Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Upgrade”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

The 12 GeV Energy Upgrade at Jefferson Laboratory

Two new cryomodules and an extensive upgrade of the bending magnets at Jefferson Lab has been recently completed in preparation for the full energy upgrade in about one year. Jefferson Laboratory has undertaken a major upgrade of its flagship facility, the CW re-circulating CEBAF linac, with the goal of doubling the linac energy to 12 GeV. I will discuss here the main scope and timeline of the upgrade and report on recent accomplishments and the present status. I will then discuss in more detail the core of the upgrade, the new additional C100 cryomodules, their production, tests and recent successful performance. I will then conclude by looking at the future plans of Jefferson Laboratory, from the commissioning and operations of the 12 GeV CEBAF to the design of the MEIC electron ion collider.

43 PARTICLE ACCELERATORS↗

DOE Hanford Network Upgrades and Disaster Recovery Exercise Support the Cleanup Mission Now and into the Future

In 2013, the U.S. Department of Energy's (DOE) Hanford Site, located in Washington State, funded an update to the critical network infrastructure supporting the Hanford Federal Cloud (HFC). The project, called ET-50, was the final step in a plan that was initiated five years ago called "Hanford's IT Vision, 2015 and Beyond." The ET-50 project upgraded Hanford's core data center switches and routers along with a majority of the distribution layer switches. The upgrades allowed HFC the network intelligence to provide Hanford with a more reliable and resilient network architecture. The culmination of the five year plan improved network intelligence and high performance computing as well as helped to provide 10 Gbps capable links between core backbone devices (10 times the previous bandwidth). These improvements allow Hanford the ability to further support bandwidth intense applications, such as video teleconferencing. The ET-50 switch upgrade, along with other upgrades implemented from the five year plan, have prepared Hanford's network for the next evolution of technology in voice, video, and data. Hand-in-hand with ET-50's major data center outage, Mission Support Alliance's (MSA) Information Management (IM) organization executed a disaster recovery (DR) exercise to perform a true integration test and capability study. The DR scope was planned within the constraints of ET-50's 14 hour datacenter outage window. This DR exercise tested Hanford's Continuity of Operations (COOP) capability and failover plans for safety and business critical Hanford Federal Cloud applications. The planned suite of services to be tested was identified prior to the outage and plans were prepared to test the services ability to failover from the primary Hanford data center to the backup data center. The services tested were: Core Network (backbone, firewall, load balancers); Voicemail; Voice over IP (VoIP); Emergency Notification; Virtual desktops; and, Select set of production applications and data. The primary objective of the exercise was to test COOP around the emergency operations at Hanford to provide information on capabilities and dependencies of the current system to insure improved focus of emergency, safety and security capacity in a disaster situation. The integration of the DR test into the ET-50 project allowed the testing of COOP at Hanford and allowed the lessons learned to be defined. These lessons learned have helped improve the understanding of Hanford's COOP capabilities and will be critical for future planning. With the completion of the Hanford Federal Cloud network upgrades and the disaster recovery exercise, the MSA has a clearer path forward for future technology implementations as well as network improvements to help shape the usability and reliability of the Hanford network in support of the cleanup mission.

97 MATHEMATICS AND COMPUTING↗

Building America Case Study: Accelerating the Delivery of Home-Performance Upgrades Using a Synergistic Business Model, Minneapolis, Minnesota

Achieving Building America energy savings goals (40 percent by 2030) will require many existing homes to install energy upgrades. Engaging large numbers of homeowners in building science-guided upgrades during a single remodeling event has been difficult for a number of reasons. Performance upgrades in existing homes tend to occur over multiple years and usually result from component failures (furnace failure) and weather damage (ice dams, roofing, siding). This research attempted to: A) Understand the homeowner's motivations regarding investing in building science based performance upgrades. B) Determining a rapidly scalable approach to engage large numbers of homeowners directly through existing customer networks. C) Access a business model that will manage all aspects of the contractor-homeowner-performance professional interface to ensure good upgrade decisions over time. The solution results from a synergistic approach utilizing networks of suppliers merging with networks of homeowner customers. Companies in the $400 to $800 billion home services industry have proven direct marketing and sales proficiencies that have led to the development of vast customer networks. Companies such as pest control, lawn care, and security have nurtured these networks by successfully addressing the ongoing needs of homes. This long-term access to customers and trust established with consistent delivery has also provided opportunities for home service providers to grow by successfully introducing new products and services like attic insulation and air sealing. The most important component for success is a business model that will facilitate and manage the process. The team analyzes a group that developed a working model.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Vertical Magnetic Measurement System Commis-sioning and First Measurements of the First Full-Length Prototype Quadrupole Magnet for the LHC Hi-Lumi Upgrade

This paper will report the commissioning of the vertical magnetic measurement system and the warm (room temperature) and cold (cryogenic) magnetic field measurements of the first full-length (4.2 m) quadrupole built by the US Accelerator Upgrade Project (AUP) project (formerly the LARP collaboration) for the high luminosity upgrade of the Large Hadron Collider at CERN. The magnet, designated MQXFAP2, is a prototype preceding production for the AUP Accelerator Upgrade Project (AUP). AUP will provide ten 8.4 m superconducting insertion region (IR) quadrupoles for the Hi-Lumi Upgrade. The 8.4 m quadrupoles will be built by assembling two 4.2 m magnets in a single cryostat. Agreement between BNL’s and LBNL’s warm measurement data has indicated that the upgraded vertical magnetic measurement system at BNL is ready for MQXFA magnet production testing. The cold magnetic measurement has been performed and preliminary data analysis has been conducted. The measured data indicates that the MQXFAP2 magnet has good magnetic field which meets the preliminary MQXFA magnet acceptance criteria.

43 PARTICLE ACCELERATORS↗

BETO 2021 Peer Review - Catalytic Upgrading of Biochemical Intermediates (CUBI) 2.3.1.101-104

The Catalytic Upgrading of Biochemical Intermediates (CUBI) project is a multi-lab effort within ChemCatBio (CCB) that is focused on improving the catalytic upgrading of intermediates from biochemical deconstruction and/or biological conversion (i.e. fermentation) to fuels and chemical co-products. This is accomplished by developing catalysts with improved performance and durability, mitigating the impact of biogenically-derived inhibitors (including water), and evaluating intensified processes to reduce separations requirements and improve carbon utilization. Specific catalytic upgrading routes being developed are: 1) fermentation-derived 2,3-butanediol (BDO); 2) fermentation-derived carboxylic acids; and 3) lignocellulosic sugar-derived furfurals. These routes represent key technology pathways being investigated within BETO's biochemical conversion portfolio. By utilizing experimental and characterization capabilities and modeling tools across the 4 CUBI labs and collaborations with CCB Enabling Projects, the CUBI project is advancing catalytic upgrading process performance and robustness. Its impact is already well-established by several high-impact journal articles and patent publications, along with industrial engagement in related, competitively-awarded collaborations. The CUBI project will result in >25% MFSP cost reduction in the catalytic upgrading section of integrated biochemical conversion routes, as quantified by ongoing TEA modeling.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An upgraded cryogenic test stand for HL-LHC cryo-assemblies

The Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles has been upgraded to test cryo-assemblies for the high-luminosity LHC upgrade (HL-LHC). The test requirements of these new cryo-assemblies required additional capabilities of the test stand cryogenic system, including controlled cool-down and warm-up, helium recovery after a quench, and operation at higher pressures. Most of these upgrades were completed to support a zero-magnet test in late 2020, with the remainder of the upgrades completed to support the first pre-series cryo-assembly test in early 2022. An overview of the design and initial operating experience of the upgraded test stand cryogenic system and associated process controls system are presented in this paper.

Rabehl, Roger J.↗

Development of Hydrothermal Liquefaction and Upgrading Technologies for Lipid-Extracted Algae Conversion to Liquid Fuels

Bench-scale tests were performed for lipid-extracted microalgae (LEA) conversion to liquid fuels via hydrotreating liquefaction (HTL) and upgrading processes. Process simulation and economic analysis for a large-scale LEA HTL and upgrading system were developed based on the best available test results. The system assumes an LEA feed rate of 608 dry metric ton/day and that the feedstock is converted to a crude HTL bio-oil and further upgraded via hydrotreating and hydrocracking to produce liquid hydrocarbon fuels, mainly alkanes. Performance and cost results demonstrate that HTL would be an effective option to convert LEA to liquid fuel. The liquid fuels annual yield was estimated to be 26.9 million gallon gasoline-equivalent and the overall energy efficiency at higher heating value basis was estimated to be 69.5%. The minimum fuel selling price (MFSP) was estimated to be $0.75/L with LEA feedstock price at $33.1 metric ton at dry basis and 10% internal rate of return. A sensitivity analysis indicated that the largest effects to production cost would come from the final products yields and the upgrading equipments cost. The impact of plant scale on MFSP was also investigated.

Microalgae, Lipid extracted algae, Hydrothermal li↗

Effect of ZSM-5 acidity on aromatic product selectivity during upgrading of pine pyrolysis vapors

The impact of catalyst acidity on the selectivity of upgraded biomass pyrolysis products was studied by passing pine pyrolysis vapors over five ZSM-5 catalysts of varying acidity at 500 degrees C. The SiO 2 -to-Al 2 O 3 ratio (SAR) of the ZSM-5 zeolite was varied from 23 to 280 to control the acidity of the catalyst and the composition of upgraded products. The upgraded product stream was analyzed by GCMS. Additionally, catalysts were characterized using temperature programmed desorption, diffuse-reflectance FTIR spectroscopy, N 2 physisorption, and X-ray diffraction. The results showed that the biomass pyrolysis vapors were highly deoxygenated to form a slate of aromatic hydrocarbons over all of the tested ZSM-5 catalysts. As the overall acidity of the ZSM-5 increased the selectivity toward alkylated (substituted) aromatics (e.g., xylene, dimethyl-naphthalene, and methyl-anthracene) decreased while the selectivity toward unsubstituted aromatics (e.g., benzene, naphthalene, and anthracene) increased. Additionally, the selectivity toward polycyclic aromatic compounds (2-ring and 3-ring) increased as catalyst acidity increased, corresponding to a decrease in acid site spacing. The increased selectivity toward less substituted polycyclic aromatic compounds with increasing acidity is related to the relative rates of cyclization and alkylation reactions within the zeolite structure. As the acid site concentration increases and sites become closer to each other, the formation of additional cyclization products occurs at a greater rate than alkylated products. The ability to adjust product selectivity within 1-, 2-, and 3-ring aromatic families, as well as the degree of substitution, by varying ZSM-5 acidity could have significant benefits in terms creating a slate of upgraded biomass pyrolysis products to meet specific target market demands.

09 BIOMASS FUELS↗

Data driven investigation to understand the influence of total solids on biological biogas upgrading

In situ biogas upgrading achieves CO 2 conversion to CH 4 via hydrogenotrophic methanogenesis; however, gas-liquid mass transfer constraints limit the upgrading performance. Recognizing that optimization studies often underrepresent the effects of total solids (TS) and organic loading rate (OLR), this study undertook a holistic, statistics driven assessment of operating conditions for in situ H 2 assisted biogas upgrading, centering the analysis on TS and OLR. A dataset of 31 studies was compiled and comprised 99 observations. A rigorous analytical framework was employed, combining data standardization, fixed- and random-effects (REML) weighted regressions with cluster-robust errors, stratified analyses, and machine learning. Mixed-effects meta regression indicated that TS was the main factor explaining differences of methane fraction (CH 4 %) when considering the between studies heterogeneity. Focusing on a near-stoichiometric subset (H 2 /CO 2 ≈ 4:1), TS remained significant. Stratified results showed a stronger negative relationship between TS and CH 4 % in UASB reactors than in CSTRs, with a negative effect under mesophilic conditions and no significant effect under thermophilic conditions. A Random Forest model corroborated the statistical findings, consistently ranking H 2 /CO 2 ratio, OLR, TS, and hydrogen injection rate (HIR) as the most influential predictors. These findings delineate trends across increasing TS levels, particularly between 1% and 10%, and provide preliminary insights for TS above 15% in in situ biogas upgrading. They further provide insights for the influence of TS by reactor type and temperature, thereby advancing the evidence base for implementing biological CO 2 conversion to CH 4 in practice.

In situ biogas upgrading↗

Cost and Life-Cycle Greenhouse Gas Implications of Integrating Biogas Upgrading and Carbon Capture Technologies in Cellulosic Biorefineries

We discuss gaseous streams in biorefineries that have been undervalued and underutilized. In cellulosic biorefineries, coproduced biogas is assumed to be combusted alongside lignin to generate process heat and electricity. Biogas can instead be upgraded to compressed biomethane and used as a transportation fuel. Capturing CO 2 -rich streams generated in biorefineries can also contribute to greenhouse gas (GHG) mitigation goals. We explore the economic and life-cycle GHG impacts of biogas upgrading and CO 2 capture and storage (CCS) at ionic liquid-based cellulosic ethanol biorefineries using biomass sorghum. Without policy incentives, biorefineries with biogas upgrading systems can achieve a comparable minimum ethanol selling price (MESP) and reduced GHG footprint ($1.38/liter gasoline equivalent (LGE) and 12.9 gCO 2e /MJ) relative to facilities that combust biogas onsite ($1.34/LGE and 24.3 gCO 2e /MJ). Incorporating renewable identification number (RIN) values advantages facilities that upgrade biogas relative to other options (MESP of $0.72/LGE). Incorporating CCS increases the MESP but dramatically decreases the GHG footprint (-21.3 gCO 2e /MJ for partial, -110.7 gCO 2e /MJ for full CCS). The addition of CCS also decreases the cost of carbon mitigation to as low as $52-$78/t CO 2 , depending on the assumed fuel selling price, and is the lowest-cost option if both RIN and California's Low Carbon Fuel Standard credits are incorporated.

09 BIOMASS FUELS↗

Life-Cycle Assessment of Alternative Pyrolysis-Based Transport Fuels: Implications of Upgrading Technology, Scale, and Hydrogen Requirement

In an effort to diversify liquid fuel supply and address climate change, there are ongoing studies on the use of biomass as a renewable source of energy. Bio-oil produced from fast pyrolysis of biomass is a promising substitute for fossil fuels that can meet climate change mitigation goals, spur rural economies, and diversify liquid fuel supply. However, for bio-oil to be used as a transportation fuel, it requires upgrading to remove oxygen present in the oil. Hydrodeoxygenation (HDO) is one means of upgrading fast pyrolysis oil, however, one of its main limitations is a large hydrogen requirement. We evaluate an alternative electrochemical deoxygenation (EDOx) method that uses catalytic electrode membranes on a ceramic, oxygen permeable support, to generate hydrogen in-situ for deoxygenation at the cathode and remove oxygen at the anode. We analyze the life cycle greenhouse gas (GHG) emissions and scale effects of gas-phase upgrading pyrolysis oil (300 metric tons per day (MTPD)) using EDOx, which reduces energy needs for condensing the pyrolysis gas to bio-oil prior to deoxygenation. The dispersed woody biomass can be accessed and thus more efficiently used if a small scale process is used to densify and stabilize the bio-oil product. We evaluate two configurations of the small-scale deoxygenation, full electrochemical deoxygenation (EDOx), which removes 100% of oxygen present in the bio-oil and partial EDOx, which removes 96% of oxygen present in the bio-oil and compare them to the large scale (2000 MTPD) deoxygenation (HDO). The partial EDOx process has the lowest total GHG emissions of 4.95 gCO2 eq. and 7.43 gCO2 eq. per MJ of a vehicle operated with diesel and gasoline respectively compared to full EDOx (8.36 g CO2 eq. diesel, 10.86 g CO2 eq. gasoline) and HDO (39 gCO2 eq. per MJ for diesel and gasoline). In addition, with the EDOx processes, we can site 10 times more small-scale pyrolysis upgrading sites compared to HDO, suggesting that small-scale on-site partial or full deoxygenation can reach more inaccessible forest biomass resources.

bio-oil hydrotreating, Biomass, deoxygenation, sol↗

New developments in structure-property and amorphous materials research at the upgraded 16-BM-B Paris-Edinburgh press station at HPCAT

Beamline 16-BM-B of the High-Pressure Collaborative Access Team (HPCAT) at the Advanced Photon Source (APS) provides a Paris-Edinburgh press program to probe the structure and properties of crystalline and amorphous materials up to 12 GPa at room temperature or 7 GPa at 2000°C. During the recent APS upgrade, 16-BM-B undertook major improvements to its instrumentation and measurement techniques. The upgrade includes the addition of a 1.2 m horizontal “condenser” mirror and a new variable-sized collimation system, the combination of which decreases the acquisition time for energy dispersive X-ray diffraction measurements by a factor of 10 when compared to pre-upgrade measurements. The addition of a new Ge energy-sensitive detector and DANTE (XGLab) digital pulse processor allows for processing the increased diffraction counts with minimal deadtime. In addition to upgraded beamline components, new techniques are being developed for eventual release to the user community, including electrical resistivity and tomography measurements.

APS upgrade↗

Get a winning Oracle upgrade session using the quarterback approach

Upgrades, upgrades... too much customer down time. Find out how we shrunk our production upgrade schedule 40% from our estimate of 10 days 12 hours to 6 days 2 hours using the quarterback approach. So your upgrade is not that complex, come anyway. This approach is scalable to any size project and will be extremely valuable.

Oracle upgrade schedule quarterback approach IBS N↗

Progress and plan of KSTAR plasma control system upgrade

The plasma control system (PCS) has been one of essential systems in annual KSTAR plasma campaigns: starting from a single-process version in 2008, extensive upgrades are done through the previous 7 years in order to achieve major goals of KSTAR performance enhancement. Here, major implementations are explained in this paper. In consequences of successive upgrades, the present KSTAR PCS is able to achieve ~48 s of 500 kA plasma pulses with full real-time shaping controls and real-time NB power controls. It has become a huge system capable of dealing with 8 separate categories of algorithms, 26 actuators directly controllable during the shot, and real-time data communication units consisting of +180 analog channels and +600 digital input/outputs through the reflective memory (RFM) network. The next upgrade of the KSTAR PCS is planned in 2015 before the campaign. An overview of the upgrade layout will be given for this paper. The real-time system box is planned to use the CERN MRG-Realtime OS, an ITER-compatible standard operating system. New hardware is developed for faster real-time streaming system for future installations of actuators/diagnostics.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Reducing the cost of home energy upgrades in the US: An industry survey

Decarbonizing the US residential building stock requires a substantial acceleration in home energy upgrades. Numerous barriers exist to accelerating adoption of efficient and electric building technologies, but foremost among these is high upfront costs. This study uses an industry survey delivered to a sample of home energy professionals to examine promising cost reduction strategies across a range of project types, including HVAC, water heating, and envelope/insulation projects. The survey included quantitative and qualitative questions to collect evidence on the estimated cost reduction potential of these strategies and their likelihood of use in the construction industry. The 167 survey respondents included contractors, energy consultants, architects, manufacturers, and others with experience in delivering energy upgrades in single-family and multifamily buildings in the US. Results show that significant cost reductions are achievable by minimizing additional infrastructure costs (such as replacing electric panels), streamlining project planning/management, and deploying innovations that simplify installation. We find that for a typical deep retrofit project, including heat pumps for space and water heating in addition to envelope upgrades, the strategies could result in a total installed cost reduction of nearly 50%, dramatically improving the customer economics of such a project. This research makes a novel contribution to the literature on strategies to reduce the costs of residential retrofits. We discuss how our study's insights on the highest-value cost reduction strategies for home energy upgrades can further accelerate their uptake in the US housing stock.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Upgraded biogas from municipal solid waste for natural gas substitution and CO{sub 2} reduction – A case study of Austria, Italy, and Spain

Highlights: • Biogas can be upgraded to create biomethane, a substitute to natural gas. • Biogas upgrading was applied to landfills and anaerobic digestors in 3 countries. • Up to 0.6% of a country’s consumption of natural gas could be replaced by biomethane. • Italy could save 46% of the national CO{sub 2} emissions attributed to the waste sector. • Scenarios were created to increase biomethane production. - Abstract: Biogas is rich in methane and can be further purified through biogas upgrading technologies, presenting a viable alternative to natural gas. Landfills and anaerobic digestors treating municipal solid waste are a large source of such biogas. They therefore offer an attractive opportunity to tap into this potential source of natural gas while at the same time minimizing the global warming impact resulting from methane emissions in waste management schemes (WMS) and fossil fuel consumption reduction. This study looks at the current municipal solid waste flows of Spain, Italy, and Austria over one year (2009), in order to determine how much biogas is generated. Then it examines how much natural gas could be substituted by using four different biogas upgrading technologies. Based on current waste generation rates, exploratory but realistic WMS were created for each country in order to maximize biogas production and potential for natural gas substitution. It was found that the potential substitution of natural gas by biogas resulting from the current WMS seems rather insignificant: 0.2% for Austria, 0.6% for Italy and 0.3% for Spain. However, if the WMS is redesigned to maximize biogas production, these figures can increase to 0.7% for Austria, 1% for Italy and 2% for Spain. Furthermore, the potential CO{sub 2} reduction as a consequence of capturing the biogas and replacing fossil fuel can result in up to a 93% reduction of the annual national waste greenhouse gas emissions of Spain and Italy.

54 ENVIRONMENTAL SCIENCES↗

110th Anniversary: Microkinetic Modeling of the Vapor Phase Upgrading of Biomass-Derived Oxygenates

Bio-oil produced from fast pyrolysis of biomass is a complex mixture of more than 200 compounds, including oxygenates and acids. As these species are highly undesirable in fuels, catalytic upgrading of biomass pyrolysis product vapors, also known as catalytic fast pyrolysis, is performed to upgrade the vapors to valuable fuels and chemicals. This work presents a detailed microkinetic model, composed of elementary steps, of the catalytic upgrading of acetic acid and acetone, two common oxygenates present in bio-oil. An automated network generator was utilized to construct a reaction network composed of 580 unique species and 2160 unique reactions. The kinetic parameters for each reaction in the network were estimated using transition state theory, the Evans-Polanyi relationship, and thermodynamic data. The resulting mechanistic model is able to describe experimental data presented in the literature for the transformation of acetic acid and acetone on HZSM-5 in a fixed-bed reactor, which is modeled as a plug-flow reactor. Additionally, the model solutions reveal vital information regarding the mechanism by which acetic acid and acetone are upgraded to valuable fuels and chemicals. In the first phase of the mechanism, acetic acid is converted to acetone via acylium ion addition to acetic acid; this is followed by decarboxylation of acetoacetic acid. The second phase is dominated by the self-aldol condensation of acetone, which is shown to occur predominantly through the keto form of acetone rather than the enol form, and subsequent deoxygenation reactions leading to olefins and aromatics. Finally, net rate analysis shows that aromatics are primarily formed via a pathway including aldol condensation of mesityl oxide, whereas olefins are produced from the addition of isobutene and subsequent cracking.

09 BIOMASS FUELS↗

Assembly and commissioning of a new SRF cryomodule for the ATLAS intensity upgrade

The Argonne National Laboratory Physics Division is in the final stages of a major upgrade to the Argonne Tandem Linear Accelerator System national user facility, referred to as the intensity upgrade. The intensity upgrade project will substantially increase beam currents for experimenters working with the existing ATLAS stable and in-flight rare isotope beams and for the neutron-rich beams from the Californium Rare Isotope Breeder Upgrade. This project includes the replacement of three existing cryomodules, containing 18 superconducting accelerator cavities and 9 superconducting solenoids, with a single cryomodule with seven SC 72.75 MHz accelerator cavities optimized for ion velocities of 7.7% the speed of light and 4 SC solenoids all operating at 4.5 K. This presentation will report: how we minimized the heat load into the 4 K and 80 K coolant streams feeding the cryomodule, a comparison of the calculated and measured static heat loads at 80 K and the mechanical design of the vacuum vessel.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗