Psyche Project Implementation During the COVID Pandemic

In January 2017, “Psyche: Journey to a Metal World” was selected for implementation as part of NASA’s Discovery program. The Psyche mission will utilize electric propulsion with SPT-140 Hall thrusters to rendezvous and orbit the metal-rich asteroid (16) Psyche, in the main asteroid belt between Mars and Jupiter. The Psyche spacecraft requires no chemical propulsion and, when launched in 2022, will be the first mission to use Hall thrusters beyond lunar orbit. The Psyche spacecraft is a hybrid development with Jet Propulsion Laboratory (JPL)-provided deep-space avionics and communications equipment mounted on a high-heritage MAXAR (formerly Space Systems Loral) Solar-Electric Propulsion (SEP) Chassis, based on their 1300 series of GEO communications satellites. The spacecraft is equipped to support a suite of science instruments, as well as a demonstration of the Deep Space Optical Communications (DSOC) technology. The spacecraft has sufficient onboard resources, autonomy, redundancy, and operability to complete a 3.5-year cruise to 16 Psyche, followed by a 20-month campaign of science investigations while orbiting the asteroid.The mission’s early concept design and progress through Preliminary Design Review (PDR) has been described in previous work. The paper will cover the recent mission progress from the Critical Design Review (CDR) through the start of Spacecraft Environmental Testing, which took place during the COVID pandemic.The authors will highlight the successful remote collaboration between the major partners: ASU, JPL, MAXAR, and the Payload teams that led to the initiation of the Assembly, Test, Launch, Operations Phase (ATLO) in early March 2021. Emphasis will be placed on the effects that the COVID-19 pandemic had on the work environment over the last 16+ months, including challenges to delivery of flight hardware and test equipment. In addition to the COVID-19 challenges, other significant anomalies discovered during design and test will be described along with any impacts to the overall science capability of the mission.

Lord, Peter↗

Differenced Doppler tracking in interplanetary navigation - The Magellan cruise reconstruction

The Magellan mission was the first in which Doppler and differenced Doppler tracking data were acquired at X-band uplink/downlink frequencies from the Deep Space Network (DSN). This paper describes a reconstruction of the Venus approach-phase navigation investigating the capabilities of these data types, which are up to an order of magnitude more precise than similar data acquired at S-band frequencies in previous missions. Comparisons of orbit solutions obtained with Doppler, Doppler plus differenced Doppler, and Doppler plus delta-differential one-way Range (DeltaDOR) data indicate that both differenced Doppler and DeltaDOR yield improvements of factors of 3 to 5 over the accuracy of the Doppler-only solutions obtained during Venus approach operations, in which the Doppler data were deweighted from their inherent accuracy due to mismodeling problems.

Ryne, Mark S.↗

Li-ion rechargeable batteries on Mars Exploration Rovers

Lithium-ion batteries have contributed significantly to the success of NASA's Mars Rovers, Spirit and Opportunity that have been exploring the surface of Mars for the last two years and performing astounding geological studies to answer the ever-puzzling questions of life beyond Earth and the origin of our planets. Combined with the triple-junction solar cells, the lithium-ion batteries have been powering the robotic rovers, and assist in keeping the rover electronics warm, and in supporting nighttime experimentation and communications. The use of Li-ion batteries has resulted in significant benefits in several categories, such as mass, volume, energy efficiency, self discharge, and above all low temperature performance. Designed initially for the primary mission needs of 300 cycles over 90 days of surface operation, the batteries have been performing admirably, over the last two years. After about 670 days of exploration and at least as many cycles, there is little change in the end-of discharge (EOD) voltages or capacities of these batteries, as estimated from the in-flight data and corroborated by ground testing. Aided by such impressive durability from the Li-ion batteries, both from cycling and calendar life stand point, these rovers are poised to extend their exploration well beyond two years. In this paper, we will describe the performance characteristics of these batteries during launch, cruise phase and on the surface of Mars thus far.

litium ion batteries↗

X-57 High-Lift Propeller Control Schedule Development

The NASA X-57 distributed electric propulsion flight demonstrator uses a high-lift propeller system to maintain low-speed capability with a highly loaded, cruise-efficient wing. Previous research showed that the control scheme for the high-lift propellers was a crucial factor to enable an adequate balance between stabilized glideslope control and appropriate lift margin during the approach-to-landing phase of flight. This paper expands the high-lift propeller control considerations to include all phases of low-speed flight, including preflight, taxi, takeoff, initial climb, approach, and landing. Two control modes, termed airspeed and fixed mode, are developed in this paper. The airspeed mode varies propeller torque based on equivalent airspeed to account for different phases of ground and flight operations. The fixed mode operates the high-lift propeller system at a fixed rotational speed to account for failures in the air data system, preflight checkout, and high-performance takeoff operations. Modeling of the high-lift propellers within the X-57 low-speed flight envelope shows that (1) the structural rotational speed limit of the propeller blades limits their effectiveness at higher altitudes and airspeeds, (2) the speed setting of the fixed mode is set by the maximum torque of the airspeed mode, and (3) minimizing the potential for windmilling in non-standard conditions sets the torque schedule at higher speeds. Additionally, the fixed mode is shown to provide an increased climb rate during normal takeoff operations.

Nicholas K. Borer↗

Spitzer Pre Launch Mission Operations System - The Road to Launch

Spitzer Space Telescope was launched on 25 August 2003 into an Earth-trailing solar orbit to acquire infrared observations from space. Development of the Mission Operations System (MOS) portion prior to launch was very different from planetary missions from the stand point that the MOS teams and Ground Data System had to be ready to support all aspects of the mission at launch (i.e., no cruise period for finalizing the implementation). For Spitzer, all mission-critical events post launch happen in hours or days rather than months or years, as is traditional with deep space missions. At the end of 2000 the Project was dealt a major blow when the Mission Operations System (MOS) had an unsuccessful Critical Design Review (CDR). The project made major changes at the beginning of 2001 in an effort to get the MOS (and Project) back on track. The result for the Spitzer Space Telescope was a successful launch of the observatory followed by an extremely successful In Orbit Checkout (IOC) and operations phase. This paper describes how the project was able to recover the MOS to a successful Delta (CDR) by mid 2001, and what changes in philosophies, experiences, and lessons learned followed. It describes how projects must invest early or else invest heavily later in the development phase to achieve a successful operations phase.

observatory↗

Orbit Determination Support for the Microwave Anisotropy Probe (MAP)

THe microwave Anisotropy Probe (MAP) ia the second Medium Class Explorer (MIDEX) mission of the National Aeronautics and Space Administration (NASA). The main goal of the MAP observatory is to measure the temperature fluctuations, known as anisotropy, of the cosmic microwave background (CBG) radiation over the entire sky and to produce a map of the CMB anisotropies with an angular resolution of approximately 3 degrees. MAP was launched from the Cape Canaveral Air Force Station Complex 17 aboard a Delta II 7425-10 expendable launch vehicle at exactly 19:46:46.183 UTC on June 30, 20001. The spacecraft receiver a nominal direct insertion by the Delta expendable launch vehicle into a 185-km circular orbit with a 28.7 deg. inclination. MAP was than maneuvered into a sequence of phasing loops designed to set up a lunar gravity-assisted acceleration of the spacecraft onto a transfer trajectory to a lissajous orbit about the Earth-Sun L2 Lagrange point, about 1.5 million km from Earth. The science mission minimum lifetime is two years of observations at L2 with a desired lifetime of 4 years. The MAP transfer orbit consisted of 3.5 phasing loops.The MAP trajectory schematic all the way through L2 is shown. The first loop had a period of 7 days, the second and third loops were 10 days long, and the last half loop was 5 days. The periselene (i.e., lunar encounter or swingby) took place approximately 30 days after launch. After the periselene, the spacecraft cruised for approximately 60 days before it arrived in the vicinity of the L2 libration point. Two mid-course correction (MCC) maneuvers were performed to refine MAP's post-launch trajectory-one after periselene and one prior to arrival at vicinity of L2. Now that MAP is at its operational L2 lissajous orbit, the MAP satellite is commanded to perform occasional station-keeping (SK) maneuvers in order to maintain its orbit around L2. Because of its complex orbital characteristics, the mission provided a unique challenge to orbit determination (OD) support in many orbital regimes.

Truong, Son H.↗

Boundary-Layer Separation Control under Low-Pressure Turbine Airfoil Conditions using Glow-Discharge Plasma Actuators

Modem low-pressure turbines, in general, utilize highly loaded airfoils in an effort to improve efficiency and to lower the number of airfoils needed. Typically, the airfoil boundary layers are turbulent and fully attached at takeoff conditions, whereas a substantial fraction of the boundary layers on the airfoils may be transitional at cruise conditions due to the change of density with altitude. The strong adverse pressure gradients on the suction side of these airfoils can lead to boundary-layer separation at the latter low Reynolds number conditions. Large separation bubbles, particularly those which fail to reattach, cause a significant degradation of engine efficiency. A component efficiency drop of the order 2% may occur between takeoff and cruise conditions for large commercial transport engines and could be as large as 7% for smaller engines at higher altitude. An efficient means of of separation elimination/reduction is, therefore, crucial to improved turbine design. Because the large change in the Reynolds number from takeoff to cruise leads to a distinct change in the airfoil flow physics, a separation control strategy intended for cruise conditions will need to be carefully constructed so as to incur minimum impact/penalty at takeoff. A complicating factor, but also a potential advantage in the quest for an efficient strategy, is the intricate interplay between separation and transition for the situation at hand. Volino gives a comprehensive discussion of several recent studies on transition and separation under low-pressure-turbine conditions, among them one in the present facility. Transition may begin before or after separation, depending on the Reynolds number and other flow conditions. If the transition occurs early in the boundary layer then separation may be reduced or completely eliminated. Transition in the shear layer of a separation bubble can lead to rapid reattachment. This suggests using control mechanisms to trigger and enhance early transition. Gad-el-Hak provides a review of various techniques for flow control in general and Volino discusses recent studies on separation control under low-pressure-turbine conditions utilizing passive as well as active devices. As pointed out by Volino, passive devices optimized for separation control at low Reynolds numbers tend to increase losses at high Reynolds numbers, Active devices have the attractive feature that they can be utilized only in operational regimes where they are needed and when turned off would not affect the flow. The focus in the present paper is an experimental Separation is induced on a flat plate installed in a closed-circuit wind tunnel by a shaped insert on the opposite wall. The flow conditions represent flow over the suction surface of a modem low-pressure-turbine airfoil ('Pak-B'). The Reynolds number, based on wetted plate length and nominal exit velocity, is varied from 50,000 to 300,000, covering cruise to takeoff conditions. Low (0.2%) and high (2.5%) Gee-stream turbulence intensities are set using passive grids. A spanwise-oriented phased-plasma-array actuator, fabricated on a printed circuit board, is surface- flush-mounted upstream of the separation point and can provide forcing in a wide frequency range. Static surface pressure measurements and hot-wire anemometry of the base and controlled flows are performed and indicate that the glow-discharge plasma actuator is an effective device for separation control. of active separation control using glow discharge plasma actuators.

Hultgren, Lennart S.↗

Transport pilot workload - A comparison of two subjective techniques

Although SWAT and NASA-TLX workload scales have been compared on numerous occasions, they have not been compared in the context of transport operations. Transport pilot workload has traditionally been classified as long periods of low workload with occasional spikes of high workload. Thus, the relative sensitivity of the scales to variations in workload at the low end of the scale were evaluated. This study was a part of a larger study which investigated workload measures for aircraft certification, conducted in a Phase II certified Link/Boeing 727 simulator. No significant main effects were found for any performance-based measures of workload. However, both SWAT and NASA-TLX were sensitive to differences between high and low workload flights and to differences among flight segments. NASA-TLX (but not SWAT) was sensitive to the increase in workload during the cruise segment of the high workload flight. Between-subject variability was high for SWAT. NASA-TLX was found to be stable when compared in the test/retest paradigm. A test/retest by segment interaction suggested that this was not the case for SWAT ratings.

Battiste, Vernol↗

Initial Considerations for Navigation and Flight Dynamics of a Crewed Near-Earth Object Mission

A crewed mission to a Near-Earth Object (NEO) was recently identified as a NASA Space Policy goal and priority. In support of this goal, a study was conducted to identify the initial considerations for performing the navigation and flight dynamics tasks of this mission class. Although missions to a NEO are not new, the unique factors involved in human spaceflight present challenges that warrant special examination. During the cruise phase of the mission, one of the most challenging factors is the noisy acceleration environment associated with a crewed vehicle. Additionally, the presence of a human crew necessitates a timely return trip, which may need to be expedited in an emergency situation where the mission is aborted. Tracking, navigation, and targeting results are shown for sample human-class trajectories to NEOs. Additionally, the benefit of in-situ navigation beacons on robotic precursor missions is presented. This mission class will require a longer duration flight than Apollo and, unlike previous human missions, there will likely be limited communication and tracking availability. This will necessitate the use of more onboard navigation and targeting capabilities. Finally, the rendezvous and proximity operations near an asteroid will be unlike anything previously attempted in a crewed spaceflight. The unknown gravitational environment and physical surface properties of the NEO may cause the rendezvous to behave differently than expected. Symbiosis of the human pilot and onboard navigation/targeting are presented which give additional robustness to unforeseen perturbations.

Holt, Greg N.↗

NASA 9-Point LDI Code Validation Experiment

This presentation highlights the experimental work to date to obtain validation data using a 9-point lean direct injector (LDI) in support of the National Combustion Code. The LDI is designed to supply fuel lean, Jet-A and air directly into the combustor such that the liquid fuel atomizes and mixes rapidly to produce short flame zones and produce low levels of oxides of nitrogen and CO. We present NOx and CO emission results from gas sample data that support that aspect of the design concept. We describe this injector and show high speed movies of selected operating points. We present image-based species maps of OH, fuel, CH and NO obtained using planar laser induced fluorescence and chemiluminescence. We also present preliminary 2-component, axial and vertical, velocity vectors of the air flow obtained using particle image velocimetry and of the fuel drops in a combusting case. For the same combusting case, we show preliminary 3-component velocity vectors obtained using a phase Doppler anemometer. For the fueled, combusting cases especially, we found optical density is a technical concern that must be addressed, but that in general, these preliminary results are promising. All optical-based results confirm that this injector produces short flames, typically on the order of 5- to-7-mm long at typical cruise and high power engine cycle conditions.

Hicks, Yolanda R.↗

En route position and time control of aircraft using Kalman filtering of radio aid data

Fixed-time-of-arrival (FTA) guidance and navigation is investigated as a possible technique capable of operation within much more stringent en route separation standards and offering significant advantages in safety, higher traffic densities, and improved scheduling reliability, both en route and in the terminal areas. This study investigated the application of FTA guidance previously used in spacecraft guidance. These FTA guidance techniques have been modified and are employed to compute the velocity corrections necessary to return an aircraft to a specified great-circle reference path in order to exercise en route time and position control throughout the entire flight. The necessary position and velocity estimates to accomplish this task are provided by Kalman filtering of data from Loran-C, VORTAC/TACAN, Doppler radar, radio or barometric altitude,and altitude rate. The guidance and navigation system was evaluated using a digital simulation of the cruise phase of supersonic and subsonic flights between San Francisco and New York City, and between New York City and London.

Mcgee, L. A.↗

Mars Pathfinder mission operations concepts

The Mars Pathfinder Project plans a December 1996 launch of a single spacecraft. After jettisoning a cruise stage, an entry body containing a lander and microrover will directly enter the Mars atmosphere and parachute to a hard landing near the sub-solar latitude of 15 degrees North in July 1997. Primary surface operations last for 30 days. Cost estimates for Pathfinder ground systems development and operations are not only lower in absolute dollars, but also are a lower percentage of total project costs than in past planetary missions. Operations teams will be smaller and fewer than typical flight projects. Operations scenarios have been developed early in the project and are being used to guide operations implementation and flight system design. Recovery of key engineering data from entry, descent, and landing is a top mission priority. These data will be recorded for playback after landing. Real-time tracking of a modified carrier signal through this phase can provide important insight into the spacecraft performance during entry, descent, and landing in the event recorded data is never recovered. Surface scenarios are dominated by microrover activity and lander imaging during 7 hours of the Mars day from 0700 to 1400 local solar time. Efficient uplink and downlink processes have been designed to command the lander and microrover each Mars day.

Sturms, Francis M., Jr.↗

Design, analysis, and tests of a shuttle-type heat-pipe-cooled leading edge

A one-half scale heat-pipe-cooled leading edge model was designed and fabricated to verify feasibility and performance of a full-scale Phase B shuttle orbiter design. Model performance was investigated experimentally by radiant heating and aerothermal tests and analytically by using a simple technique which predicts heat pipe start-up from the frozen state and also predicts transient and steady-state thermal behavior. Analytical results agree well with experimental results for start-up and steady-state heat pipe operation. The results indicate that variations in angle of attack and roll orientation had a negligible effect on heat pipe performance. The heat pipes effectively isothermalized the leading edge, and reduced peak temperatures to levels compatible with the use temperatures of superalloys. Results of these tests demonstrated the durability of the heat-pipe-cooled leading edge in withstanding earth-entry thermal and mechanical loads and indicate that the use of heat pipes in leading edge structures is a reliable concept for fully reusable hypersonic cruise and space transportation systems.

Camarda, C. J.↗

Mission Planning for Trident: Discovery proposal to Neptune’s moon, Triton

Trident was one of the four Discovery-class Step-1 mission proposals selected by NASA in 2020 for further development and study; however, in 2021, the Step-2 proposal was not down-selected to transition into the next phase of mission development, i.e., a mission for flight.Neptune’s largest moon, Triton, was the primary focus of study for Trident. Triton’s physical and orbital characteristics make it a unique planetary target for scientific exploration, providing opportunities for investigations in a wide variety of scientific fields, including geomorphological, atmospheric, geophysical, magnetospheric, and ionospheric studies. The science objectives of the Trident mission encompassed an in-depth interior-to-exterior set of objectives, focused on multiple outstanding questions resulting from the 1989 encounter of Voyager 2, and subsequent analysis.Ball Aerospace Corp. was tasked with building the Trident spacecraft, with JPL responsible for providing Engineering Support (Mission Design & Navigation, Mission Planning, Flight Operations, Ground Data Systems, Systems Engineering) and leading Project Management. The observatory would carry a wide-ranging suite of scientific instruments onboard, including an Infrared Spectrometer (IRS) and Narrow Angle Camera (NAC) to be provided by Ball Aerospace Corp., a Wide Angle Camera (WAC) from JPL, a Magnetometer from UCLA, a contributed Plasma Science Suite from IRF (Sweden), and a contributed Radio Science instrument from ASI (Italy). All of these instruments would be used to collect unique datasets during the Triton encounter. Trident would have taken advantage of an ~13-yr, nearly-ballistic trajectory to Triton, utilizing a timely Jupiter Gravity Assist, to execute a 10-day long encounter in the Neptunian system. Launch was planned for October 2025, with Triton arrival scheduled for December 2038. The timeline for this mission would have been sub-divided into seven major phases: Launch, Commissioning, Inner Planet Cruise, Outer Planet Cruise, Approach, Encounter, and Science Data Return. Multiple planetary flybys were planned to be performed during the cruise, including three Earth flybys and one Venus flyby in the Inner Planet Cruise phase, and one Jupiter flyby in the Outer Planet Cruise phase. Along with conventional (Range and Doppler) tracking data, Delta-DOR and Optical Navigation data were also to be acquired to assist with spacecraft navigation during the Approach and Encounter phases. A 3 meter X-Band High Gain Antenna would allow playback of all science data at 1 kbps within 1 year after the Triton Encounter. The Mission Planning element on Trident encompassed and informed multiple aspects of this proposal, ranging from science observation planning during the Triton Encounter phase, to generation of activity timelines for all mission phases; performing ground coverage analysis for science observations to be acquired by all instruments and tracing them to science requirements; evaluation of spacecraft resources including data volume stored onboard, power/energy consumption, telecom (commanding/telemetry) requirements, and overall, working at the interface of science and engineering teams on the mission. All of these functions that were performed by the Mission Planning team on this proposal are discussed in this paper.

Prockter, Louise↗

Mars Phoenix Entry, Descent, and Landing Simulation Design and Modelling Analysis

The 2007 Mars Phoenix Lander was launched in August of 2007 on a ten month cruise to reach the northern plains of Mars in May 2008. Its mission continues NASA s pursuit to find evidence of water on Mars. Phoenix carries upon it a slew of science instruments to study soil and ice samples from the northern region of the planet, an area previously undiscovered by robotic landers. In order for these science instruments to be useful, it was necessary for Phoenix to perform a safe entry, descent, and landing (EDL) onto the surface of Mars. The EDL design was defined through simulation and analysis of the various phases of the descent. An overview of the simulation and various models developed to characterize the EDL performance is provided. Monte Carlo statistical analysis was performed to assess the performance and robustness of the Phoenix EDL system and are presented in this paper. Using these simulation and modelling tools throughout the design and into the operations phase, the Mars Phoenix EDL was a success on May 25, 2008.

Prince, Jill L.↗

Comparison of predicted and measured drag for a single-engine airplane

Renewed interest in natural laminar flow (NLF) has rekindled designers' concerns that manufacturing deviations, (loss of surface contours or other surface imperfections) may destroy the effectiveness of NLF for an operational airplane. This paper reports on experimental research that compares predicted and measured boundary layer transition, total drag, and two-dimensional drag coefficients for three different wing surface conditions on an airplane typical of general aviation manufacturing technology. The three flight test phases included: (1) assessment of an unpainted airframe, (2) flight tests of the same airplane after painstakingly filling and sanding the wings to design contours, and (3) similar measurements after this airplane was painted. In each flight phase, transition locations were monitored using either sublimating chemicals or pigmented oil. As expected, total drag changes were difficult to measure. Two-dimensional drag coefficients were estimated using the Eppler-Somers code and measured with a wake rake in a method very similar to Jones' pitot traverse method. The net change in two-dimensional drag was approximately 20 counts between the unpainted airplane and the 'hand-smoothed' airplane for typical cruise flight conditions.

Ward, D. T.↗

An Overview of the Mars Reconnaissance Orbiter (MRO) Science Mission

The Mars Reconnaissance Orbiter (MRO) is the latest addition to the suite of missions on or orbiting Mars as part of the NASA Mars Exploration Program. Launched on 12 August 2005, the orbiter successfully entered Mars orbit on 10 March 2006 and finished aerobraking on 30 August 2006. Now in its near-polar, near-circular, low-altitude (approximately 300 km), 3 p.m. orbit, the spacecraft is operating its payload of six scientific instruments throughout a one-Mars-year Primary Science Phase (PSP) of global mapping, regional survey, and targeted observations. Eight scientific investigations were chosen for MRO, two of which use either the spacecraft accelerometers or tracking of the spacecraft telecom signal to acquire data needed for analysis. Six instruments, including three imaging systems, a visible-near infrared spectrometer, a shallow-probing subsurface radar, and a thermal-infrared profiler, were selected to complement and extend the capabilities of current working spacecraft at Mars. Whether observing the atmosphere, surface, or subsurface, the MRO instruments are designed to achieve significantly higher resolution while maintaining coverage comparable to the current best observations. The requirements to return higher-resolution data, to target routinely from a low-altitude orbit, and to operate a complex suite of instruments were major challenges successfully met in the design and build of the spacecraft, as well as by the mission design. Calibration activities during the seven-month cruise to Mars and limited payload operations during a three-day checkout prior to the start of aerobraking demonstrated, where possible, that the spacecraft and payload still had the functions critical to the science mission. Two critical events, the deployment of the SHARAD radar antenna and the opening of the CRISM telescope cover, were successfully accomplished in September 2006. Normal data collection began 7 November 2006 after solar conjunction. As part of its science mission, MRO will also aid identification and characterization of the most promising sites for future landed missions, both in terms of safety and in terms of the scientific potential for future discovery. Ultimately, MRO data will advance our understanding of how Mars has evolved and by which processes that change occurs, all within a framework of identifying the presence, extent, and role of water in shaping the planet s climate over time.

astronomical instruments↗

Assessment of Creep Capability of HSR-EPM Turbine Airfoil Alloys

The High Speed Civil Transport (HSCT) mission of the High Speed Research-Enabling Propulsion Materials (HSR-EPM) Program represented a unique challenge for turbine airfoil materials because the highest operating temperatures occur during climb and supersonic cruise. The accumulated hot time of an HSCT engine before overhaul is many thousands of hours. This is significantly different from subsonic engines, where the maximum operating temperatures occur during takeoff and thrust reverse after landing, and the accumulated hot time before overhaul is about 300 hr. The goal of airfoil alloy development under the HSR-EPM Program was to develop an alloy with a 75 F increase in creep rupture capability over the average Rene N5/PWA 1484 baseline. Airfoil alloy development under the HSR-EPM Program pursued a path that led to evolutionary mechanical behavior improvements, resulting from increased amounts of high density, refractory metals. The purpose of the present paper is to describe the experimental work that was performed at NASA Glenn Research Center after the HSR-EPM Program ended. Emphasis will be placed on the creep behavior of coated specimens, as well as on the development and progression of phase instabilities during creep deformation. Mitigation techniques that were used to reduce phase instabilities are also discussed. Most of the work described in this report was performed at NASA Glenn during the years 2000 and 2001.

MacKay, Rebecca A.↗