Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “contingency analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

How Should Life Support Be Modeled and Simulated?

Why do most space life support research groups build and investigate large models for systems simulation? The need for them seems accepted, but are we asking the right questions and solving the real problems? The modeling results leave many questions unanswered. How then should space life support be modeled and simulated? Life support system research and development uses modeling and simulation to study dynamic behavior as part of systems engineering and analysis. It is used to size material flows and buffers and plan contingent operations. A DoD sponsored study used the systems engineering approach to define a set of best practices for modeling and simulation. These best practices describe a systems engineering process of developing and validating requirements, defining and analyzing the model concept, and designing and testing the model. Other general principles for modeling and simulation are presented. Some specific additional advice includes performing a static analysis before developing a dynamic simulation, applying the mass and energy conservation laws, modeling on the appropriate system level, using simplified subsystem representations, designing the model to solve a specific problem, and testing the model on several different problems. Modeling and simulation is necessary in life support design but many problems are outside its scope.

Jones, Harry W.↗

Dynamic modeling studies of basin-scale pressure interference and CO 2 plume evolution in multi-well geologic CO 2 storage

This research employs numerical modeling to analyze how CO 2 plumes and pressure fronts evolve when CO 2 is injected into a single storage formation from multiple projects located in proximity. Here, this analysis also evaluates the extent to which injection well spacing alleviates pressure buildup in the absence of active pressure management tactics. The simulation approach was based on a single, homogenous saline aquifer in which CO 2 injection occurs under a one-injector baseline case and several multi-well cases where well spacing varies. Analysis results show that the extent of pressure buildup is in the range of tens or a few hundreds of kilometers and contingent upon the defining pressure buildup demarcating the front edge. For the geological setting evaluated in this paper, our analysis suggests that without active basin pressure management strategies, commercial-scale projects would likely need to be sited far apart to avoid pressure interference from one another. Analysis results show the radius of CO 2 plume varies approximately from 2 to 3 km from injection wells (each injecting 1 Mt/year for 30 years) depending on cases and modeling parameters assumed. Given the pressure interference, this paper thus draws attention to the importance of greater coordination among storage operators and regulatory stakeholders. Because this analysis assumes a very specific geologic setting, this exploratory analysis bears further investigations across other geologic scenarios.

42 ENGINEERING↗

Independent Orbiter Assessment (IOA): Analysis of the displays and controls subsystem

The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA approach features a top-down analysis of the hardware to determine failure modes, criticality, and potential critical items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. This report documents the independent analysis results corresponding to the Orbiter Displays and Controls (D and C) subsystem hardware. The function of the D and C hardware is to provide the crew with the monitor, command, and control capabilities required for management of all normal and contingency mission and flight operations. The D and C hardware for which failure modes analysis was performed consists of the following: Acceleration Indicator (G-METER); Head Up Display (HUD); Display Driver Unit (DDU); Alpha/Mach Indicator (AMI); Horizontal Situation Indicator (HSI); Attitude Director Indicator (ADI); Propellant Quantity Indicator (PQI); Surface Position Indicator (SPI); Altitude/Vertical Velocity Indicator (AVVI); Caution and Warning Assembly (CWA); Annunciator Control Assembly (ACA); Event Timer (ET); Mission Timer (MT); Interior Lighting; and Exterior Lighting. Each hardware item was evaluated and analyzed for possible failure modes and effects. Criticality was assigned based upon the severity of the effect for each failure mode.

Trahan, W. H.↗

Review and Analysis of Heat Transfer Correlations For Horizontal Pseudocritical CO 2 Heat Exchanger Applications

There is significant interest in the development of supercritical carbon dioxide (sCO 2 ) power cycles because of the potential for smaller and more energy efficient systems than a steam Rankine cycle. Heat exchanger designs typically use empirical correlations, but the applicability of these correlations near the CO 2 critical point is a potential issue. Though numerous correlations have been proposed in the literature, there are some disagreements when it comes to the accuracy. The current work recognizes the role of thermophysical properties, and its impacts on the heat transfer correlations and cycle efficiency. Heat transfer correlations proposed for horizontal flow inside circular pipes were analyzed with the help of numerical simulations. Steady state RANS simulations were performed using SST k-w turbulence model to evaluate the Nusselt number empirical correlations. It was found that the most of correlations (except Yoon) produced a Nusselt number that differed significantly with the one predicted numerically. Some of the correlations were developed for pure forced convection regime and as mentioned in Lin et al. do not account for mixed convection or free convection effects. Based on the limited observation, it appears that Yoon et al. predictions match well with the numerically predicted Nusselt Numbers. However, further analysis is required understand the applicability of various correlations and is contingent on accurate measurements or predictions of wall temperature profiles in the axial and the circumferential directions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Apollo experience report: Evolution of the rendezvous-maneuver plan for the lunar-landing missions

The evolution of the nominal rendezvous-maneuver plan for the lunar landing missions is presented along with a summary of the significant development for the lunar module abort and rescue plan. A general discussion of the rendezvous dispersion analysis that was conducted in support of both the nominal and contingency rendezvous planning is included. Emphasis is placed on the technical developments from the early 1960's through the Apollo 15 mission (July to August 1971), but pertinent organizational factors also are discussed briefly. Recommendations for rendezvous planning for future programs relative to Apollo experience also are included.

Alexander, J. D.↗

Space shuttle/food system study. Volume 2, Appendix F: Flight food and primary packaging

The analysis and selection of food items and primary packaging, the development of menus, the nutritional analysis of diet, and the analyses of alternate food mixes and contingency foods is reported in terms of the overall food system design for space shuttle flight. Stowage weights and cubic volumes associated with each alternate mix were also evaluated.

Source record↗

Benchmark data on the separability among crops in the southern San Joaquin Valley of California

Landsat MSS data were input to a discriminant analysis of 21 crops on each of eight dates in 1979 using a total of 4,142 fields in southern Fresno County, California. The 21 crops, which together account for over 70 percent of the agricultural acreage in the southern San Joaquin Valley, were analyzed to quantify the spectral separability, defined as omission error, between all pairs of crops. On each date the fields were segregated into six groups based on the mean value of the MSS7/MSS5 ratio, which is correlated with green biomass. Discriminant analysis was run on each group on each date. The resulting contingency tables offer information that can be profitably used in conjunction with crop calendars to pick the best dates for a classification. The tables show expected percent correct classification and error rates for all the crops. The patterns in the contingency tables show that the percent correct classification for crops generally increases with the amount of greenness in the fields being classified. However, there are exceptions to this general rule, notably grain.

Morse, A.↗

SPOT Program

A Spacecraft Position Optimal Tracking (SPOT) program was developed to process Global Positioning System (GPS) data, sent via telemetry from a spacecraft, to generate accurate navigation estimates of the vehicle position and velocity (state vector) using a Kalman filter. This program uses the GPS onboard receiver measurements to sequentially calculate the vehicle state vectors and provide this information to ground flight controllers. It is the first real-time ground-based shuttle navigation application using onboard sensors. The program is compact, portable, self-contained, and can run on a variety of UNIX or Linux computers. The program has a modular objec-toriented design that supports application-specific plugins such as data corruption remediation pre-processing and remote graphics display. The Kalman filter is extensible to additional sensor types or force models. The Kalman filter design is also strong against data dropouts because it uses physical models from state and covariance propagation in the absence of data. The design of this program separates the functionalities of SPOT into six different executable processes. This allows for the individual processes to be connected in an a la carte manner, making the feature set and executable complexity of SPOT adaptable to the needs of the user. Also, these processes need not be executed on the same workstation. This allows for communications between SPOT processes executing on the same Local Area Network (LAN). Thus, SPOT can be executed in a distributed sense with the capability for a team of flight controllers to efficiently share the same trajectory information currently being computed by the program. SPOT is used in the Mission Control Center (MCC) for Space Shuttle Program (SSP) and International Space Station Program (ISSP) operations, and can also be used as a post -flight analysis tool. It is primarily used for situational awareness, and for contingency situations.

Smith, Jason T.↗

Analysis of ocular torsion data from Space Labs D-1 and SL-1

A series of preflight, inflight, and postflight vestibular experiments were conducted on Spacelab missions SL-1 and D-1. Two portions of the investigation, the 'sled' and 'dome' functional objectives, involved recording the torsional motion of human subject's eyes. In the SL-1 sled and dome experiments, preflight and postflight ocular torsion was recorded on 35 mm film using a Nikon motor driven camera (2.6 frames/sec). The film was to be analyzed by measuring the motion of contact lens landmarks using a Hermes senior film scanner. However, an inflight failure of the dome experiment camera flash unit led the crew to utilize the Spacelab video camera as an alternative contingency method for imaging the eye in this FO. A suitable method for analysis of the video data was developed. Results of the analysis are presented.

Oman, C. M.↗

Adaptive Planning: Understanding Organizational Workload to Capability/ Capacity through Modeling and Simulation

In August 2003, the Secretary of Defense (SECDEF) established the Adaptive Planning (AP) initiative [1] with an objective of reducing the time necessary to develop and revise Combatant Commander (COCOM) contingency plans and increase SECDEF plan visibility. In addition to reducing the traditional plan development timeline from twenty-four months to less than twelve months (with a goal of six months)[2], AP increased plan visibility to Department of Defense (DoD) leadership through In-Progress Reviews (IPRs). The IPR process, as well as the increased number of campaign and contingency plans COCOMs had to develop, increased the workload while the number of planners remained fixed. Several efforts from collaborative planning tools to streamlined processes were initiated to compensate for the increased workload enabling COCOMS to better meet shorter planning timelines. This paper examines the Joint Strategic Capabilities Plan (JSCP) directed contingency planning and staffing requirements assigned to a combatant commander staff through the lens of modeling and simulation. The dynamics of developing a COCOM plan are captured with an ExtendSim [3] simulation. The resulting analysis provides a quantifiable means by which to measure a combatant commander staffs workload associated with development and staffing JSCP [4] directed contingency plans with COCOM capability/capacity. Modeling and simulation bring significant opportunities in measuring the sensitivity of key variables in the assessment of workload to capability/capacity analysis. Gaining an understanding of the relationship between plan complexity, number of plans, planning processes, and number of planners with time required for plan development provides valuable information to DoD leadership. Through modeling and simulation AP leadership can gain greater insight in making key decisions on knowing where to best allocate scarce resources in an effort to meet DoD planning objectives.

Hase, Chris↗

Additional design studies of the NASA/Navy lift/cruise fan

Additional preliminary design studies were performed for a turbotip lift/cruise fan propulsion system for a Navy multimission aircraft. The LCF459/J97 propulsion system was previously designed for this application. These studies extended the analysis in areas of (1) scroll commonality, (2) increased engine-out contingency ratings, (3) mounting systems, (4) manufacturing cost reductions, and (5) vulnerability.

Source record↗

OSIRIS-REx Off-Nominal Re-entry Breakup Analysis

The Origins, Spectral Interpretation, Resource Identification, Security, Regolith Explorer (OSIRIS-REx) is a NASA asteroid sampling mission that launched on September 8, 2016. Its objectives are to study the asteroid Bennu for up to 505 days and obtain at least 60 grams of pristine regolith. The sample return to Earth is planned for September 2023. For contingency planning and risk assessment of a potential off-nominal Earth-return trajectory, a re-entry breakup analysis was performed to determine the response of the spacecraft to the environment and predict the breakup sequence and timeline, debris survival, and debris impact conditions. The failure scenario assumed a failure to separate between the bus and the sample return capsule (SRC), resulting in the combined bus+SRC configuration for the re-entry vehicle. Furthermore, consistent overburns or underburns were considered to produce three sets of initial conditions for the analysis consisting of nominal, steep, and shallow entry flight path angles. The results were compared to the breakup analysis performed for a similar vehicle, the Stardust spacecraft, which returned samples from the comet Wild 2 in 2006. This paper describes the OSIRIS-REx spacecraft and presents the results of the re-entry breakup analysis.

reentry breakup analysis↗

Creating Formal Characterizations ofRoutine Contingency Management inCommercial Aviation

Traditional approaches to safety management focus on collection of data describing unwanted states (i.e., accidents and incidents) and analysis of undesired behaviors (i.e., faults and errors) that precede those states. Thus, in the traditional view of safety, safety is both defined and measured by its absence, namely the lack of safety. In extremely high confidence systems like commercial air transport, however, opportunities to measure the absence of safety are relatively rare. Ironically, a critical barrier to measuring safety and the impact of mitigation strategies in commercial aviation is the lack of opportunities for measurement.

Intelligent Contingency Management,↗

Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture to where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publicatoin5, in 2006 development was started to baseline Extra- Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency EVA preparation team structure, approach, goals, and the resources allocated to its work after the 2010 events. Finally, the authors will overview the implementation of these updates in addressing failures onboard the ISS in 2012, 2013, and 2014. The successful use of the updated approaches, and the application of the approaches to other spacewalks, will demonstrate the effectiveness of this additional work and make a case for putting significant time and resources into pre-failure planning and analysis for critical hardware items on human-tended spacecraft.

Van Cise, E. A.↗

Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publication, in 2006 development was started to baseline Extra-Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency EVA preparation team structure, approach, goals, and the resources allocated to its work after the 2010 events. Finally, the authors will overview the implementation of these updates in addressing failures onboard the ISS in 2012, 2013, and 2014. The successful use of the updated approaches, and the application of the approaches to other spacewalks, will demonstrate the effectiveness of this additional work and make a case for putting significant time and resources into pre-failure planning and analysis for critical hardware items on human-tended spacecraft.

Van Cise, E. A.↗