Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “issues management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Review—Thermal Safety Management in Li-Ion Batteries: Current Issues and Perspectives

Approaches for thermal management of lithium-ion (Li-ion) batteries do not always keep pace with advances in energy storage and power delivering capabilities. Root-cause analysis and empirical evidence indicate that thermal runaway (TR) in cells and cell-to-cell thermal propagation are due to adverse changes in physical and chemical characteristics internal to the cell. However, industry widely uses battery management systems (BMS) originally designed for aqueous-based batteries to manage Li-ion batteries. Even the "best" BMS that monitor both voltage and outside-surface temperature of each cell are not capable of preventing TR or TR propagation, because voltage and surface-mounted temperature sensors do not track fast-emerging adverse events inside a cell. Most BMS typically include a few thermistors mounted on select cells to monitor their surface temperature. Technology to track intra-cell changes that are TR precursors is becoming available. Simultaneously, the complex pathways resulting in cell-to-cell TR propagation are being successfully modelled and mapped. Innovative solutions to prevent TR and thermal propagation are being advanced. These include modern BMS for rapid monitoring the internal health of each individual cell and physical as well as chemical methods to reduce the deleterious effects of rapid cell-to-cell heat and material transport in case of TR.

25 ENERGY STORAGE↗

Panel Session 36: Hot Topics in US Commercial Low-Level Waste Management

This panel focused on emerging issues in commercial LLW management in the US from the perspective of active members of the Low-Level Radioactive Waste Forum, Inc. State, compact, federal and industry officials shared their views on a variety of timely and significant topics related to low-level radioactive waste management, disposal and related issues. Session no. 36 Co-Chairs, Patricia Holahan and Daniel Shrum, introduced the panelists and provided a summary of the purpose of the session. This Panel Session focused on several current and emerging issues impacting the commercial Low-Level Radioactive Waste (LLRW) management in the US from the perspective of active members of the Low-Level Waste Forum, Inc., States, Compact, as well as Federal and nuclear industries. The panelists provided different perspectives on number of key issues such as: LLW disposal facility status and updates (e.g.; in terms of disposal capacity, plans, and waste acceptance conditions). The panelists also addressed waste disposal rates and potential impacts of ongoing regulatory developments by the NRC and the concerned States. Other timely topics pertaining to the revision of 10CFR Part 61, the Greater-than-Class C (GTCC) and Transuranic (TRU) waste, and Very Low-Level Waste (VLLW) disposal issues were also addressed at this Session. Panelists with presentations: Hot Topics in US Commercial LLW Management (Joe Weismann); Texas LLRW Compact (David Carlson); Texas Low-Level Radioactive Waste Disposal Compact Commission (John Salsman); Barnwell LLRW Disposal Facility (Benjamin Smith, Bill Carver)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Control theoretics for large structural systems

The areas of research addressed include modeling identification for both the purposes of analysis and controls, design of structural control systems actuator sensor placement, and distributed sensing and actuation as opposed to co-located sensor and actuators. Also investigated are adaptive/learning processes that could more specifically be referred to as inflight testing procedures where a structure is tested during its deployment or assembly and during its orbital life at specific points where the characteristics of the structure for the purpose of tuning the control system are identified. Another area is redundancy management techniques for structural systems. This is important because of the reliability issue for managing multiple very large numbers of sensors and actuators.

Montgomery, R. C.↗

Toward a Suite of Standard Lunar Regolith Simulants for NASA's Lunar Missions: Recommendations of the 2005 Workshop of Lunar Regolith Simulant Materials

As NASA turns its exploration ambitions towards the Moon once again, the research and development of new technologies for lunar operations face the challenge of meeting the milestones of a fast-pace schedule, reminiscent of the 1960's Apollo program. While the lunar samples returned by the Apollo and Luna missions have revealed much about the Moon, these priceless materials exist in too scarce quantities to be used for technology development and testing. The need for mineral materials chosen to simulate the characteristics of lunar regoliths is a pressing issue that is being addressed today through the collaboration of scientists, engineers and NASA program managers. The issue of reproducing the properties of lunar regolith for research and technology development purposes was addressed by the recently held Workshop on Lunar Regolith Simulant Materials at Marshall Space Flight Center. The conclusions from the workshop and considerations concerning the feasibility (both technical and programmatic) of producing such materials will be presented here.

Schlagheck, R. A.↗

Standard Lunar Regolith Simulants for Space Resource Utilization Technologies Development: Effects of Materials Choices

As NASA turns its exploration ambitions towards the Moon once again, the research and development of new technologies for lunar operations face the challenge of meeting the milestones of a fastpace schedule, reminiscent of the 1960's Apollo program. While the lunar samples returned by the Apollo and Luna missions have revealed much about the Moon, these priceless materials exist in too scarce quantities to be used for technology development and testing. The need for mineral materials chosen to simulate the characteristics of lunar regoliths is a pressing issue that is being addressed today through the collaboration of scientists, engineers and NASA program managers. The issue of reproducing the properties of lunar regolith for research and technology development purposes was addressed by the recently held 2005 Workshop on Lunar Regolith Simulant Materials at Marshall Space Flight Center. The recommendation of the workshop of establishing standard simulant materials to be used in lunar technology development and testing will be discussed here with an emphasis on space resource utilization. The variety of techniques and the complexity of functional interfaces make these simulant choices critical in space resource utilization.

Sibille, Laurent↗

Space station human productivity study. Volume 2: Executive summary and oral review presentation

Definition of design/operations requirements for support of human productivity, identification of problem areas lacking data for requirements definition, generation of management plans for conduct of studies to acquire needed data for timely space station program impact, and correlation of all issue study management plans with space station progam milestone need dates were addressed.

Source record↗

Cognitive representations of flight-deck information attributes

The experiment described in this paper had two ojectives. The first objective was to empirically identify how pilots organize flight-deck information attributes. Such an organization should provide a useful nomenclature for classifying Information Management (IM) issues and problems. The second objective of this study was to empirically assess pilots' estimate of the relative importance of each attribute on managing information. Results from addressing this latter objective were intended to suggest areas on which flight-deck researchers and designers will want to focus their attention.

Ricks, Wendell R.↗

Communicating Risk to Program Managers

Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

Shivers, C. Herbert↗

Safety and Mission Assurance Knowledge Management Retention

This viewgraph presentation reviews the issues surrounding the management of knowledge in regards to safety and mission assurance. The JSC workers who were hired in the 1960's are slated to retire in the next two to three years. The experiences and knowledge of these NASA workers must be identified, and disseminated. This paper reviews some of the strategies that the S&MA is developing to capture that valuable institutional knowledge.

Johnson, Teresa A.↗

NASA's Agency-Wide Strategy for Environmental Regulatory Risk Analysis and Communication

NASA's Agency-wide.resource for identifying and managing risks associated with changing environmental regulations Goals of the RRAC PC: 1) Proactively. detect, analyze and communicate environmental regulatory risks to NASA Programs and facilities; 2) Communicate with regulators and participate in the mitigation of such risks; and 3) Provide centralized support on emerging regulations to NASA HQ Environmental Management Division. When significant regulatory changes are identified, timely communication is essential. Communication of changing requirements to the regulatory stakeholders - NASA Programs and Facilities. Communication of potential issues to management and, when appropriate, back to the regulating agency.

Scroggins, Sharon↗

Airborne Management of Traffic Conflicts in Descent With Arrival Constraints

NASA is studying far-term air traffic management concepts that may increase operational efficiency through a redistribution of decisionmaking authority among airborne and ground-based elements of the air transportation system. One component of this research, En Route Free Maneuvering, allows trained pilots of equipped autonomous aircraft to assume responsibility for traffic separation. Ground-based air traffic controllers would continue to separate traffic unequipped for autonomous operations and would issue flow management constraints to all aircraft. To evaluate En Route Free Maneuvering operations, a human-in-the-loop experiment was jointly conducted by the NASA Ames and Langley Research Centers. In this experiment, test subject pilots used desktop flight simulators to resolve conflicts in cruise and descent, and to adhere to air traffic flow constraints issued by test subject controllers. Simulators at NASA Langley were equipped with a prototype Autonomous Operations Planner (AOP) flight deck toolset to assist pilots with conflict management and constraint compliance tasks. Results from the experiment are presented, focusing specifically on operations during the initial descent into the terminal area. Airborne conflict resolution performance in descent, conformance to traffic flow management constraints, and the effects of conflicting traffic on constraint conformance are all presented. Subjective data from subject pilots are also presented, showing perceived levels of workload, safety, and acceptability of autonomous arrival operations. Finally, potential AOP functionality enhancements are discussed along with suggestions to improve arrival procedures.

Doble, Nathan A.↗

Issues in NASA Program and Project Management. Special Report: 1997 Conference. Project Management Now and in the New Millennium

Topics Considered Include: NASA's Shared Experiences Program; Core Issues for the Future of the Agency; National Space Policy Strategic Management; ISO 9000 and NASA; New Acquisition Initiatives; Full Cost Initiative; PM Career Development; PM Project Database; NASA Fast Track Studies; Fast Track Projects; Earned Value Concept; Value-Added Metrics; Saturn Corporation Lessons Learned; Project Manager Credibility.

Hoffman, Edward J.↗

Conflict Resolution Performance in an Experimental Study of En Route Free Maneuvering Operations

NASA has developed a far-term air traffic management concept, termed Distributed Air/Ground Traffic Management (DAG-TM). One component of DAG-TM, En Route Free Maneuvering, allows properly trained flight crews of equipped autonomous aircraft to assume responsibility for separation from other autonomous aircraft and from Instrument Flight Rules (IFR) aircraft. Ground-based air traffic controllers continue to separate IFR traffic and issue flow management constraints to all aircraft. To examine En Route Free Maneuvering operations, a joint human-in-the-loop experiment was conducted in summer 2004 at the NASA Ames and Langley Research Centers. Test subject pilots used desktop flight simulators to resolve traffic conflicts and adhere to air traffic flow constraints issued by subject controllers. The experimental airspace integrated both autonomous and IFR aircraft at varying traffic densities. This paper presents a subset of the En Route Free Maneuvering experimental results, focusing on airborne and ground-based conflict resolution, and the effects of increased traffic levels on the ability of pilots and air traffic controllers to perform this task. The results show that, in general, increases in autonomous traffic do not significantly impact conflict resolution performance. In addition, pilot acceptability of autonomous operations remains high throughout the range of traffic densities studied. Together with previously reported findings, these results continue to support the feasibility of the En Route Free Maneuvering component of DAG-TM.

Doble, Nathan A.↗

Air Traffic Management Technology Demonstration - 3 (ATD-3) Dynamic Weather Routes Domestic En Route Concept of Operations Synopsis Version 1.0

NASA conducted a survey in 2015 of stakeholders in industry, flight operators, and others to collect data on the most pressing air traffic management (ATM) issues impacting en route operations. Weather related delays and interruptions were identified as the most significant and costly problem impacting en route operations in today's system. Additionally, future traffic demands will place greater demands on the FAA's air traffic control system, necessitate a more efficient and integrated traffic management system and provide controller tools to leverage human productivity. Consequently, NASA is assembling a suite of integrated ground and aircraft-based technologies and decision-making aids under the Airspace Technology Demonstrations 3 (ATD-3) project to continuously search for more efficient weather-avoidance routes and to rapidly respond to weather changes and associated traffic management initiatives. These route efficiency enhancements are targeted at en route airspace and will enable continued use of en route and arrival metering in the presence of weather. NASA's Dynamic Weather Routes (DWR) concept represents a subset of those technologies and focuses primarily on the cruise phase of flight. It leverages existing air traffic weather, airspace, and traffic data, as well as improvements in navigation, surveillance, communication and digital network technologies, and builds upon existing ATM automation to address the shortcomings associated with strategic traffic flow management initiatives and weather forecasting uncertainties. The potential benefits in the form of time, fuel, and cost savings are significant. This concept of operations synopsis provides a detailed description of DWR, its potential benefits and notional implementation paths.

DWR↗

An Approach to Building a Traceability Tool for Software Development

It is difficult in a large, complex computer program to ensure that it meets the specified requirements. As the program evolves over time, a11 program constraints originally elicited during the requirements phase must be maintained. In addition, during the life cycle of the program, requirements typically change and the program must consistently reflect those changes. Imagine the following scenario. Company X wants to develop a system to automate its assembly line. With such a large system, there are many different stakeholders, e.g., managers, experts such as industrial and mechanical engineers, and end-users. Requirements would be elicited from all of the stake holders involved in the system with each stakeholder contributing their point of view to the requirements. For example, some of the requirements provided by an industrial engineer may concern the movement of parts through the assembly line. A point of view provided by the electrical engineer may be reflected in constraints concerning maximum power usage. End-users may be concerned with comfort and safety issues, whereas managers are concerned with the efficiency of the operation. With so many points of view affecting the requirements, it is difficult to manage them, communicate information to relevant stakeholders. and it is likely that conflicts in the requirements will arise. In the coding process, the implementors will make additional assumptions and interpretations on the design and the requirements of the system. During any stage of development, stakeholders may request that a requirement be added or changed. In such a dynamic environment, it is difficult to guarantee that the system will preserve the current set of requirements. Tracing, the mapping between objects in the artifacts of the system being developed, addresses this issue. Artifacts encompass documents such as the system definition, interview transcripts, memoranda, the software requirements specification, user's manuals, the functional specifications, design reports, and system code. Tracing helps 1) validate system features against, the requirement specification, 2) identify error sources and, most importantly, 3) manage change. With so many people involved in the development of the system, it becomes necessary to identify the reasons behind the design requirements or the implementation decisions. This paper is concerned with an approach that maps documents to constraints that capture properties of and relationships between the objects being modeled by the program. Section 2 provides the reader with a background on traceability tools. Section 3 gives a brief description of the context monitoring system on which the approach suggested in this paper is based. Section 4 presents an overview of our approach to providing traceability. The last section presents our future direction of research.

Delgado, Nelly↗

NASA Schedule Management Handbook

The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

Source record↗

Civil Uses of Remotely Piloted Aircraft

The technology effort is identified and assessed that is required to bring the civil uses of RPVs to fruition and to determine whether or not the potential market is real and economically practical, the technologies are within reach, the operational problems are manageable, and the benefits are worth the cost. To do so, the economic, technical, and environmental implications are examined. The time frame is 1980-85. Representative uses are selected; detailed functional and performance requirements are derived for RPV systems; and conceptual system designs are devised. Total system cost comparisons are made with non-RPV alternatives. The potential market demand for RPV systems is estimated. Environmental and safety requirements are examined, and legal and regulatory concerns are identified. A potential demand for 2,000-11,000 RPV systems is estimated. Typical cost savings of 25-35% compared to non-RPV alternatives are determined. There appear to be no environmental problems, and the safety issue appears manageable.

Aderhold, J. R.↗

Utilization of Machine Learning Techniques for Managing the Tracking and Data Relay Satellite Constellation

National Aeronautics and Space Administration’s (NASA) Goddard Space Flight Center (GSFC) operates a constellation of ten geosynchronous Tracking and Data Relay Satellites (TDRS). The TDRS constellation consists of multiple geosynchronous communication relay satellites located around the equator so they can provide continual coverage of any mission in low earth orbit. The TDRS are located primarily in three oceanic regions around the earth. NASA’s White Sands Complex provides the ground communication support for TDRS located over the Atlantic and Pacific Oceans. Another TDRS ground station in Guam supports the TDRS over the Indian Ocean. With these satellites the TDRS network can provide continuous coverage of satellites in low-earth orbit. The NASA Space Network (SN) project office at GSFC manages the constellation of spacecraft. Major customers of the TDRS constellation include, but are not limited to, the International Space Station and the Hubble Space Telescope. The TDRS constellation has three generations of satellites and has been active for over 30 years providing reliable communication links between customer satellites and corresponding ground stations. However, one of the major concerns for TDRS, and in any space mission, is to ensure the health and safety of the spacecraft. Generally, engineers use telemetry data to monitor and analyze the performance and state of health of the spacecraft. Telemetry data contains hundreds of parameters that monitor each important component in the spacecraft, which can be utilized to recognize and characterize the behavior of the spacecraft. Each parameter contains considerable information to represent time-dependent properties of each spacecraft subsystem and component. During the entire life of a TDRS spacecraft, thousands of gigabytes of telemetry data are transmitted in real-time from the spacecraft to the ground station at the White Sands Complex in Las Cruces, New Mexico, and recorded as historical data sets for engineers to process and analyze the events that occurred on-orbit. These parameters contain the function of multiple spacecraft subsystems, such as the attitude control system (ACS), Thermal, Electrical Power Subsystem (EPS), etc. . The first and second generations have exceeded their required lifetime and NASA is keen to manage these spacecrafts carefully in order to maximize the remaining life using the spacecraft telemetry. The challenge is to know when the risk of losing a spacecraft in geosynchronous orbit exceeds the benefit of continued operations for customer support. In the TDRS fleet, the EPS is the most critical subsystem related to spacecraft operations. Failure of the EPS would strand a spacecraft in geosynchronous orbit. Since EPS provides power to the spacecraft, component failures ultimately lead to the inability to support the spacecraft loads and the communications payload. For instance, TDRS-8 has several anomalies in EPS including the Bus Voltage Limiter (BVL) shunt current, solar array loss of circuits, and failed battery cells. Any of these anomalies can cause critical issues to the spacecraft. Therefore, developing a system to analyze and perform early detection of a potential anomaly is an important issue in telemetry data analysis. In recent years, Telemetry Mining (TM) has been proposed to process telemetry data by using Data Mining (DM) techniques such as classification, clustering, regression and anomaly detection. Anomaly detection, also known as outlier detection, has been widely used in many data mining areas such as remote sensing, medical data processing and digital image processing. The goal of anomaly detection is to detect abnormal data, which contains a relatively low probability of occurrence among the entire data set. Early detection of anomalies is one of the most significant issues in managing the spacecraft configuration. If anomalies can be detected early enough, then the redundant resources can be used to extend the life of the operational spacecraft. We present an unsupervised anomaly detection method to process the EPS data extracted from TDRS-8. This is different from traditional analytical methods, which use telemetry data to illustrate behavior and physical meaning of each spacecraft component. TM connects multiple parameters as a vector and then conducts data analysis on this high dimension telemetry vector. This method is looking at the properties of a high dimensional vector that is able to consider the relationship between different parameters in the anomaly detection problem. This kind of method performs much better than the traditional limit checking method. In addition, we propose a new approach of real-time anomaly detection to process telemetry data in real-time, which can then be applied to spacecraft monitoring with high reliability, low cost and high accuracy.

Machine Learning (ML)↗