Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Third Quarter,”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Adoption of a token-based authentication model for the CMS Submission Infrastructure

The CMS Submission Infrastructure (SI) is the main computing resource provisioning system for CMS workloads. A number of HTCondor pools are employed to manage this infrastructure, which aggregates geographically distributed resources from the WLCG and other providers. Historically, the model of authentication among the diverse components of this infrastructure has relied on the Grid Security Infrastructure (GSI), based on identities and X509 certificates. In contrast, commonly used modern authentication standards are based on capabilities and tokens. The WLCG has identified this trend and aims at a transparent replacement of GSI for all its workload management, data transfer and storage access operations, to be completed during the current LHC Run 3. As part of this effort, and within the context of CMS computing, the Submission Infrastructure group is in the process of phasing out the GSI part of its authentication layers, in favor of IDTokens and Scitokens. The use of tokens is already well integrated into the HTCondor Software Suite, which has allowed us to fully migrate the authentication between internal components of SI. Additionally, recent versions of the HTCondor-CE support tokens as well, enabling CMS resource requests to Grid sites employing this CE technology to be granted by means of token exchange. After a rollout campaign to sites, successfully completed by the third quarter of 2022, the totality of HTCondor CEs in use by CMS are already receiving Scitoken-based pilot jobs. On the ARC CE side, a parallel campaign was launched to foster the adoption of the REST interface at CMS sites (required to enable token-based job submission via HTCondor-G), which is nearing completion as well. In this contribution, the newly adopted authentication model will be described. We will then report on the migration status and final steps towards complete GSI phase out in the CMS SI.

Pérez-Calero Yzquierdo, Antonio↗

1996 Seattle Household Travel Survey Wave 6

The Seattle Household Travel Survey Wave 6, conducted in the second and third quarters of 1996, was the sixth wave in a ten-part longitudinal panel survey of the travel patterns of households in the Puget Sound region of Washington state. The survey series was initiated in 1989 by the Puget Sound Regional Council. This collection contains the sixth set of panel data for approximately 2,000 households in King, Kitsap, Pierce, and Snohomish counties. Due to various sources of attrition, approximately 20% of households needed to be replaced for each survey wave. The survey relied on the willingness of study area residents to 1) provide demographic information about their household, its members, and its vehicles; 2) document all travel for each household member, aged 15 years or older, for an assigned two-day period; and 3) agree to participate in additional survey waves. After an initial telephone screening, survey participants received mailed travel diaries to aid in documenting travel information for the two-day assessment period. Respondents were instructed to record their mode of transportation, trip purpose, number of vehicle passengers, departure and arrival times, ride fare, and parking costs. Demographic information for this study includes age, gender, education, employment status, and household income.

1Hz data↗

Preliminary Theoretical Analysis of Mixed Precision Krylov Subspace Methods (Q3 Report)

The third quarter of the project was spent performing theoretical finite precision analysis of Krylov subspace method variants that use mixed precision. Our focus here is on the Conjugate Gradient (CG) method and the Lanczos method. We have performed an analysis of maximum attainable accuracy for the classical CG method in which 3 precisions are used: a working precision ε, a precision ε IP for the inner product computations, and a precision ε MV for the matrix-vector products. Our results show that performing inner product computations in lower precision does not affect the attainable accuracy. Further, we have performed a complete error analysis of the s-step Lanczos algorithm. In this case, we show that the numerical behavior of the algorithm can be significantly improved by using extra precision in a small part of the computation. We summarize the main theorems in the remainder of the document. Other activities include attending biweekly xSDK meetings. The subsequent quarter will be spent finalizing these results into technical reports and/or manuscripts for submission to journals, as well as identifying opportunities for future work.

97 MATHEMATICS AND COMPUTING↗

Analysis of Benefits Associated With Projects and Technologies Supported by the Clean Transportation Program

The California Energy Commission's Clean Transportation Program (CTP) supports a wide range of alternative, low-carbon fuel and vehicle projects. This report improves upon the 2014 Alternative and Renewable Fuel and Vehicle Technology Program (ARFVTP) Benefits Report(the former name of the Clean Transportation Program), which focused on two components of benefit calculation: expected benefits and market transformation benefits. The "expected benefits" are defined as benefits that accrue because of the direct displacement of petroleum-based fuels or vehicle technologies. The "market transformation benefits" accrue because of CTP funding shifting the underlying market dynamics and accelerating the adoption of alternative fuel vehicles. This report documents the updated methods used in the benefits analysis in 2014 and applies them for this 2021 Clean Transportation Program Benefits Report. The project team used data collected from CTP projects funded from 2009 to the third quarter of 2021 to estimate the benefits between 2021 and 2030. CTP projects valued at $\$898.3 million$ were assessed (out of $\$1.04 billion$ funded) to estimate expected benefits of 249 million gallons per year petroleum reduction and 2.79 million metric tons per year of carbon dioxide equivalent greenhouse gas (GHG) reduction in 2030. Market transformation benefits are additive to the expected benefits and were estimated with high and low ranges for the 315 relevant projects evaluated. The market transformation benefits' GHG reductions are estimated as 2.2 million to 6.2 million metric tons of carbon dioxide equivalent per year and the petroleum reductions as 145.3 million to 671.5 million gasoline gallon equivalents per year in 2030. Combining both benefit types, the CTP projects can make significant progress toward meeting California's long-term GHG and petroleum fuel use reduction goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FERC Order No. 2222 and Considerations for Distributed Wind

The Federal Energy Regulatory Commission (FERC) issued Order No. 2222 in October 2020. The rule directs Regional Transmission Organizations and Independent System Operators (ISOs) to amend their tariffs and participation models to accommodate heterogeneous distributed energy resource (DER) aggregations in the wholesale energy markets that they operate, including capacity, energy, and ancillary service markets. The Commission issued the rule to better capture the benefits provided by DERs deployed in the United States, whose use has been expanding rapidly. The Commission defines DERs as “any resource located on the distribution system, any subsystem thereof or behind a customer meter,” including but not limited to “electric storage resources, distributed generation, demand response, energy efficiency, thermal storage, and electric vehicles and their supply equipment.” The rule aims to increase DER participation in wholesale markets by allowing the creation of DER aggregations, in which multiple DERs that are too small to meet minimum capacity requirements for wholesale markets individually would be able to participate in markets as a single unit. As of June 20, 2023, all ISOs have filed initial compliance plans and a number have begun implementation. Compliance dates range from 2024 to 2029, with Midcontinent ISO having the latest date of compliance proposed for 2029. Southwest Power Pool still has an outstanding date, having no final order yet from FERC, but a target date of the third quarter of calendar year 2025. The rule, which is technology agnostic and requires ISOs to create participation plans that accommodate different DERs, provides an opportunity for distributed wind market expansion. In addition, distributed wind can bring benefits to heterogenous DER aggregations. These benefits include resource diversity (i.e., a complementary generation profile to other types of distributed generation), its small footprint and ability to be co-located with load, and its potential to provide frequency response, voltage support, and black start services, among other ancillary services. This report provides a status update on FERC Order No. 2222, the current state of ISO compliance, and information relevant to the distributed wind industry as DER aggregators and other stakeholders expand their participation to wholesale energy markets.

17 WIND ENERGY↗

Results for the October 2023 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the October 2023 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the SWPF DSS sample was obtained. The October 2023 Semiannual sample of the SWPF DSS is a composite from the six months of SWPF processing during the Third Quarter Fiscal Year 2023 (3QFY2023) and the Fourth Quarter Fiscal Year 2023 (4QFY2023).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the October 2025 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the October 2025 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TAR GETS that were established at the time the SWPF DSS sample was obtained. 1 The October 2025 Semiannual sample of the SWPF DSS is a composite from one month of SWPF processing during the Third Quarter Fiscal Year 2025 (3QFY2025) and two months of SWPF processing during the Fourth Quarter Fiscal Year 2025 (4QFY2025).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DETERMINATION OF EMISSIVITY OF MATERIALS.

During the third quarter of the contractual year of Contract NASW-104 for the determination of emissivity of materials, the emittance of nine specimens was measured at temperatures ranging up to 2200F and at pressures averaging 10(exp -8) mm Hg. The materials tested included columbium, columbium with an oxidized surface, molybdenum, graphite varnish on Type 310 stainless steel, stainless steel with an oxidized surface, and platinum black. In the spectral emittance rig, spectral as well as total emittance was measured on three specimens and total emittance only was measured on a fourth. In the total emittance rig, total emittance data was obtained on five specimens. Two of the specimens were endured. Investigations were made concerning the operational characteristics of both rigs in order to eliminate possible sources of error in the data. On the spectral emittance rig, tests were conducted to determine the exact magnitude of any error introduced in the spectral emittance values by beam intermixing resulting from imperfections in the optical system. On the total emittance rig, work was concentrated on the determination of the relative accuracy of the chromel-alumel and platinum-platinum 10% rhodium thermocouples used to measure the temperature of the specimen.

Emission↗

The development of sine vibration test requirements for Viking lander capsule components

In connection with the Viking project for exploring the planet Mars, two identical spacecraft, each consisting of an orbiter and a lander, will be launched in the third quarter of 1975. Upon arrival at the planet, the Viking lander will separate from the Viking orbiter and descend to a soft landing at a selected site on the Mars surface. It was decided to perform a sine vibration test on the Viking spacecraft, in its launch configuration, to qualify it for the booster-induced transient-dynamic environment. It is shown that component-level testing is a cost- and schedule-effective prerequisite to the system-level, sine-vibration test sequences.

Barrett, S.↗

NASA aviation safety reporting system

During the third quarter of operation of the Aviation Safety Reporting System (ASRS), 1429 reports concerning aviation safety were received from pilots, air traffic controllers, and others in the national aviation system. Details of the administration and results of the program are discussed. The design and construction of the ASRS data base are briefly presented. Altitude deviations and potential aircraft conflicts associated with misunderstood clearances were studied and the results are discussed. Summary data regarding alert bulletins, examples of alert bulletins and responses to them, and a sample of deidentified ASRS reports are provided.

Source record↗

Automotive Stirling Engine Development Program

The third quarter (April-June, 1978) effort of the Ford/DOE Automotive Stirling Engine Development Program is reported, specifically Task 1 of that effort, which is Fuel Economy Assessment. At the end of this quarter the total fourth generation fuel economy projection was 26.12 MPG (gasoline) with a confidence level of 44%. This represents an improvement of 66.4% over the baseline M-H fuel economy of 15.7 MPG. The confidence level for the original 20.6 MPG goal has been increased from 53% to 57%. Engine 3X17 has accumulated a total of 213 hours of variable speed running. A summary of the individual sub-tasks of Task 1 are given. The sub-tasks are grouped into two categories: Category 1 consists of those sub-tasks which are directly related to fuel economy and Category 2 consists of those sub-tasks which are not directly related to fuel economy but are an integral part of the Task 1 effort.

Source record↗

Low Cost Solar Array Project: Composition Measurements by Analytical Photon Catalysis

The applicability of the photon catalysis technique for effecting composition analysis of silicon samples was assessed. Third quarter activities were devoted to the study of impurities in silicon matrices. The evaporation process was shown to be congruent; thus, the spectral analysis of the vapor yields the composition of the bulk sample. Qualitative analysis of metal impurities in silicon was demonstrated e part per million level. Only one atomic spectral interference was noted; however, it is imperative to maintain a leak tight system due to chemical and spectral interferences caused by the presence of even minute amounts of oxygen in the active nitrogen afterglow.

Sutton, D. G.↗

Planetary radar

The radar astronomy activities supported by the Deep Space Network during the third quarter of FY81 are reported. The planet Mercury was the principal object of interest.

Shaffer, R. D.↗

Information expectations from Landsat-D

The first satellite of the Landsat-D Project is to be launched in the third quarter of 1982 with a second satellite to be prepared for launch 12 to 15 months later. Both spacecraft are to include the familiar Multispectral Scanner (MSS) and the advanced multispectral scanner called the Thematic Mapper (TM). The ground data processing system for the MSS data is to be ready to produce 200 scenes a day in 1982. The data processing systems for the TM are to be fully operational at the 50 to 100 scenes a day level in early 1985. The fabrication of the system components has proceeded well in recent months, and integration of the total system is under way. The procedures for processing the data and meeting specifications are nearly completed for the MSS and are outlined in detail for the TM. An outline of an investigation program stressing systems performance has been developed for the period 1982 to 1985.

Salomonson, V. V.↗

An investigation of transitional management problems for the NSTS at NASA, executive summary

A summary is given of the work of the University of Houston research team for the third quarter of effort in a yearly grant for the National Space Transportation System (NSTS). As such it serves as a resting place for the ideas and concepts developed this quarter with the collaboration of the Management Integration Offices of NASA. Another objective is the hope that the report will help to stimulate the healthy problem solving process already present at NASA. The main goal of the contractual work is to help NASA to find ways and means of moving into a truly operational era with the shuttle program. This work is a continuation of early work and the reader is encouraged to read the final reports of earlier years. Chapter One of the report is an introduction. Chapter Two deals with industrial adaptation and is in two parts: theory and application. In the theory section, impressions of the management system immediately after reflight are discussed. A key issue, in the author's opinion is the seeming lack of purpose of the program. The application section has six appendices: 1988 Demographic Survey, Field Notes of Interview with HL/P South Texas Nuclear Project, a comparison of the Agendas of the current manager with that of a previous manager, a note on compartmentalization to assist in manifesting, a study on launch prediction for STS-26, and a discussion of a statistical decision-making course for upper level managers. Chapter Three deals with theoretical results returned on flow shop scheduling which will be of use downstream. Chapter Four deals with a statistical model developed to predict the flight rate in future years and indicates the program will have trouble making its schedule. Chapter Five covers the constructural effort and shows the work to be on schedule.

Hunsucker, John↗

Extended sodium exosphere of the moon

Sodium emission has been observed up to 1200 km above the subsolar limb of the moon at third quarter. The intensity of the emission is far in excess of that predicted from the scale height and surface density derived previously from measurements of sodium emission at low altitudes above the lunar surface. This can be explained by assuming that there are both 'hot' and 'cold' components of the lunar sodium exosphere.

Potter, A. E.↗

Mini All-purpose Satellite Control Center (MASCC)

A new generation of Mini All-purpose Satellite Control Centers (MASCC) has been developed by CNES (F). They turn out to be easily adaptable to different kinds of satellites, both Low Earth Orbital or Geostationary. The features of MASCC allow both standard satellite control activities, and checking of passengers experiments hosted on a space platform. In the different environments in which it may be used, MASCC provides standard broadcasting of telemetry parameters on animated synoptics (curves, bar graphs, alphanumeric displays, ...), which turns out to be a very useful and ergonomic medium for operational teams or satellite specialists. Special care has been taken during the MASCC development about two points: - automation of all routine tasks, allowing automated operation, and limiting human commitment to system supervision and decision making, - software adaptability. To reach these two main objectives, the MASCC design provides:(1) a simple, robust and flexible hardware architecture, based on powerful distributed workstations; and (2) a table-driven software architecture, easily adapted to various operational needs. Satellite characteristics are described in a central Data Base. Hence, the processing of telemetry and commands is largely independent from the satellite itself. In order to validate these capabilities, the MASCC has been customized to several types of satellites and orbital platforms: (1) SPOT4, the French new generation of remote sensing satellites; (2) TELECOM2, the French geostationary TV and telecommunication satellite; and (3) MIR, the Russian orbital platform. MASCC development has been completed by the third quarter of 1993. This paper will provide first a description of the MASCC basic functions, of its hardware and software design. It will then detail the increased automation capability, along with the easy adaptation of the MASCC to new satellites with minimal software modifications.

Zaouche, Gerard↗