Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “departure time”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Predicting Airport Runway Configurations for Decision-Support Using Supervised Learning

One of the most challenging tasks for air traffic controllers is runway configuration management (RCM). It deals with the optimal selection of runways to operate on (for arrivals and departures) based on traffic, surface wind speed, wind direction, other environmental variables, noise constraints, and several other airport-specific factors. It affects the efficiency of the National Airspace System (NAS) and both surface and airspace operations can benefit from better understanding future runway configurations. In this paper, we present a comprehensive implementation of predictive models for runway configuration estimation from large volumes of historical data. Specifically, operational data from two full years (2018 and 2019) is collected, analyzed, and fused together to build the data product used in this work. The data set differs from prior work in the field in terms of its scope, resolution, and variety of factors collected and considered. Meteorological data is collected from two different sources – current weather conditions from METAR (Meteorological Terminal Aviation Routine Weather Report) and forecast weather conditions from Localized Aviation MOS Program (LAMP). Operational data from the Federal Aviation Administration (FAA) Aviation System Performance Metrics (ASPM) related to scheduled and actual number of arrivals and departures, average taxi times, etc. are collected. NASA’s Sherlock Data Warehouse is used to identify critical information such as go-arounds, and other events that might impact RCM decision-making. All data is collected and aggregated over 15-minute intervals throughout the two years. This provides a resolution like the timescales that might be necessary for runway configuration management decision-making. A variety of supervised learning algorithms are tested including Support Vector Machine, Random Forest, Gradient Boosting, etc. including tuning of the model hyperparameters. The modeling process is applied and presented on two representative U.S. airports – Charlotte Douglas International Airport (KCLT) and Denver International Airport (KDEN). The two airports present different levels of complexity in terms of the total number of configurations used and provide a balanced perspective on the generalizability of the developed approach to other airports in the NAS. Initial results are promising (F1 score of 0.91 at KCLT and 0.83 at KDEN) for data in the test set. The final paper will contain a comprehensive comparison between different models and model building strategies as well as further refined results. Most important predictors for each airport will be identified along with a discussion and recommendations on adapting the framework to other scenarios.

Tejas G Puranik↗

The Carrier's Liability for Damage Caused by Delay in International Air Transport

Delay in the air transport occurs when passengers, baggage or cargo do not arrive at their destination at the time indicated in the contract of carriage. The causes of delay in the carriage of passengers are booking errors or double booking, delayed departure of aircraft, incorrect information regarding the time of departure, failure to land at the scheduled destination and changes in flight schedule or addition of extra landing stops. Delay in the carriage of baggage or cargo may have different causes: no reservation, lack of space, failure to load the baggage or cargo at the right place, or to deliver the covering documents at the right place. The Montreal Convention of 1999 Article 19 provides that 'The carrier is liable for damage occasioned by delay in the carriage by air of passengers, baggage or cargo. Nevertheless, the carder shall not be liable for damage occasioned by delay if it proves that it and its servants and agents took all measures that could reasonably be required to avoid the damage or that it was impossible for it or them to take such measures'. The Montreal Convention Article 22 provides liability limits of the carrier in case of delay for passengers and their baggage and for cargo. In the carriage of persons, the liability of the carrier for each passenger is limited to 4,150 SDR. In the carriage of baggage, the liability of the carrier is limited to 1,000 SDR for each passenger unless a special declaration as to the value of the baggage has been made. In the carriage of cargo, the liability of the carrier is limited to 17 SDR per kilogram unless a special declaration as to the value of the cargo has been made. The Montreal Convention Article 19 has shortcomings: it is silent on the duration of the liability for carriage,andit does not make any distinction between persons and good. It does not give any indication concerning the circumstances to be taken into account in cases of delay, and about the length of delay. In conclusion, it is desirable to define the period of carriage with accuracy, and to insert the word 'unreasonable' in Article 19.

Lee, Kang Bin↗

Performance Evaluation of Conflict-Free Trajectory Taxiing in Airport Ramp Area Using Fast-Time Simulations

The German Aerospace Center (DLR) and the National Aeronautics and Space Administration (NASA) have been collaborating to conduct joint research addressing future surface traffic management challenges. The surface management tool from DLR, called Taxi Routing for Aircraft: Creation and Controlling (TRACC), was adapted to be integrated in NASA's fast-time simulation environment called Surface Operations Simulator and Scheduler (SOSS). The research described in this paper 1) applied TRACC to trajectory-based ramp traffic management, where TRACC generates conflict-free aircraft trajectories in a congested ramp area, 2) investigated the feasibility of the concept through the integrated TRACC-SOSS fast-time simulation, and 3) evaluated the performance of the integrated system. For this activity, TRACC was adapted for ramp operations at Charlotte Douglas International Airport, called TRACC_PB (TRACC for pushback optimization). TRACC_PB provides four-dimensional taxi trajectories with a command speed profile for each aircraft following standard taxi routes within the ramp area. In this study, departures are given the Target Movement Area entry Times (TMATs) provided by the baseline surface metering scheduler based on NASA's Spot and Runway Departure Advisor (SARDA). TRACC_PB also calculates optimal pushback times for departures, as well as the times when arrivals shall enter the ramp, the Target Movement area Exit Times (TMETs). The initial results showed that the TRACC_PB successfully generated conflict-free trajectories for the ramp area taxi operations and improved taxiing efficiency compared to the baseline results. TRACC_PB aimed to provide conflict-free taxi routes avoiding any stops while taxiing. This resulted in longer gate hold times for departures and postponed throughput values compared to the baseline simulation without trajectory optimization. Having conflict-free routes without stoppage also created shorter taxi times but required renegotiation of the given TMATs. TRACC_PB also achieved reductions in both fuel consumption and engine emissions (17% for departures and 10% for arrivals), which correlate with the ramp taxi time reduction.

trajectory-based taxi operations↗

Scheduling and Delivering Aircraft to Departure Fixes in the NY Metroplex with Controller-Managed Spacing Tools

In this paper, successful Time-Based Flow Management (TBFM) scheduling systems for arrivals are considered and adapted to apply to departures. We present a concept of operations that integrates Controller-Managed Spacing tools for departures (CMS-D) with existing tactical departure scheduling tools to coordinate demand at departure fixes in a metroplex environment. We tested our concept in a Human-in-the-Loop simulation and compared the effect of two scheduling conditions: 1) "Departure Scheduling" consisting of an emulation of the Integrated Departure and Arrival Capability (IDAC) where Towers and a Planner (Traffic Management Coordinator at the appropriate facility) coordinate aircraft scheduled takeoff times to departure fixes; and 2) "Arrival Sensitive Departure Scheduling" where, in addition, the Tower and Planner also consider arrival Scheduled Time of Arrivals (STAs) at the airport's dependent runway. Results indicate little difference between the two scheduling conditions, but a large difference between the No Tools and the two scheduling conditions with CMS-D tools. The scheduling/CMS-D tools conditions markedly reduced heading, speed clearances, and workload for controllers who were merging flows at the departure fixes. In the tool conditions, departure controllers conditioned departures earlier rather than later when aircraft were tied near the departure fixes. In the scheduling/CMS-D tools conditions, departures crossed the departure fixes 50 seconds earlier and with an 8% error rate (consisting of time ahead or behind desired time of arrival) compared to a 19% error rate in the No Tool condition. Two exploratory runs showed that similar beneficial effects can be obtained only with the CMS-D tools without scheduling takeoff times, but at the cost of a somewhat higher workload for controllers, indicating the benefits of pre-departure scheduling of aircraft with minimal delays. Hence, we found that CMS-D tools were very beneficial in the metroplex environment we tested but that further research is needed to clarify the benefits of the various scheduling approaches.

terminal airspace↗

Launch and Assembly Reliability Analysis for Human Space Exploration Missions

NASA's future human space exploration strategy includes single and multi-launch missions to various destinations including cis-lunar space, near Earth objects such as asteroids, and ultimately Mars. Each campaign is being defined by Design Reference Missions (DRMs). Many of these missions are complex, requiring multiple launches and assembly of vehicles in orbit. Certain missions also have constrained departure windows to the destination. These factors raise concerns regarding the reliability of launching and assembling all required elements in time to support planned departure. This paper describes an integrated methodology for analyzing launch and assembly reliability in any single DRM or set of DRMs starting with flight hardware manufacturing and ending with final departure to the destination. A discrete event simulation is built for each DRM that includes the pertinent risk factors including, but not limited to: manufacturing completion; ground transportation; ground processing; launch countdown; ascent; rendezvous and docking, assembly, and orbital operations leading up to trans-destination-injection. Each reliability factor can be selectively activated or deactivated so that the most critical risk factors can be identified. This enables NASA to prioritize mitigation actions so as to improve mission success.

Cates, Grant↗

Geospatial Analysis of Built Infrastructure and Modeled Household Driving Patterns

The level of access to opportunities for a location can be quantified in the amount of time it takes to travel from a departure point to the destinations that somebody would want or need to visit. Isochrone maps are geometric representations of the area accessible from a departure point within a set amount of time. Informed in part by the National Household Travel Survey, this report merges location data for amenities and opportunities across six frequent destination categories – employment, education, health, food, community, and transportation – with isochrone maps generated by the TravelTime API, whose departure points are census tract population-weighted centroids. Using a “Points-In-Polygon” analysis, destinations that fall within a census tract’s isochrone are tallied as accessible from the region within one of three time thresholds: 15-, 30-, and 45-minutes by the walking, cycling, public transit, and driving modes of travel. We find that access to a high number of jobs within a typical commute duration is negatively correlated with annual household vehicle miles traveled (VMT). The spatial distribution of our data suggests that the high household VMT frequently seen surrounding the edges of major cities may be related to worker commutes into the city core, and that the high household VMT frequently seen in rural tracts may be related to the longer travel distances required to access a variety of key opportunities from these areas.

99 GENERAL AND MISCELLANEOUS↗

Assessing Tactical Scheduler Options for Time-Based Surface Metering

NASA is committed to demonstrating a concept of integrated arrival, departure, and surface operations by 2020 under the Airspace Technology Demonstration 2 (ATD2) sub-project. This will be accomplished starting with a demonstration of flight specific time-based departure metering at Charlotte Douglass International Airport (CLT). ATD2 tactical metering capability is based on NASAs Spot And Runway Departure Advisor (SARDA) which has been tested successfully in human-in-the-loop simulations of CLT. SARDA makes use of surface surveillance data and surface modeling to estimate the earliest takeoff time for each flight active on the airport surface or ready for pushback from the gate. The system then schedules each flight to its assigned runway in order of earliest takeoff time and assigns a target pushback time, displayed to ramp controllers as an advisory gate hold time. The objective of this method of departure metering is to move as much delay as possible to the gate to minimize surface congestion and engine on-time, while keeping sufficient pressure on the runway to maintain throughput. This flight specific approached enables greater flight efficiency and predictability, facilitating trajectory-based operations and surface-airspace integration, which ATD2 aims to achieve.Throughout ATD2 project formulation and system development, researchers have continuously engaged with stakeholders and future users, uncovering key system requirements for tactical metering that SARDA did not address. The SARDA scheduler is updated every 10 seconds using real-time surface surveillance data to ensure the most up-to-date information is used to predict runway usage. However, rapid updates also open the potential for fluctuating advisories, which Ramp controllers at a busy airport like CLT find unacceptable. Therefore, ATD2 tactical metering requires that all advisories freeze once flights are ready so that Ramp controllers may communicate a single hold time when responding to pilot ready calls.

Zelinski, Shannon↗

Analysis of ETMS Data Quality for Traffic Flow Management Decisions

The data needed for air traffic flow management decision support tools is provided by the Enhanced Traffic Management System (ETMS). This includes both the tools that are in current use and the ones being developed for future deployment. Since the quality of decision support provided by all these tools will be influenced by the quality of the input ETMS data, an assessment of ETMS data quality is needed. Motivated by this desire, ETMS data quality is examined in this paper in terms of the unavailability of flight plans, deviation from the filed flight plans, departure delays, altitude errors and track data drops. Although many of these data quality issues are not new, little is known about their extent. A goal of this paper is to document the magnitude of data quality issues supported by numerical analysis of ETMS data. Guided by this goal, ETMS data for a 24-hour period were processed to determine the number of aircraft with missing flight plan messages at any given instant of time. Results are presented for aircraft above 18,000 feet altitude and also at all altitudes. Since deviation from filed flight plan is also a major cause of trajectory-modeling errors, statistics of deviations are presented. Errors in proposed departure times and ETMS-generated vertical profiles are also shown. A method for conditioning the vertical profiles for improving demand prediction accuracy is described. Graphs of actual sector counts obtained using these vertical profiles are compared with those obtained using the Host data for sectors in the Fort Worth Center to demonstrate the benefit of preprocessing. Finally, results are presented to quantify the extent of data drops. A method for propagating track positions during ETMS data drops is also described.

Chatterji, Gano B.↗

Turbulence Climatology at Dallas/Ft.Worth (DFW) Airport: Implications for a Departure Wake Vortex Spacing System

Potential adaptive wake vortex spacing systems may need to rely on wake vortex decay rather than wake vortex transport in reducing wake separations. A wake vortex takeoff-spacing system in particular will need to rely on wake decay. Ambient turbulence is the primary influence on wake decay away from the ground. This study evaluated 18 months of ambient turbulence measurements at Dallas/Ft. Worth (DFW) Airport. The measurements show minor variation in the turbulence levels at various times of the year or times of the day for time periods when a departure system could be used. Arrival system operation was also examined, and a slightly lower overall turbulence level was found as compared to departure system benefit periods. The Sarpkaya model, a validated model of wake vortex behavior, was applied to various turbulence levels and compared to the DFW turbulence statistics. The results show that wake vortices from heavy aircraft on takeoff should dissipate within one minute for the majority of the time and will rarely last two minutes. These results will need to be verified by wake vortex measurements on departure.

Perras, G. H.↗

Optimization of multiple target electric propulsion trajectories.

Development of the mathematical basis for the generation of multiple target low-thrust trajectories. The unique trajectory shaping capabilities of electric propulsion make it ideally suited for modifying the path of the spacecraft to effect close encounters of selected asteroids with only slight penalties in performance. Each intermediate encounter with an asteroid involves the optimization of four parameters, the encounter time and the three components of the relative velocity at encounter. A second type of mission amenable to this analysis is that of asteroid or comet sample return missions. For missions of this type, both launch date and division of departure and return flight times are capable of being optimized. Use is made of the traditional calculus of variations to derive the necessary conditions that must be satisfied for both types of missions. In addition, examples are presented of both a Comet Encke rendezvous mission with multiple encounters of the asteroids Aschera and Alekto and also a sample return mission from the asteroid Flora.

Sauer, C. G., Jr.↗

A Concept and Implementation of Optimized Operations of Airport Surface Traffic

This paper presents a new concept of optimized surface operations at busy airports to improve the efficiency of taxi operations, as well as reduce environmental impacts. The suggested system architecture consists of the integration of two decoupled optimization algorithms. The Spot Release Planner provides sequence and timing advisories to tower controllers for releasing departure aircraft into the movement area to reduce taxi delay while achieving maximum throughput. The Runway Scheduler provides take-off sequence and arrival runway crossing sequence to the controllers to maximize the runway usage. The description of a prototype implementation of this integrated decision support tool for the airport control tower controllers is also provided. The prototype decision support tool was evaluated through a human-in-the-loop experiment, where both the Spot Release Planner and Runway Scheduler provided advisories to the Ground and Local Controllers. Initial results indicate the average number of stops made by each departure aircraft in the departure runway queue was reduced by more than half when the controllers were using the advisories, which resulted in reduced taxi times in the departure queue.

Jung, Yoon C.↗

ATD-2 TFDM Terminal Publication Service (TTP)

Learn the many benefits of the newest SWIM feed from the surface system. This will discuss current options to onboard with this feed, allow participants to ask questions and provide some examples of how the data can be used. Service Includes Flight Data Individual flight updates containing flight identifiers, targeted times, actual times, runway, parking gate, spot, departure fix (predicted, assigned, actual as appropriate), flight states, and more. Airport Information Airport configurations, airport and runway rates, ramp closures, runway closures, taxiway closures. Traffic Management Restrictions Call for Release programs departure MIT/MINIT restrictions, departure stop/ground stop programs. Along with list of impacted flights for each. Flight Delay Airport and runway delay by arrival, departure, and total. Operational Metrics Metrics on airport throughput and individual flight metrics. Surface Metering Program SMP start / end times, metering constraint type / details, updates to existing programs, TMAT compliance window, departure queue length, and more.

Gorman, Shawn M.↗

Teaching high-performance skills using above-real-time training

The above real-time training (ARTT) concept is an approach to teaching high-performance skills. ARTT refers to a training paradigm that places the operator in a simulated environment that functions at faster than normal time. It represents a departure from the intuitive, but not often supported, feeling that the best practice is determined by the training environment with the highest fidelity. This approach is hypothesized to provide greater 'transfer value' per simulation trial, by incorporating training techniques and instructional features into the simulator. Two related experiments are discussed. In the first, 25 naive male subjects performed three tank gunnery tasks on a simulator under varying levels of time acceleration (i.e., 1.0x, 1.6x, 2.0x, sequential, and mixed). They were then transferred to a standard (1.0x) condition for testing. Every accelerated condition or combination of conditions produced better training and transfer than the standard condition. Most effective was the presentation of trials at 1.0x, 1.6x, and 2.0x in a random order during training. Overall, the best ARTT group scored about 50 percent higher and trained in 25 percent less time compared to the real-time control group. In the second experiment, 24 mission-capable F-16 pilots performed three tasks on a part-task F-16A flight simulator under varying levels of time compression (i.e., 1.0x, 1.5x, 2.0x, and random). All subjects were then tested in a real-time environment. The emergency procedure (EP) task results showed increased accuracy for the ARTT groups. In testing (transfer), the ARTT groups not only performed the EP more accurately, but dealt with a simultaneous enemy significantly better than a real-time control group. Although the findings on an air combat maneuvering task and stern conversion task were mixed, most measures indicated that the ARTT groups performed better and faster than a real-time control group. Other implications for ARTT are discussed along with future research directions.

Guckenberger, Dutch↗

Evaluation of the Monotonic Lagrangian Grid and Lat-Long Grid for Air Traffic Management

The Air Traffic Monotonic Lagrangian Grid (ATMLG) is used to simulate a 24 hour period of air traffic flow in the National Airspace System (NAS). During this time period, there are 41,594 flights over the United States, and the flight plan information (departure and arrival airports and times, and waypoints along the way) are obtained from an Federal Aviation Administration (FAA) Enhanced Traffic Management System (ETMS) dataset. Two simulation procedures are tested and compared: one based on the Monotonic Lagrangian Grid (MLG), and the other based on the stationary Latitude-Longitude (Lat- Long) grid. Simulating one full day of air traffic over the United States required the following amounts of CPU time on a single processor of an SGI Altix: 88 s for the MLG method, and 163 s for the Lat-Long grid method. We present a discussion of the amount of CPU time required for each of the simulation processes (updating aircraft trajectories, sorting, conflict detection and resolution, etc.), and show that the main advantage of the MLG method is that it is a general sorting algorithm that can sort on multiple properties. We discuss how many MLG neighbors must be considered in the separation assurance procedure in order to ensure a five-mile separation buffer between aircraft, and we investigate the effect of removing waypoints from aircraft trajectories. When aircraft choose their own trajectory, there are more flights with shorter duration times and fewer CD&R maneuvers, resulting in significant fuel savings.

Kaplan, Carolyn↗

Evaluation of a Tactical Surface Metering Tool for Charlotte Douglas International Airport via Human-in-the-Loop Simulation

NASA has been working with the FAA and aviation industry partners to develop and demonstrate new concepts and technologies that integrate arrival, departure, and surface traffic management capabilities. In March 2017, NASA conducted a human-in-the-loop (HITL) simulation for integrated surface and airspace operations, modeling Charlotte Douglas International Airport, to evaluate the operational procedures and information requirements for the tactical surface metering tool, and data exchange elements between the airline controlled ramp and ATC Tower. In this paper, we focus on the calibration of the tactical surface metering tool using various metrics measured from the HITL simulation results. Key performance metrics include gate hold times from pushback advisories, taxi-in-out times, runway throughput, and departure queue size. Subjective metrics presented in this paper include workload, situational awareness, and acceptability of the metering tool and its calibration.

Verma, Savita↗

Evaluation of a Tactical Surface Metering Tool for Charlotte Douglas International Airport Via Human-in-the-Loop Simulation

NASA has been working with the FAA and aviation industry partners to develop and demonstrate new concepts and technologies that integrate arrival, departure, and surface traffic management capabilities. In March 2017, NASA conducted a human-in-the-loop (HITL) simulation for integrated surface and airspace operations, modeling Charlotte Douglas International Airport, to evaluate the operational procedures and information requirements for the tactical surface metering tool, and data exchange elements between the airline controlled ramp and ATC Tower. In this paper, we focus on the calibration of the tactical surface metering tool using various metrics measured from the HITL simulation results. Key performance metrics include gate hold times from pushback advisories, taxi-in/out times, runway throughput, and departure queue size. Subjective metrics presented in this paper include workload, situational awareness, and acceptability of the metering tool and its calibration

air traffic management↗

The Exploration of Mars Launch and Assembly Simulation

Advancing human exploration of space beyond Low Earth Orbit, and ultimately to Mars, is of great interest to NASA, other organizations, and space exploration advocates. Various strategies for getting to Mars have been proposed. These include NASA's Design Reference Architecture 5.0, a near-term flyby of Mars advocated by the group Inspiration Mars, and potential options developed for NASA's Evolvable Mars Campaign. Regardless of which approach is used to get to Mars, they all share a need to visualize and analyze their proposed campaign and evaluate the feasibility of the launch and on-orbit assembly segment of the campaign. The launch and assembly segment starts with flight hardware manufacturing and ends with final departure of a Mars Transfer Vehicle (MTV), or set of MTVs, from an assembly orbit near Earth. This paper describes a discrete event simulation based strategic visualization and analysis tool that can be used to evaluate the launch campaign reliability of any proposed strategy for exploration beyond low Earth orbit. The input to the simulation can be any manifest of multiple launches and their associated transit operations between Earth and the exploration destinations, including Earth orbit, lunar orbit, asteroids, moons of Mars, and ultimately Mars. The simulation output includes expected launch dates and ascent outcomes i.e., success or failure. Running 1,000 replications of the simulation provides the capability to perform launch campaign reliability analysis to determine the probability that all launches occur in a timely manner to support departure opportunities and to deliver their payloads to the intended orbit. This allows for quantitative comparisons between alternative scenarios, as well as the capability to analyze options for improving launch campaign reliability. Results are presented for representative strategies.

Cates, Grant↗

The Exploration of Mars Launch and Assembly Simulation

Advancing human exploration of space beyond Low Earth Orbit, and ultimately to Mars, is of great interest to NASA, other organizations, and space exploration advocates. Various strategies for getting to Mars have been proposed. These include NASA's Design Reference Architecture 5.0, a near-term flyby of Mars advocated by the group Inspiration Mars, and potential options developed for NASA's Evolvable Mars Campaign. Regardless of which approach is used to get to Mars, they all share a need to visualize and analyze their proposed campaign and evaluate the feasibility of the launch and on-orbit assembly segment of the campaign. The launch and assembly segment starts with flight hardware manufacturing and ends with final departure of a Mars Transfer Vehicle (MTV), or set of MTVs, from an assembly orbit near Earth. This paper describes a discrete event simulation based strategic visualization and analysis tool that can be used to evaluate the launch campaign reliability of any proposed strategy for exploration beyond low Earth orbit. The input to the simulation can be any manifest of multiple launches and their associated transit operations between Earth and the exploration destinations, including Earth orbit, lunar orbit, asteroids, moons of Mars, and ultimately Mars. The simulation output includes expected launch dates and ascent outcomes i.e., success or failure. Running 1,000 replications of the simulation provides the capability to perform launch campaign reliability analysis to determine the probability that all launches occur in a timely manner to support departure opportunities and to deliver their payloads to the intended orbit. This allows for quantitative comparisons between alternative scenarios, as well as the capability to analyze options for improving launch campaign reliability. Results are presented for representative strategies.

Cates, Grant↗