Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “commissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Eulusmap - An international land resources map utilizing satellite imagery

The paper describes the European land use map ('Eulusmap') sponsored by the World Land Use Survey Commission and printed in May 1978. The map was compiled on the basis of theme extraction techniques applied to Landsat-1 imagery. Various aspects of Landsat-image analysis are discussed here, and detailed consideration is given to the land-use classification system developed by the World Land Use Survey Commission.

Paludan, T.↗

Alternative licensing arrangements and spectrum economics: The case of multipoint distribution service

At present, the Federal Communications Commission assigns radio licenses following a determination of the public interest. Whenever mutually conflicting license applications are filed, the Commission holds a comparative hearing. This assignment mechanism is criticized as cumbersome and unrealiable, and three alternatives are proposed: increasing the available spectrum, and either auctions or lotteries of radio licenses. An analysis is presented of the present system and these alternative arrangments for assigning rights to the frequency spectrum for the Multipoint Distribution Service (MDS). Although MDS is a relatively minor radio service, it serves as a prototype for message distribution services with a large potential for use in business communications. Moreover, the way in which the initial batch of MDS licenses was assigned provides a unique opportunity for empirical work on the economics of the licensing process.

Agnew, C. E.↗

Assessment of institutional barriers to the use of natural gas fuel in automotive vehicle fleets

Institutional barriers to the use of natural gas as a fuel for motor vehicle fleets were identified. Recommendations for barrier removal were developed. Eight types of institutional barriers were assessed: (1) lack of a national standard for the safe design and certification of natural gas vehicles and refueling stations; (2) excessively conservative or misapplied state and local regulations, including bridge and tunnel restrictions, restrictions on types of vehicles that may be fueled by natural gas, zoning regulations that prohibit operation of refueling stations, parking restrictions, application of LPG standards to LNG vehicles, and unintentionally unsafe vehicle or refueling station requirements; (3) need for clarification of EPA's tampering enforcement policy; (4) the U.S. hydrocarbon standard; (5) uncertainty concerning state utility commission jurisdiction; (6) sale for resale prohibitions imposed by natural gas utility companies or state utility commissions; (7) uncertainty of the effects of conversions to natural gas on vehicle manufactures warranties; and (8) need for a natural gas to gasoline equivalent units conversion factor for use in calculation of state road use taxes.

Jablonski, J.↗

Preliminary Comparisons of the Information Content and Utility of TM Versus MSS Data

Comparisons were made between subscenes from the first TM scene acquired of the Washington, D.C. area and a MSS scene acquired approximately one year earlier. Three types of analyses were conducted to compare TM and MSS data: a water body analysis, a principal components analysis and a spectral clustering analysis. The water body analysis compared the capability of the TM to the MSS for detecting small uniform targets. Of the 59 ponds located on aerial photographs 34 (58%) were detected by the TM with six commission errors (15%) and 13 (22%) were detected by the MSS with three commission errors (19%). The smallest water body detected by the TM was 16 meters; the smallest detected by the MSS was 40 meters. For the principal components analysis, means and covariance matrices were calculated for each subscene, and principal components images generated and characterized. In the spectral clustering comparison each scene was independently clustered and the clusters were assigned to informational classes. The preliminary comparison indicated that TM data provides enhancements over MSS in terms of (1) small target detection and (2) data dimensionality (even with 4-band data). The extra dimension, partially resultant from TM band 1, appears useful for built-up/non-built-up area separation.

Markham, B. L.↗

Space Station design for growth

This paper reviews the current status of Space Station planning for growth as the basis of an assessment of potential Space Station evolution directions in the 21st Century to meet the challenges of the report of the U.S. National Commission on space, 'Pioneering the Space Frontier'. Thus future mission requirements are reviewed and assessed. Based on these requirements, evolution scenarios and potential configurations are developed. It is concluded that the Space Station, as a multipurpose facility, should evolve to a capability of 300 kW, crew of 18 and 5 lab modules. Beyond this capability it will be necessary to separate functions and establish two separate Space Stations, one for research and one for operational activities (e.g., transportation node, servicing, etc.). If the U.S. National Commission on space's recommendations are adopted, this separation or 'branching' could occur as early as 2005 to meet the needs of a permanent lunar base.

Pritchard, E. B.↗

Life systems for a lunar base

The Biosphere 2 project is pioneering work on life systems that can serve as a prototype for long-term habitation on the Moon. This project will also facilitate the understanding of the smaller systems that will be needed for initial lunar base life-support functions. In its recommendation for a policy for the next 50 years in space, the National Commission on Space urged, 'To explore and settle the inner Solar System, we must develop biospheres of smaller size, and learn how to build and maintain them' (National Commission on Space, 1986). The Biosphere 2 project, along with its Biospheric Research and Development Center, is a materially closed and informationally and energetically open system capable of supporting a human crew of eight, undertaking work to meet this need. This paper gives an overview of the Space Biospheres Ventures' endeavor and its lunar applications.

Nelson, Mark↗

Definitions in use by the visible and near-infrared, and thermal working groups

The Calibration Advisory Panel (CAP) is composed of calibration experts from each of the Earth Observing System (EOS) instruments, science investigation, and cross-calibration teams. These members come from a variety of institutions and backgrounds. In order to facilitate an exchange of ideas, and assure a common basis for communication, it was desirable to assemble this list of definitions. These definitions were developed for use by the visible and near-infrared working group, and the thermal infrared working group. Where necessary or appropriate, deviations from these for specific instruments or other sensor types are given in the individual calibration plans. The definitions contained in this document are derived, wherever possible, from definitions accepted by international and national metrological commissions including the United States National Institute of Standards and Technology (NIST), the International Bureau of Weights and Measures (BIPM), the International Electrotechnical Commission (IEC), the International Organization for Standardization (ISO), and the International Organization of Legal Metrology (OIML).

Bruegge, Carol J.↗

A systems engineering initiative for NASA's space communications

In addition to but separate from the Red and Blue Teams commissioned by the NASA Administrator, NASA's Associate Administrator for Space Communications commissioned a Blue Team to review the Office of Space Communications (Code O) Core Program and determine how the program could be conducted faster, better, and cheaper, without compromising safety. Since there was no corresponding Red Team for the Code O Blue Team, the Blue Team assumed a Red Team independent attitude and challenged the status quo. The Blue Team process and results are summarized. The Associate Administrator for Space Communications subsequently convened a special management session to discuss the significance and implications of the Blue Team's report and to lay the groundwork and teamwork for the next steps, including the transition from engineering systems to systems engineering. The methodology and progress toward realizing the Code O Family vision and accomplishing the systems engineering initiative for NASA's space communications are presented.

Hornstein, Rhoda S.↗

Re-engineering NASA's space communications to remain viable in a constrained fiscal environment

Along with the Red and Blue Teams commissioned by the NASA Administrator in 1992, NASA's Associate Administrator for Space Communications commissioned a Blue Team to review the Office of Space Communications (Code O) Core Program and determine how the program could be conducted faster, better, and cheaper. Since there was no corresponding Red Team for the Code O Blue Team, the Blue Team assumed a Red Team independent attitude and challenged the status quo, including current work processes, functional distinctions, interfaces, and information flow, as well as traditional management and system development practices. The Blue Team's unconstrained, non-parochial, and imaginative look at NASA's space communications program produced a simplified representation of the space communications infrastructure that transcends organizational and functional boundaries, in addition to existing systems and facilities. Further, the Blue Team adapted the 'faster, better, cheaper' charter to be relevant to the multi-mission, continuous nature of the space communications program and to serve as a gauge for improving customer services concurrent with achieving more efficient operations and infrastructure life cycle economies. This simplified representation, together with the adapted metrics, offers a future view and process model for reengineering NASA's space communications to remain viable in a constrained fiscal environment. Code O remains firm in its commitment to improve productivity, effectiveness, and efficiency. In October 1992, the Associate Administrator reconstituted the Blue Team as the Code O Success Team (COST) to serve as a catalyst for change. In this paper, the COST presents the chronicle and significance of the simplified representation and adapted metrics, and their application during the FY 1993-1994 activities.

Hornstein, Rhoda Shaller↗

On the conversion of orbital elements from 1950.0 to J 2000

Formulas are developed for the transformation of ecliptical orbital elements from B 1950 to J 2000. The results are compared with those recommended by IAU Commission 20. Some drawbacks to the Commission 20 formulation are pointed out and we develop procedures which are consistent with standard precessional formulations.

Lieske, J. H.↗

The Effects of Linear Microphone Array Changes on Computed Sound Exposure Level Footprints

Airport land planning commissions often are faced with determining how much area around an airport is affected by the sound exposure levels (SELS) associated with helicopter operations. This paper presents a study of the effects changing the size and composition of a microphone array has on the computed SEL contour (ground footprint) areas used by such commissions. Descent flight acoustic data measured by a fifteen microphone array were reprocessed for five different combinations of microphones within this array. This resulted in data for six different arrays for which SEL contours were computed. The fifteen microphone array was defined as the 'baseline' array since it contained the greatest amount of data. The computations used a newly developed technique, the Acoustic Re-propagation Technique (ART), which uses parts of the NASA noise prediction program ROTONET. After the areas of the SEL contours were calculated the differences between the areas were determined. The area differences for the six arrays are presented that show a five and a three microphone array (with spacing typical of that required by the FAA FAR Part 36 noise certification procedure) compare well with the fifteen microphone array. All data were obtained from a database resulting from a joint project conducted by NASA and U.S. Army researchers at Langley and Ames Research Centers. A brief description of the joint project test design, microphone array set-up, and data reduction methodology associated with the database are discussed.

Mueller, Arnold W.↗

Making the Learning of Mathematics More Meaningful

In the early 1980's, the National Commission on Excellence in Education responded to the call for reform in the teaching and learning of mathematics. In particular, the Commission developed a document addressing the consensus that all students need to learn more, and often different, mathematics and that instruction in mathematics must be significantly revised. In a response to these calls for mathematics education reform, the National Council of Teachers of Mathematics (NCTM) developed its Curriculum and Evaluation Standards (1989) with a two-fold purpose: 1) to create a coherent vision of what it means to be mathematically literate in a world that relies on calculators and computers, and 2) to create a set of standards to guide the revisions of school mathematics curriculum.

Ward, Robin A.↗

Landsat TM as a Tool for Locating Habitat for Cerulean Warblers

I believe that I made significant strides in three areas between fall of 1997 and fall of 2000 when I concluded my participation in the JOVE program. First, I acquired skill in digital remote sensing. This was significant to me because it had been 20 years since I had done any work utilizing remote sensing. I used my new skills in two classroom settings (forest ecology and GIS). In addition, I will participate as an instructor of digital remote sensing in a workshop for secondary educators this coming spring. Second, I received funding from the Arkansas Game and Fish Commission and the U.S. Forest Service to supplement JOVE funds. Third, and most importantly, a students and I developed a technique using LandSAT TM for identifying habitat for cerulean warblers. We developed a habitat model using logistic regression to discriminate between pixels that had a high probability of representing good cerulean warbler habitat and pixels that had a low probability of representing cerulean warbler habitat. Using this model, we located five significant populations of cerulean warblers in the Ozark National Forest of Arkansas. These populations were unknown before the initiation of this research and further represent a significant proportion of the known cerulean warblers in Arkansas. Preliminary findings were presented at the Ornithological Societies of America meeting in August of 1999. I also presented findings at the Arkansas Game and Fish Commission Research Symposium held in June of 2000. Finally, one paper is in press: James, D. A., C.J. Kellner, J. Self, and J. Davis., 'Breeding season distribution of cerulean warblers in Arkansas in the 1990's'. In addition, one paper is under construction: 'Population fluctuation and habitat selection by cerulean warblers in upland forests of Arkansas,' and one paper is under consideration: 'LandSAT TM and Logistic regression for identification of cerulean warbler habitat in upland forests of Arkansas.'

Kellner, Chris↗

Model-Based Testability Assessment and Directed Troubleshooting of Shuttle Wiring Systems

We have recently completed a pilot study on the Space shuttle wiring system commissioned by the Wiring Integrity Research (WIRe) team at NASA Ames Research Center, As the space shuttle ages, it is experiencing wiring degradation problems including arcing, chaffing insulation breakdown and broken conductors. A systematic and comprehensive test process is required to thoroughly test and quality assure (QA) the wiring systems. The NASA WIRe team recognized the value of a formal model based analysis for risk-assessment and fault coverage analysis. However. wiring systems are complex and involve over 50,000 wire segments. Therefore, NASA commissioned this pilot study with Qualtech Systems. Inc. (QSI) to explore means of automatically extracting high fidelity multi-signal models from wiring information database for use with QSI's Testability Engineering and Maintenance System (TEAMS) tool.

Deb, Somnath↗

Development of the Electron Drift Instrument (EDI) for Cluster

The Electron Drift Instrument (EDI) is a new technique for measuring electric fields in space by detecting the effect on weak beams of test electrons. This U.S. portions of the technique, flight hardware, and flight software were developed for the Cluster mission under this contract. Dr. Goetz Paschmann of the Max Planck Institute in Garching, Germany, was the Principle Investigator for Cluster EDI. Hardware for Cluster was developed in the U.S. at the University of New Hampshire, Lockheed Palo Alto Research Laboratory, and University of California, San Diego. The Cluster satellites carrying the original EDI instruments were lost in the catastrophic launch failure of first flight of the Arianne-V rocket in 1996. Following that loss, NASA and ESA approved a rebuild of the Cluster mission, for which all four satellites were successfully launched in the Summer of 2000. Limited operations of EDI were also obtained on the Equator-S satellite, which was launched in December, 1997. A satellite failure caused a loss of the Equator-S mission after only 5 months, but these operations were extremely valuable in learning about the characteristics and operations of the complex EDI instrument. The Cluster mission, satellites, and instruments underwent an extensive on-orbit commissioning phase in the Fall of 2000, carrying over through January 2001. During this period all elements of the instruments were checked and careful measurements of inter-experiments interferences were made. EDI is currently working exceptionally well in orbit. Initial results verify that all aspects of the instrument are working as planned, and returning highly valuable scientific information. The first two papers describing EDI on-orbit results have been submitted for publication in April, 2001. The principles of the EDI technique, and its implementation on Cluster are described in two papers by Paschmann et al., attached as Appendices A and B. The EDI presentation at the formal Cluster Commissioning Review, held at ESA Headquarters in Paris, is attached as Appendix C.

Quinn, Jack↗

Decision Making In A High-Tech World: Automation Bias and Countermeasures

Automated decision aids and decision support systems have become essential tools in many high-tech environments. In aviation, for example, flight management systems computers not only fly the aircraft, but also calculate fuel efficient paths, detect and diagnose system malfunctions and abnormalities, and recommend or carry out decisions. Air Traffic Controllers will soon be utilizing decision support tools to help them predict and detect potential conflicts and to generate clearances. Other fields as disparate as nuclear power plants and medical diagnostics are similarly becoming more and more automated. Ideally, the combination of human decision maker and automated decision aid should result in a high-performing team, maximizing the advantages of additional cognitive and observational power in the decision-making process. In reality, however, the presence of these aids often short-circuits the way that even very experienced decision makers have traditionally handled tasks and made decisions, and introduces opportunities for new decision heuristics and biases. Results of recent research investigating the use of automated aids have indicated the presence of automation bias, that is, errors made when decision makers rely on automated cues as a heuristic replacement for vigilant information seeking and processing. Automation commission errors, i.e., errors made when decision makers inappropriately follow an automated directive, or automation omission errors, i.e., errors made when humans fail to take action or notice a problem because an automated aid fails to inform them, can result from this tendency. Evidence of the tendency to make automation-related omission and commission errors has been found in pilot self reports, in studies using pilots in flight simulations, and in non-flight decision making contexts with student samples. Considerable research has found that increasing social accountability can successfully ameliorate a broad array of cognitive biases and resultant errors. To what extent these effects generalize to performance situations is not yet empirically established. The two studies to be presented represent concurrent efforts, with student and professional pilot samples, to determine the effects of accountability pressures on automation bias and on the verification of the accurate functioning of automated aids. Students (Experiment 1) and commercial pilots (Experiment 2) performed simulated flight tasks using automated aids. In both studies, participants who perceived themselves as accountable for their strategies of interaction with the automation were significantly more likely to verify its correctness, and committed significantly fewer automation-related errors than those who did not report this perception.

Mosier, Kathleen L.↗

Automation Bias: Decision Making and Performance in High-Tech Cockpits

Automated aids and decision support tools are rapidly becoming indispensible tools in high-technology cockpits, and are assuming increasing control of "cognitive" flight tasks, such as calculating fuel-efficient routes, navigating, or detecting and diagnosing system malfunctions and abnormalities. This study was designed to investigate "automation bias," a recently documented factor in the use of automated aids and decision support systems. The term refers to omission and commission errors resulting from the use of automated cues as a heuristic replacement for vigilant information seeking and processing. Glass-cockpit pilots flew flight scenarios involving automation "events," or opportunities for automation-related omission and commission errors. Pilots who perceived themselves as "accountable" for their performance and strategies of interaction with the automation were more likely to double-check automated functioning against other cues, and less likely to commit errors. Pilots were also likely to erroneously "remember" the presence of expected cues when describing their decision-making processes.

Mosier, Kathleen L.↗

U.S. Aerospace and Aviation Industry: A State-By-State Analysis

President George W. Bush and the Congress created the Commission on the Future of the United States Aerospace Industry to evaluate the current and future health of the industry as well as the challenges that lie ahead for the U.S. workforce and the economy. To accomplish our mission, we commissioned a study on the economic impact of the aerospace industry nationally and on a state-by-state basis, using the best available U.S. government data. This study sought to define the core of the aerospace industry. The resulting data represents that very core those jobs specifically tied to commercial and civilian aerospace. U.S. Aerospace and Aviation: A State-by-State Analysis examines the civilian and commercial aerospace and aviation industry by employment, wages, payroll, and establishments. The report found that the U.S. civilian and commercial aerospace and aviation industry employed over 2 million workers in 2001.

STATES (UNITED STATES)↗