Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “WOOL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

DOE ZERH Case Study: Glastonbury Housesmith, Hickory Drive, South Glastonbury, CT

Case study of a DOE 2015 Housing Innovation Award winning custom home in the cold climate that got a HERS 29 without PV -23 with PV, with 2x6 24” on center walls with 5.5 blown fiberglass and 2.75” rigid mineral wool; basement with 4” XPS exterior, 4” under slab; sealed attic with 5” ccsf and R-58 blown fiberglass; ground source heat pump COP 4.4.

Building America↗

Window to the Hot Cell: The Challenges of Repairing a Specialized Nuclear Containment

Here, at the Idaho National Laboratory (INL) nuclear R&D site we come across a myriad of challenges and health hazards. Recently, a first time activity for the INL was to replace a hot cell window put in place circa 1977. This job evolution was complex in nature and involved several health and safety hazards. A hot cell is a containment designed to protect workers from radioactivity yet continue to allow work with remote handled tools and windows for visibility. The hot cell window weighed approximately 14,000 lbs. and was held in place by 1.6 cubic yards of high density grout. Removal of the window required abrasive grout removal techniques, radiological control efforts, specialized ventilation, and personal protective equipment utilization. In order to contain the large amounts of dust from the removal of concrete and potential contamination exposure a special containment tent and ventilation system was designed to protect workers in the surrounding areas from dust and debris. Once the window was removed it had to be further taken apart for shipment. While performing this activity, several lead sheets and lead wool was required to be removed. Overall it took 38 days to accomplish this task and had several organizations involved. There were no injuries or unexpected conditions that occurred during this job task. This was the first time this activity was performed at the INL and was completed in a successful manner. Further windows are set to be replaced in the near future.

99 GENERAL AND MISCELLANEOUS↗

Nano-material

A fluffy nano-material and method of manufacture are described. At 2000× magnification the fluffy nanomaterial has the appearance of raw, uncarded wool, with individual fiber lengths ranging from approximately four microns to twenty microns. Powder-based nanocatalysts are dispersed in the fluffy nanomaterial. The production of fluffy nanomaterial typically involves flowing about 125 cc/min of organic vapor at a pressure of about 400 torr over powder-based nano-catalysts for a period of time that may range from approximately thirty minutes to twenty-four hours.

Menchhofer, Paul A.↗

Hermetic edge-connect headers and corresponding connectors

A hermetically-sealed edge-connect header that can withstand high temperatures, high pressures (or high vacuum levels), and high vibration environments, along with two corresponding connectors are disclosed. After brazing the edge-connect header components, the assembly is machined to form a slot with a portion of each of a plurality of electrical conductors removed in the machining process, resulting in a header with a high pin density. During the process of mating the first connector design to the edge-connect header, a plurality of wipers in the connector deflect, thereby causing the wipers to extend from the connector and contact the corresponding electrical conductors in the header. During the process of mating the second connector design to the edge-connect header, each of a plurality of wipers formed of low-mass, compliant metal wool, forms multiple contact points with a corresponding electrical conductor in the header.

Kellogg, Rick A.↗

Hermetic edge-connect headers and corresponding connectors

A hermetically-sealed edge-connect header that can withstand high temperatures, high pressures (or high vacuum levels), and high vibration environments, along with two corresponding connectors are disclosed. After brazing the edge-connect header components, the assembly is machined to form a slot with a portion of each of a plurality of electrical conductors removed in the machining process, resulting in a header with a high pin density. During the process of mating the first connector design to the edge-connect header, a plurality of wipers in the connector deflect, thereby causing the wipers to extend from the connector and contact the corresponding electrical conductors in the header. During the process of mating the second connector design to the edge-connect header, each of a plurality of wipers formed of low-mass, compliant metal wool, forms multiple contact points with a corresponding electrical conductor in the header.

Kellogg, Rick A.↗

Hermetic edge-connect headers and corresponding connectors

A hermetically-sealed edge-connect header that can withstand high temperatures, high pressures (or high vacuum levels), and high vibration environments, along with two corresponding connectors are disclosed. After brazing the edge-connect header components, the assembly is machined to form a slot with a portion of each of a plurality of electrical conductors removed in the machining process, resulting in a header with a high pin density. During the process of mating the first connector design to the edge-connect header, a plurality of wipers in the connector deflect, thereby causing the wipers to extend from the connector and contact the corresponding electrical conductors in the header. During the process of mating the second connector design to the edge-connect header, each of a plurality of wipers formed of low-mass, compliant metal wool, forms multiple contact points with a corresponding electrical conductor in the header.

Kellogg, Rick A.↗

Remote Dismantling and Packaging of the RPV and Thermal Shield at the Obrigheim NPP - 16073

The Obrigheim Nuclear Power Plant (KWO) is located in the Federal State of Baden- Wuerttemberg in Germany and was operated by the EnKK-KWO. The Nuclear Power Plant - a light water pressurized water reactor with 357 MW of electrical power - was operated from 1968 to 2005. In June 2009 the Energiewerke Nord GmbH (EWN) was charged with the dismantling planning and dismantling of the reactor. According to the German nuclear and radiation protection law, several licenses will be required for the realisation of this task. This also applies to the disposal of the waste produced by dismantling, which must finally be stored in the German final repository for low and medium-radioactive waste (underground repository 'Konrad'). In spring 2010 EWN completed all application documents for the dismantling of the reactor pressure vessel (RPV) and the RPV internals and EnKK-KWO delivered them to the responsible Environmental Ministry of Baden-Wuerttemberg. Since then it has been worked intensively on the design, construction and manufacturing of the facilities for dismantling. With a separate notification of amendment, it was applied for the license to install and commission the facilities for the dismantling of the RPV and the RPV internals at the Environmental Ministry of Baden-Wuerttemberg in October 2010. This notification of amendment was confirmed in summer 2012. In September 2011 the work process and test plan and the technical information about the campaign for the removal of the radioactive waste resulting from the RPV with internals, peripheral components and secondary waste with the aim of final disposal in the Federal Repository 'Konrad' was submitted to the Federal Office for Radiation Protection. The evaluation and assessment of the work process and test plan was concluded in August 2013, when it was audited by TUV Nord EnSys without any further measures and indications. On September 10 the work process and test plan was released by the Federal Office for radiation protection. The dismantling of the RPV internals upper core and lower core structure started in September 2013 in the wet cutting area in room 01.106/306 and were finished in October 2014. In the presentation 'Dismantling of the Obrigheim NPP Reactor and Waste Management' held on the WM Symposia in Phoenix, 2014, an overview about the remote cutting and packaging of the upper and lower core structure was given. In today's presentation the subsequent dismantling activities will be outlined and evaluated. The presentation will start with the short description of the basic frame conditions for the nuclear licensing procedure, important procedural principles, and necessary plant-specific conditions. After the remote cutting and packing of the reactor internals of the upper and lower core structure was completed, the wet cutting area 'reactor room 01.106/306' was cleaned and the reactor room rebuilt into a cutting area for peripheral components. After the peripheral components were dismantled, all preconditions were set to lift the RPV from its mounting position and to arrange it in the upper reactor room 01.306. After these activities were completed, the lifting of the RPV was prepared and the cutting area 'Dismantling of the RPV insulation in the reactor room 01.106/306' was set up. To carry out this task, a strand jack unit with connection block was installed on the bridge of the reactor building crane. The opening created by the dismantling of the pool plate was closed with a flap door. The manipulators used for the wet cutting of the RPV internals were also used for the remote dismantling of the RPV insulation and mounted in the cutting area. The remote facilities were handled from a control centre and/or control stand. The air-technical housing which has already been used for the remote dismantling of the RPV internals was designed for the dismantling of the RPV insulation and was extended for this dismantling scope with appropriate ventilation systems. A special feature is the fixation of the RPV insulation at the RPV corpus. The RPV insulation consists of insulation wool, wire mesh and metal-sheet insulation. This 'Sandwich Construction' is detached with a steel corset at the RPV corpus and partly tightened. The insulation of the RPV bottom dome is tightened at the supporting frame. Due to the activation of the material in the core area and the resulting high ambient dose rate the RPV insulation can only be dismantled remotely. Additionally, as asbestos fibers are expected to be found in the insulation the dismantling has to be performed according to the Technical Rules for hazardous substances. The demolition, restoration or maintenance works have to be performed remotely according to the Technical Rules for hazardous substances when the RPV is located in the cutting area. But in case of dismantling of a power reactor no such experience can be found. Beginning with the explanation of the technical, radiological and substantial boundary conditions this presentation will not only impart knowledge about the dismantling of the RPV insulation but also about the remote controlled packaging of the metal sheet insulation and the manual conditioning of the RPV insulation. Subsequently, reports on the remotely controlled cutting and packaging of the RDB are given. Here is particularly interesting that cutting methods have been used and how the activity determination of the segments was carried out. On the basis of the evaluation of the realisation the subsequent dismantling activities will be lined out. In parallel to the dismantling tasks, the waste package documentation for the final repository was issued, checked and confirmed for the containers loaded with parts of the RDB internals. The most important stages are exemplified in this presentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transport and Treatment of Chapelcross Gas Ducts for Clearance and Recycling - 19662

In the summer of 2018, Cyclife, the EDF group's specialist radioactive waste management and decommissioning company, transported sixteen gas ducts and associated equipment from the shutdown Chapelcross nuclear power plant to treatment facilities in the UK and Sweden. The client requested a full removal, treatment and disposal service for approximately 820 te of low level metallic waste comprising Upper Gas Duct Assemblies (including bellows), Upper Gas Duct elbows, Filter Pots and Convoluted pipework. The complex scope involved heavy lifting, transport by road and sea, processing and recycling on a large scale, thereby necessitating involvement of a wide range of suppliers at different tiers all managed by Cyclife. The purpose of the entire project was to safely handle and treat all of the components for clearance and recycling into the public domain for the manufacture of new steel products. Most of the treatment took place in Cyclife's nuclear licensed metal treatment facility in Sweden. Cyclife has a long and unique experience of arranging safe transport of large contaminated components on road and sea. The metal treatment facility in Sweden can, without special arrangements, receive components up to 30 meters long with a weight of up to 400 tonnes for decontamination, size reduction and melting. The actual treatment of the components consisted of the following steps: a) Separation of a gas duct from the gantry, b) size reduction, radiological verification measurements and clearance of the gantry, c) stepwise segmentation of the gas duct and elbow including removal of asbestos, d) decontamination, e) melting, f) radiological assessment and clearance of the metal ingots, g) management of the secondary waste for return to UK. The result of the project, upon completed treatment of all the material, demonstrates a high recycling rate of the material. 5-10% of the original mass of material will have to disposed as radioactive waste. This number include all residues, untreatable material (asbestos, mineral wool, filters etc.) and two melt batches with a too high activity content for clearance. The paper takes the reader through the entire project from the initial planning to the clearance of the metal and the return of the secondary waste to UK for disposal. It will also present and discuss pros and cons for alternative management approaches in several perspectives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transient Triamidoamine Neptunium(V)–Mono(Imido) Complexes: C–H Activations and Hydrogen Atom Transfer Driven by Effective Nuclear Charge

Metal-mono(imido) linkages have been known for seven decades, and they are found in transition metal, main group, lanthanide, thorium, and uranium complexes. However, transuranium-mono(imido) complexes remain unknown in any scenario. Here, we present evidence for transient neptunium(V)–mono(imido) complexes. Treatment of [Np III (Tren TIPS )] (1, Tren TIPS = {N(CH 2 CH 2 NSiPr i 3 ) 3 } 3– ) with N 3 R (R = SiMe 3 ; 1-adamantyl, Ad) results in N 2 evolution and dark purple solutions consistent with the formation of [Np V (Tren TIPS )(NR)] (3NpNR). However, solutions of 3NpNR rapidly turn orange, where for R = SiMe 3 the isolated 1:1 products are [Np IV (Tren TIPS ){N(H)SiMe 3 }] (4a) and [Np IV (Tren TIPS-2H ){N(H)SiMe 3 }] (4b, Tren TIPS-2H = {N(CH 2 CH 2 NS i Pri 3 ) 2 (NCH 2 CH 2 NSiPr i 2 C[Me]=CH 2 )} 3– ). The latter contains a dehydrogenated-Pr i vinyl functionality accounting for the source of the two amido H atoms. The reaction for R = Ad proceeds similarly, but only [Np IV (Tren TIPS ){N(H)Ad}] (5a) could be unequivocally confirmed, though its isolation suggests generality of the imido-to-amido functional group transformation. Complexes 4a/4b exhibit slow relaxation of their magnetization, adding to the small number of transuranium single ion magnets. Experimental and computational analysis suggests that the amido products are formed by C–H activation and two sequential hydrogen atom transfer reactions involving a three-step proton-coupled electron-transfer sequence of H • radical abstraction, electron transfer, then another H • radical abstraction step. In contrast to transient 3NpNR, the 5f 2 uranium(IV)-imido complex [K(2.2.2-cryptand)][U IV (Tren TIPS )(NSiMe 3 )] (8UNSiMe 3 ) is robust, even in boiling THF, suggesting the transience of 5f 2 3NpNR is not due to the 5f n -count but the increased effective nuclear charge of neptunium vs uranium. This work highlights divergence of uranium- and neptunium-imido stabilities, emphasizing that the latter is an inherently challenging synthetic target.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Enhanced Simulation of Atmospheric Blocking in a High‐Resolution Earth System Model: Projected Changes and Implications for Extreme Weather Events

Atmospheric blocking is closely linked to the occurrence of extreme weather events. However, low-resolution Earth system models often underestimate the frequency of blocking, undermining confidence in future projections. Here, in this study, we use the high-resolution Community Earth System Model (CESM-HR; 25 km atm and 10 km ocean) to show that CESM-HR reduces biases in atmospheric blocking for both winter and summer, particularly for events lasting longer than 10 days. This improvement is partly due to reduced sea surface temperature biases at higher resolution. Additionally, applying a bias correction to the 500 hPa geopotential height further enhances blocking frequency simulations, highlighting the crucial role of the mean state. Under the Representative Concentration Pathway 8.5 scenario, CESM-HR projects a decrease in wintertime blocking over regions such as the Euro-Atlantic and Chukchi-Alaska, consistent with previous studies. In contrast, summer blocking is expected to become more frequent and persistent, driven by weakened zonal winds. The blocking center shifts from historical locations over Scandinavia and eastern Russia to central Eurasia, significantly increasing blocking over the Ural region. Summer blocking frequency over the Scandinavia-Ural region may eventually surpass historical winter blocking over the Euro-Atlantic. This increase in summer blocking could exacerbate summer heatwaves in a warming climate, making severe heatwaves, like those observed recently, more common in the future.

Atmospheric blocking↗

Uranium(III)-carbon multiple bonding supported by arene δ-bonding in mixed-valence hexauranium nanometre-scale rings

Despite the fact that non-aqueous uranium chemistry is over 60 years old, most polarised-covalent uranium-element multiple bonds involve formal uranium oxidation states IV, V, and VI. The paucity of uranium(III) congeners is because, in common with metal-ligand multiple bonding generally, such linkages involve strongly donating, charge-loaded ligands that bind best to electron-poor metals and inherently promote disproportionation of uranium(III). Here, we report the synthesis of hexauranium-methanediide nanometre-scale rings. Combined experimental and computational studies suggest overall the presence of formal uranium(III) and (IV) ions, though electron delocalisation in this Kramers system cannot be definitively ruled out, and the resulting polarised-covalent U = C bonds are supported by iodide and δ-bonded arene bridges. The arenes provide reservoirs that accommodate charge, thus avoiding inter-electronic repulsion that would destabilise these low oxidation state metal-ligand multiple bonds. Using arenes as electronic buffers could constitute a general synthetic strategy by which to stabilise otherwise inherently unstable metal-ligand linkages.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Neptunium and plutonium complexes with a sterically encumbered triamidoamine (TREN) scaffold

Here, the syntheses and characterization of isostructural neptunium(IV) and plutonium(IV) complexes [M IV (TREN TIPS )(Cl)] [An = Np, Pu; TREN TIPS = {N(CH 2 CH 2 NSiPr i 3 ) 3 } 3 ] are reported, along with the demonstration that they are likely reduced to the corresponding neptunium(III) and plutonium(III) products [M III (TREN TIPS )]; this chemistry provides new platforms from which to target a plethora of unprecedented molecular functionalities in transuranic chemistry and the neptunium(IV) molecule is the first structurally characterized neptunium(IV)–amide complex.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Influences of semiconductor morphology on the mechanical fatigue behavior of flexible organic electronics

The influence of crystalline morphology on the mechanical fatigue of organic semiconductors (OSCs) was investigated using 6,13-bis(triisopropylsilylethynyl)pentacene (TIPS-pentacene) as a crystalline OSC and poly(triarylamine) (PTAA) as an amorphous OSC. During cyclic bending, resistances of the OSCs were monitored using the transmission-line method on a metal-semiconductor-metal structure. The resistance of the TIPS-pentacene increased under fatigue damage in tensile-stress mode, but no such degradation was observed in the PTAA. Both OSCs were stable under compressive bending fatigue. The formation of intergranular cracks at the domain boundaries of the TIPS-pentacene was responsible for the degradation of its electrical properties under tensile bending fatigue.

36 MATERIALS SCIENCE↗

A coupled hydrodynamic (HEC-RAS 2D) and water quality model (WASP) for simulating flood-induced soil, sediment, and contaminant transport

Increased intensity and frequency of floods raise concerns about the release and transport of contaminated soil and sediment to and from rivers and streams. To model these processes during flooding events, we developed an External Coupler in Python to link the Hydrologic Engineering Center-River Analysis System (HEC-RAS) 2D hydrodynamic model to the Water Quality Analysis Simulation Program (WASP). Accurate data transfer from a hydrodynamic model to a water quality model is critical. Our test results showed the External Coupler successfully linked HEC-RAS and WASP and addressed technical challenges in aggregating flow data and conserving mass during the flood event. We ran the coupled models for a 100-year flood event to calculate flood-induced transport of sediment-associated arsenic in Woodbridge Creek, NJ. Change in surface sediment and arsenic at the end of 48-h flood simulation ranged from a net loss of 13.5 cm to a net gain of 11.6 cm, and 16.2 to 2.9 mg/kg, respectively, per model segment, which demonstrates the capability of the coupled model for simulating sediment and contaminant transport in flood.

54 ENVIRONMENTAL SCIENCES↗