Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Workforce integration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

133 records · Page 8

NSTX-U National Research Program: White Paper in Response to Call from FESAC Sub-Committee

Both scientific and technical innovation is needed for the realization of an attractive engineering solution for a timely and cost-effective Pilot Plant, the design and construction of which is the overarching recommendation of the FESAC Long Range Plan, and the 2021 NASEM Pilot Plant reports, which underpin the Bold Decadal Vision. The two most significant plasma physics gaps to close for a Compact Pilot Plant (CPP) are core confinement improvement and heat flux mitigation, neither of which have been closed in an integrated fashion for any planned fusion power production device. High core confinement and stability are essential for producing majority self-driven plasmas in CPPs with reduced size and auxiliary heating power requirements, with an improvement in confinement being the major driver for cost reduction of a CPP. The National Spherical Tokamak Experiment - Upgrade (NSTX-U) is a unique low aspect ratio research facility that will address the fundamental challenge of developing the science and technology basis for a CPP design that integrates high core and edge confinement with the ability to mitigate very high incident heat fluxes. NSTX-U capabilities will enable the high performance, already achieved on NSTX, to extend into physics regimes much closer to those anticipated in Spherical Tokamak (ST)-based CPPs. These confinement and stability properties will be assessed by a full complement of diagnostics and analysis tools, which will also aid in the development of the underlying theory and predictive models needed for further optimization. Both conventional and transformative heat flux mitigation methods, such as liquid lithium plasma-facing components, will be developed and tested in-situ in NSTX-U at incident heat fluxes of ~100 MW/m 2 , and will inform plans and reduce risk for a subsequent major upgrade to the device to fully heated, high-Z wall and full liquid lithium divertor capability, a technology that potentially could then be implemented on any magnetic confinement device at any aspect ratio. NSTX-U research is fully complementary to programs performed on other STs, nationally and internationally. Furthermore, NSTX-U research has a direct connection to the private sector by informing design choices for future power production facilities being developed by these companies. The NSTX-U program will operate as a national User Facility, with collaborating researchers, engineers, and graduate students from 19 outside institutions, and open to participation and experiments led by researchers from both public and private entities. The research program will advance workforce development through training of young scientists, engineers, and technicians, and it will also serve for further diagnostic innovation, especially for high heat flux and high-Z wall environments, and implementation of advanced artificial intelligence (AI) for plasma and heat flux control.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

Educational Consortium for Energy-related Data Science & Computation in Building Engineering Programs

The project spearheaded by Pennsylvania State University aims to address the growing need for integrating energy-focused computation and data science into building engineering education. As the demand for energy-efficient building designs and operations increases, the educational sector must adapt to equip future engineers with the necessary skills. This initiative responds to this need by developing a consortium that unites multiple institutions to enhance curriculum development, dataset curation, and resource sharing, thereby ensuring students are well-prepared for the evolving energy sector. The primary goal of the project is to establish a consortium that will develop and disseminate educational materials and training programs focused on energy-related data science and computation. Key accomplishments include the creation of a beta website for resource sharing, the development of training programs and standalone modules, and the curation of datasets accessible to the public. This effort will culminate in a curriculum that incorporates advanced modeling technologies and data science skills into building engineering programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

The Reconstruction and Failure Analysis of the Space Shuttle Columbia

Several days following the Columbia accident a team formed and began planning for the reconstruction of Columbia. A hangar at the Kennedy Space Center was selected for this effort due to it's size, available technical workforce and materials science laboratories and access to the vehicle ground processing infrastructure. The Reconstruction team established processes for receiving, handling, decontamination, tracking, identifying, cleaning and assessment of the debris. Initially, a 2-dimensional reconstruction of the Orbiter outer mold line was developed. As the investigation progressed fixtures which allowed a 3-dimensional reconstruction of the forward portions of the left wing's leading edge was developed. To support the reconstructions and forensic analyses a Materials and Processes (M&P) 'team was formed. This M&P team established processes for recording factual observations, debris cleaning, and engineering analysis. Fracture surfaces and thermal effects of selected airframe debris were assessed, and process flows for both nondestructive and destructive sampling and evaluation of debris were developed. The Team also assessed left hand airframe components that were believed to be associated with a structural breach of Columbia. A major portion of this analysis was evaluation of metallic deposits were prevalent on left wing leading edge components. Extensive evaluation of the visual, metallurgical and chemical nature of the deposits provided conclusions that were consistent with the visual assessments and interpretations of the NASA lead teams and the findings of the Columbia Accident Investigation Board. Analytical data collected by the M&P Team showed that a significant thermal event occurred at the left wing leading edge in the proximity of LH RCC Panels 8-9, and a correlation was formed between the deposits and overheating in these areas to the wing leading edge components. The analysis of deposits also showed exposure to temperatures in excess of 1649 C (3200 F), which would severely degrade support structure, tiles, and RCC panel materials. The integrated failure analysis of wing leading edge debris and deposits strongly supported the hypothesis that a breach occurred at LH RCC Panel 8.

Russell, Richard

Comprehensive Shuttle Foam Debris Reduction Strategies

The Columbia Accident Investigation Board (CAIB) was clear in its assessment of the loss of the Space Shuttle Columbia on February 3, 2003. Foam liberated from the External Tank (ET) impacting the brittle wing leading edge (WLE) of the orbiter causing the vehicle to disintegrate upon re-entry. Naturally, the CAB pointed out numerous issues affecting this exact outcome in hopes of correcting systems of systems failures any one of which might have altered the outcome. However, Discovery s recent return to flight (RTF) illustrates the primacy of erosion of foam and the risk of future undesirable outcomes. It is obvious that the original RTF focused approach to this problem was not equal to a comprehensive foam debris reduction activity consistent with the high national value of the Space Shuttle assets. The root cause is really very simple when looking at the spray-on foam insulation for the entire ET as part of the structure (e.g., actual stresses > materials allowable) rather than as some sort of sizehime limited ablator. This step is paramount to accepting the CAB recommendation of eliminating debris or in meeting any level of requirements due to the fundamental processes ensuring structural materials maintain their integrity. Significant effort has been expended to identify root cause of the foam debris In-Flight Anomaly (FA) of STS-114. Absent verifiable location specific data pre-launch (T-0) and in-flight, only a most probable cause can be identified. Indeed, the literature researched corroborates NASNTM-2004-2 13238 disturbing description of ill defined materials characterization, variable supplier constituents and foam processing irregularities. Also, foam is sensitive to age and the exposed environment making baseline comparisons difficult without event driven data. Conventional engineering processes account for such naturally occurring variability by always maintaining positive margins. Success in a negative margin range is not consistently achieved. Looking at the ET S spray-on foam insulation as part of the structural system (e.g., glass half full mentality) will create an environment where ET debris levels as low as reasonably achievable (ALARA) can be realized. ALARA is a NASA requirements philosophy deployed for the complex, mission altering radiation exposure requirements for life safety of astronauts. In the Shuttle s case, reasonableness is established by exhaustive engineering rigor, allowable debris size/quantity, technology maturity and programmatic constraints. A more robust urethane foam thermal protection system (TPS) will enhance the hctionality of the new Ares I Crew Launch Vehicle (CLV) Upper Stage. This paper will outline the strategy for a comprehensive effort to reduce ET foam debris and outline steps leading to an improved foam TPS. The NASA must remain committed to such an approach no matter what becomes of the next flight s actual debris field lest we fall back into a false sense of security. This commitment along with full implementation of all the other CAB recommendations such as orbiter hardening will significantly improve the Shuttle system, the engineering workforce, future capabilities & alternate policy offramps, national human resource protection, high value national asset protection and increase the level of service to the overall NASA mission.

Semmes, Edmund B.

Data-Driven Modeling and Control of Systems with Plasma-Surface Interactions (Final Technical Report)

This final technical report summarizes the activities and accomplishments in the period from February 2023 thru January 2026. The objective of the proposed research is to investigate the physical mechanisms and processes underlying the formation of structures and patterns in systems with plasma-surface interactions. In the past decades, there have been extensive studies on the interaction of glow discharges, dielectric barrier discharges, and arc discharges with confining or intervening surfaces. The advancement of the understanding of these phenomena is not only of fundamental scientific interest and relevance to the knowledge of the plasma state, but also with profound implications in various technological applications. The research will integrate theoretical, computational, and experimental work within an innovative framework of data assimilation, i.e., optimally combining model predictions with measurements. The scientific merit of this research has three aspects. Firstly, it extends the studies of plasma-surface interactions to systems with insulator surfaces and multi-layer systems, while existing studies are predominantly on electrode surfaces. Secondly, it expects to develop a novel data-driven modeling approach based on data assimilation to enhance the predictive and control capabilities, which could make transformative contributions to basic plasma research. Thirdly, it will shed new light on outstanding problems related to formation of patterns interfacing plasmas. This project also aims to launch an education and outreach initiative at Texas A&M University-Kingsville, a non-R1, minority-serving institution in South Texas. The initiative is structured as a four-tier pyramid. Tier one will be a webinar series for culture and capacity building to inform broader audience in the region about the research fields of plasma science and engineering. Tier two will be the creation and offering of an upper-level undergraduate course on introductory plasma physics, which will help with the recruitment for the upper tiers. On tier three, we will engage and mentor senior design students to conduct work toward the research goal of this project. There will also be a certificate program on general plasma science for undergrad and graduate students, part of which will be lab training at Princeton University. Tier four will be the supervision and mentoring of Ph.D. students. Therefore, this project will systematically expand the talent pipeline, broaden participation from communities historically and geographically underrepresented in DOE SC research portfolio, significantly improve the research and education capacity at the PI’s institution, and contribute to developing a diverse workforce in plasma science and engineering.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

Thermal Protection Systems Technology Transfer from Apollo and Space Shuttle to the Orion Program

This paper describes how the Orion program is utilizing the Thermal Protection System (TPS) experience from the Apollo and Space Shuttle programs to reduce program risk and improve affordability to meet NASA's future manned exploration missions. The Orion program successfully completed the Exploration Flight Test (EFT-1) mission in 2014 and is currently assembling, integrating, and testing the next spacecraft for the Exploration Mission (EM-1) to meet the flight test objectives of an unmanned orbital mission to the moon and return to earth in 2019. The Orion spacecraft production operations are located in the Neil Armstrong Operations and Checkout (O&C) facility at the Kennedy Space Center (KSC) providing an affordable and seamless delivery approach of vehicles directly to the launch site eliminating spacecraft transportation and additional checkout testing. Innovative vehicle design, manufacturing and test operations approaches are maturing and evolving with each Orion vehicle build to support the challenging NASA exploration mission requirements beyond Low Earth Orbit (LEO) while reducing program cost and schedule impacts. An example of Orion's evolution is the incorporation of an improved heat shield design, assembly and testing approach to meet the higher re-entry velocities for a lunar return for the EM-1 mission. The EFT- 1 heat shield was based on the Apollo heat shield manufacturing processes and was assembled at a supplier location and then transported to KSC for final integration. The EM-1 heat shield is now manufactured, assembled, tested, and installed into the spacecraft at the O&C facility reducing program cost and production schedules. The transition of the Space Shuttle TPS capabilities has enabled Orion to provide a human rated capsule design using proven materials and processes established over years of orbiter re-entry missions. The Orion Crew Module (CM) TPS configuration is derived from the Apollo CM approach utilizing improved materials and processes developed from the Space Shuttle program. The Orion EFT-1 heat shield utilized the Avcoat ablative material from Apollo which was injected into a honeycomb substrate and has been updated for EM-1 incorporating a block configuration bonded to a composite shell structure. This approach utilizes the proven Avcoat material for the heat shield ablator and is utilizing derived bonding and inspection methods and techniques from the Space Shuttle tile experience. The Orion back shell TPS configuration is based on Space Shuttle tile designs using proven tile materials and coatings. The Orion forward bay cover utilizes the high temperature tiles similar to the back shell tiles and low temperature blankets derived from the Space Shuttle program reducing weight impacts. Space Shuttle Multi-Layer Insulation (MLI) is installed in the Orion capsule to control the interior temperature environment providing a light weight design. These TPS design approaches have performed successfully on the Orion first flight test on EFT-1 and are incorporated in the configuration for the next flight test for EM-1. Completion of these two flight tests will certify the TPS for the Orion program for human rated exploration missions and has reduced the development cost to the Orion program. In addition to transitioning the Space Shuttle TPS design configurations to Orion, the supporting manufacturing infrastructure, manufacturing processes, and inspection methods are also incorporated into the Orion assembly operations at KSC. This has avoided significant startup schedule and costs impacts of new capabilities and development of support operations necessary to fabricate, install, inspect, and validate the TPS installations for the Orion spacecraft. The Thermal Protection System Facility (TPSF) which supported the Space Shuttle program provides the heat shield Avcoat blocks and the back shell AETB-8 tiles for Orion program. Extending the existing Space Shuttle TPS operations at KSC provides onsite support to the Orion spacecraft assembly operations. A significant benefit to the Orion program is the transition of the Space Shuttle technician work force at KSC. This highly skilled workforce was able to transition to the Orion program and immediately support the TPS installation operations. They brought with them the human rated manufacturing and assembly operations culture that was critical to the Space Shuttle success avoiding the retraining cost and schedule impacts of a new workforce to Orion. The technician skills certification program from the Space Shuttle was found to be compatible with the Lockheed Martin technician certification programs enabling a seamless training process utilizing process similarity avoiding the cost of retraining the work force to Orion standards. The existing workforce is certificated for multiple processes enabling reassignment of technicians to other tasks in the Orion AI&P operations reducing the overall touch labor manpower requirements. Additional benefits of using the Space Shuttle workforce is the incorporation of the lessons learned from Space Shuttle processes to improve the Orion TPS processes. This has resulted in a continuous evolution of TPS processes to improve the producibility and reduce the program cost for the TPS for the Orion program. Transitioning the Apollo and Space Shuttle TPS designs, processes, and technician workforce has been instrumental in enabling Orion to successfully meet the program challenges for NASA's exploration missions of the future.

Stewart, Michael

Gerischer Electrochemistry Today

Semiconductor photoelectrochemistry is a dynamic and interdisciplinary field at the forefront of research in solar fuels, energy conversion, and catalysis. Here, this Perspective captures the collective insights from the second Gerischer Electrochemistry Today Symposium, held at Colorado State University in Fort Collins, CO, in August 2024, which convened leading researchers, early-career scientists, and industry partners to define the critical next steps for the field. Through interactive sessions, technical talks, panel discussions, and training initiatives─including a Semiconductor Electrochemistry Bootcamp─the symposium emphasized three pillars of advancement: (i) facilitating the exchange of new ideas in semiconductor electrochemistry and charge separation; (ii) fostering the development of future researchers, research topics, and participation in the semiconductor workforce; and (iii) building community. This Energy Focus distills key themes from the meeting and identifies major knowledge gaps in the following areas: mechanisms of charge separation and recombination, role of defects and disorder, dynamic and operando characterization methods, interfacial chemistry and surface passivation, theoretical and modeling limitations, and standardization and benchmarking. The inclusive and collaborative structure of the symposium enabled the generation of this comprehensive report that will serve as a roadmap for fundamental and applied research in the rapidly evolving field of semiconductor electrochemistry over the next decade.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH