Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “VABS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

132 records · Page 8

Artemis I Flight Instrumentation Data Quality Assessment and Processing

This paper is in support of the SciTech 2024 Space Launch System Aerosciences Special Sessions being organized by Brent Pomeroy and Jeremy Pinier. On November 16th, 2022, NASA launched the inaugural test flight of the Space Launch System (SLS) carrying the Orion capsule into a high orbit far beyond the Moon. The launch vehicle was instrumented with over three thousand flight instrumentation sensors, which monitored aerodynamic, acoustic, structural, and thermal environments. These data are intended to validate experimental and numerical tools used to predict the design environments which the vehicle experiences during launch and ascent. Prior to launch, tests were performed at the SLS Systems Integration Laboratory (SIL) using flight-like avionics and on the integrated flight hardware of Artemis I at the Vehicle Assembly Building (VAB). The purpose of these tests was to characterize the data acquisition units (DAUs) used to record and telemeter flight data to ground stations in order to assure that flight test objectives can be achieved and to quantify the expected quality of the flight data. In addition, pre-flight assessment and development of tools and methods used to process and disseminate flight data at the Huntsville Operations Support Center (HOSC) were conducted and adjustments made with respect to DAU time-synchronization prior to and after the flight. This paper summarizes these tests and some aspects of the post processing of data are discussed.

Developmental Flight Instrumentation↗

Artemis I Flight Instrumentation Data Quality Assessment and Processing

This paper is in support of the SciTech 2024 Space Launch System Aerosciences Special Sessions being organized by Brent Pomeroy and Jeremy Pinier. On November 16th, 2022, NASA launched an inaugural test flight of the Space Launch System (SLS) carrying the Orion capsule around the moon. The vehicle was instrumented with thousands of Developmental Flight Instrumentation (DFI) sensors, which monitored aerodynamic, acoustic, structural, and thermal environments. These data are used to validate experimental and numerical tools used to predict conditions the vehicle experiences during ascent. Prior to launch, a set of tests were performed to quantify the expected quality of the DFI flight data. These included testing of individual components, such as data acquisition units, at the Systems Integration Laboratory (SIL) and testing of integrated vehicle components at the Vehicle Assembly Building (VAB). This paper summarizes these tests. Some aspects of post processing of data are also discussed.

Developmental Flight Instrumentation↗

2022 Through April 2023 Corrective Measures Implementation and Interim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, Interim Measures and Monitoring Mobile Launch Platform Rehabilitation Sites / Vehicle Assembly Building Area (Swmu 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from January 2022 through April 2023 at the Mobile Launch Platform Rehabilitation Sites (MLP)/Vehicle Assembly Building (VAB) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The following summaries briefly describe areas within SWMU 056 identified by historical site investigation activities where groundwater monitoring and remedial actions have been implemented to date.

VOCs↗

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins↗

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins↗