Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “building load”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Online distributed price-based control of DR resources with competitive guarantees

Demand response (DR) of building HVAC load can provide crucial demand-side flexibility for the future smart grid. Compared to direct load control, price-based control can respect the customers’ autonomy and privacy. However, it is challenging for price-based control to attain provable performance guarantees under future uncertainty. In this paper, we propose a framework for a utility to perform price-based control of flexible building load within the utility’s service area, in order to attain competitive performance guarantees in terms of controlling the system peak demand under future uncertainty. By adopting a two-step approach, our online price-based control solution can attain a provable competitive ratio for all possible realizations within a given uncertainty set. Simulation experiments demonstrate that, with a robustification procedure, our solution can perform well not only for worst-case inputs, but also for average-case inputs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Stochastic Multi-Criteria Decision-Making Algorithm for Dynamic Load Prioritization in Grid-Interactive Efficient Buildings

Increasing deployment of advanced sensing, controls, and communication infrastructure enables buildings to provide services to the power grid, leading to the concept of grid-interactive efficient buildings. Since occupant activities and preferences primarily drive the availability and operational flexibility of building devices, there is a critical need to develop occupant-centric approaches that prioritize devices for providing grid services, while maintaining the desired end-use quality of service. In this paper, we present a decision-making framework that facilitates a building owner/operator to effectively prioritize loads for curtailment service under uncertainties, while minimizing any adverse impact on the occupants. The proposed framework uses a stochastic (Markov) model to represent the probabilistic behavior of device usage from power consumption data, and a load prioritization algorithm that dynamically ranks building loads using a stochastic multi-criteria decision-making algorithm. The proposed load prioritization framework is illustrated via numerical simulations in a residential building use-case, including plug-loads, air-conditioners, and plug-in electric vehicle chargers, in the context of load curtailment as a grid service. Suitable metrics are proposed to evaluate the closed-loop performance of the proposed prioritization algorithm under various scenarios and design choices. Scalability of the proposed algorithm is established via computational analysis, while time-series plots are used for intuitive explanation of the ranking choices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

MPC solution for optimal load shifting for buildings with ON/OFF staged packaged units: Experimental demonstration, and lessons learned

Small and medium-sized commercial buildings (SMCB) are significant demand response resources, and it is important to develop grid-responsive control algorithms that exploit those resources and create financial benefits for building owners and HVAC service providers. Furthermore, unlike large-sized commercial buildings, there is an opportunity to have universally applicable control solutions for many SMCBs since those buildings have a consistent HVAC system configuration: SMCBs are commonly served by multiple-staged air conditioning units controlled by their own thermostats. Despite the demand response potential and scalability, however, very few control solutions are available for SMCBs. Typical model predictive control (MPC) and heuristic control approaches for cooling load shifting that lower thermostat setpoints before an electric price jump are suitable mainly for large-sized commercial buildings where a continuous capacity modulation is possible, e.g., via dampers in variable air volume terminal units. However, those approaches can cause undesired, high peaks for SMCBs due to the nature of ON/OFF unit staging and narrow thermostat deadbands. This could discourage the use of advanced grid-responsive controls for SMCBs due to the concern of high demand charges, and has to be resolved. This paper presents a MPC solution that overcomes this challenge. It has a hierarchical MPC structure where an upper level MPC is responsible for electrical load shifting in response to an electric price signal while a lower level MPC is responsible for coordinating compressor stages to eliminate unnecessary peaks and follows the setpoints determined by the upper level MPC. In this work, two one-month, comprehensive laboratory tests have been carried out to demonstrate load shifting and cost savings for the algorithm. Interesting trade-offs between energy efficiency and load flexibility were observed and are discussed, and lessons learned for applying MPCs for SMCBs are also presented.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modulating thermal load through lightweight residential building walls using thermal energy storage and controlled precooling strategy

Precooling is a recognized technique for reducing cooling energy in buildings during peak hours by shifting load to off-peak hours. This technique is particularly effective in buildings with high thermal mass, because of their large thermal energy storage capacity, and in commercial buildings due to their variable electricity pricing based on time-of-use rates. Precooling in residential buildings has been a matter of limited interest in the past because of their low thermal mass and typically uniform electricity pricing rate. While previous studies on precooling primarily focused on cost savings, an important aspect of precooling is the thermal load modulation, which could be very effective in managing peak demand in lightweight residential buildings integrated with thermal energy storage systems. In this study, we examine different precooling strategies to manage the heat gains in lightweight building walls integrated with phase-change materials. We create nine different precooling profiles by controlling the interior temperature, and then evaluate the influence of the precooling profiles on four key building energy performance parameters: total heat gain, peak heat gain, maximum heat gain during peak hours, and time at which peak occurs. To thoroughly understand the fundamental physics, we first consider hypothetical climates and obtain the optimal precooling strategy required to achieve maximum peak shedding and shifting while minimizing the total heat gains. We then extend the model to Baltimore, Maryland, and estimate the benefits of the optimized precooling strategy under real conditions. The optimal precooling strategy proposed in this study can shift the peak heat gain by up to 14 hours, thereby reducing the heat gain during peak period by up to 95%, at the expense of a 23% increase in the total heat gains.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Accuracy of hourly energy predictions for demand flexibility applications

Decarbonization goals in the United States electricity sector are increasing the levels of renewable energy generation in the electricity supply system, and are driving increased attention to building electrification, which will increase the magnitude and shift the timing of the electricity system peak. These changes are motivating new approaches to coordinate building electricity demand with low-carbon renewable generation, elevating the importance of demand flexibility (DF) in buildings and the need to quantify the temporal impacts of DF. In this paper, we first characterize the hourly predictive accuracy of six commonly used baseline models in an application context of quantifying building-level load shift. Our analysis revealed insights such as hours of the day (afternoons), periods of the week (weekends), and seasons (summer) that were predicted with more accuracy than other time periods. In addition, the analysis showed tendencies toward overprediction or underprediction of load. Secondly, we provide the first published investigation of baseline erosion from repeated dispatch of building load shifting. We observed that as the baseline period is pushed back further from the prediction day, the distribution of errors across baseline model predictions increases, with notable inflection points near the three-week erosion point for two of the three models.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building energy efficiency and load flexibility optimization using phase change materials under futuristic grid scenario

This work investigates the energy savings and load flexibility capacity of phase change material (PCM) integrated into building envelope under a future energy generation scenario, where 80% of the energy load comes from renewable sources. Using community-scale modeling, we first determine the net thermal storage required to fully manage the demand variability at a utility grid, and then using whole-building simulations we optimize operating parameters - such as PCM thickness, latent heat, interior setpoint profile, PCM distribution, and heat transfer coefficient - to determine the optimal conditions required for maximum energy reduction and load flexibility without compromising occupants' thermal comfort. The optimal PCM-integrated envelope proposed in this study can provide annual load flexibility up to 33.6% and annual energy savings up to 10.8% in a lightweight residential building located in Baltimore, MD. This study is relevant given the increasing contributions of renewable energy in the total energy generation mix, leading to a significant time-imbalance between peak energy demand and peak energy production. While thermal energy storage using PCM is a recognized technique, there is no known prior study dedicated to examining the thermal performance of PCM-integrated envelope under future energy generation scenarios. This study bridges the research gap by investigating a practical way to implement PCMs in the buildings and maximize the energy efficiency as well as load flexibility related benefits.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

End-Use Load Profiles for the U.S. Building Stock

The End-Use Load Profiles for the U.S. Building Stock project uses New ResStock and ComStock models to statistically represent the energy use of U.S. buildings. The project's hybrid approach combines best-available ground truth data, such as submetering studies and statistical disaggregation of whole-building interval meter data, with the reach, cost-effectiveness, and granularity of physics-based and data-driven building stock modeling to deliver a nationally-comprehensive data set at a fraction of the historical cost.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Introduction to ComStock

This presentation is an introduction to ComStock and the datasets it produces. The goal of this work is to help cities, states, utilities, and other stakeholders have information and resources needed to make informed decisions about their building stock.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Calibration of urban building energy model using smart meter data for district peak load prediction

Urban building energy modeling (UBEM) is a powerful approach to assessing baseline building energy performance and retrofits with new technologies across building stocks in cities. However, the accuracy of UBEM is often constrained by the limited availability of reliable data about building characteristics and operations, such as envelope efficiency levels, HVAC system performance, and end-use load patterns. Existing research has performed UBEM calibration using annual or monthly energy consumption data, which falls short when higher-resolution time series applications are needed, such as peak load prediction for utility operation planning. This study presents a new framework for calibrating building energy models at urban scale using smart meter data, targeting the accurate prediction of summer peak electricity loads to support robust grid planning. The framework first integrates various data sources to enhance baseline input assumptions for building models, and then calibrates the baseline models through a pattern-matching approach. A case study using CityBES and two years of AMI data from over 9000 residential customers in Portland, Oregon, demonstrated the workflow and its effectiveness. The calibrated models achieved a daily peak load mean absolute percentage error of 2.6 % during the heatwave in the calibration year, and 2.0 % in the validation year using another year of AMI data. Using the calibrated models, we analyzed the demand flexibility potential of the district building stock as an application of UBEM calibration. The findings affirm the appropriate use of UBEM for peak electric load forecasting and demand side management at the utility distribution system level.

AMI data↗

Pathways to commercial building plug and process load efficiency and control

Abstract To accomplish net-zero carbon emissions in the built environment by 2050, we must equitably decarbonize commercial buildings, including reducing plug and process loads (PPLs). PPLs are plug-in or hardwired electric and gas loads that are not associated with major building end uses like lighting and HVAC. Research shows PPL energy reduction strategies and control technologies have the potential to save energy. But even when implemented, these savings have rarely been achieved and there has not been widespread uptake in U.S. commercial buildings. We investigate why these technologies and strategies have not seen widespread adoption and identify behavior and technology pathways to increase PPL reduction in U.S. commercial buildings. We examined behaviors of commercial building stakeholders through 44 interviews and cross-referenced qualitative analysis findings with in-depth technical knowledge of existing PPL control technologies and reduction strategies. PPL control implementation must be paired with management strategies, such as occupant engagement and training, to achieve optimal savings, and best practices should be disseminated across the industry. We found that increasing access to cost and energy savings data will promote uptake of PPL control technologies and allow designers to better incorporate PPLs into building design. Improving access to funding for PPL energy efficiency projects and addressing the split-incentive problem will increase adoption of PPL efficiency and control. Code bodies should continue to include PPL monitoring and reduction measures in energy codes. Key building stakeholders, including cybersecurity and information technology teams, should be involved in PPL monitoring and reduction strategy processes for successful implementation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Challenges and Opportunities for HVAC + Phase Change Material Thermal Energy Storage in Buildings

Phase-change material (PCM) thermal-energy storage (TES) integrated with HVAC and domestic hot water (DHW) can shift a large share of building thermal loads. By flattening and shifting loads, PCM TES reduces peak electricity use, eases stress on local and grid infrastructure, and lowers costs. It can also defer costly upgrades to service panels, distribution, and transmission. Higher energy density relative to chilled or hot water storage makes PCM TES practical for small, space limited, and retrofit projects, while packaged HVAC-integrated systems expand cost-effective load shifting to commercial buildings that previously lacked options. Despite this promise, deployment faces barriers. This paper presents challenges, opportunities, and lessons learned from lab and field integrations of PCM TES with packaged HVAC systems. Key challenges include misalignment between default heat pump controls tuned for direct-to-load operation and TES charge/discharge objectives, PCM properties that diverge from manufacturer claims and evolve with cycling, and high integration and deployment costs with off-the-shelf products. These studies underscore the need for factory built, integrated systems that arrive as prepackaged modules with proven controls, reducing design and installation effort and delivering predictable performance across projects. The paper outlines steps to enable viable and scalable PCM TES HVAC and DHW systems, including 1) validated methods that can be used to characterize PCM properties and TES system performance, 2) supervisory controls that optimize charge/discharge scheduling, and 3) factory integrated packaging that eliminates bespoke field engineering.

Dutton, Spencer↗

Best Practices for Plug Load Management Using a Building Energy Management System

The University of California San Diego (UCSD) successfully integrated PLCs with their BEMS, which resulted in 66% energy savings over one week across 25 plug loads (K. Chia et al. 2023). UCSD documented each step of this effort, highlighting best practices along the way, in their 10-page brief, "Best Practices for Plug Load Management Using a Building Energy Management System" (also referred to as "brief" in this document). This fact sheet provides highlights and key takeaways from UCSD's brief. The reader is encouraged to read UCSD's full brief if they wish to move forward with implementing PLC integration with their BEMS.

Building Energy Management System Integration↗

Peak Power Reduction for HVAC Operations in Multi-unit Commercial Buildings

The load profiles of most commercial consumers are characterized by brief periods of very high power consumption followed by intervals of relatively lower demand. In order to flatten commercial load profiles, several power utilities in addition to billing energy consumption, levy a demand charge (DC) on the monthly peak demand. In this work, we consider the problem of joint optimization of energy costs (EC) and DC incurred by a multi-unit building which follows a demand response (DR) program. Despite the non-linear structure of the problem, we show how the optimal solutions can be obtained efficiently using linear programming. We evaluate the performance of the proposed power control scheme for various climate zones in the US. We show that depending on the ambient conditions and the prescribed tariff structure, our strategy can result in savings of up to nearly 19% compared to the baseline.

Raza Naqvi, Syed A.↗

Integration of a Smart Outlet-Based Plug Load Management System with a Building Automation System

The growth of and reliance on renewable energy necessitate a multi-pronged approach to achieve grid reliability and economics. As they represent a notable portion of U.S. energy consumption, commercial buildings must play an active role in this effort. Conserving energy and responding to grid conditions through demand flexibility can be achieved through the integration of major building systems. Integration of plug and process loads with lighting and heating, ventilation, and air conditioning systems maximizes the effectiveness of integrated building energy management. In this research, we demonstrate the integration of smart outlets into a building automation system. We cover the installation process as well as the architecture required for smart outlets to communicate data to the building automation system and to receive commands back. After recording power measurements for one week as a baseline, we configured the building automation system to turn the smart outlets on and off according to a set schedule. This resulted in energy savings of 66% during 1 week on 25 plug loads. This work demonstrates that grid-interactive efficient buildings are achievable through building system integration.

building automation system↗