Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “US SUPERFUND”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Remedial Investigation of Hanford Site Releases to the Columbia River - 13603

In south-central Washington State, the Columbia River flows through the U.S. Department of Energy Hanford Site. A primary objective of the Hanford Site cleanup mission is protection of the Columbia River, through remediation of contaminated soil and groundwater that resulted from its weapons production mission. Within the Columbia River system, surface water, sediment, and biota samples related to potential Hanford Site hazardous substance releases have been collected since the start of Hanford operations. The impacts from release of Hanford Site radioactive substances to the Columbia River in areas upstream, within, and downstream of the Hanford Site boundary have been previously investigated as mandated by the U.S. Department of Energy requirements under the Atomic Energy Act. The Remedial Investigation Work Plan for Hanford Site Releases to the Columbia River [1] was issued in 2008 to initiate assessment of the impacts under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 [2]. The work plan established a phased approach to characterize contaminants, assess current risks, and determine whether or not there is a need for any cleanup actions. Field investigation activities over a 120-mile stretch of the Columbia River began in October 2008 and were completed in 2010. Sampled media included surface water, pore water, surface and core sediment, island soil, and fish (carp, walleye, whitefish, sucker, small-mouth bass, and sturgeon). Information and sample results from the field investigation were used to characterize current conditions within the Columbia River and assess whether current conditions posed a risk to ecological or human receptors that would merit additional study or response actions under CERCLA. The human health and ecological risk assessments are documented in reports that were published in 2012 [3, 4]. Conclusions from the risk assessment reports are being summarized and integrated with remedial investigation/feasibility study (RI/FS) reports developed for upland areas, riparian areas, and groundwater in the Hanford Site River Corridor. The RI/FS reports will evaluate the impacts to soil, groundwater, and river sediments and lead to proposed cleanup actions and records of decision to address releases from the Hanford Site reactor operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Observation and Responses to Post-Closure Instances of Localized Instability and Subsidence at the DOE Legacy Management Rocky Flats Site, Colorado-13052

The former Rocky Flats Plant in Colorado began operations as part of the nation's nuclear weapons complex in the early 1950's. By the 1980's the associated heavily industrialized area covered approximately 1.2 km{sup 2} (300 acres) and was surrounded by an approximately 25.3 km{sup 2} (6,245 acre) security buffer zone. The federally owned property and adjacent offsite areas were placed on the CERCLA National Priority List in 1989. To complete closure, all buildings and other structures that composed the Rocky Flats industrial complex were removed from the surface, but remnants remain in the subsurface. Contouring and grading to return the surface to approximate conditions that were present prior to the plant's construction was completed in 2005. A goal of the final land configuration was to provide long-term surface and subsurface land stability. Several instances of localized surface subsidence or instability have occurred since the final configuration. The localized nature and the relatively small areas of observed subsidence and instability indicate that, overall, the final configuration is performing well, but responses to these occurrences and the observations that followed may be useful in planning for the closure and designing the final land configuration and post-closure monitoring at other sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Removal of the Plutonium Recycle Test Reactor - 13031

The 309 Facility housed the Plutonium Recycle Test Reactor (PRTR), an operating test reactor in the 300 Area at Hanford, Washington. The reactor first went critical in 1960 and was originally used for experiments under the Hanford Site Plutonium Fuels Utilization Program. The facility was decontaminated and decommissioned in 1988-1989, and the facility was deactivated in 1994. The 309 facility was added to Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response actions as established in an Interim Record of Decision (IROD) and Action Memorandum (AM). The IROD directs a remedial action for the 309 facility, associated waste sites, associated underground piping and contaminated soils resulting from past unplanned releases. The AM directs a removal action through physical demolition of the facility, including removal of the reactor. Both CERCLA actions are implemented in accordance with U.S. EPA approved Remedial Action Work Plan, and the Remedial Design Report / Remedial Action Report associated with the Hanford 300-FF-2 Operable Unit. The selected method for remedy was to conventionally demolish above grade structures including the easily distinguished containment vessel dome, remove the PRTR and a minimum of 300 mm (12 in) of shielding as a single 560 Ton unit, and conventionally demolish the below grade structure. Initial sample core drilling in the Bio-Shield for radiological surveys showed evidence that the Bio-Shield was of sound structure. Core drills for the separation process of the PRTR from the 309 structure began at the deck level and revealed substantial thermal degradation of at least the top 1.2 m (4LF) of Bio-Shield structure. The degraded structure combined with the original materials used in the Bio-Shield would not allow for a stable structure to be extracted. The water used in the core drilling process proved to erode the sand mixture of the Bio-Shield leaving the steel aggregate to act as ball bearings against the core drill bit. A redesign is being completed to extract the 309 PRTR and entire Bio-Shield structure together as one monolith weighing 1100 Ton by cutting structural concrete supports. In addition, the PRTR has hundreds of contaminated process tubes and pipes that have to be severed to allow for a uniformly flush fit with a lower lifting frame. Thirty-two 50 mm (2 in) core drills must be connected with thirty-two wire saw cuts to allow for lifting columns to be inserted. Then eight primary saw cuts must be completed to severe the PRTR from the 309 Facility. Once the weight of the PRTR is transferred to the lifting frame, then the PRTR may be lifted out of the facility. The critical lift will be executed using four 450 Ton strand jacks mounted on a 9 m (30 LF) tall mobile lifting frame that will allow the PRTR to be transported by eight 600 mm (24 in) Slide Shoes. The PRTR will then be placed on a twenty-four line, double wide, self powered Goldhofer for transfer to the onsite CERCLA Disposal Cell (ERDF Facility), approximately 33 km (20 miles) away. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Aspects of Two Volatile Organic Compound Groundwater Treatment Designs at the Rocky Flats Site - 13135

DOE's Rocky Flats Site in Colorado is a former nuclear weapons production facility that began operations in the early 1950's. Because of releases of hazardous substances to the environment, the federally owned property and adjacent offsite areas were placed on the CERCLA National Priorities List in 1989. The final remedy was selected in 2006. Engineered components of the remedy include four groundwater treatment systems that were installed before closure as CERCLA-accelerated actions. Two of the systems, the Mound Site Plume Treatment System and the East Trenches Plume Treatment System, remove low levels of volatile organic compounds using zero-valent iron media, thereby reducing the loading of volatile organic compounds in surface water resulting from the groundwater pathway. However, the zero-valent iron treatment does not reliably reduce all volatile organic compounds to consistently meet water quality goals. While adding additional zero-valent iron media capacity could improve volatile organic compound removal capability, installation of a solar powered air-stripper has proven an effective treatment optimization in further reducing volatile organic compound concentrations. A comparison of the air stripper to the alternative of adding additional zero-valent iron capacity to improve Mound Site Plume Treatment System and East Trenches Plume Treatment System treatment based on several key sustainable remediation aspects indicates the air stripper is also more 'environmentally friendly'. These key aspects include air pollutant emissions, water quality, waste management, transportation, and costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pastures to Prairies to Pools: An Update on Natural Resource Damages Settlement Projects at the Fernald Preserve - 13198

The DOE Office of Legacy Management oversees implementation and monitoring of two ecological restoration projects at the Fernald Preserve, Fernald, Ohio, that are funded through a CERCLA natural resource damage settlement. Planning and implementation of on-property ecological restoration projects is one component of compensation for natural resource injury. The Paddys Run Tributary Project involves creation of vernal pool wetland habitat with adjacent forest restoration. The Triangle Area Project is a mesic tall-grass prairie establishment, similar to other efforts at the Fernald Preserve. The goal of the Fernald Natural Resource Trustees is to establish habitat for Ambystomatid salamander species, as well as grassland birds. Field implementation of these projects was completed in May 2012. Herbaceous cover and woody vegetation survival was determined in August and September 2012. Results show successful establishment of native vegetation. Additional monitoring will be needed to determine whether project goals have been met. As with the rest of the Fernald Preserve, ecological restoration has helped turn a DOE liability into a community asset. (authors)

54 ENVIRONMENTAL SCIENCES↗

Development of a Regional Groundwater Flow Model for the U.S. Department of Energy Oak Ridge Reservation: Numerical Model using MODFLOW-USG - 17368

A regional scale groundwater flow model (GFM) has been developed for the U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR). Development of the model implements a key recommendation of the ORR Groundwater Strategy. The model will be used as the single calibrated flow model for the ORR and as the framework for future, smaller scale, modeling efforts to support cleanup actions and decisions under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The Oak Ridge site is located in a geologically complex region and encompasses three large government facilities, including the Y-12 National Security Complex (Y-12), Oak Ridge National Laboratory (ORNL), and the East Tennessee Technology Park (ETTP). An interagency approach for addressing legacy groundwater contamination from past operations at these facilities has been developed, resulting in an ORR Groundwater Strategy that was agreed to by DOE, the U.S. Environmental Protection Agency (EPA), and Tennessee Department of Environment and Conservation (TDEC). The ORR Groundwater Strategy provides a comprehensive approach to addressing and prioritizing groundwater issues across the DOE reservation. One component of the strategy is to 'develop and maintain an ORR-wide regional groundwater flow model to ensure a single, regional, calibrated model to support groundwater characterization, decision-making, and remediation.' As part of the cleanup plans for the Oak Ridge site under CERCLA and the Federal Facility Agreement (FFA), there are six final watershed-scale groundwater Records of Decision (RODs) currently planned. In preparation for future projects, the regional GFM has been constructed to serve as the single, calibrated regional flow model to be used as the hydrologic base for the groundwater plume-specific modeling developed for the RODs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High-Resolution Characterization of Comingled Contaminants in the Deep Vadose Zone, Hanford Site, Washington - 17387

The contaminated deep vadose zone in the Central Plateau of the Hanford Site in Washington state presents a unique challenge to remediation. The Comprehensive Environmental Response, Compensation, and Liability Act, commonly known as the CERCLA project responsible for addressing these deep contaminants is designated as the 200-Deep Vadose Zone Operable Unit (DV-1 project). The vadose zone is 55-82 meters (180-270 feet) thick and is contaminated with both radiological and chemical contaminants from multiple historical waste streams. The mobile contaminants from this waste are still present in the deep vadose zone and pose a potential threat to the groundwater. Characterizing the nature and extent of the comingled mobile contaminants is an important step before assessing possible remedial alternatives. One factor controlling the migration and distribution of subsurface contaminants is the lithologic heterogeneity of the vadose zone sediments. A sampling plan for the DV-1 project includes continuous sediment core collection and analysis to identify key lithologic factors (i.e., small-scale bedding and structural features) that act as barriers, preferential pathways or conduits for mobile contaminants migrating through the vadose zone. Over six hundred meters (2,000 feet) of intact sediment core from 26 boreholes were collected in 1.5 meters (5 feet) long, 10 centimeter (4-inch) diameter segments. These intact sediment samples provide significant improvement in the level of detail and understanding of mechanisms and features controlling contaminant distribution that is not possible with traditional homogenized drill cuttings or conventional split-spoon samples. Detailed geological descriptions and photographs of the intact core are correlated to high-resolution geophysical logs which aid in the development of a comprehensive contaminant distribution profile of the borehole. These lithologic interpretations are used to define specific depth intervals for sampling based on changes in moisture, lithology, and elevated gamma radiation. The selected samples are analyzed for contaminants of concern, geochemical parameters, and hydraulic properties. Significant lithologic features observed in the intact cores include sharp contact boundaries to graded bedding, iron-oxide and carbonate cementation, silty laminations, clastic dike intrusions, and soft sediment deformation. Preliminary geologic logs integrated with the sample analysis indicate features that correlate to the variable distribution of contaminants both laterally and vertically. Integration of measured hydraulic parameters to lithologic units in individual borehole profiles provide key inputs for more precise geo-framework and vadose zone flux models supporting the DV-1 project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using Prescribed Fire to Manage the Fernald On-Site Disposal Facility Vegetated Cap - 17401

The Fernald Preserve is a former uranium processing plant that underwent extensive remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is situated on a 425 ha (1,050 acre) tract of land, approximately 29 km (18 miles) northwest of Cincinnati, Ohio. Remedial activities and subsequent ecological restoration have converted the site from an industrial production facility to an undeveloped park, encompassing a series of wetlands, prairies, and forested communities. The remediation of buildings and soil contamination was completed in 2006, but aquifer remediation is ongoing. Since 2007, the site has been managed by the US Department of Energy (DOE) Office of Legacy Management. Portions of the site are open to the public, with approximately 11 km (7 miles) of walking trails that are open year-round and a visitors center. Site remediation included the construction of an On-Site Disposal Facility (OSDF) for the long-term disposal of contaminated soil and building materials. The OSDF consists of eight disposal cells that encompass approximately 30 hectares (75 acres) on the eastern portion of the Fernald site. Cells are lined and capped, and each has a separate leak detection and leachate collection system. The integrated cap is vegetated with native grasses and forbs. Management of the Fernald Preserve includes the monitoring and maintenance of ecologically restored communities and the vegetated OSDF cap, as required by the site's institutional controls plan. Prescribed burning is recognized as the preferred method for prairie management. Prescribed fire has been used at the Fernald site since 2009 for established prairies in restored areas, but not on the OSDF cap. Stakeholders had reservations regarding the safety of using prescribed fire on the OSDF cap. Because of that, vegetation on the cap was managed as a grassland community. It was mowed, raked, and baled to remove thatch, and promote the continued establishment of native grasses and forbs. Since agricultural use is restricted at the site, the resulting hay bales were kept on property and reused as organic matter and mulch. Over time, more hay bales were being generated in a season than were reused. Therefore in 2015, DOE decided to revisit stakeholder acceptance of prescribed fire on the OSDF cap. Ongoing relationships with local stakeholders allowed for extensive discussions regarding the current management and proposed use of prescribed fire on the OSDF cap. The public was provided information about the planning and implementation of prescribed burns at the site and invited to observe the execution of a successful site burn. This approach led to stakeholder acceptance of DOE's proposal, and vegetation on the caps of cells 4, 5, and 6 was burned in late March 2016. The burn was successful and resulted in several benefits from a land stewardship and cost perspective. This paper details the stakeholder engagement approach and the resulting benefits from the use of prescribed fire on the OSDF cap. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overcoming Vicinity Property and Ground Water Challenges at the FUSRAP Middlesex Sampling Plant Project - 17529

The US Army Corps of Engineers (USACE) is addressing the Formerly Utilized Sites Remedial Action Program (FUSRAP) Middlesex Sampling Plant Site (MSP) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The MSP has been an active FUSRAP site since the early 1980's and was listed on the National Priority List (NPL) in 1999. Two challenges that the project team are currently addressing are Ground Water (GW) movement through fractured bedrock and Vicinity Properties (VP) assessments. USACE and the US Environmental Protection Agency (USEPA) signed a Record of Decision (ROD) for soils remedial action in 2005 and USACE completed the soils remediation at MSP in 2008, however, VPs were not a part of the soils ROD. Additionally, the State of New Jersey recently identified a potential contaminated VP of the site. VPs are any property in the vicinity of a CERCLA 'facility.' The contaminated VPs of the MSP were addressed prior to the adoption of the CERCLA process to address FUSRAP sites. Since the 1980's many changes to potential Applicable or Relevant and Appropriate Requirements have occurred. As such USACE has begun reassessing the previously addressed VPs for inclusion under the soils ROD as part of the CERCLA process. USACE does expect to have to revisit and potentially remediate up to 12 VPs. This paper will discuss the approach, some challenges, and lessons learned in adequately addressing VPs both from a field work and a post ROD regulatory perspective. USACE is currently in the Feasibility Study phase of the CERCLA process for GW. The project team has encountered and overcome significant challenges with regard to contaminant plume bounding and groundwater movement through the secondary porosity of dipping bedding plane partings and fractured bedrock of the Passaic Aquifer beneath the site. This paper will discuss the challenges, the approaches used, and lessons learned while delineating these contaminants. This paper's discussions are useful for anyone addressing an environmental site with soils contamination on VPs or with delineating contaminants in fractured bedrock. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Formerly Utilized Sites Remedial Action Program - Program Update - 17530

The legacy of the United States' early atomic energy program is an important piece of our Nation's history. That legacy however, left low-level radiological contamination at properties now owned and operated by commercial, private and/or local government entities. Although many of these contaminated sites were identified by the Government in the past, additional properties continue to be identified. The United States Government, thru the US Department of Energy (USDOE) and the US Army Corps of Engineers (USACE), is addressing these sites with the Formerly Utilized Sites Remedial Action Program (FUSRAP) and has been doing so since the 1970's. The USDOE and the USACE both have roles in the Program. The USACE FUSRAP Program has an important task but faces many challenges to achieve a success conclusion. Since the implementation of 'sequestration cap' budgeting by Congress in 2012, the annual budget for the Program has decreased significantly compared to the funding levels in prior years. The Program complies with USACE Civil Works budgetary reprogramming rules that requires close coordination between the project and program teams to appropriately and efficiently obligate and expend Program funding. The very nature of environmental remediation work results in consistently finding additional unknowns during each phase of a project. The Program is required to follow Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) guidance and conduct cost recovery activities but does not have authorities such as those held by the US Environmental Protection Agency (USEPA). In order to pursue cost recovery actions, conclude a settlement agreement or file an administrative order, USACE must engage the US Department of Justice or USEPA to act on their behalf as USACE does not have the authority to do so themselves. Twenty years later, USACE continues to carry out the FUSRAP mission and work in coordination with the USDOE Office of Legacy Management (DOE-LM) to ensure that the Government's responsibilities are addressed. Success is measured by finishing each site cleanup so they can be turned back to their property owner and stakeholders for safe use. USACE continues to seek new technologies and methods of approach to improve and expedite site investigations and clean ups. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SORTIE DB - Source term integrated environmental management disposal facility database - 15249

The Environmental Management Disposal Facility (EMDF) in Oak Ridge, Tennessee, is a proposed U.S. Department of Energy low-level Comprehensive Environmental Response Compensation and Liability Act (CERCLA) waste disposal facility with an operational start in the early 2020's. As a DOE low-level waste disposal facility, it is subject to DOE Order 435.1, requiring a composite analysis and possibly a performance assessment. The Source Term Integrated EMDF Data Base - SORTIE DB - provides source term estimates used in these assessments. An Oak Ridge Office of Environmental Management (OREM) Federal and Contractor team developed this state-of-the-art descriptive analytics and visualization schema. DOE OREM senior management has recognized complementary beneficial uses of SORTIE DB in decisions for accelerating clean-up progress, dealing with conflicting sequencing and budget priorities, and enhancing stakeholder and regulatory interfaces. SORTIE DB is designated as an OREM planning tool. SORTIE DB contains estimated forecast waste volumes and masses for over 800 Decontamination and Decommissioning (D and D) and Remedial Action (RA) sequenced baseline packages over the next 25+ years. Available characterization data, radionuclide identification and concentrations, and data from safety basis and emergency management documents are incorporated into SORTIE DB. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Of the final end state for decommissioning of reactors at SRS: collaboration between stakeholders, regulators, and the Federal Government - 15279

The Savannah River Site (SRS) is an 802 square-kilometer (310 square-miles) United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina. Nuclear weapons material production began in the early 1950's, utilizing five (5) production reactors. In the early 1990's all SRS production reactor operations were terminated. The first reactor closure end-state declaration was documented in a Comprehensive Environmental Response and Compensation and Liability Act (CERCLA) Early Action Record of Decision. The decision for the final closure of the 29,543 square-meter (318,000 square-feet) 105-P Reactor was determined to be in situ decommissioning (ISD). ISD is an acceptable and cost-effective alternative to off-site disposal for the reactor building, which will allow for consolidation of remedial action wastes generated from other cleanup activities within the P Area. ISD is considered protective by the regulators, U.S. Environmental Protection Agency (USEPA) and the South Carolina Department of Health and Environmental Control (SCDHEC), public and stakeholders as waste materials are stabilized / immobilized, and radioactivity is allowed to naturally decay, thus preventing future exposure to the environment. Stakeholder buy-in was critical in the up-front planning in order to achieve this monumental final decision. Numerous public meetings and workshops were held in two different states (covering a 321 kilometer (200-mile) radius) with stakeholder and SRS Citizens Advisory Board (CAB) participation. These meetings were conducted over an eight- month period as the end-state decision making progressed. Information provided to the public evolved from workshop to workshop as data became available and public input from the public meetings were gathered. ISD is being considered for the balance of the four (4) SRS reactors and other hardened facilities such as the chemical Separation Facilities (canyons). Closure of the SRS P Reactor Area was precedent setting and sets the stage for closure of other reactors and hardened facilities. The DOE, USEPA, and SCDHEC engaged in active, up-front, and timely involvement with the SRS. The SRS CAB, elected officials, and citizens of South Carolina and Georgia met to discuss the P reactor area closure and associated risks. Early public involvement gave SRS and the regulators assurance that the selected decision was valid and would not be overturned. Public input improved the process and ensured that the important decision on the final end-state of the reactor facilities was not made in isolation. ISD of P Reactor will provide adequate protection of human health and the environment and the lowest cost since short-term risk is minimized to remedial workers from exposure to contaminated equipment and facilities by leaving the reactor vessel in place allowing for radiological decay over time. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Approaches to consider covers and liners in a low-level waste disposal facility performance assessment - 15300

On-site disposal cells are in use and being considered at several US DOE sites as the final disposition for large amounts of waste associated with cleanup of contaminated areas and facilities. These disposal cells are typically regulated by States and/or the USEPA in addition to having to comply with requirements in DOE Order 435.1, Radioactive Waste Management. The US DOE-EM Office of Site Restoration formed a working group to foster improved communication and sharing of information for personnel associated with these Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) disposal cells and work towards more consistent assumptions, as appropriate, for technical and policy considerations related to performance and risk assessments in support of a Record of Decision and Disposal Authorization Statement. One task completed by the working group addressed approaches for considering the performance of covers and liners/leachate collections systems in the context of a performance assessment (PA). A document has been prepared which provides recommendations for a general approach to address covers and liners/leachate collection systems in a PA and how to integrate assessments with defense-in-depth considerations such as design, operations and waste acceptance criteria to address uncertainties. Specific information and references are provided for details needed to address the evolution of individual components of cover and liner/leachate collection systems. This information is then synthesized into recommendations for best practices for cover and liner system design and examples of approaches to address the performance of covers and liners as part of a performance assessment of the disposal system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of natural resource damages settlement funds for watershed protection at the Fernald Preserve, Harrison, Ohio - 15309

The Fernald, Ohio, Site, also called the Fernald Preserve is a former uranium processing plant that underwent extensive remediation pursuant to CERCLA. The Fernald site is managed by the US DOE Office of Legacy Management. US DOE and the Ohio EPA settled a long-standing CERCLA natural resource damage claim against the site in November 2008. As part of the settlement, US DOE paid $13.75 million to compensate for natural resource injury. These settlement funds were appointed for restoration, replacement, or acquisition of equivalent natural resources at or near the Fernald Preserve. Following finalization of a Funds Utilization Plan in February 2010, the Fernald Natural Resource Trustees (composed of US DOE, Ohio EPA, and the US Department of the Interior and known collectively as the Trustees) used a portion of the settlement funds to initiate the Paddys Run Conservation Project. This effort is a means to secure development rights and conservation easements within the Paddys Run watershed. Paddys Run is a third-order stream located on the western side of the Fernald Preserve. The Trustees partnered with Three Valley Conservation Trust to obtain assistance with land acquisition and conservation easement management. Since Fall 2012, more than 1,093 hectares (2,700 acres) have been permanently protected via easement or purchase. The Trustees are also partnering with MetroParks of Butler County, Ohio, to establish a nature preserve on acquired land. The Salamander Run Preserve is situated on 51 hectares (125 acres) of forest and former agricultural land approximately 11 kilometers (7 miles) north of the Fernald site. The land was purchased by Three Valley Conservation Trust and is undergoing ecological restoration using settlement funds. Upon completion, the property will be donated to MetroParks of Butler County, Ohio.(authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oak Ridge environmental information system (OREIS): formalizing the shapes of things on the Oak Ridge Reservation - 15393

As representations of object and area boundaries on Earth's surface, shapes are important components of geographic information system platforms. The US Department of Energy Office of Environmental Management in Oak Ridge, Tennessee recognizes the importance of shapes as boundary representations and has mandated the Oak Ridge Environmental Information System as the official repository of all geographic information system shapes related to CERCLA cleanup on the Oak Ridge Reservation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Niagara Falls Storage Site - Balance of plant investigation results - 15432

The Niagara Falls Storage Site (NFSS) is a 77.3-hectare (ha) (191-acre) property that is owned by the United States Government and located in the township of Lewiston, Niagara County, New York. The NFSS is part of the former Lake Ontario Ordnance Works (LOOW) that was used by the War Department beginning in 1942 for the production of trinitrotoluene (TNT). During the 1940's and 1950's, the Manhattan Engineer District and the Atomic Energy Commission brought various radioactive wastes and uranium processing byproducts (residues) resulting from our nation's atomic energy program to the LOOW for storage. Site operations caused soil, sediment, and groundwater contamination that lead to several remedial actions, which culminated in the construction of the Interim Waste Containment Structure (IWCS) on the NFSS. The U. S. Army Corps of Engineers (USACE)-Buffalo District is the lead Federal agency for Formerly Utilized Sites Remedial Action Program (FUSRAP) remediation of the NFSS. As the lead agency, USACE is conducting a remedial investigation/feasibility study (RI/FS) pursuant to the protocols set forth in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). CERCLA activities at the NFSS have transitioned from the site RI activities to the FS evaluation of potential remediation alternatives. USACE recognizes the need to implement a focused CERCLA FS process and, therefore, has established three separate operable units (OUs) for NFSS: the IWCS OU, the Balance of Plant (BOP) OU [i.e., all on-site areas outside the boundary of the IWCS], and the Groundwater OU. This paper details recent investigations into the underground utilities, groundwater/soil contamination, and past storage of contaminated material on the Balance of Plant Operable Unit of the NFSS. Recent fieldwork activities have investigated areas of elevated groundwater contamination as well as an investigation to determine/eliminate any preferential pathway that historical underground utilities may have provided on-site in these areas. Additional areas of investigation included strategic placement of groundwater wells at locations of historic residue storage piles and intersections of various underground utilities (based on aerial photography and geophysical surveys). Several hundred locations across the site were investigated with a gamma walk-over survey, boring, surveying and sampling of soil-cores to aide in the delineation of soil contamination throughout the Balance of Plant Operable Unit. The series of investigations indicated multiple operational areas still have impacts above background conditions, risk-based concentrations, and promulgated maximum contaminant levels for multiple media in the Balance of Plant Operable Unit. The soil, groundwater, sediment, and utility sampling data show that 1) radionuclide impacts derived from ore-residue handling operations still exist, 2) impacts from other inorganic and organic compound exist in TNT manufacturing and support areas, and 3) contaminant transport from past source areas is minimal. The full compendium of site history and recent sampling data provides a well-defined conceptual site model that provides the necessary input data to prepare volumetric soil estimates for the Balance of Plant Operable Unit Feasibility Study. The scale of the NFSS and complexity of prior operations provide many remedial challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A paradigm shift: an introduction to structured decision making for sustainable waste management and remediation - 15649

transport of contaminants and human health risk assessment. Most often these modeling activities are carried out in a conservative fashion, usually beyond even the conservatism that is built into the associated regulations and guidance. Decisions are aimed primarily at compliance with regulatory objectives, rather than optimization. This leads to unnecessarily costly remediation and under-utilization of the nation's relatively few radioactive waste disposal facilities. Risk assessment decisions under CERCLA and RCRA might seem to perform better, but if anything this is because the focus is on shorter-term decision-making because long term fate and transport modeling is not considered necessary in most cases. However, some more complex contamination problems suffer from the same basic issues as radioactive waste disposal in terms of the need for complex fate and transport modeling and subsequent risk assessment. At least CERCLA addresses optimization in the feasibility study, but it does not address how to perform that optimization in the face of uncertainty or stakeholders who have different competing objectives. Other environmental issues that fall outside the realm of DOE Orders, NRC regulations, and regulations such as CERCLA and RCRA, have found a different path towards effective decision-making. This includes land reuse and watershed management decisions, for which there is a focus on sustainability and on stakeholder involvement throughout the decision making process. EPA is using 'structured decision analysis' to achieve the primary goal of maximizing societal welfare. These same tools and approaches can be brought into environmental and waste management decisions that need to be made by DOE. Structured decision analysis provides a formal process for capturing not only the science side of the problem, but also the costs and value judgments of the stakeholders, to reach an optimal solution. But this approach requires a paradigm shift within the DOE and NRC environmental and waste management programs. That is, it requires a willingness to engage a new approach that will provide a path towards effective optimization in the decision-making process for the complex environmental problems faced by DOE and NRC. Because of the current nature of problem solving for these types of problems, which involves many layers of conservatism, this structured decision analysis path towards optimization will also realize substantial cost savings for these programs, while maintaining or improving defensibility and transparency in the decision making process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Interactive statistical decision tools (GiSdT): An open source software integration of decision analysis and stakeholder judgment for sustainable waste management, disposal and remediation - 15650

The vast majority of remediation and waste management decisions are made without quantitative consideration of economic and socio-political factors. They are made instead based on quantitative metrics of human health risk. Sustainable decisions need to be made based on all three 'pillars of sustainability' (economics, environment and social), and require understanding and characterization of the costs and values associated with each pillar. In addition, such decisions need to conform to regulatory or other legal requirements, which often constrains the decision space of interest. Although efforts are often made to include factors across all three pillars (for example, for decisions made under CERCLA), these efforts are usually qualitative, and hence difficult to defend. They lack technical defensibility, transparency and traceability. The purpose of GiSdT (Guided Interactive Statistical Decision Tools) is to provide a quantitative framework whereby all aspects of a decision problem, such as remediation and waste management decisions, can be addressed quantitatively, and hence, defensibly, transparently and traceably. Most decision-makers do not currently have access to useful or usable methods and approaches when are presented with choices that have significant impacts across all three pillars of sustainability. The goal of GiSdT is to provide that access by identifying or developing effective and user-friendly decision methods and approaches that empower decision-makers to explicitly and routinely incorporate all aspects of sustainability into their decision-making. To identify and develop these methods and approaches, GiSdT provides the tools needed for decision-makers and stakeholders to understand and characterize their knowledge of their current decision-making processes, and what methods and approaches they need to pro-actively and quantitatively address all aspects of sustainability in their decisions. GiSdT is an open source interactive framework program that provides the tools needed to address the relevant components of a sustainability-based decision problem, including describing the decision landscape, translating that landscape into goals and objectives, valuing the measurable attributes that describe each objective, identifying decision options and addressing the uncertainty in the attributes (e.g., human health risk, institutional controls) through appropriate probabilistic models. In addition to addressing these quantitative technical components, the GiSdT program is aimed at facilitating stakeholder involvement so that the perspectives, values and objectives are all relevant stakeholders are addressed explicitly in the decision making process. The technical underpinnings of our software program, called Guided Interactive Statistical Decision Tools (GiSdT), are described. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗