Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “distributed wind siting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

144 records · Page 8

Influence of Time and Frequency Domain Wave Forcing on the Power Estimation of a Wave Energy Converter Array

Industry-specific tools for analyzing and optimizing the design of wave energy converters (WECs) and associated power systems are essential to advancing marine renewable energy. This study aims to quantify the influence of phase information on the device power output of a virtual WEC array. We run the phase-resolving wave model FUNWAVE-TVD (Total Variation Diminishing) to generate directional waves at the PacWave South site offshore from Newport, Oregon, where future WECs are expected to be installed for testing. The two broad cases presented correspond to mean wave climates during warm months (March–August) and cold months (September–February). FUNWAVE-TVD time series of sea-surface elevation are then used in WEC-Sim, a time domain numerical model, to simulate the hydrodynamic response of each device in the array and estimate their power output. For comparison, WEC-Sim is also run with wave energy spectra calculated from the FUNWAVE-TVD simulations, which do not retain phase information, and with wave spectra computed using the phase-averaged model Simulating WAves Nearshore (SWAN). The use of spectral data in WEC-Sim requires a conversion from frequency to time domain by means of random superposition of wave components, which are not necessarily consistent because of the linear assumption implicit in this method. Thus, power response is characterized by multiple realizations of the wave climates.

13 HYDRO ENERGY↗

Generic characterization of electrical test benches for AC- and HVDC-connected wind power plants

The electrical test and assessment of wind turbines go hand in hand with standards and network connection requirements. In this paper, the generic structure of advanced electrical test benches, including grid emulator or controllable grid interface, wind torque emulator, and device under test, is proposed to harmonize state-of-the-art test sites. On the other hand, modern wind turbines are under development towards new features, concerning grid-forming, black-start, and frequency support capabilities as well as harmonic stability and control interaction considerations, to secure the robustness and stability of renewable-energy-based power systems. Therefore, it is necessary to develop new and revised test standards and methodologies to address the new features of wind turbines. This paper proposes a generic test structure within two main groups, including open-loop and closed-loop tests. The open-loop tests include the IEC 61400-21-1 standard tests as well as the additional proposed test options for the new capabilities of wind turbines, which replicate grid connection compliance tests using open-loop references for the grid emulator. In addition, the closed-loop tests evaluate the device under test as part of a virtual wind power plant and perform real-time simulations considering the grid dynamics. The closed-loop tests concern grid connection topologies consisting of AC and HVDC, as well as different electrical characteristics, including impedance, short-circuit ratio, inertia, and background harmonics. The proposed tests can be implemented using available advanced test benches by adjusting their control systems. The characteristics of a real power system can be emulated by a grid emulator coupled with real-time digital simulator systems through a high-bandwidth power-hardware-in-the-loop interface.

17 WIND ENERGY↗

Circular dichroism in hard X-ray photoelectron diffraction observed by time-of-flight momentum microscopy

X-ray photoelectron diffraction (XPD) is a powerful technique that yields detailed structural information of solids and thin films that complements electronic structure measurements. Among the strongholds of XPD we can identify dopant sites, track structural phase transitions, and perform holographic reconstruction. High-resolution imaging of k ll -distributions (momentum microscopy) presents a new approach to core-level photoemission. It yields full-field k x -k y XPD patterns with unprecedented acquisition speed and richness in details. Here, we show that beyond the pure diffraction information, XPD patterns exhibit pronounced circular dichroism in the angular distribution (CDAD) with asymmetries up to 80%, alongside with rapid variations on a small k ll -scale (0.1 Å -1 ). Measurements with circularly-polarized hard X-rays (hν = 6 keV) for a number of core levels, including Si, Ge, Mo and W, prove that core-level CDAD is a general phenomenon that is independent of atomic number. The fine structure in CDAD is more pronounced compared to the corresponding intensity patterns. Additionally, they obey the same symmetry rules as found for atomic and molecular species, and valence bands. Further, the CD is antisymmetric with respect to the mirror planes of the crystal, whose signatures are sharp zero lines. Calculations using both the Bloch-wave approach and one-step photoemission reveal the origin of the fine structure that represents the signature of Kikuchi diffraction. To disentangle the roles of photoexcitation and diffraction, XPD has been implemented into the Munich SPRKKR package to unify the one-step model of photoemission and multiple scattering theory.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Power Supply Options for the Marpi Landfill, Saipan: Addendum to 2023 Feasibility Study

The Marpi Landfill (Marpi or the landfill), located on the northern end of the island of Saipan in the Commonwealth of the Northern Mariana Islands (CNMI), is powered by an on-site diesel generator that only operates when the landfill is open and staffed. The CNMI Office of Planning and Development (OPD) aspires to provide the Marpi Landfill with 24-hour power availability despite its remote location and to increase sustainable energy consumption within the CNMI. Pacific Northwest National Laboratory (PNNL) authored a feasibility study in 2023 that explores alternative power supply options for the landfill. This feasibility study (hereafter referred to as Phase I of this study) culminated in a report named “Power Supply Options for the Marpi Landfill, Saipan.” In Phase I, the project team investigated and prioritized seven different power supply scenarios (Table ES-1) for the landfill according to Solid Waste (SW) Taskforce priorities. The project team found that Scenario 4 (100 kW of solar photovoltaic [PV] generation, a 75 kW/300 kWh battery energy storage system [BESS], and 160 kW of diesel generation) ranked highest. Following the Phase I feasibility study, the SW Taskforce secured additional funding for PNNL to assess additional considerations regarding power supply options for Marpi. The purpose of Phase II of this study is to investigate these additional considerations, as compiled in this addendum. Some of the findings compiled here replace findings from the original report. The project team evaluated additional considerations regarding power supply options for the landfill, including modified operations to account for 24/7 power supply, electrified landfill equipment, new and replacement distribution line costs, and the social cost of carbon.

14 SOLAR ENERGY↗

Optimal Electrification Using Renewable Energies: Microgrid Installation Model with Combined Mixture k-Means Clustering Algorithm, Mixed Integer Linear Programming, and Onsset Method

Optimal planning and design of microgrids are priorities in the electrification of off-grid areas. Indeed, in one of the Sustainable Development Goals (SDG 7), the UN recommends universal access to electricity for all at the lowest cost. Several optimization methods with different strategies have been proposed in the literature as ways to achieve this goal. This paper proposes a microgrid installation and planning model based on a combination of several techniques. The programming language Python 3.10 was used in conjunction with machine learning techniques such as unsupervised learning based on K-means clustering and deterministic optimization methods based on mixed linear programming. These methods were complemented by the open-source spatial method for optimal electrification planning: onsset. Four levels of study were carried out. The first level consisted of simulating the model obtained with a cluster, which is considered based on the elbow and k-means clustering method as a case study. The second level involved sizing the microgrid with a capacity of 40 kW and optimizing all the resources available on site. The example of the different resources in the Togo case was considered. At the third level, the work consisted of proposing an optimal connection model for the microgrid based on voltage stability constraints and considering, above all, the capacity limit of the source substation. Finally, the fourth level involved a planning study of electrification strategies based mainly on microgrids according to the study scenario. The results of the first level of study enabled us to obtain an optimal location for the centroid of the cluster under consideration, according to the different load positions of this cluster. Then, the results of the second level of study were used to highlight the optimal resources obtained and proposed by the optimization model formulated based on the various technology costs, such as investment, maintenance, and operating costs, which were based on the technical limits of the various technologies. In these results, solar systems account for 80% of the maximum load considered, compared to 7.5% for wind systems and 12.5% for battery systems. Next, an optimal microgrid connection model was proposed based on the constraints of a voltage stability limit estimated to be 10% of the maximum voltage drop. The results obtained for the third level of study enabled us to present selective results for load nodes in relation to the source station node. Finally, the last results made it possible to plan electrification using different network technologies and systems in the short and long term. The case study of Togo was taken into account. The various results obtained from the different techniques provide the necessary leads for a feasibility study for optimal electrification of off-grid areas using microgrid systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solar Photovoltaics Resilient Fasteners Levelized Cost of Energy (LCOE) Tool

Solar photovoltaics (PV) module fasteners are one of the most common structural failure points on PV systems, particularly in high winds and coastal areas with ocean spray. Some fastener types have been shown to survive these conditions at higher rates than others. The fastener type, material, quantity, and placement all impact performance. Fasteners that fail less often typically have a higher upfront cost, but this investment can pay off in savings from less frequent torque audits (which reduces O&M costs), reduced system damage, and decreased system downtime. We developed an Excel-based tool to evaluate different module fasteners for a PV system - either a new or retrofit project - and compare differences in upfront and outyear costs to determine the expected life cycle costs and simple payback periods of different fastener options. The tool is site-specific, with inputs including system attributes (such as system size, location, price of power) and fastener attributes (such as design, washer type, nut type, use of locking hardware, materials, installation time, and torque audit requirements). A baseline fastener scenario can be compared to up to four proposed fastener scenarios. In addition to presenting expected life cycle cost implications of the different fastener options, the tool produces results showing the reductions in outyear costs needed to offset any initial cost premiums for more reliable fasteners across four categories: preventative O&M, avoided damage, reduced downtime, and reduced insurance premiums. These numbers can serve as decision aids for users when considering fastener options on new or existing projects. This poster will present the tool, methodology, and scenarios using example sites to highlight the tool capabilities and how it can inform different fastener decisions on different projects. Future work includes incorporating lifetime expected damage costs by embedding damage function curves that the authors are developing from field data.

14 SOLAR ENERGY↗

Identifying Potential Sub-Synchronous Oscillations Using Impedance Scan Approach: Preprint

This paper presents an impedance scan study on the real-world power system in Australia that has observed 17 to 20 Hz intermittent subsynchronous oscillations. Through the impedance scan of each of the IBRs, both individually and collectively, potential resonance modes are identified. The impedance scans were carried out using electromagnetic transient PSCAD models of the network. The network comprises of site-specific, black-boxed models of IBRs supplied by the generators. The impedance scan approach was divided in three major steps: (1) the first step is to identify IBRs where impedance analysis needs to be performed based on the magnitude of oscillations observed at their points of interconnection (POIs); (2) the second step focuses on performing impedance scans at selected IBRs in single-machine infinite-bus (SMIB) configuration to identify internal resonance modes of an IBR and to evaluate if any of these modes become unstable under certain grid conditions; (3) the third step performs impedance scans at a few selected IBRs while connected to the wider network model to obtain the impedance response of both the IBR and the grid - this step evaluates control interactions among IBRs. The impedance scan study found that a few IBRs have an underdamped resonance mode at around 17 Hz, which becomes unstable under a certain operating condition. Another interesting finding was that certain IBRs increase the effective grid impedance seen by another IBR in proximity for a particular operating condition. Under this operating condition, the resulting subsynchronous oscillation mode is more pronounced due to a combination of control interactions among IBRs through the transmission network under study and a resonance mode inside the IBRs.

control interactions↗

Assessment of Potential Dose and Environmental Impacts from Proposed Testing at the INL Radiological Response Training Range

This assessment uses screening-level models to calculate potential environmental impacts from proposed tests at the Idaho National Laboratory (INL) Radiological Response Training Range (RRTR) site. Proposed tests could be conducted using 11 different radioactive material types that include K2O, LaBr3, KBr, Cu, Zr, F, Ga, Ga2O3, NaNO2, Ga-68, and Tc-99m. The tests could potentially release radioactive material to the atmosphere and radionuclides and other contaminants to the soil, which could leach into the unsaturated zone and migrate to the aquifer. Atmospheric transport of radionuclides to potential human receptors and time-integrated air concentrations were calculated with a Gaussian plume model and three years of hourly meteorological data. Potential surface-soil impacts were calculated with the computer program mixing-cell model (MCM). Groundwater impacts were calculated with the computer programs MCM and GWSCREEN. Radiological doses from potential atmospheric releases were calculated for public receptors off the INL Site and for workers at nearby INL facilities. Results were compared to regulatory dose limits. Maximum potential groundwater concentrations were estimated in the aquifer below the NSTR site and compared to drinking water standards or risk-based screening levels for resident tap water. Soil concentrations were calculated and compared to risk-based screening levels for workers and potential future residents. All impacts were estimated assuming 12 tests are conducted annually using all 11 material types for a period of 15 years. This document provides the resources to enable a subject matter expert in the field of environmental assessments to replicate the modeling and calculations. The methodology and parameters are presented in the text. All electronic files, including computer-code input, output, executable files, batch files, scripts, and spreadsheet files are contained in a zip file that can be accessed by selecting “Additional Information” (select Native File) in the INL Electronic Document Management System (EDMS). It is highly unlikely the test scenarios evaluated in this ECAR will adversely impact human health based on comparisons of calculated dose and concentration against regulatory standards and risk-based screening levels. Conservative estimates of dose to workers and the public from atmospheric transport of possible radionuclide releases are far below federal radiation protection standards. Conservative estimates of potential contaminant concentrations in groundwater are less than federal drinking water standards or screening levels. Predicted radionuclide concentrations in surface soils are below risk-based screening levels, except for Ge-68 (material Ga-68) for the worker. The Ge-68 soil concentration can be made less than the worker PRG, if the number of annual tests using Ga-68 is reduced from 12 to 6. However, the sum of ratios still exceeds one because of the high K-40 ratio. If the EF of the worker (number of days the worker is in the contaminated testing area) is reduced from 225 days/yr (default value for full time worker) to 112 days/yr, the Ge-68 ratio is less than one and the sum of ratios is less than one. Actual radiation doses and groundwater and surface-soil concentrations are likely to be much less than those calculated because of the conservative assumptions and parameters employed in the modeling. For example, atmospheric-transport calculations assume the entire inventory of each material type is readily released to the atmosphere and no plume deposition, depletion, or radioactive decay occurs during transport. The calculations also assume the same meteorological conditions (e.g., wind velocity, wind direction, stability class) that produce the maximum 95th percentile concentration (i.e., concentration representing the 95th percentile of a distribution of concentrations derived from 3 years of hourly meteorological data) at each receptor location are the same for all 12 tests during the year, and each receptor is assumed to be present during all 12 tests. The surface-soil assessment assumes the entire inventory of each test is deposited in the top 5 cm of soil. No atmospheric dispersal is assumed, and the radionuclides are subject only to leaching and radioactive decay. The groundwater-pathway modeling is conservative in that it is one-dimensional in the unsaturated zone (no lateral spreading/dilution) and assumes the entire inventory of contaminants infiltrates into the ground at the same location for every test. This is especially conservative for particulate radionuclides because they would have to dissolve or corrode first and some would be dispersed into the atmosphere. The groundwater receptor is also assumed to consume water directly from a hypothetical well positioned in the location of maximum concentration. In addition, conservative degradation rates were used, and volatilization was not considered for the nonradioactive chemical

54 ENVIRONMENTAL SCIENCES↗

Assessment of Potential Dose and Environmental Impacts from Proposed Testing at the INL National Security Test Range

This assessment uses screening-level models to calculate potential environmental impacts from proposed tests at two locations at the Idaho National Laboratory (INL) National Security Test Range (NSTR) site. Proposed tests could be conducted using 11 different radioactive material types that include K 2 O, LaBr 3 , KBr, Cu, Zr, F, Ga, Ga 2 O 3 , NaNO 2 , Ga-68, and Tc-99m. The tests could potentially release radioactive material to the atmosphere and radionuclides and other contaminants to the soil, which could leach into the unsaturated zone and migrate to the aquifer. Atmospheric transport of radionuclides to potential human receptors and time-integrated air concentrations were calculated with a Gaussian plume model and three years of hourly meteorological data. Potential surface-soil impacts were calculated with the computer program mixing-cell model (MCM). Groundwater impacts were calculated with the computer programs MCM and GWSCREEN. Radiological doses from potential atmospheric releases were calculated for public receptors off the INL Site and for workers at nearby INL facilities. Results were compared to regulatory dose limits. Maximum potential groundwater concentrations were estimated in the aquifer below the NSTR site and compared to drinking water standards or risk-based screening levels for resident tap water. Soil concentrations were calculated and compared to risk-based screening levels for workers and potential future residents. All impacts were estimated based on the assumption that 12 tests are conducted annually using all 11 material types for 15 years. This document provides the resources to enable a subject matter expert in the field of environmental assessments to replicate the modeling and calculations. The methodology and parameters are presented in the text. All electronic files, including computer-code input, output, executable files, batch files, scripts, and spreadsheet files, are contained in a zip file that can be accessed by selecting “Additional Information” (select Native File) in the INL Electronic Document Management System (EDMS). It is highly unlikely the test scenarios evaluated in this ECAR will adversely impact human health based on comparisons of calculated dose and concentration against regulatory standards and risk-based screening levels. Conservative estimates of dose to workers and the public from atmospheric transport of possible radionuclide releases are far below federal radiation protection standards. Conservative estimates of potential contaminant concentrations in groundwater are less than federal drinking water standards or screening levels. Predicted radionuclide concentrations in surface soils are below risk-based screening levels, except for Ge-68 (material Ga-68) for the worker. The Ge-68 soil concentration can be made less than the worker PRG, if the number of annual tests using Ga-68 is reduced from 12 to 6. However, the sum of ratios still exceeds one because of the high K-40 ratio. If the EF of the worker (number of days the worker is in the contaminated testing area) is reduced from 225 days/yr (default value for full time worker) to 112 days/yr, the Ge-68 ratio is less than one and the sum of ratios is less than one. Actual radiation doses and groundwater and surface-soil concentrations are likely to be much less than those calculated because of the conservative assumptions and parameters employed in the modeling. For example, atmospheric-transport calculations assume the entire inventory of each material type is readily released to the atmosphere and no plume deposition, depletion, or radioactive decay occurs during transport. The calculations also assume the same meteorological conditions (e.g., wind velocity, wind direction, stability class) that produce the maximum 95th percentile concentration (i.e., concentration representing the 95th percentile of a distribution of concentrations derived from 3 years of hourly meteorological data) at each receptor location are the same for all 12 tests during the year, and each receptor is assumed to be present during all 12 tests. The surface-soil assessment assumes the entire inventory of each test is deposited in the top 5 cm of soil. No atmospheric dispersal is assumed, and the radionuclides are subject only to leaching and radioactive decay. The groundwater-pathway modeling is conservative in that it is one-dimensional in the unsaturated zone (no lateral spreading/dilution) and assumes the entire inventory of contaminants infiltrates into the ground at the same location for every test. This is especially conservative for particulate radionuclides because they would have to dissolve or corrode first and some would be dispersed into the atmosphere. The groundwater receptor is also assumed to consume water directly from a hypothetical well positioned in the location of maximum concentration. In addition, conservative degradation rates were used, and volatilization was not considered for the nonradradioactive chemicals modeled. And finally, the calculations assume all 12 tests will be performed at the same place at both locations, and all 11 radioactive material types will be used for each test. This is conservative because it is anticipated that no more than two material types will be used per test.

99 GENERAL AND MISCELLANEOUS↗

Hybrid Power Plants: Status of Installed and Proposed Projects [Slides]

As battery prices fall and wind and solar generation rises, power plant developers are increasingly combining wind and solar projects with on-site batteries, creating “hybrid” power plants. But hybrid or co-located plants have been part of the U.S. electricity mix for decades, with widely ranging configurations that extend beyond pairing a generator with a battery. This new summary tracks and maps existing hybrid and co-located plants across the United States while also synthesizing data from generation interconnection queues to illustrate developer interest in the next wave of plants. The scope is inclusive of co-located hybrid plants that pair two or more generators and/or that pair generation with storage at a single point of interconnection, and also full hybrids that feature co-location and co-control. The focus is on larger, 1 MW+ systems: smaller (often behind-the-meter) projects are also increasingly common, but are not included in the data synthesis. Based in part on EIA Form 860 data, there were at least 125 co-located hybrid plants (>1 MW) already operating across the United States at the end of 2019, totaling over 14 GW of aggregate capacity. Some of the most common configurations include wind+storage (13 projects, 1,290 MW wind, 184 MW storage), PV+storage (40 projects, 882 MW PV, 169 MW storage), and fossil+storage (10 projects, 2,414 MW fossil, 91 MW storage). Data from interconnection queues demonstrates the considerable commercial interest that exists in hybrid power plants, especially solar co-located with storage. By the end of 2019, there were at least 367 GW of solar plants in the nation’s queues; 102 GW (~28%) of this capacity was proposed as a hybrid, most typically pairing PV with battery storage. For wind, 225 GW of capacity sat in the queues, with 11 GW (~5%) proposed as a hybrid, again most-often pairing wind with storage. The proposed solar+storage plants are located throughout the United States, but with California and the non-ISO West being the most prominent areas of commercial interest. Proposed wind+storage and standalone storage plants also center to a degree on these regions of the country.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Catalina Repower Feasibility Study: NREL Phases I & II Summary Report

Engineers at the National Renewable Energy Laboratory (NREL) supported Southern California Edison (SCE) and the United States Environmental Protection Agency (EPA) by conducting technical and economic analyses for energy systems at Santa Catalina (Catalina) Island, which is located 22 miles off the coast of Long Beach, California. This effort was part of a broader Repower Catalina Feasibility Study that was also supported by NV5, an engineering consulting firm and project partner to NREL for this analysis. This document describes NREL’s techno-economic modeling and optimization analysis for the first two phases of this project which focus on supply-side generation and energy storage options for Catalina. SCE’s goal for this analysis is to determine a strategy for electricity generation on Catalina Island that results in lower energy costs, improved energy resiliency, and reduced air emissions. EPA goals for this effort are to reduce emissions of air pollution and encourage renewable energy development on contaminated and formerly contaminated lands when such development is aligned with the community’s vision for the site. Currently, an on-island SCE power plant serves the Catalina Island electrical load with 6 reciprocating diesel generators totaling 9.4 MW; 23 propane-fueled microturbines totaling 1.5 MW; and a 1-MW, 7.2-MWh sodium sulfur battery energy storage system (BESS). In 2017, the electricity consumption on the island was 29.1 GWh, with an average load of 3.3 MW and peak load of approximately 5.5 MW. Considering new environmental standards on diesel generator emissions from California’s South Coast Air Quality Management District, a 60% renewable energy target for 2030 laid out in California’s Senate Bill 100, SCE’s Clean Power Electrification Pathway, and the characteristics of the island’s existing diesel generators, SCE is seeking to evaluate the technical and economic implications of different energy technology options to determine a path forward. Phases I and II of the Repower Catalina Feasibility Study, summarized in this document, evaluated the following: Interconnection with the mainland via an undersea cable; On-island fossil fuel generation, including diesel, propane, and/or liquified natural gas (LNG); On-island renewable energy (RE) technologies, including solar photovoltaics (PV), wind turbines, and wave energy devices; BESS to support the above generation technologies; Initial analysis of the potential impacts of implementing energy efficiency measures. Results indicate strong techno-economic potential for a mix of on-island diesel and/or propane generators, solar PV, BESS, and energy efficiency measures to help SCE and Catalina achieve their goals compliant with California’s emissions and clean energy standards while minimizing electricity life cycle costs (LCC) over the 30-year analysis period. This document summarizes the considerations and findings of Phases I and II, focusing on high-level takeaways from Phase I and more detailed results from Phase II, and discusses a potential path forward for Phase III.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Clean Energy Deployment Baseline for the Energy Community and Low-Income Tax Credit Bonuses [Slides]

The Inflation Reduction Act of 2022 introduced, for the first time, place-based federal tax incentives for projects sited in “Energy Communities,” potentially changing the economic calculus of where projects are best sited. Storage projects can qualify for a 10-percentage-point bonus to the Investment Tax Credit (e.g., from 30% to 40%), while wind and solar projects may qualify for either the ITC bonus or a 10% bonus to the Production Tax Credit (e.g., from $\$27.5$ to $\$30.25$/MWh). Energy Communities are areas with historical ties to fossil fuel industries and above average unemployment levels (FFEU), with closed coal mines or power plants, or contaminated properties. They seek to identify locations across the US that could especially benefit from economic revitalization. This report explores how the new federal tax credit incentives are impacting clean energy deployment patterns and establishes historical baselines against which future changes can be compared. We include a few case studies of clean energy projects going specifically to areas that were recently impacted by coal power plant closures to provide concrete examples of investments in Energy Communities. However, this publication does not assess how much of the incentive benefits pass from clean energy developers to hosting communities, nor does it offer a comprehensive view of the economic effects of clean energy deployment on Energy Communities. Key highlights include: - As clean energy projects take multiple years to conceptualize and develop, it is likely too early to see shifts towards Energy Community locations either among newly built projects or those that entered interconnection queues in 2023. - Approximately 35% of onshore wind, 50% of solar, and 60% of storage capacity built in 2023 and the first half of 2024 are located in Energy Communities, making them likely eligible for bonus incentives. While these bonus incentives were not available to projects coming online before 2023, we used 2023 Energy Community definitions to classify whether past projects were built in what is now considered an Energy Community. The deployment levels for 2023-2024 are similar to recent years (2020-2022) for solar and storage but slightly lower for wind. - Clean energy capacity has surged in the interconnection queues over the last few years, with about 45-50% of both recently proposed and total queued capacity being located in Energy Communities. While the amount of capacity in Energy Communities has also grown, its relative share is either stable (solar and storage) or slightly lower (wind) among projects that entered the queue in 2023. - Clean energy projects can be built at lower costs in Energy Communities. The levelized cost of energy after incentives was on average $\$9$/MWh (24%) lower for solar projects and $\$2$/MWh (6%) lower for wind projects built in 2023, relative to projects not located in Energy Communities. Wholesale electricity values at Energy Community locations relative to the rest of the market vary by region. The average value was often higher for wind projects (-$\$3$ to $\$11$/MWh) but lower for solar projects (-$\$6$ to 0/MWh). - Distributed solar that is owned by commercial entities is eligible for the Energy Community bonus and also, potentially, a Low-Income Community bonus. Residential solar installations in qualifying Energy Communities that are third-party owned represent about 10% of the total residential market. Larger commercial and industrial solar installations in Energy Communities make up 17% of the total market in 2023. Nearly 2 GW of distributed solar was built in areas qualifying as Low-Income Communities in 2023, exceeding the available annual program cap of 700 MW. Continued tracking of these trends will be important for system planners, investors, and local communities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Data from: "Warming and the dependence of limber pine (Pinus flexilis) establishment on summer soil moisture within and above its current elevation range"

This data package contains data that were used for analysis in “Warming and the dependence of limber pine (Pinus flexilis) establishment on summer soil moisture within and above its current elevation range”, by Moyes et al. 2013. All data collection and field research were completed on Niwot Ridge, Colorado, USA.This data package contains nine comma-separated-values (.csv) files, one text (.txt) file, and two zipped seedling folders that were used for leaf area analysis. One zipped folder contains 468 .jpg photographs of seedlings, and the second contains 468 corresponding Image J-processed .jpg images that include silhouette leaf area values. .csv and .txt files can be opened using any compatible simple text-editor software such as TextEdit (Mac) and Notepad (Windows); .csv’s can also be opened using R and Microsoft Excel. Image files can be opened using Preview (Mac) and Photos (Windows). In addition, there are a total of 31 Microsoft Excel files: three .xlsx files, and 28 raw Li-Cor output .xls files. This data user’s guide is available in .pdf format, and can be opened using Adobe Acrobat Reader, or any other compatible file viewing software. Geospatial data showing field site locations are also included in the archive for use and reference. There are two geospatial formats in this archive: ESRI shapefiles (.shp) and keyhole markup-language (.kml) files. Both file types contain bounding box information, with the former being polygons, and the latter containing corner coordinates for each site. ESRI shapefiles can be opened using any geospatial software compatible with the file type (such as ESRI’s ArcGIS suite and QGIS), and .kml files are compatible with Google Earth and Google Maps.--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Continued changes in climate are projected to alter the geographic distributions of plant species, in part by affecting where individuals can establish from seed. We tested the hypothesis that warming promotes uphill redistribution of subalpine tree populations by reducing cold limitation at high elevation and enhancing drought stress at low elevation. We seeded limber pine (Pinus flexilis) into plots with combinations of infrared heating and water addition treatments, at sites positioned in lower subalpine forest, the treeline ecotone, and alpine tundra. In 2010, first-year seedlings were assessed for physiological performance and survival over the snow-free growing season. Seedlings emerged in midsummer, about 5–8 weeks after snowmelt. Low temperature was not observed to limit seedling photosynthesis or respiration between emergence and October, and thus experimental warming did not appear to reduce cold limitation at high elevation. Instead, gas exchange and water potential from all sites indicated a prevailing effect of summer moisture stress on photosynthesis and carbon balance. Infrared heaters raised soil growing degree days (base 5 °C, p < 0.001) and August–September mean soil temperature (p < 0.001). Despite marked differences in vegetation cover and meteorological conditions across sites, volumetric soil moisture content (θ) at 5–10 cm below 0.16 and 0.08 m^3 m^(−3) consistently corresponded with moderate and severe indications of drought stress in midday stem water potential, stomatal conductance, photosynthesis, and respiration. Seedling survival was greater in watered plots than in heated plots (p = 0.01), and negatively related to soil growing degree days and duration of exposure to θ < 0.08 m^3 m^(−3) in a stepwise linear regression model (p < 0.0001). We concluded that seasonal moisture stress and high soil surface temperature imposed a strong limitation to limber pine seedling establishment across a broad elevation gradient, including at treeline, and that these limitations are likely to be enhanced by further climate warming.--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Maintenance log:Amended file name error in Data User's Guide May 19 2022

54 ENVIRONMENTAL SCIENCES↗

Least-Cost Pathways for India's Electric Power Sector

The Government of India has a target of deploying 175 GW from renewable energy by 2022 and 40% of electricity capacity from renewable energy by 2030 and has indicated that ambitions for 2030 could be higher. Rapid changes in technology costs and performance could drive further deployment of wind and solar capacity beyond these policy targets. Increased deployment of variable renewable energy (VRE) raises new questions for power system planning regarding the optimal siting of generation capacity, trade-offs between generation and transmission infrastructure, and system flexibility needs. This study aims to evaluate least-cost pathways for India's electric power system over the period 2017-2047. Uniquely, this work considers an expanded planning horizon and range of scenarios not previously analyzed in national planning studies in India. The data collection and model design processes undertaken for this study provides a framework for recurring planning studies. This study finds anticipated changes in electricity demand and component costs can drive a significant shift in India's future electricity supply and how this system will be operated. In the Base scenario, the share of generation from VRE reaches 54% by 2047. Reducing the capital cost of wind has a larger impact on VRE penetration than reducing the capital cost of solar PV or battery storage. In the lowest wind cost scenario (40% capital cost decline by 2047 relative to the Base scenario), the penetration of VRE in the generation mix reaches 722%, exceeding the penetration levels achieved when the cost of battery storage or solar PV are reduced by an even greater 50%. In a future system with high penetrations of RE, capacity additions are driven by the coincidence of demand and RE generation rather than peak demand alone. This study finds the system could have surplus capacity during the peak demand months of July–September because this period corresponds to periods with high wind speeds and more wind generation available to meet peak demand. By contrast, new capacity is needed to meet demand during moderate demand months of October–November when output from wind plants falls more than 75% nationally compared to the previous two months. Finally, the success for gas for electricity production may depend on cost competitiveness rather than fuel availability. Increasing the amount of gas available for electricity production had no significant impact on the capacity or generation mix by 2047, as determined from a scenario that significantly increases fuel availability throughout the planning horizon. In fact, over 80% of new gas fuel available for the power sector remains unused. This suggests the high cost of gas plant operations relative to other technologies may constrain the expansion of gas generation in India more than fuel availability.

14 SOLAR ENERGY↗

Power Supply Options for the Marpi Landfill, Saipan: Feasibility Study

The Marpi Landfill, located on the northern end of the island of Saipan in the Commonwealth of the Northern Mariana Islands (CNMI), is powered by an on-site diesel generator that only operates when the landfill is open and staffed. The CNMI Office of Planning and Development (OPD) aspires to provide the Marpi Landfill with 24-hour power availability despite its remote location and to increase the use of sustainable energy within the CNMI. CNMI has a 20% target for renewable energy consumption, as documented in Sustainable Development Goal #7 in the Comprehensive Sustainable Development Plan (OPD 2021) and the renewable portfolio standard (GPO 2014). To accomplish these goals, the U.S. Department of Energy, through its Interagency Reimbursable Work Agreement with the Federal Emergency Management Agency, funded this feasibility study to assess and prioritize power supply options for the landfill. The availability of solar and wind resources varies seasonally, as does the load. A BESS can help to balance mismatches between generation and load on short (hourly or daily) timescales, but not across seasons. The microgrid scenarios evaluated for Marpi consider options for technology combinations that will both meet the load and utilize available resources, despite the challenge presented by higher loads and lower solar and wind availability during the rainy season, depicted in Figure ES-2. The seven scenarios evaluated are summarized in Table ES-1. Each scenario’s configuration was optimized to include component capacities that reduce capital and operating costs, meet the load, and minimize carbon emissions, as feasible. The costs and levelized cost of energy (LCOE) shown do not assume the use of any grant funding or incentives, although these options were also evaluated. To assist with decision-making, a prioritization matrix (Table ES-3) was created to compare the microgrid scenarios evaluated in this feasibility study according to various stakeholder priorities. The prioritization metrics were chosen based on discussions with OPD and will be finalized through stakeholder feedback. The scenarios were given a score between 1 and 7 for each prioritization metric (the lower the score, the higher the priority), and total scores were calculated using assigned weights based on the relative priority of each metric. The total scores were then ranked to produce a prioritized list of microgrid scenarios based on the metrics most important to the project stakeholders. As shown, scenario 4 (100 kW of solar PV, a 75 kW/300 kWh BESS, and 160 kW of diesel generation) ranks highest.

14 SOLAR ENERGY↗

Representing the Future Role of Hydropower and Pumped Storage Hydropower (PSH) in Electricity Planning Tools

Existing tools for long-term electric sector planning struggle to represent hydropower's nuanced site-specific technical and operating characteristics, which depend on technical specifications as well as water management practices and regulations. As a result, long-term planning models and tools insufficiently characterize hydropower value and incentives, and they cannot fully represent the role hydropower can play in a future electricity system that could include a high penetration of variable wind and solar generation, battery storage, and other low-carbon technologies. This presentation demonstrates the culmination of a multi-year effort to enhance hydropower representations in electricity planning models at the National Renewable Energy Laboratory (NREL), as part of the U.S. Department of Energy (USDOE) HydroWIRES Initiative. New modeling techniques are demonstrated using the NREL Regional Energy Deployment System (ReEDS), an open-access electric sector capacity expansion model used extensively in a wide range of technology deployment and integration analysis, including the 2016 USDOE Hydropower Vision. ReEDS uses a least-cost optimization approach to understand investment and operation of electricity generation, storage, and transmission technologies under future scenarios of electricity technology innovation, demand, policy, and other sectoral drivers. ReEDS was modified to better represent value and opportunities for both pumped storage hydropower (PSH) and hydropower systems without pumping. We incorporated a new national closed-loop PSH resource and cost assessment to explore new PSH deployment opportunities and added plant-level data to better represent the existing PSH fleet. New upgrade pathways enable opportunities for enhanced hydropower flexibility by adding pumps, upgrading dispatchability, increasing capacity, or increasing energy availability. The model was also modified to better represent the value of long-duration energy storage beyond diurnal time scales, allowing both hydropower and PSH to better balance energy supply and demand variations in high-renewable systems. These new features are demonstrated under reference and high-renewable futures and a range of sensitivity scenarios to understand which hydropower and PSH deployment and upgrade opportunities are the most attractive. These scenarios indicate potential for new closed-loop PSH deployment and for hydropower flexibility improvements to have important impacts on long-term electricity system emissions and economic outcomes. Increasing flexibility of the existing hydropower fleet can reduce the need to invest in new flexible grid technologies and help achieve decarbonization goals. Systems with sufficient energy storage could also be valuable for balancing seasonal differences in renewable energy availability, particularly from solar energy. The methods developed for ReEDS and subsequent scenario results reveal important considerations for future hydropower and grid system planning, and all data and code is freely available in a public code repository for use throughout the hydropower industry.

capacity expansion↗

WHONDRS River Corridor Sediment and Water Geochemistry and In Situ Sensor Data from Machine-Learning-Informed Sites across the Contiguous United States (v6)

This dataset supports a broader study examining hyporheic zone respiration rates to improve predictive models at a contiguous United States (CONUS) scale. The CONUS-Scale Model-Sample Study (CM) was designed following ICON (integrated, coordinated, open, and networked) principles to facilitate a model-experiment (ModEx) iteration approach, leveraging crowdsourced sampling across the CONUS. New machine learning models were created every month to guide sampling locations. Data from the resulting samples were used to test and rebuild the machine learning models for the next round of sampling guidance. Sampling began in April 2022 and ended in October 2023. In addition to the widely distributed CONUS sites, a more spatially focused sampling occurred in the Yakima River Basin, WA in summer 2022. Data from this more spatially intensive sampling occurred under the label “Second Spatial Study (SSS)” and were also included in the machine learning models. Other data types collected from SSS that were not part of CM were published in a separate data package (https://data.ess-dive.lbl.gov/view/doi:10.15485/1969566). This data package was originally published in February 2023. It was updated in June 2023 (v2; new and modified files); December 2023 (v3; new and modified files); June 2024 (v4; new and modified files); April 2024 (v5; new and modified files); and September 2025 (v6; modified files). See the change history section in the readme for more details. For details on how to navigate data packages generated by this project, see https://data.ess-dive.lbl.gov/portals/PNNLRiverCorridorSFA/About. This dataset is comprised of two folders of field photos and videos, one folder of raw Fourier transform ion cyclotron resonance mass spectrometry (FTICR-MS) data and one main data folder containing (1) file-level metadata; (2) data dictionary; (3) field metadata; (4) readme; (5) international generic sample number (IGSN) mapping file; (6) field protocols; (7) a subfolder with sample data; and (8) a subfolder with sensor data. The sample data subfolder contains (1) surface water and sediment dissolved organic carbon (DOC, measured as non-purgeable organic carbon, NPOC) data and averages; (2) surface water and sediment total nitrogen data and averages; (3) surface water major cations and anions and averages; (4) sediment grain size data; (5) sediment iron (II) data and averages; (6) wet sediment mass, dry sediment mass, water mass, and wet sediment volume in incubation and sediment ICR vials; (7) sediment incubation respiration rate data and averages; (8) normalized respiration rate data and averages; (9) methods codes; (10) sediment specific surface area; (11) sediment percent carbon and nitrogen; (12) sediment gravimetric moisture and averages; (15) sediment X-ray diffraction (XRD) data; (16) sediment adenosine triphosphate (ATP) and averages; (17) a subfolder with sediment incubation respiration data, scripts, and plots; (18) surface water and sediment FTICR methods; and (19) a subfolder of 9.4 Tesla (9.4T) FTICR-MS data. This folder contains five subfolders, one containing the sediment .xml data files, one containing the water .xml files, one containing the sediment CoreMS output files, one containing the water CoreMS output files, and the other containing instructions and scripts for processing the files in CoreMS (https://github.com/EMSL-Computing/CoreMS).The sensor data subfolder contains (1) a subfolder with miniDOT dissolved oxygen and temperature data and plots; (2) miniDOT dissolved oxygen and temperature summary data; and (3) miniDOT installation methods. All files are .csv, .pdf, .R, .xml, .d, .html, .Rmd, .py, .cal, .json, .jpg, .jpeg, .png, .mov, or .mp4. CORRECTION: Carbon and nitrogen content are reported as percentages. The current column headers "01395_C_percent_per_mg" and "01397_N_percent_per_mg" are incorrect. These should read "01395_C_percent" and "01397_N_percent" and will be corrected in the next version of this data package. We thank the United States Forest Service, Washington Department of Fish and Wildlife, Washington Department of Natural Resources, Cowiche Canyon Conservatory, Washington State Parks and Recreation Commission (Scientific Research Permit #210901), and the Confederated Tribes and Bands of the Yakama Nation for access to field locations where the samples labeled “SSS” were collected. We also thank the Yakama Nation Tribal Council and Yakama Nation Fisheries for working with us to facilitate sample collection and optimization of data usage according to their values and worldview. WHONDRS consortium members were asked to provide any acknowledgments for the collection of samples labeled “CM” and the following is a list of acknowledgments that were submitted with their corresponding Site IDs: (MART) Research activities were conducted in part on the Wind River Experimental Forest within the Gifford Pinchot National Forest; (MP- 100379) Philadelphia is part of Lenapehoking, the ancestral homelands of the Lenape peoples; (MP-102398) Land surveyed is the ancestral homelands of the Nookhose'iinenno (Arapaho), Tsis tsis'tas (Cheyenne), and Nuuchu (Ute); (MP-100749 and MP- 100747) Georgia Coastal Ecosystem LTER, OCE-1832178; (SP-70 and SP-72) Eastern Shoshone, Shoshone-Bannock; (MP- 102944) Funded by Oregon Watershed Enhancement Board. On the traditional lands of the Confederated Tribes of the Siletz, Confederated Tribes of the Grand Rhonde, and the Clatsop-Nehalem Confederated Tribe; (MP- 100607) Holiday Creek is located on the traditional territory of the Monacan Indian Nation; (SP-45) Lafayette Blue Springs State Park; (MP-102420) NSF DEB-2016749; (MP-100019) New Hampshire Agriculture Experiment Station; (SP-35) Rayonier (land owner; https://www.rayonier.com/); (MP- 101276) US Department of Energy, Office of Science, Biological and Environmental Research, Subsurface Biogeochemical Research, Watershed Dynamics and Evolution SFA at ORNL; (MP- 103224) Watershed Dynamics and Evolution SFA at ORNL; (MP- 101584) Traditional lands of the Oceti Sakowin (Dakota, Lakota, Nakoda) and Anishinaabe Peoples.

54 ENVIRONMENTAL SCIENCES↗

Data from: "Snowmelt Timing Regulates Community Composition, Phenology, and Physiological Performance of Alpine Plants"

This archive contains data that were used to support conclusions drawn in “Snowmelt Timing Regulates Community Composition, Phenology, and Physiological Performance of Alpine Plants”, by Winkler et al., 2018. Data were collected throughout the 2009 growing season on Niwot Ridge, Colorado, before the site became part of the Alpine Treeline Warming Experiment (ATWE). Geospatial files are included in this archive to provide additional locational context. The files in this data package consist of five comma-separated-values (.csv) files, one keyhole markup language (.kml) file, and two ESRI shapefiles (.shp). The .csv files can be opened by Microsoft Excel, R, or any simple text-editor software, such as TextEdit (MacOS) or Notepad (Windows). The .kml files can be opened by Google Maps or Google Earth, and the .shp files are compatible with GIS softwares such as ESRI’s ArcGIS suite, and QGIS.------------------------------------------------------------------------------------------------------------------------------------------------------------------------------We asked how plant community composition, phenology, plant water relations, and photosynthetic gas exchange of alpine-restricted and wide-ranging species differ in their responses to a ca. 40-day snowmelt gradient in the Colorado Rocky mountains (Lewisia pygmaea, Sibbaldia procumbens, and Hymenoxys grandiflora were alpine-restricted and Artemisia scopulorum, Carex rupestris, and Geum rossii were wide-ranging species). To do this, we measured percent cover and flowering initiation across 20 plots varying in snowmelt timing and measured net photosynthesis and stomatal conductance in multiple individuals of each target species in these plots in 2009.As hypothesized, species richness and foliar cover increased with earlier snowmelt, due to a greater abundance of wide-ranging species present in earlier melting plots. Flowering initiation occurred earlier with earlier snowmelt for 12 out of 19 species analyzed, while flowering duration was shortened with later snowmelt for six species (all but one were wide ranging species). We observed >50% declines in net photosynthesis from July to September as soil moisture and plant water potentials declined. Early-season stomatal conductance was higher in wide-ranging species, indicating a more competitive strategy for water acquisition when soil moisture is high. Even so, there were no associated differences in photosynthesis or transpiration, suggesting no strong differences between these groups in physiology.

54 ENVIRONMENTAL SCIENCES↗