Solar thermal plant impact analysis and requirements definition

Progress on a continuing study comprising of ten tasks directed at defining impact and requirements for solar thermal power systems (SPS), 1 to 10 MWe each in capacity, installed during 1985 through year 2000 in a utility or a nonutility load in the United States is summarized. The point focus distributed receiver (PFDR) solar power systems are emphasized. Tasks 1 through 4, completed to date, include the development of a comprehensive data base on SPS configurations, their performance, cost, availability, and potential applications; user loads, regional characteristics, and an analytic methodology that incorporates the generally accepted utility financial planning methods and several unique modifications to treat the significant and specific characteristics of solar power systems deployed in either central or distributed power generation modes, are discussed.

Gupta, Y. P.↗

Reinventing The Design Process: Teams and Models

The future of space mission designing will be dramatically different from the past. Formerly, performance-driven paradigms emphasized data return with cost and schedule being secondary issues. Now and in the future, costs are capped and schedules fixed-these two variables must be treated as independent in the design process. Accordingly, JPL has redesigned its design process. At the conceptual level, design times have been reduced by properly defining the required design depth, improving the linkages between tools, and managing team dynamics. In implementation-phase design, system requirements will be held in crosscutting models, linked to subsystem design tools through a central database that captures the design and supplies needed configuration management and control. Mission goals will then be captured in timelining software that drives the models, testing their capability to execute the goals. Metrics are used to measure and control both processes and to ensure that design parameters converge through the design process within schedule constraints. This methodology manages margins controlled by acceptable risk levels. Thus, teams can evolve risk tolerance (and cost) as they would any engineering parameter. This new approach allows more design freedom for a longer time, which tends to encourage revolutionary and unexpected improvements in design.

Wall, Stephen D.↗

Reinventing the Design Process: Teams and Models

The future of space mission designing will be dramatically different from the past. Formerly, performance-driven paradigms emphasized data return with cost and schedule being secondary issues.

Design↗

Design and Performance of Kokkos Staging Space toward Scalable Resilient Application Couplings

With the growing number of applications designed for heterogeneous HPC devices, application programmers and users are finding it challenging to compose scalable workflows as ensembles of these applications, that are portable, performant and resilient. The Kokkos C++ library has been designed to simplify this cumbersome procedure by providing an intra-application uniform programming model and portable performance. However, assembling multiple Kokkos-enabled applications into a complex workflow is still a challenge. Although Kokkos enables a uniform programming model, the inter-application data exchange still remains a challenge from both performance and software development cost perspectives. In order to address this issue, we propose Kokkos data staging memory space, an extension of Kokkos' data abstraction (memory space) for heterogeneous computing systems. This new abstraction allows to express data on a virtual shared-space for multiple Kokkos applications, thus extending Kokkos to support inter-application data exchange to build an efficient application workflow. Additionally, we study the effectiveness of asynchronous data layout conversions for applications requiring different memory access patterns for the shared data. Our preliminary evaluation with a synthetic benchmark indicate the effectiveness of this conversion adapted to three different scenarios representing access frequency and use patterns of the shared data.

97 MATHEMATICS AND COMPUTING↗

"Fly-by-Wireless" Vehicles and Evaluations of ISA 100 Applications to Space-Flight

"Fly-by-Wireless" (What is it?) Vision: To minimize cables and connectors and increase functionality across the aerospace industry by providing reliable, lower cost, modular, and higher performance alternatives to wired data connectivity to benefit the entire vehicle/program life-cycle. Focus Areas: 1. System Engineering and Integration to reduce cables and connectors. 2. Provisions for modularity and accessibility in the vehicle architecture. 3. Develop Alternatives to wired connectivity (the "tool box").NASA and Aerospace depend more and more on cost-effective solutions that can meet our requirements. ISA-100.11 a is a promising new standard and NASA wants to evaluate it. NASA should be involved in understanding and contributing to other ISA-100 efforts that contribute to "Fly-by-Wireless" and it's objectives. ISA can engage other aerospace groups that are working on similar goals and obtain more aerospace industry perspective.

Studor, George F.↗

An Empirical Study on the Use of the Rancor Microworld Simulator to Support Full-scope Data Collection

A lack of data has been identified as a major challenge in human reliability analysis (HRA). Accordingly, several institutes and researchers have tried to collect HRA data from different data sources such as actual historical measurements, expert judgements, or simulator studies. While the most recent studies predominantly focus on collecting data using full-scope simulators with actual operators, Idaho National Laboratory (INL) has begun to collect HRA data using a simplified simulator, i.e., the Rancor Microworld simulator, with student participants. Full-scope studies have been known to have several intrinsic challenges to securing enough quantity of the data due to many reasons like the high cost for performing experiments or requiring actual operators’ cooperation. The ultimate goal of INL’s effort aims to infer actual operators’ data collected from a full-scope simulator on the basis of microworld data with student subjects as well as collect additional data that could be missed in the full-scope research. As a first step to achieve this goal, this paper projects an experimental plan for investigating the differences in human performance between individuals in two groups: 1) an actual operator and 2) a student when using the Rancor Microworld simulator. A randomized factorial experiment design has been developed with two independent variables, i.e., type of scenario and type of subject. Six human performance measures, i.e., 1) time, 2) error, 3) workload, 4) situation awareness, 5) patterns of attention and 6) the number of manipulations were selected. A couple of scenarios and their procedures available to the Rancor Microworld simulator have been developed.

99 GENERAL AND MISCELLANEOUS↗

Evolving the Technical Infrastructure of the Planetary Data System for the 21st Century

The Planetary Data System (PDS) was established in 1989 as a distributed system to assure scientific oversight. Initially the PDS followed guidelines recommended by the National Academies Committee on Data Management and Computation (CODMAC, 1982) and placed emphasis on archiving validated datasets. But overtime user demands, supported by increased computing capabilities and communication methods, have placed increasing demands on the PDS. The PDS must add additional services to better enable scientific analysis within distributed environments and to ensure that those services integrate with existing systems and data. To face these challenges the Planetary Data System (PDS) must modernize its architecture and technical implementation. The PDS 2010 project addresses these challenges. As part of this project, the PDS has three fundamental project goals that include: (1) Providing more efficient client delivery of data by data providers to the PDS (2) Enabling a stable, long-term usable planetary science data archive (3) Enabling services for the data consumer to find, access and use the data they require in contemporary data formats. In order to achieve these goals, the PDS 2010 project is upgrading both the technical infrastructure and the data standards to support increased efficiency in data delivery as well as usability of the PDS. Efforts are underway to interface with missions as early as possible and to streamline the preparation and delivery of data to the PDS. Likewise, the PDS is working to define and plan for data services that will help researchers to perform analysis in cost-constrained environments. This presentation will cover the PDS 2010 project including the goals, data standards and technical implementation plans that are underway within the Planetary Data System. It will discuss the plans for moving from the current system, version PDS 3, to version PDS 4.

Beebe, Reta F.↗

Vegetation Management Cost and Maintenance Implications of Different Ground Covers at Utility-Scale Solar Sites

Utility-scale solar photovoltaics (PV) is the largest and fastest-growing sector of the solar energy market, and plays an important role in ensuring that state and local jurisdictions can meet renewable energy targets. Potential adverse environmental impacts of utility-scale solar PV are well-documented, and the effects of diverse mitigation and dual land use strategies under the banner of ’low-impact solar’ are justly receiving more attention; this article seeks to contribute to improving understanding of this topic. Capital costs for different PV configurations are well-documented; however, operation and maintenance (O&M) costs for vegetation management at low-impact utility-scale solar PV sites are not as well-understood, particularly as they compare to costs for sites that use more conventional ground cover practices, such as turfgrass or gravel. After a literature review of different vegetation strategies and O&M cost considerations, we collected data from utility-scale solar PV O&M stakeholders, including site owners/operators, O&M service providers, vegetation maintenance companies, and solar graziers, on costs and activities associated with vegetation management at low-impact, agrivoltaic, and conventional PV sites. In this paper, we perform data analysis to detail the per-activity and total O&M costs for vegetation management at PV sites with different ground covers and management practices, providing the most comprehensive and detailed assessment of PV vegetation O&M costs to date. For the 54 sites included in our analysis, we found that while the per-acre and per-kilowattdc (kWdc) costs for individual activities, such as mowing, trimming, and herbicide application at native or pollinator friendly ground covers, were lower than at turfgrass sites, the total combined vegetation O&M costs were slightly higher; this is presumably because more individual activities are required for the first 3–5 years of vegetation establishment. Qualitative results include recommendations from data providers for site and system design, and ongoing vegetation management operations.

14 SOLAR ENERGY↗

Flight Planning

Seagull Technology, Inc., Sunnyvale, CA, produced a computer program under a Langley Research Center Small Business Innovation Research (SBIR) grant called STAFPLAN (Seagull Technology Advanced Flight Plan) that plans optimal trajectory routes for small to medium sized airlines to minimize direct operating costs while complying with various airline operating constraints. STAFPLAN incorporates four input databases, weather, route data, aircraft performance, and flight-specific information (times, payload, crew, fuel cost) to provide the correct amount of fuel optimal cruise altitude, climb and descent points, optimal cruise speed, and flight path.

Source record↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The effects of design details on cost and weight of fuselage structures

Crown panel design studies showing the relationship between panel size, cost, weight, and aircraft configuration are compared to aluminum design configurations. The effects of a stiffened sandwich design concept are also discussed. This paper summarizes the effect of a design cost model in assessing the cost and weight relationships for fuselage crown panel designs. Studies were performed using data from existing aircraft to assess the effects of different design variables on the cost and weight of transport fuselage crown panel design. Results show a strong influence of load levels, panel size, and material choices on the cost and weight of specific designs. A design tool being developed under the NASA ACT program is used in the study to assess these issues. The effects of panel configuration comparing postbuckled and buckle resistant stiffened laminated structure is compared to a stiffened sandwich concept. Results suggest some potential economy with stiffened sandwich designs for compression dominated structure with relatively high load levels.

Swanson, G. D.↗

Solid propulsion advanced concepts

The feasibility and application of a solid propulsion powered spacecraft concept to implement high energy missions independent of multiplanetary swingby opportunities are assessed and recommendations offered for future work. An upper stage, solid propulsion launch vehicle augmentation system was selected as the baseline configuration in view of the established program goals of low cost and high reliability. Spacecraft and propulsion system data that characterize mission performance capabilities were generated to serve as the basis for subsequent tradeoff studies. A cost effectiveness model was used for the preliminary feasibility assessment to provide a meaningful comparative effectiveness measure of the various candidate designs. The results substantiated the feasibility of the powered spacecraft concept when used in conjunction with several intermediate-sized launch vehicles as well as the existence of energy margins by which to exploit the attainment of extended mission capabilities. Additionally, in growth option applications, the employment of advanced propulsion systems and alternate spacecraft approaches appear promising.

Nakamura, Y.↗

Design guide for space shuttle low-cost payloads

A handbook is presented which delineates the principles of the new low-cost design methodology for designers of unmanned payloads to be carried by the space shuttle. The basic relationships between payload designs and program cost effects are discussed, and some concepts for designing low-cost payloads and implementing low-cost programs are given. The data are summarized from a payloads effects study of three unmanned earth satellites (OAO, a syneq orbiter, and a small research satellite), and the earth satellite design is emphasized. Brief summaries of space shuttle and space tug performance, environmental, and interface data pertinent to low-cost payload concepts are included.

Source record↗

Weight and the Future of Space Flight Hardware Cost Modeling

Weight has been used as the primary input variable for cost estimating almost as long as there have been parametric cost models. While there are good reasons for using weight, serious limitations exist. These limitations have been addressed by multi-variable equations and trend analysis in models such as NAFCOM, PRICE, and SEER; however, these models have not be able to address the significant time lags that can occur between the development of similar space flight hardware systems. These time lags make the cost analyst's job difficult because insufficient data exists to perform trend analysis, and the current set of parametric models are not well suited to accommodating process improvements in space flight hardware design, development, build and test. As a result, people of good faith can have serious disagreement over the cost for new systems. To address these shortcomings, new cost modeling approaches are needed. The most promising approach is process based (sometimes called activity) costing. Developing process based models will require a detailed understanding of the functions required to produce space flight hardware combined with innovative approaches to estimating the necessary resources. Particularly challenging will be the lack of data at the process level. One method for developing a model is to combine notional algorithms with a discrete event simulation and model changes to the total cost as perturbations to the program are introduced. Despite these challenges, the potential benefits are such that efforts should be focused on developing process based cost models.

Prince, Frank A.↗

"PoliMOR: A Policy Engine \"Made-to-Order\" for Automated and Scalable Data Management in Lustre"

Modern supercomputing systems are increasingly reliant on hierarchical, multi-tiered file and storage system architectures due to cost-performance-capacity trade-offs. Within such multi-tiered systems, data management services are required to maintain healthy utilization, performance, and capacity levels. We present PoliMOR, a pragmatic and reliable policy-driven data management framework. PoliMOR is composed of modular, single-purpose agents that gather file system metadata and enforce policies on storage systems. PoliMOR facilitates automated and scalable data management with customizable agents tailored to HPC facility-specific storage systems and policies. Our evaluations demonstrate the scalability and performance of PoliMOR both by its individual agents and as a collective entity. We believe PoliMOR is widely applicable across HPC facilities with large-scale data management challenges and will garner interest from the HPC community, given its flexible and open-source nature.

George, Anjus↗

A random search algorithm for laboratory computers

The small laboratory computer is ideal for experimental control and data acquisition. Postexperimental data processing is often performed on large computers because of the availability of sophisticated programs, but costs and data compatibility are negative factors. Parameter optimization can be accomplished on the small computer, offering ease of programming, data compatibility, and low cost. A previously proposed random-search algorithm ('random creep') was found to be very slow in convergence. A method is proposed (the 'random leap' algorithm) which starts in a global search mode and automatically adjusts step size to speed convergence. A FORTRAN executive program for the random-leap algorithm is presented which calls a user-supplied function subroutine. An example of a function subroutine is given which calculates maximum-likelihood estimates of receiver operating-characteristic parameters from binary response data. Other applications in parameter estimation, generalized least squares, and matrix inversion are discussed.

Curry, R. E.↗

RISE: Reducing I/O Contention in Staging-based Extreme-Scale In-situ Workflows

While in-situ workflow formulations have addressed some of the data-related challenges associated with extreme-scale scientific workflows, these workflows involve complex interactions and different modes of data exchange. In the context of increasing system complexity, such workflows present significant resource management challenges, requiring complex cost-performance tradeoffs. This paper presents RISE, an intelligent staging-based data management middleware, which builds on the DataSpaces framework and performs intelligent scheduling of data management operations to reduce I/O contention. In RISE, data are always written immediately to local buffers to reduce the effect of the transfer impact upon application performance. RISE identifies applications’ data access patterns and moves data towards data consumers only when the network is expected to be idle, reducing the impact of asynchronous background data movement upon critical data read/write requests. Here, we experimentally demonstrate that RISE can take advantage of staging nodes to offload data during writes without degrading application data movement performance.

97 MATHEMATICS AND COMPUTING↗

Space shuttle/payload interface analysis (study 2.4). Volume 2: Space shuttle traffic analysis

The transfer is reported of the capability to perform capture/cost analyses to MSFC. Space shuttle performance and direct costs, tug characteristics, reliability, and cost data were provided by NASA. The launch vehicle, mission models, payloads, and computer programs are discussed along with capture/cost analysis, and cost estimates. For Vol. 1, see N74-12493.

Plough, J. A.↗