Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Upgrade”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Benefits of Advanced Control Room Technologies: Phase One Upgrades to the HSSL, Research Plan, and Performance Measures

Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control room. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes the initial upgrades to the HSSL and outlines the methodology for a pilot test of the HSSL configuration.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Accelerating the Delivery of Home Performance Upgrades through a Synergistic Business Model

Achieving Building America energy savings goals (40% by 2030) will require many existing homes to install energy upgrades. Engaging large numbers of homeowners in building science-guided upgrades during a single remodeling event has been difficult for a number of reasons. Performance upgrades in existing homes tend to occur over multiple years and usually result from component failures (furnace failure) and weather damage (ice dams, roofing, siding). This research attempted to: A) understand the homeowner's motivations regarding investing in building science based performance upgrades; B) determining a rapidly scalable approach to engage large numbers of homeowners directly through existing customer networks; and C) access a business model that will manage all aspects of the contractor-homeowner-performance professional interface to ensure good upgrade decisions over time. The solution results from a synergistic approach utilizing networks of suppliers merging with networks of homeowner customers. Companies in the $\$ $400 to $\$ $800 billion home services industry have proven direct marketing and sales proficiencies that have led to the development of vast customer networks. Companies such as pest control, lawn care, and security have nurtured these networks by successfully addressing the ongoing needs of homes. This long-term access to customers and trust established with consistent delivery has also provided opportunities for home service providers to grow by successfully introducing new products and services like attic insulation and air sealing. The most important component for success is a business model that will facilitate and manage the process. The team analyzes a group that developed a working model.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Catalytic Upgrading of Key Biorefining Building Blocks to Renewable Chemicals, Polymeric Materials, and Liquid Fuels

The central objective of this project is to develop efficient, selective, and cost-effective catalytic systems for upgrading of key biorefining building blocks derived from catalytic conversion of plant biomass into value-added chemicals, polymeric materials, and liquid fuels. More specifically, the proposed work for the current grant period seeks to accomplish the following three specific objectives: (a) developing cost-effective and recyclable catalysts for selective upgrading (direct coupling) of the C 6 biorefining building block 5-hydroxymethylfurfural (HMF) into C 12 intermediates and for integrating biomass conversion and upgrading processes; (b) transforming the upgraded C 12 intermediates into polyols, polyurethanes, polyesters, and diesel fuels; and (c) reforming the upgraded intermediates into premium C 12 centered liquid hydrocarbon transportation fuels via selective hydrodeoxygenation catalysis.

09 BIOMASS FUELS↗

Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned

Historically, regulatory barriers have precluded nuclear plant safety-related (SR) Instrumentation and Control (I&C) system modernizations. These barriers have been largely addressed by industry and United States Nuclear Regulatory Commission (NRC) efforts, including development of the License Amendment Request (LAR) Alternate Review (AR) process for digital I&C upgrades. The U.S. Department of Energy (DOE) and the Idaho National Laboratory (INL) are supporting a SR I&C pilot upgrade at the Limerick Generating Station (LGS) to demonstrate this process and capturing associated lessons learned for the benefit of industry. In 2021, a paper summarizing lessons learned as captured in INL/EXT-20-59809, Safety Related Instrumentation & Control Pilot Upgrade Initial Scoping Phase Implementation Report and Lessons Learned was presented at the 12th NPIC & HMIT conference. It is recommended that readers of this paper review reference 1 or the associated Nuclear Journal paper for context. This paper summarizes activities performed and lessons learned for the conceptual design phase and portions of the detailed design phase as captured in INL/RPT-23-XXXX, “Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned.” The portions of the effort covered by reference 2 include conceptual design phase activities from December 2020, through completion in November 2021, and detailed design activities through September 2022. These efforts and associated detailed documentation in reference 3 are intended to support similar industry upgrades as a foundation stone for a Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Diagnostics for PSR Upgrade

This report discusses the diagnostics upgrade plan for the PSR. The PSR diagnostics under discussion include beam position and phase monitor (BPPM), wirescanners, wall current monitors, bunch shape monitors, laser notchers, and diamond array detectors. Existing diagnostics at the PSR include beam position monitors (BPM), a wirescanner, and a wall current monitor. All existing diagnostics need modernization, as part of the PSR upgrade plan. Meanwhile, we will introduce minor changes to improve the existing setups, which will enhance the performance and the longevity of the diagnostics equipment and components in the upgraded PSR operation. On the other hand, new, advanced, and available diagnostic technologies at a high technology readiness level (TRL) can also be considered for implementation for the PSR upgrade. In this note, we go through all types of diagnostics, introducing their basic principle, operating status, and plans for the PSR upgrade.

43 PARTICLE ACCELERATORS↗

LA100 Equity Strategies. Chapter 12: Distribution Grid Upgrades for Equitable Resilience and Solar, Storage, and Electric Vehicle Access

The LA100 Equity Strategies project integrates community guidance with robust research, modeling, and analysis to identify strategy options that can increase equitable outcomes in Los Angeles' clean energy transition. As Los Angeles transitions toward clean energy, existing distribution grid infrastructure will need to be updated and expanded to support reliable service during routine operations, enable interconnection with distributed energy resources and electrified loads, and provide access to energy-related services during disasters. This chapter focuses on equity in distribution grid upgrades, reliability, and resilience in Los Angeles. Specifically, NREL performed grid upgrade and resilience analyses using a detailed model of the distribution grid and income-differentiated household load profiles, electric vehicle (EV) adoption patterns, distributed solar adoption, and grid reliability to explore two key questions to inform how the City of Los Angeles can ensure a resilient and reliable distribution grid for all communities during the clean energy transition: Where can distribution system upgrades can be prioritized to enable equitable access to, and adoption of, clean energy technologies and how can Los Angeles provide equitable, resilient access to electricity-related services (e.g., health care, food) during disaster events like earthquakes and flooding? The electric distribution system is the "last mile" of the grid, linking the multistate bulk power system with customers; new loads, including EVs; and distributed energy resources, such as customer and community solar and storage. This analysis focuses on the 4.8-kilovolt (kV) system, including service transformers that represent the utility-side of the grid connection for most residential customers. Chapter 17 looks at the customer-side of the grid connection with a focus on electric panel upgrade needs. The transition toward clean energy can put additional stress on the distribution system from distributed energy resources and electrification - especially EVs and increased use of electricity for heating, cooling, cooking, and hot water. This stress, measured here as the number of equipment overloads and voltage violations, correlates strongly to grid reliability and therefore is used as a proxy for understanding additional upgrades needed and to help ensure equitable access to electrification and distributed energy resources. NREL also conducted community resilience analysis to examine customer-level access to both electricity and a larger range of services, such as hospitals and grocery stores during a disaster. This analysis explicitly considers equity to understand differences in current resilience and resilience strategies to effectively improve critical services access for all Angelenos. Research was guided by input from the community engagement process, and associated equity strategies are presented in alignment with that guidance.

14 SOLAR ENERGY↗

Energy impacts of nationwide window upgrades in commercial buildings

This report presents comprehensive estimates of the energy impacts of nationwide commercial building window upgrades in the United States, using a conservative approach. Windows play a substantial role in determining building energy use and occupant experience. Estimates point to commercial building windows impacting loads that represent more than 6 quads (approximately 6%) of annual primary energy use in the U.S. (Harris, 2022). Beyond heating and cooling loads, windows also have effects on lighting and occupant comfort. The fastest route to improving the energy efficiency of windows in U.S. buildings is upgrading or replacing windows in existing buildings. This is due to poor performance of windows in older existing buildings compared to most new construction, low levels of window replacement, and long window service life compared to energy-using building components. Nationwide window upgrades were considered using the following technologies: • Secondary glazing systems • Double pane (clear and tinted) • Triple pane (clear and tinted) • Electrochromic glazing Nationwide upgrades provide on the order of 4%–6% site energy savings in typical buildings, or up to 26% in buildings with the highest savings potential. Electrochromic windows, with their ability to adapt dynamically to environmental conditions, can provide additional benefits, ranging from median savings of 7.2% in buildings with window to wall ratio (WWR) greater than 10% and up to 28% for some buildings. Savings increase substantially for buildings with higher WWR. This study’s approach focused on isolating the direct energy benefits from improvement in window performance, and does not take into account the following additional benefits from window retrofits, which are likely to be substantial: • Managing peak demand and enabling HVAC equipment downsizing. • Energy savings from customizing upgrades to building type and climate. • Energy savings and comfort improvements resulting from post-retrofit reductions in air leakage. • Non-energy benefits, such as occupant comfort and resilience during extreme weather.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Progress on the upgrade of the CMS Hadron Calorimeter Front-End electronics

We present a scheme to upgrade the CMS HCAL front-end electronics in the second long shutdown to upgrade the LHC (LS2), which is expected to occur around 2018. The HCAL electronics upgrade is required to handle the major instantaneous luminosity increase (up to 5 * 10{sup 34} cm{sup -2} s{sup -1}) and an expected integrated luminosity of {approx}3000 fb{sup -1}. A key aspect of the HCAL upgrade is to read out longitudinal segmentation information to improve background rejection, energy resolution, and electron isolation at the L1 trigger. This paper focuses on the requirements for the new electronics and on the proposed solutions. The requirements include increased channel count, additional timing capabilities, and additional redundancy. The electronics are required to operate in a harsh environment and are constrained by the existing infrastructure. The proposed solutions span from chip level to system level. They include the development of a new ASIC ADC, the design and testing of higher speed transmitters to handle the increased data volume, the evaluation and use of circuits from other developments, evaluation of commercial FPGAs, better thermal design, and improvements in the overall readout architecture. We will report on the progress of the designs for these upgraded systems, along with performance requirements and initial design studies.

43 PARTICLE ACCELERATORS↗

The 12 GeV Energy Upgrade at Jefferson Laboratory

Two new cryomodules and an extensive upgrade of the bending magnets at Jefferson Lab has been recently completed in preparation for the full energy upgrade in about one year. Jefferson Laboratory has undertaken a major upgrade of its flagship facility, the CW re-circulating CEBAF linac, with the goal of doubling the linac energy to 12 GeV. I will discuss here the main scope and timeline of the upgrade and report on recent accomplishments and the present status. I will then discuss in more detail the core of the upgrade, the new additional C100 cryomodules, their production, tests and recent successful performance. I will then conclude by looking at the future plans of Jefferson Laboratory, from the commissioning and operations of the 12 GeV CEBAF to the design of the MEIC electron ion collider.

43 PARTICLE ACCELERATORS↗

DOE Hanford Network Upgrades and Disaster Recovery Exercise Support the Cleanup Mission Now and into the Future

In 2013, the U.S. Department of Energy's (DOE) Hanford Site, located in Washington State, funded an update to the critical network infrastructure supporting the Hanford Federal Cloud (HFC). The project, called ET-50, was the final step in a plan that was initiated five years ago called "Hanford's IT Vision, 2015 and Beyond." The ET-50 project upgraded Hanford's core data center switches and routers along with a majority of the distribution layer switches. The upgrades allowed HFC the network intelligence to provide Hanford with a more reliable and resilient network architecture. The culmination of the five year plan improved network intelligence and high performance computing as well as helped to provide 10 Gbps capable links between core backbone devices (10 times the previous bandwidth). These improvements allow Hanford the ability to further support bandwidth intense applications, such as video teleconferencing. The ET-50 switch upgrade, along with other upgrades implemented from the five year plan, have prepared Hanford's network for the next evolution of technology in voice, video, and data. Hand-in-hand with ET-50's major data center outage, Mission Support Alliance's (MSA) Information Management (IM) organization executed a disaster recovery (DR) exercise to perform a true integration test and capability study. The DR scope was planned within the constraints of ET-50's 14 hour datacenter outage window. This DR exercise tested Hanford's Continuity of Operations (COOP) capability and failover plans for safety and business critical Hanford Federal Cloud applications. The planned suite of services to be tested was identified prior to the outage and plans were prepared to test the services ability to failover from the primary Hanford data center to the backup data center. The services tested were: Core Network (backbone, firewall, load balancers); Voicemail; Voice over IP (VoIP); Emergency Notification; Virtual desktops; and, Select set of production applications and data. The primary objective of the exercise was to test COOP around the emergency operations at Hanford to provide information on capabilities and dependencies of the current system to insure improved focus of emergency, safety and security capacity in a disaster situation. The integration of the DR test into the ET-50 project allowed the testing of COOP at Hanford and allowed the lessons learned to be defined. These lessons learned have helped improve the understanding of Hanford's COOP capabilities and will be critical for future planning. With the completion of the Hanford Federal Cloud network upgrades and the disaster recovery exercise, the MSA has a clearer path forward for future technology implementations as well as network improvements to help shape the usability and reliability of the Hanford network in support of the cleanup mission.

97 MATHEMATICS AND COMPUTING↗

Building America Case Study: Accelerating the Delivery of Home-Performance Upgrades Using a Synergistic Business Model, Minneapolis, Minnesota

Achieving Building America energy savings goals (40 percent by 2030) will require many existing homes to install energy upgrades. Engaging large numbers of homeowners in building science-guided upgrades during a single remodeling event has been difficult for a number of reasons. Performance upgrades in existing homes tend to occur over multiple years and usually result from component failures (furnace failure) and weather damage (ice dams, roofing, siding). This research attempted to: A) Understand the homeowner's motivations regarding investing in building science based performance upgrades. B) Determining a rapidly scalable approach to engage large numbers of homeowners directly through existing customer networks. C) Access a business model that will manage all aspects of the contractor-homeowner-performance professional interface to ensure good upgrade decisions over time. The solution results from a synergistic approach utilizing networks of suppliers merging with networks of homeowner customers. Companies in the $400 to $800 billion home services industry have proven direct marketing and sales proficiencies that have led to the development of vast customer networks. Companies such as pest control, lawn care, and security have nurtured these networks by successfully addressing the ongoing needs of homes. This long-term access to customers and trust established with consistent delivery has also provided opportunities for home service providers to grow by successfully introducing new products and services like attic insulation and air sealing. The most important component for success is a business model that will facilitate and manage the process. The team analyzes a group that developed a working model.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Vertical Magnetic Measurement System Commis-sioning and First Measurements of the First Full-Length Prototype Quadrupole Magnet for the LHC Hi-Lumi Upgrade

This paper will report the commissioning of the vertical magnetic measurement system and the warm (room temperature) and cold (cryogenic) magnetic field measurements of the first full-length (4.2 m) quadrupole built by the US Accelerator Upgrade Project (AUP) project (formerly the LARP collaboration) for the high luminosity upgrade of the Large Hadron Collider at CERN. The magnet, designated MQXFAP2, is a prototype preceding production for the AUP Accelerator Upgrade Project (AUP). AUP will provide ten 8.4 m superconducting insertion region (IR) quadrupoles for the Hi-Lumi Upgrade. The 8.4 m quadrupoles will be built by assembling two 4.2 m magnets in a single cryostat. Agreement between BNL’s and LBNL’s warm measurement data has indicated that the upgraded vertical magnetic measurement system at BNL is ready for MQXFA magnet production testing. The cold magnetic measurement has been performed and preliminary data analysis has been conducted. The measured data indicates that the MQXFAP2 magnet has good magnetic field which meets the preliminary MQXFA magnet acceptance criteria.

43 PARTICLE ACCELERATORS↗

BETO 2021 Peer Review - Catalytic Upgrading of Biochemical Intermediates (CUBI) 2.3.1.101-104

The Catalytic Upgrading of Biochemical Intermediates (CUBI) project is a multi-lab effort within ChemCatBio (CCB) that is focused on improving the catalytic upgrading of intermediates from biochemical deconstruction and/or biological conversion (i.e. fermentation) to fuels and chemical co-products. This is accomplished by developing catalysts with improved performance and durability, mitigating the impact of biogenically-derived inhibitors (including water), and evaluating intensified processes to reduce separations requirements and improve carbon utilization. Specific catalytic upgrading routes being developed are: 1) fermentation-derived 2,3-butanediol (BDO); 2) fermentation-derived carboxylic acids; and 3) lignocellulosic sugar-derived furfurals. These routes represent key technology pathways being investigated within BETO's biochemical conversion portfolio. By utilizing experimental and characterization capabilities and modeling tools across the 4 CUBI labs and collaborations with CCB Enabling Projects, the CUBI project is advancing catalytic upgrading process performance and robustness. Its impact is already well-established by several high-impact journal articles and patent publications, along with industrial engagement in related, competitively-awarded collaborations. The CUBI project will result in >25% MFSP cost reduction in the catalytic upgrading section of integrated biochemical conversion routes, as quantified by ongoing TEA modeling.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An upgraded cryogenic test stand for HL-LHC cryo-assemblies

The Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles has been upgraded to test cryo-assemblies for the high-luminosity LHC upgrade (HL-LHC). The test requirements of these new cryo-assemblies required additional capabilities of the test stand cryogenic system, including controlled cool-down and warm-up, helium recovery after a quench, and operation at higher pressures. Most of these upgrades were completed to support a zero-magnet test in late 2020, with the remainder of the upgrades completed to support the first pre-series cryo-assembly test in early 2022. An overview of the design and initial operating experience of the upgraded test stand cryogenic system and associated process controls system are presented in this paper.

Rabehl, Roger J.↗

User and Performance Impacts from Franklin Upgrades

The NERSC flagship computer Cray XT4 system"Franklin" has gone through three major upgrades: quad core upgrade, CLE 2.1 upgrade, and IO upgrade, during the past year. In this paper, we will discuss the various aspects of the user impacts such as user access, user environment, and user issues etc from these upgrades. The performance impacts on the kernel benchmarks and selected application benchmarks will also be presented.

97 MATHEMATICS AND COMPUTING↗

CMS hadron calorimeter front-end upgrade for SLHC phase I

We present an upgrade plan for the CMS HCAL detector. The HCAL upgrade is required for the increased luminosity (3 * 10E34) of SLHC Phase I which is targeted for 2014. A key aspect of the HCAL upgrade is to add longitudinal segmentation to improve background rejection, energy resolution, and electron isolation at the L1 trigger. The increased segmentation is achieved by replacing the hybrid photodiodes (HPDs) with silicon PMTs (SIPMs). We plan to instrument each fiber of the calorimeter with an SIPM (103,000 total). We will then electrically sum outputs from selected SIPMs to form the longitudinal readout segments. In addition to having more longitudinal information, the upgrade plans include a new custom ADC with matched sensitivity and timing information. The increased data volume requires higher speed transmitters and the additional power dissipation for the readout electronics requires better thermal design, since much of the on-detector infrastructure (front-end electronics crates, cooling pipes, optical fiber plant, etc.) will remain the same. We will report on the preliminary designs for these upgraded systems, along with performance requirements and initial design studies.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Development of Hydrothermal Liquefaction and Upgrading Technologies for Lipid-Extracted Algae Conversion to Liquid Fuels

Bench-scale tests were performed for lipid-extracted microalgae (LEA) conversion to liquid fuels via hydrotreating liquefaction (HTL) and upgrading processes. Process simulation and economic analysis for a large-scale LEA HTL and upgrading system were developed based on the best available test results. The system assumes an LEA feed rate of 608 dry metric ton/day and that the feedstock is converted to a crude HTL bio-oil and further upgraded via hydrotreating and hydrocracking to produce liquid hydrocarbon fuels, mainly alkanes. Performance and cost results demonstrate that HTL would be an effective option to convert LEA to liquid fuel. The liquid fuels annual yield was estimated to be 26.9 million gallon gasoline-equivalent and the overall energy efficiency at higher heating value basis was estimated to be 69.5%. The minimum fuel selling price (MFSP) was estimated to be $0.75/L with LEA feedstock price at $33.1 metric ton at dry basis and 10% internal rate of return. A sensitivity analysis indicated that the largest effects to production cost would come from the final products yields and the upgrading equipments cost. The impact of plant scale on MFSP was also investigated.

Microalgae, Lipid extracted algae, Hydrothermal li↗

Effect of ZSM-5 acidity on aromatic product selectivity during upgrading of pine pyrolysis vapors

The impact of catalyst acidity on the selectivity of upgraded biomass pyrolysis products was studied by passing pine pyrolysis vapors over five ZSM-5 catalysts of varying acidity at 500 degrees C. The SiO 2 -to-Al 2 O 3 ratio (SAR) of the ZSM-5 zeolite was varied from 23 to 280 to control the acidity of the catalyst and the composition of upgraded products. The upgraded product stream was analyzed by GCMS. Additionally, catalysts were characterized using temperature programmed desorption, diffuse-reflectance FTIR spectroscopy, N 2 physisorption, and X-ray diffraction. The results showed that the biomass pyrolysis vapors were highly deoxygenated to form a slate of aromatic hydrocarbons over all of the tested ZSM-5 catalysts. As the overall acidity of the ZSM-5 increased the selectivity toward alkylated (substituted) aromatics (e.g., xylene, dimethyl-naphthalene, and methyl-anthracene) decreased while the selectivity toward unsubstituted aromatics (e.g., benzene, naphthalene, and anthracene) increased. Additionally, the selectivity toward polycyclic aromatic compounds (2-ring and 3-ring) increased as catalyst acidity increased, corresponding to a decrease in acid site spacing. The increased selectivity toward less substituted polycyclic aromatic compounds with increasing acidity is related to the relative rates of cyclization and alkylation reactions within the zeolite structure. As the acid site concentration increases and sites become closer to each other, the formation of additional cyclization products occurs at a greater rate than alkylated products. The ability to adjust product selectivity within 1-, 2-, and 3-ring aromatic families, as well as the degree of substitution, by varying ZSM-5 acidity could have significant benefits in terms creating a slate of upgraded biomass pyrolysis products to meet specific target market demands.

09 BIOMASS FUELS↗