Start-up of Silo 130 Waste Retrieval at La Hague: first Step Towards Reducing Legacy Inventory - 20020
On June 25, 2019, the first grapple of waste and debris was lifted from Silo 130, one of the most challenging legacy waste storage silos at La Hague. This was the achievement of more than ten years of studies and efforts focused on solving some very unique technical and safety challenges, and on designing an innovative, efficient solution. The waste is from de-cladding materials from past Gas-Cooled Reactor fuel reprocessing operations. It is an unsorted mixture of magnesium cladding pieces, graphite debris, and various other metallic waste types. These materials can be chemically reactive and therefore need specific dispositions for handling and storing. The building is more than 40 years old and does not meet modern standards. French safety authorities have required the silo to be emptied. After about three years of operation, the bulk of this waste will be removed and placed in safe storage, pending the selection of a final conditioning solution. Removal of bottom debris will then be possible. When finished, this operation will bring a conclusion to a significant legacy-related hazard on the site. The silo will then be available for final cleaning and de-activation. This paper will describe the technical, safety, and economical challenges, and the various decisions and optimizations that led to the definition of the process and technology to be implemented. Several innovative features were developed and implemented, in all sections of the project: project organization, progressive approach for the waste disposition strategy, light building design, customized and robust retrieval technology, processing technologies involving the most modern robotic and sorting techniques, storage method... Several of these first-of-a-kind innovative features have been developed and qualified specifically for this application, using the detailed qualification procedure specified for all La Hague projects. The facility was built in less than five years, overcoming various difficulties along the line. Commissioning is now finished with the combined efforts of the project, engineering, start-up, and operating teams assisted by dedicated suppliers. The facility is now ramping-up. The paper will also report on the commissioning and start-up of the facility and describe the first operational results. (authors)