Shuttle and International Space Station Medical Kits before the JSC Pharmacy was established; however, the role of the pharmacist in packing medical kits has grown. The pharmacists are now full members of the operations team providing consultation for new drug delivery systems, regulations, and patient safety issues. As the space crews become more international, so does the drug information provided by the pharmacists. This presentation will review the journey of the JSC Pharmacy as it celebrated its five year anniversary in April of 2008. The implementation of the pharmacy, challenges to the incorporation of the pharmacy into an existing health-care system, and the current responsibilities of a pharmacist at the Johnson Space Center will be discussed.

Bayuse, Tina↗

NASA's Space Launch System: Affordability for Sustainability

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is charged with delivering a new capability for human exploration beyond Earth orbit in an austere economic climate. But the SLS value is clear and codified in United States (U.S.) budget law. The SLS Program knows that affordability is the key to sustainability and will provide an overview of initiatives designed to fit within the funding guidelines by using existing engine assets and hardware now in testing to meet a first launch by 2017 within the projected budget. It also has a long-range plan to keep the budget flat, yet evolve the 70-tonne (t) initial lift capability to 130-t lift capability after the first two flights. To achieve the evolved configuration, advanced technologies must offer appropriate return on investment to be selected through the competitive process. For context, the SLS will be larger than the Saturn V that took 12 men on 6 trips for a total of 11 days on the lunar surface some 40 years ago. Astronauts train for long-duration voyages on platforms such as the International Space Station, but have not had transportation to go beyond Earth orbit in modern times, until now. To arrive at the launch vehicle concept, the SLS Program conducted internal engineering and business studies that have been externally validated by industry and reviewed by independent assessment panels. In parallel with SLS concept studies, NASA is now refining its mission manifest, guided by U.S. space policy and the Global Exploration Roadmap, which reflects the mutual goals of a dozen member nations. This mission planning will converge with a flexible heavy-lift rocket that can carry international crews and the air, water, food, and equipment they need for extended trips to asteroids and Mars. In addition, the SLS capability will accommodate very large science instruments and other payloads, using a series of modular fairings and adapters to configure the rocket for the mission. The SLS affordability plan includes streamlining interfaces, applying risk-based insight into contracted work, centralizing systems engineering and integration, and nurturing a learning culture where the question Why? is often asked and the answer "Because we've always done it that way" is rarely heard. The SLS Program will deliver affordable space transportation solutions for the Orion Multi-Purpose Cargo Vehicle s first autonomous certification flight in 2017, followed by a crewed flight in 2021. As this briefing will show, the SLS will offer a global infrastructure asset for robotic and human scouts of all nations.

May, Todd A.↗

NASA Space Launch System Operations Strategy

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is charged with delivering a new capability for human and scientific exploration beyond Earth orbit. The SLS also will provide backup crew and cargo services to the International Space Station, where astronauts have been training for long-duration voyages to destinations such as asteroids and Mars. For context, the SLS will be larger than the Saturn V, providing 10 percent more thrust at liftoff in its initial 70 metric ton (t) configuration and 20 percent more in its evolved 130 t configuration. The SLS Program knows that affordability is the key to sustainability. This paper will provide an overview of its operations strategy, which includes initiatives to reduce both development and fixed costs by using existing hardware and infrastructure assets to meet a first launch by 2017 within the projected budget. It also has a long-range plan to keep the budget flat using competitively selected advanced technologies that offer appropriate return on investment. To arrive at the launch vehicle concept, the SLS Program conducted internal engineering and business studies that have been externally validated by industry and reviewed by independent assessment panels. A series of design reference missions has informed the SLS operations concept, including launching the Orion Multi-Purpose Crew Vehicle on an autonomous demonstration mission in a lunar flyby scenario in 2017, and the first flight of a crew on Orion for a lunar flyby in 2021. Additional concepts address the processing of very large payloads, using a series of modular fairings and adapters to flexibly configure the rocket for the mission. This paper will describe how the SLS, Orion, and 21st Century Ground Systems programs are working together to create streamlined, affordable operations for sustainable exploration.

Singer, Joan A.↗

Siting and sizing of public–private charging stations impacts on household and electric vehicle fleets

To facilitate the provision of electric vehicle charging stations (EVCS) in urban areas, this study investigates the benefits of co-locating fleet-owned chargers with public charging stations to enable construction incentives and cord-sharing cost savings. Shared EVCS can serve charging demand from both user types: private (household) EV owners and those managing fleet vehicles – like shared and fully automated EV (SAEV) fleets. Using POLARIS to simulate all person-travel across the 6-county Austin, Texas region, new EVCS were sited and sized with DC fast-charging (DCFC) plugs to lower operating and construction costs while providing public + private (PP) service across an 81-square-mile core geofence (where 200 SAEVs were active) over 24-hour days. When co-location is permitted, 115 DCFC cords were added to the 23 existing (publicly available) stations to enable SAEVs and household EVs (HHEVs) charging access, within the geofence. Each 250-mile-range SAEV was simulated to travel an average of 330 miles per day, serve over 92 person-trips, and recharge 2.7 times a day (for 2.4 h per session). The new DCFC plugs were primarily added to public EVCS at shopping centers and schools, and in residential settings along freeways. The average plug served 4.8 EVs per day. Most co-located PP EVCS permitted immediate (no-wait) charging, except for 2 stations along freeways that averaged 8 min of wait time to begin charging. In conclusion, the co-location strategy lowered fleet owners’ initial EVCS construction costs by 12 % (thanks to cord-sharing to avoid cord duplication), while reducing SAEV wait times to just 3.1 min (versus 10.7 min if SAEV managers had to build and operate their own EVCS).

EV charging modeling↗

Electrolyte-Induced Restructuring of Acid-Stable Oxygen Evolution Catalysts

Crystalline metal oxide catalysts operating under oxygen evolution reaction (OER) conditions invariably restructure, resulting in active sites with hydroxo/oxo species in an amorphous environment. An increase in the population of terminal hydroxo/oxo species (i.e., edge sites) facilitates proton-coupled electron-transfer (PCET) kinetics for oxygen generation and thus improves catalyst competency. While amorphous films benefit from a greater density of active sites, they suffer from diminished charge transport as compared to that of extended crystalline lattices. Managing this amorphous–crystalline dichotomy is essential when designing OER catalysts, which we highlight with the examination of electrodeposited PbO x materials, which historically are very poor OER catalysts. Along these lines, the presence of phosphate during PbO x electrodeposition truncates the growth of an extended lattice owing to its strong bonding to oxide surfaces to afford an amorphous catalyst film (A-PbO x ) with significant charge-transfer resistance (138 ± 42 Ω) and poor OER kinetics (420 ± 105 mV dec –1 Tafel slope). Conversely, electrodeposition of Pb 2+ in the presence of less coordinating electrolytes such as nitrate affords crystalline β-PbO2 with improved charge-transfer resistance (42.6 ± 1.1 Ω), though still poor OER kinetics (134 ± 36 mV dec –1 Tafel slope). By operating amorphous A-PbOx in less coordinating electrolytes, however, a new partially crystalline material can be generated (μc-PbO x ) with further reduced charge-transfer resistance (33.0 ± 1.4 Ω) and improved OER kinetics (70 ± 15 mV dec –1 Tafel slope). The enhanced OER activity of μc-PbO x is the result of coupling the high edge-site population of an amorphous PbOx phase with crystalline-like charge transport properties. Finally, the ability to use an electrolyte to induce OER activity in an inactive amorphous form of PbO x highlights the benefits of optimizing the amorphous–crystalline phase compositions in the design of active OER catalysts.

catalysts↗

The power reliability event simulator tool (PRESTO): A novel approach to distribution system reliability analysis and applications

The growing interest in onsite solar photovoltaic and energy storage systems is partially motivated by customer concerns regarding grid reliability. However, accurately assessing the effectiveness of PVESS in mitigating these interruptions requires a comprehensive understanding of location-specific outage patterns and the ability to simulate realistic scenarios. To address the gap, we introduce the Power Reliability Event Simulation TOol (PRESTO), the first publicly available tool that simulates location-specific power interruptions at the county level. PRESTO allows for a more realistic assessment of system reliability by considering the unpredictability and location-specific patterns of power interruptions. We applied PRESTO in a case study of a single-family home across three U.S. counties, examining the performance of a solar photovoltaic system with 10kWh of battery storage during short-duration power interruptions. Our findings show that this system reliably met 93% of energy demand for essential non-heating and cooling loads, fully serving these loads in 84% of events, despite the constraints of daily time-of-use bill management which limits the battery's state-of-charge reserve. However, when heating and cooling loads were included, system performance decreased significantly, with only 70% of demand met and full service in 43% of events. These results highlight the challenges of using solar photovoltaic and energy storage systems for short-duration outages, emphasizing the need to consider factors like battery size and grid charging strategies to improve reliability. Our study demonstrates the practical applications of PRESTO, providing valuable insights into potential mitigation strategies including grid charging and optimizing battery size.

14 SOLAR ENERGY↗

PowerConverterDynamics.jl

SAND2026-22944O PowerConverterDynamics.jl is a Julia software package for differentiable DC power-conversion dynamics. It models a variable DC source, power converter, common DC bus, and battery module with current, voltage, loss, and state-of-charge dynamics. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Michelen Strofer, Carlos [Sandia National Lab. (SN↗

NASA Space Launch System Operations Strategy

The National Aeronautics and Space Administration s (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center (MSFC), is charged with delivering a new capability for human and scientific exploration beyond Earth orbit (BEO). The SLS may also provide backup crew and cargo services to the International Space Station, where astronauts have been training for long-duration voyages to destinations such as asteroids and Mars. For context, the SLS will be larger than the Saturn V, providing 10 percent more thrust at liftoff in its initial 70 metric ton (t) configuration and 20 percent more in its evolved 130-t configuration. The SLS Program knows that affordability is the key to sustainability. This paper will provide an overview of its operations strategy, which includes initiatives to reduce both development and fixed costs by using existing hardware and infrastructure assets to meet a first launch by 2017 within the projected budget. It also has a long-range plan to keep the budget flat using competitively selected advanced technologies that offer appropriate return on investment. To arrive at the launch vehicle concept, the SLS Program conducted internal engineering and business studies that have been externally validated by industry and reviewed by independent assessment panels. A series of design reference missions has informed the SLS operations concept, including launching the Orion Multi-Purpose Crew Vehicle (MPCV) on an autonomous demonstration mission in a lunar flyby scenario in 2017, and the first flight of a crew on Orion for a lunar flyby in 2021. Additional concepts address the processing of very large payloads, using a series of modular fairings and adapters to flexibly configure the rocket for the mission. This paper will describe how the SLS, Orion, and Ground Systems Development and Operations (GSDO) programs are working together to create streamlined, affordable operations for sustainable exploration for decades to come.

Singer, Joan A.↗

Control and Optimization of Energy Storage System in Power Distribution System

The widespread adoption of electric vehicles (EVs) and transportation electrification is encumbered by two chief barriers: i) the limited driving range of EVs in the market today and ii) inadequate fast-charging infrastructure for long-distance trips. Extreme fast charging (XFC) technology can recharge EVs in less than 10 minutes for 200 miles range. Firstly, a novel robust optimization-based mixed integer linear programming model is proposed to size a battery energy storage system (BESS) and PV system in an XFCS. In this part, it is assumed that the sizing and location of the XFCS are known. Secondly, the aforesaid assumption is relaxed, and a strategic multi-period coordinated planning model is proposed to optimally site and size BESS-assisted charging stations in a highway transportation network and PV systems in a power distribution network by considering the coupling between both networks. Optimal operation and control of BESS-assisted EV charging stations are vital to alleviate the adverse impact of extreme fast charging of EVs on the host power network. A joint solution is proposed to mitigate the steady state and transient impact of extremefast charging of EVs and ensure grid-friendly integration of XFCSs with the host grid. Lastly, to make the operation of the XFCS cost-effective, a multi-layered energy management framework is proposed for the XFCS by considering forecast uncertainties, monthly demand charges reduction, and BESS degradation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Air Traffic Management-eXploration Testbed for Urban Air Mobility Research and Development

The presentation will describe the architecture, current capabilities and some future enhancements of the testbed that is being developed at the National Aeronautics and Space Administration (NASA) to enable benefit, impact, safety and cost assessments for accelerating the deployment of air traffic management concept and technologies in the national airspace system. The testbed will support analysis of operational feasibility of urban air mobility operations, a part of NASA's Air Traffic Management eXploration project, and provide the data needed by regulatory agencies charged with public safety. Introduction of concepts and technologies, especially new concepts and technologies, is difficult and often takes decades because of the inability to assess the operational impact of the interaction between the proposed concept and technology and operationally deployed systems in terms of system-wide safety, traffic flow efficiency, roles and workload of controllers and traffic managers, and impact on airlines and other operators. To overcome these limitations, the testbed is developing infrastructure to enable mathematical modeling, human-in-the-loop evaluations and testing with operational systems in a simulated environment. In addition to the difficulty of establishing communications between geographically distributed systems, downloading/installing software, and management of startup, error-handling and shutdown, a major impediment for conducting simulations and human-in-the-loop testing with operational systems is the tedious manual scenario generation process. Several of these difficulties have been addressed in the current state of the testbed. The testbed can be described in terms of the following elements (1) web-based frontend and backend, (2) Testbed Builder, (3) Data Distribution Service, (4) Component Library, (5) Simulation Management, and (6) Scenario Generation. The web-based frontend and backend enable the user to interact with the testbed for tasks such as composing a simulation, running a simulation and retrieving output data. The Testbed Builder application launched from the web frontend is a graphical user interface for the user to drag-and-drop and connect predefined blocks for composing a simulation/scenario generation task. The Builder writes a set of instructions for Simulation Management based on the links between the blocks and the block properties such as the component (executable) associated with a particular block. Management of the distributed simulation is accomplished by Execution and Component Managers. Execution Manager interprets the instructions provided by the Builder to instruct the Component Managers to download components from the Component Library to specified computers and to start them up. Once started, the components communicate with each other by publishing messages and subscribing to messages that are delivered by the Data Distribution Service. The Scenario Generation capability can be used for creating traffic scenarios for Multi-Aircraft Control System, which has been used extensively at NASA for human-in-the-loop-based concept evaluations. The presentation will provide a testbed enabled example scenario of Multi-Aircraft Control System based simulation in which the urban air mobility pilot using the conflict detection and resolution system would interact with the air traffic controllers for resolving conflicts with other aircraft during terminal area operations.

Testbed↗

Air Traffic Management-eXploration Testbed for Urban Air Mobility Research and Development

The presentation will describe the architecture, current capabilities and some future enhancements of the testbed that is being developed at the National Aeronautics and Space Administration (NASA) to enable benefit, impact, safety and cost assessments for accelerating the deployment of air traffic management concept and technologies in the national airspace system. The testbed will support analysis of operational feasibility of urban air mobility operations, a part of NASA's Air Traffic Management eXploration project, and provide the data needed by regulatory agencies charged with public safety. Introduction of concepts and technologies, especially new concepts and technologies, is difficult and often takes decades because of the inability to assess the operational impact of the interaction between the proposed concept and technology and operationally deployed systems in terms of system-wide safety, traffic flow efficiency, roles and workload of controllers and traffic managers, and impact on airlines and other operators. To overcome these limitations, the testbed is developing infrastructure to enable mathematical modeling, human-in-the-loop evaluations and testing with operational systems in a simulated environment. In addition to the difficulty of establishing communications between geographically distributed systems, downloading/installing software, and management of startup, error-handling and shutdown, a major impediment for conducting simulations and human-in-the-loop testing with operational systems is the tedious manual scenario generation process. Several of these difficulties have been addressed in the current state of the testbed. The testbed can be described in terms of the following elements- (1) web-based frontend and backend, (2) Testbed Builder, (3) Data Distribution Service, (4) Component Library, (5) Simulation Management, and (6) Scenario Generation. The web-based frontend and backend enable the user to interact with the testbed for tasks such as composing a simulation, running a simulation and retrieving output data. The Testbed Builder application launched from the web frontend is a graphical user interface for the user to drag-and-drop and connect predefined blocks for composing a simulation/scenario generation task. The Builder writes a set of instructions for Simulation Management based on the links between the blocks and the block properties such as the component (executable) associated with a particular block. Management of the distributed simulation is accomplished by Execution and Component Managers. Execution Manager interprets the instructions provided by the Builder to instruct the Component Managers to download components from the Component Library to specified computers and to start them up. Once started, the components communicate with each other by publishing messages and subscribing to messages that are delivered by the Data Distribution Service. The Scenario Generation capability can be used for creating traffic scenarios for Multi-Aircraft Control System, which has been used extensively at NASA for human-in-the-loop-based concept evaluations. The presentation will provide a testbed enabled example scenario of Multi-Aircraft Control System based simulation in which the urban air mobility pilot using the conflict detection and resolution system would interact with the air traffic controllers for resolving conflicts with other aircraft during terminal area operations.

Simulation↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Timeouts Best Practices

This study investigates common timeouts encountered in the electric vehicle (EV) charging communications process. Many different timeouts are defined within the EV charging communications protocols. These timeouts can either be a fixed value or a defined range of values. In both cases, the timeout defines the duration of time for which one or both parties in the communications session are expected to wait for some action or process to complete before terminating the charge attempt. These timeout-based terminations are intended to prevent the charging process from becoming stuck indefinitely in any particular step. These terminations also enable a retry of the terminated charging session to begin. However, misaligned timeout values can have a significant negative impact on the user experience. Premature termination of charging sessions due to inappropriate timeout settings can lead to charging failures, causing inconvenience, wasted time, and frustration for users. These disruptions can degrade the overall user experience, making it essential to carefully manage and align timeout values with the relevant actions and processes to ensure reliable and satisfactory EV charging sessions. The core objective of this study is to boost reliability and enhance user experience by conducting a thorough review of timeout-based issues in EV charging and delivering a set of recommendations to modify these existing timeouts. These recommendations are informed by feedback gathered from multiple EV charging partners. This document is intended to inform electric vehicle supply equipment (EVSE) and EV manufacturers, EV charging infrastructure developers, and policymakers responsible for designing and implementing EV charging protocols and systems.

33 ADVANCED PROPULSION SYSTEMS↗

A Framework for Probabilistic Evaluation of Interval Management Tolerance in the Terminal Radar Control Area

Projections of future traffic in the national airspace show that most of the hub airports and their attendant airspace will need to undergo significant redevelopment and redesign in order to accommodate any significant increase in traffic volume. Even though closely spaced parallel approaches increase throughput into a given airport, controller workload in oversubscribed metroplexes is further taxed by these approaches that require stringent monitoring in a saturated environment. The interval management (IM) concept in the TRACON area is designed to shift some of the operational burden from the control tower to the flight deck, placing the flight crew in charge of implementing the required speed changes to maintain a relative spacing interval. The interval management tolerance is a measure of the allowable deviation from the desired spacing interval for the IM aircraft (and its target aircraft). For this complex task, Formal Methods can help to ensure better design and system implementation. In this paper, we propose a probabilistic framework to quantify the uncertainty and performance associated with the major components of the IM tolerance. The analytical basis for this framework may be used to formalize both correctness and probabilistic system safety claims in a modular fashion at the algorithmic level in a way compatible with several Formal Methods tools.

Hercencia-Zapana, Heber↗

Exploring the Potential of Second-Life Batteries for Mobile Charging Infrastructure: A Review

This review paper investigates the potential applications of second-life batteries (SLBs) specifically for mobile charging stations. As the adoption of electric vehicles (EVs) continues to rise, the need for accessible and efficient charging infrastructure becomes increasingly critical to address range anxiety of EV owners. The repurposing of SLBs presents a promising solution to address this need, offering cost-effective and sustainable alternatives to traditional stationary charging infrastructure. This paper examines key technical considerations, including battery chemistry, state of health assessment, heterogeneity and battery management system design, and safety protocols tailored to SLBs. The paper also highlights economic and environmental implications of utilizing SLBs in mobile charging applications, encompassing techno-economic analysis techniques and sustainability metrics. Through an exploration of challenges, opportunities, and emerging trends, this review aims to provide valuable insights to stakeholders involved in the development and deployment of SLBs in mobile charging infrastructure.

Gautam, Mukesh (ORCID:0000000305715825)↗

Managing radiation degradation of CCDs on the Chandra X-ray Observatory II

The CCDs on the Chandra X-ray Observatory are vulnerable to radiation damage from low-energy protons scattered off the telescope's mirrors onto the focal plane. Following unexpected damage incurred early in the mission, the Chandra Team developed, implemented, and maintains a radiation-protection program. This program - involving scheduled radiation safing during radiation-belt passes, intervention based upon real-time space-weather conditions and radiation-environment modeling, and on-board radiation monitoring with autonomous radiation safing - has successfully managed the radiation damage to the CCDs. Since implementing the program, the charge-transfer inefficiency (CTI) has increased at an average annual rate of only 2.9x10^-6 (2.3%) for the front- illuminated CCDs and 0.95x10^-6 (6.5%) for the back-illuminated CCDs. This paper describes the current status of Chandra radiation-management program.

O'Dell, Stephen L.↗

A cryogenic near-field thermal diode leveraging superconducting phase transitions

Control of charge and heat transport is essential for computing and thermal management technologies. Recent work with superconducting materials has shown rectified electrical supercurrents near liquid helium temperatures. However, despite large theoretical interest and expected impact on quantum technologies, no experiments have demonstrated control of nanoscale radiative heat currents at cryogenic temperatures. Here we study photon-mediated thermal transport in nanogaps between niobium and gold. Using novel scanning calorimetric probes and nanofabricated devices, we reveal a ~20-fold suppression of radiative heat transport, when niobium transitions from the metallic to the superconducting state. Taking advantage of this effect, we also demonstrate a niobium-based cryogenic thermal diode with a heat rectification ratio of 70%. As a result, the experimental techniques and advances presented here will enable studying nanoscale thermal transport in quantum materials and advancing thermal management of superconducting devices.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗