Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “engine qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Design and development of a structural mode control system

A program was conducted to compile and document some of the existing information about the conceptual design, development, and tests of the B-1 structural mode control system (SMCS) and its impact on ride quality. This report covers the following topics: (1) Rationale of selection of SMCS to meet ride quality criteria versus basic aircraft stiffening. (2) Key considerations in designing an SMCS, including vane geometry, rate and deflection requirements, power required, compensation network design, and fail-safe requirements. (3) Summary of key results of SMCS vane wind tunnel tests. (4) SMCS performance. (5) SMCS design details, including materials, bearings, and actuators. (6) Results of qualification testing of SMCS on the "Iron Bird" flight control simulator, and lab qualification testing of the actuators. (7) Impact of SMCS vanes on engine inlet characteristics from wind tunnel tests.

Source record↗

Application experience with the NASA aircraft interrogation and display system - A ground-support equipment for digital flight systems

The NASA Dryden Flight Research Facility has developed a microprocessor-based, user-programmable, general-purpose aircraft interrogation and display system (AIDS). The hardware and software of this ground-support equipment have been designed to permit diverse applications in support of aircraft digital flight-control systems and simulation facilities. AIDS is often employed to provide engineering-units display of internal digital system parameters during development and qualification testing. Such visibility into the system under test has proved to be a key element in the final qualification testing of aircraft digital flight-control systems. Three first-generation 8-bit units are now in service in support of several research aircraft projects, and user acceptance has been high. A second-generation design, extended AIDS (XAIDS), incorporating multiple 16-bit processors, is now being developed to support the forward swept wing aircraft project (X-29A). This paper outlines the AIDS concept, summarizes AIDS operational experience, and describes the planned XAIDS design and mechanization.

Glover, R. D.↗

Design and initial application of the extended aircraft interrogation and display system: Multiprocessing ground support equipment for digital flight systems

A pipelined, multiprocessor, general-purpose ground support equipment for digital flight systems has been developed and placed in service at the NASA Ames Research Center's Dryden Flight Research Facility. The design is an outgrowth of the earlier aircraft interrogation and display system (AIDS) used in support of several research projects to provide engineering-units display of internal control system parameters during development and qualification testing activities. The new system, incorporating multiple 16-bit processors, is called extended AIDS (XAIDS) and is now supporting the X-29A forward-swept-wing aircraft project. This report describes the design and mechanization of XAIDS and shows the steps whereby a typical user may take advantage of its high throughput and flexible features.

Glover, Richard D.↗

Failure Engineering Study and Accelerated Stress Test Results for the Mars Global Surveyor Spacecraft's Power Shunt Assemblies

An Engineering-of-Failure approach to designing and executing an accelerated product qualification test was performed to support a risk assessment of a "work-around" necessitated by an on-orbit failure of another piece of hardware on the Mars Global Surveyor spacecraft. The proposed work-around involved exceeding the previous qualification experience both in terms of extreme cold exposure level and in terms of demonstrated low cycle fatigue life for the power shunt assemblies. An analysis was performed to identify potential failure sites, modes and associated failure mechanisms consistent with the new use conditions. A test was then designed and executed which accelerated the failure mechanisms identified by analysis. Verification of the resulting failure mechanism concluded the effort.

Gibbel, Mark↗

The SWIFT Gamma-Ray Burst X-Ray Telescope

The Swift Gamma-Ray Burst Explorer is designed to make prompt multi-wavelength observations of Gamma-Ray Bursts and GRB afterglows. The X-ray Telescope enables Swift to determine GRB positions with a few arcseconds accuracy within 100 seconds of the burst onset. The XRT utilizes a mirror set built for JET-X and an XMM-Newton/ EPIC MOS CCD detector to provide a sensitive broad-band (0.2-10 keV) X-ray imager with an effective area of more than 120 sq cm at 1.5 keV, a field of view of 23.6 x 23.6 arcminutes, and an angular resolution of 18 arcseconds (HPD). The detection sensitivity is 2x10(exp 14) erg/sq cm/s in 10(exp 4) seconds. The instrument provides automated source detection and position reporting within 5 seconds of target acquisition. It can also measure the redshifts of GRBs with Iron line emission or other spectral features. The XRT operates in an auto-exposure mode, adjusting the CCD readout mode automatically to optimize the science return as the source intensity fades. The XRT measures spectra and lightcurves of the GRB afterglow beginning about a minute after the burst and follows each burst for days or weeks. We provide an overview of the X-ray Telescope scientific background from which the systems engineering requirements were derived, with specific emphasis on the design and qualification aspects from conception through to launch. We describe the impact on cleanliness and vacuum requirements for the instrument low energy response and to maintain the high sensitivity to the fading signal of the Gamma-ray Bursts.

Hill, J. E.↗

NEXT Ion Propulsion System Development Status and Performance

NASA s Evolutionary Xenon Thruster (NEXT) project is developing next generation ion propulsion technologies to provide future NASA science missions with enhanced mission performance benefit at a low total development cost. The objective of the NEXT project is to advance next generation ion propulsion technology by producing engineering model and prototype model system components, validating these through qualification-level and integrated system testing, and ensuring preparedness for transitioning to flight system development. This paper describes the NEXT ion propulsion system development status, characteristics and performance. A review of mission analyses results conducted to date using the NEXT system is also provided.

Patterson, Michael J.↗

NASA's Space Launch System: Momentum Builds Toward First Launch

NASA's Space Launch System (SLS) is gaining momentum toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. It will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017. Its first crewed flight follows in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. The SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015. In the NASA project life cycle process, SLS has completed 50 percent of its major milestones toward first flight. Every SLS element manufactured development hardware for testing over the past year. Accomplishments during 2013/2014 included manufacture of core stage test articles, preparations for qualification testing the solid rocket boosters and the RS-25 main engines, and shipment of the first flight hardware in preparation for the Exploration Flight Test-1 (EFT-1) in 2014. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd A.↗

Advanced Manufacturing of the SLS Block 1B Payload Adapter: Engineering Development Unit

The Payload Adapter (PLA) for the Space Launch System Block 1B configuration (SLS B1B) is a structural frustum that interfaces with the Exploration Upper Stage (EUS) and the Universal Stage Adapter (USA) or the cargo fairing at the aft end and interfaces with the primary or co-manifested payload at the forward end. The primary structure is composed of a single piece aluminum forward ring, a segmented aluminum aft ring, eight carbon composite sandwich panels, and composite bonded longitudinal joints. The PLA is designed and fabricated in-house at MSFC. Development and flight article builds are joint efforts between the Materials & Processes Laboratory (EM), the Spacecraft & Vehicle Systems Department (EV), the Space Systems Department (ES), and the Test Laboratory (ET). The large-scale manufacturing efforts associated with this task include the fabrication of pathfinder panels; the fabrication and assembly of a full-scale Manufacturing Demonstration Article (MDA); the fabrication, assembly, and test of an Engineering Demonstration Unit (EDU); the fabrication, assembly, and test of a qualification Article; and the fabrication, assembly, and proof test of subsequent flight articles. The PLA team recently completed assembly of the EDU. The final assembly included the instillation of the co-manifested secondary payload, NEST, and the instillation and tensioning of the Payload Separation System (PSS). This poster will detail the assembly process which includes: (1) composite panel to ring assembly, (2) adhesive bonding for the longitudinal joints, and (3) instillation of the NEST and PSS. The PLA EDU is prepared to undergo modal and static load testing.

Monique Wallace↗

Synergistic Development, Test, and Qualification Approaches for the Ares I and V Launch Vehicles

The U.S. National Aeronautics and Space Administration is designing and developing the Ares I and Ares V launch vehicles for access to the International Space Station (ISS) and human exploration of the Moon. The Ares I consists of a first stage reusable five-segment solid rocket booster, a upper stage using a J-2X engine derived from heritage experience (Saturn and Space Shuttle External Tank programs), and the Orion crew exploration vehicle (CEV). The Ares V is designed to minimize the development and overall life-cycle costs by leveraging off of the Ares I design. The Ares V consists of two boosters, a core stage, an earth departure stage (EDS), and a shroud. The core stage and EDS use LH2/LO2 propellants, metallic propellant tanks, and composite dry structures. The core stage has six RS-68B upgraded Delta IV engines while the EDS uses a J-2X engine for second stage ascent and trans-lunar injection (TLI) burn. System and propulsion tests and qualification approaches for Ares V elements are being considered as follow-on extensions of the Ares I development program. Following Ares I IOC, testing will be conducted to verify the J-2X engine's orbital restart and TLI burn capability. The Ares I upper stage operation will be demonstrated through integrated stage development and acceptance testing. The EDS will undergo similar development and acceptance testing with additional testing to verify aspects of cryogenic propellant management, operation of sub-systems in a space simulation environment, and orbital re-start of the main propulsion system. RS-68B certification testing will be conducted along with integrated core stage development and acceptance testing. Structural testing of the Ares V EDS and core stage propellant tanks will be conducted similar to the Ares I upper stage. The structural qualification testing may be accomplished with separate propellant tank test articles. Structural development and qualification testing of the dry structure will be pursued as part of the design and development process. Especially critical is the development test program for the composite structures. The Ares V payload shroud will undergo acoustic, vibration, structural qualification, and deployment testing in a space simulation environment. Similar to Ares I, requirements for full-scale structural dynamic testing are being studied. Both Ares I and Ares V include validation flight testing as part of the qualification programs.

Cockrell, Charles E.↗

Space Flight Requirements for Fiber Optic Components; Qualification Testing and Lessons Learned

"Qualification" of fiber optic components holds a very different meaning than it did ten years ago. In the past, qualification meant extensive prolonged testing and screening that led to a programmatic method of reliability assurance. For space flight programs today, the combination of using higher performance commercial technology, with shorter development schedules and tighter mission budgets makes long term testing and reliability characterization unfeasible. In many cases space flight missions will be using technology within years of its development and an example of this is fiber laser technology. Although the technology itself is not a new product the components that comprise a fiber laser system change frequently as processes and packaging changes occur. Once a process or the materials for manufacturing a component change, even the data that existed on its predecessor can no longer provide assurance on the newer version. In order to assure reliability during a space flight mission, the component engineer must understand the requirements of the space flight environment as well as the physics of failure of the components themselves. This can be incorporated into an efficient and effective testing plan that "qualifies" a component to specific criteria defined by the program given the mission requirements and the component limitations. This requires interaction at the very initial stages of design between the system design engineer, mechanical engineer, subsystem engineer and the component hardware engineer. Although this is the desired interaction what typically occurs is that the subsystem engineer asks the components or development engineers to meet difficult requirements without knowledge of the current industry situation or the lack of qualification data. This is then passed on to the vendor who can provide little help with such a harsh set of requirements due to high cost of testing for space flight environments. This presentation is designed to guide the engineers of design, development and components, and vendors of commercial components with how to make an efficient and effective qualification test plan with some basic generic information about many space flight requirements. Issues related to the ~ physics of failure, acceptance criteria and lessons learned will also be discussed to assist with understanding how to approach a space flight mission in an ever changing commercial photonics industry.

Ott, Melanie N.↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

Operating Characteristics of a 15-cm dia. Ion Engine for Small Planetary Spacecraft

A 15-cm diameter, scaled-down version of the NASA light-weight 30-cm ion engine has been developed for potential application to very small planetary spacecraft. Integration of the 15-cm ion source into 4x15-cm segmented engine configuration results in a 30-cm equivalent engine which can be throttled over a 7-to-1 input power variation with a constant beam current in each of the four segments. Throttling the segmented engine by turning off individual segments can result in a significant decrease in the required service life (and qualification requirements) of the ion source components.

grids segmented ion engine↗

Vibration testing of the JE-M-604-4-IUE rocket motor (Thiokol P/N E 28639-03)

The NASA International Ultraviolet Explorer (IUE) rocket motor (TE-M-604-4), a solid fuel, spherical rocket motor, was vibration tested in the Impact, Vibration, and Acceleration (IVA) Test Unit of the von Karman Gas Dynamics Facility (VKF). The objective of the test program was to subject the motor to qualification levels of sinusoidal and random vibration prior to the altitude firing of the motor in the Propulsion Development Test Cell (T-3), Engine Test Facility (ETF), AEDC. The vibration testing consisted of a low level sine survey from 5 to 2,000 Hz, followed by a qualification level sine sweep and qualification level random vibration. A second low level sine survey followed the qualification level testing. This sequence of testing was accomplished in each of three orthogonal axes. No motor problems were observed due to the imposition of these dynamic environments.

Alt, R. E.↗

Students Solving Problems for ISS and Beyond: Inspiring the Next-Generation

Students Solving Problems for ISS and Beyond: Inspiring the Next-Generation Session Title: Students Solving Problems for ISS and Beyond: Inspiring the Next-Generation Session Description: NASA High school students United with NASA to Create Hardware (HUNCH) mission is to empower and inspire students through a Project-Based Learning program where 7-12 grade students learn 21st century skills and can launch their careers through participation in the design and fabrication of real-world valued products for NASA. With six different tracks consisting of Design & Prototype, Culinary Challenge, Softgoods, Precision Machining, Software, and Video Challenge, students are given the opportunity to create solutions for the International Space Station (ISS), the Moon, and beyond. Many projects are requested by the Crew to help ease living conditions, giving students the opportunity to make an impact on the lives of Astronauts. Other projects come directly from NASA and its partners. Join our session to learn how NASA is working with teachers across the country to mentor the next generation of scientists and engineers to solve some of NASA’s greatest challenges. Learning Outcomes: 1. Describe the NASA HUNCH Program, including the program objectives, goals, and strategic partnerships for middle school and high school outreach and advocacy efforts. 2. Identify the innovative strategies NASA is using to work with middle and high school students to solve real-world problems 3. Use the knowledge gained to inspire the next generation of scientists and engineers Session Track: Advocacy & Outreach Specialized Focus Area: Women in Government and Military Learning Level: Foundational Session Format: Listen & Learn Speaker Qualifications: 1. Deboshri Sadhukhan • Current Job Title: Deputy Project Manager • Topic Experience (years of experience related to proposed topic): 1-5 years • Biography: Deboshri Sadhukhan is an engineer for NASA Glenn Research Center (GRC). She has worked on numerous projects — from International Space Station (ISS) fluid technologies, to Orion European Service Module propulsion, to planetary science missions and other game-changing technologies. Her roles have ranged from Project Manager to System Safety Lead. She currently serves as a GRC Regional Mentor for the High school students United with NASA to Create Hardware (HUNCH) program. She also serves as Deputy Project Manager for an ISS payload and Safety & Mission Assurance Lead for a Radioisotope Power Systems project. In these roles, she oversees each phase of a project from beginning to end and provides leadership to increase the reliability, maintainability and system safety of hardware and personnel throughout the system life cycle. She holds a Bachelor of Science in Electrical Engineering from The University of Akron. 2. Nancy Hall • Current Job Title: Project Manager • Topic Experience: 20+ years • Biography: Nancy Rabel Hall earned a B.S. degree in Space Sciences from Florida Institute of Technology and a M.S. degree in Mechanical Engineering from the University of Toledo. She has been at NASA Glenn for over 30 years. She has led several International Space Station experiments that studied how the behavior of fluids and fluid systems behave differently in microgravity as compared to here on Earth. She is also the High school students United with NASA to Create Hardware (HUNCH) project manager, a program that allows students to design and fabricate hardware and softgoods for NASA as well as participate in a culinary and video challenge. She enjoys talking to the public and students about the work being done at NASA as well as showing students how math and science can be fun. She is an amateur radio operator, enjoys playing golf, and reading science fiction and fantasy books.

HUNCH↗

NASA Progress on the Development and Qualification of a 12-kW Hall-Effect, Solar Electric Propulsion Thruster

I. Motivation and Background Beginning in 2014, the National Aeronautics and Space Administration (NASA) Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The resulting Advanced Electric Propulsion System (AEPS) project has developed a 12 kW Hall Current Thruster in support of the NASA mission to establish a permanent human presence in lunar orbit and to land the next American astronauts on the South Pole of the Moon. The project is led by the NASA Glenn Research Center, supported by the Jet Propulsion Laboratory and development, qualification & flight hardware all provided by L3 Harris Aerojet Rocketdyne (AR).The AEPS project has completed the development testing of a high power, solar electric propulsion Hall Current thruster that will be used on the NASA Power & Propulsion Element (PPE) of the Gateway space station. NASA initially built three Technology Development Units to understand key characteristics of the hall-effect rocket with magnetic shielding. The design led to development testing on two Engineering Test Unit Thrusters and multiple critical components. The project has begun production of the three flight thrusters and entered qualification testing at the component and thruster levels. II. Approach NASA and AR teams completed all development phases of the project, including full development and integration testing of the Engineering Model hardware, Critical Design Review, and ground test equipment validation, as well as fabrication and acceptance testing of the initial qualification thruster. Qualification and verification of the environmental and life requirements of the AEPS design was initiated in the Fall of 2023 and will be accomplished on two thruster units and using a series of component-level tests during 2024 and 2025. Environmental testing will incorporate functional reference firings, shock, vibration, and Thermal Vacuum (TVAC) testing. Life verification will assess the thruster wear and performance over the lifetime of the Gateway spacecraft. Critical component qualification tests include cathode heater, magnet coils, magnet heaters, temperature sensors, and a cathode assembly that will undergo life cycle testing on multiple units. Flight thrusters will complete assembly and acceptance testing and be delivered to the PPE program in early 2025. III. Preliminary and Anticipated Results The program has completed the acceptance testing, including dynamic testing and hot fire characterization, of the first qualification thruster. In the Fall of 2023, the program entered the environmental qualification phase for thruster testing. This paper will present an overview of the AEPS thruster project, thruster capabilities and flight design, preliminary results from the thruster acceptance and qualification testing, component life cycle testing and flight hardware status.

Clayton Kachele↗

(abstract) Evaluation and Development of Diamond Grids for Ion Optics

A research program is underway to establish the feasibility of fabricating 15 cm diameter ion engine optics from polycrystalline diamond film. Because of its high thermal conductivity, low CTE, and low sputter yield, diamond film has the potential of mitigating life limiting and performance degrading processes which have hindered flight qualification of ion thrusters to date. Results of experiments are reported.

ion engines diamond films ion optics fabrication f↗