Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Test Pilots”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Rare Earth Extraction and Concentration at Pilot-Scale from North Dakota Coal-Related Feedstocks (Final Technical Report)

The objectives of this project were to design, construct, commission, and operate a pilot-scale system utilizing UND's REE extraction technology from lignite, and complete saleability and economic evaluations of products. The process includes a dilute-acid extraction process from low-rank-coals, followed by selective precipitations and further processing to produce mixed rare earth oxide materials. The pilot was successfully constructed to a 1,000 lb/hr nameplate capacity and tested with over 100 tons of >300-ppm lignite-based feedstocks and produced saleable-quality products during operation. The team successfully attained a TRL status of 6 with the completion and testing of the pilot system, and the technology is poised for demonstration at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Infrastructure improvements in the National Reactor Innovation Center Virtual Test Bed

The National Reactor Innovation Center’s (NRIC) mission is to support deployment of novel reactor concepts. This is achieved by providing physical and virtual spaces for building and testing various components, systems, and complete pilot plants. The Virtual Test Bed (VTB) represents the virtual counterpart to the physical test bed. The VTB is being developed in collaboration with the Department of Energy’s (DOE) Nuclear Energy Advanced Modeling and Simulation (NEAMS) program. The mission of the VTB is to accelerate the deployment and licensing of advanced reactors by leveraging state-of-the-art modeling and simulation (M&S) tools developed by the DOE NEAMS program. This is accomplished via three primary means: (1) openly hosting simulations that showcase analysis capabilities, (2) continuously testing the models hosted against code updates to avoid deprecation, and (3) filling key M&S gaps that are relevant for the physical NRIC test beds. The VTB repository consists of two sub-entities: • A documentation website detailing the models: https://mooseframework.inl.gov/virtual_test_bed • A GitHub repository that hosts the corresponding files: https://github.com/idaholab/virtual_test_bed. This paper presents the infrastructure added to the VTB in the last two fiscal years. Additional information about the VTB can be found in various publications [1, 2, 3, 4, 5, 6, 7, 8].

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Status of New Models Hosted on the Virtual Test Bed (VTB) in 2024

The National Reactor Innovation Center (NRIC) mission is to support deployment of novel reactor concepts. This is achieved by providing physical and virtual spaces for building and testing various components, systems, and complete pilot plants. The Virtual Test Bed (VTB) represents the virtual counterpart to the physical test bed. It is in development in collaboration with the Department of Energy’s (DOE) Nuclear Energy Advanced Modeling and Simulation (NEAMS) program. The mission of the VTB is to accelerate the deployment and licensing of advanced reactors by leveraging state-of-the-art modeling and simulation (M&S) tools developed by the DOE NEAMS program. This is accomplished by three primary means: (1) openly hosting simulations that showcase analysis capabilities, (2) continuously testing the models hosted against code updates to avoid deprecation, and (3) filling key M&S gaps that are relevant for the physical NRIC test beds. The VTB repository consists of two sub-entities: 1. A documentation website detailing the models (https://mooseframework.inl.gov/virtual_test_bed). 2. A GitHub repository that hosts the corresponding files (https://github.com/idaholab/virtual_test_bed). Previous documentation on the models hosted in the VTB can be found in [1,2,3,4]. These references also include additional background information on the various NEAMS codes showcased in the VTB (which is omitted here for brevity). This paper primarily provides a status update of the most recent additions to the repository.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Demonstration of Scaled-Production of Rare Earth Oxides and Critical Materials from U. S. Coal-Based Sources (Final Report)

The project objective was to demonstrate scaled production of high purity rare earth oxides (REO), nominally exceeding 90% grade, from coal refuse sources using innovative technologies that reduce cost and improve environmental outcomes relative to traditional rare earth processing technologies. The project utilized a critical material pilot plant constructed and tested as part of a previous U.S. Department of Energy project. Target performance criteria was a 50% reduction in production cost based on previous optimum values, 150% increase in recovery and greater than 2% concentrates of rare earth oxides, cobalt and manganese. Concentrate production goals were to produce a rare earth mix oxide product at a rate of 200 grams per day having a minimum purity of 50% as well as products of cobalt and manganese having a minimum purity of 2%. A previous pilot plant investigation identified acid cost as the major contributor to an operating cost that made the recovery of rare earth and other critical metals from bituminous coal sources economically challenging. As such, acid cost reduction was a major target using bio-oxidation reactors to produce sulfuric acid from naturally occurring coal pyrite. Based on laboratory data, a bio-oxidation circuit was designed for the pilot plant to produce 7.5 l/min of acid using two 11-m3 (3000 gallon) reactors equipped with 40 hp aerators for air dispersion. The pilot-scale tests revealed that acid concentration equivalent to as high as 1.0 M sulfuric acid could be continuously produced. However, the bio-acid contained exceptionally high iron concentrations, which complicated downstream processing of the pregnant leach solution (PLS). A TEA of the bio-oxidation circuit showed that production cost was approximately $0.13 per kg acid equivalent if produced using a four-day retention time in the reactors. This value represents a 48% reduction from that of purchased bulk sulfuric acid. Calcination (or roasting) studies were conducted on coarse refuse from West Kentucky No. 13 and Fire Clay coal seam sources. The test results revealed the potential to increase recovery by nearly 100% using temperatures between 500°C to 700°C with light REE recovery value being the most improved. Acid baking of the calcined products using sulfuric acid at 250°C increased heavy rare earth recovery from around 40% to 80% while decreasing the acid requirements by over 50%. The existing pilot plant was upgraded for the pilot scale demonstration of REE and CM recovery. The primary feedstocks were West Kentucky No.13 and heap leach pregnant leach solution (PLS) while a secondary feedstock was a lignite waste material from a construction sand operation. The pilot scale operation started with PLS generation through leaching followed by iron and aluminum removal, nominally at 3.3 and 4.5 pH, respectively. Leaching lixiviants used for the test were industrial grade sulfuric acid or bio-acid generated at the pilot scale facility. For most of the tests, the solid feed rate was 200 lb/hr whereas lixiviant was added at 2 gpm to provide an optimal residence time of 45 minutes. Following the contaminant removal step, several different process schematics were tested with the goal of maximizing REE recovery and purity. In the first test, direct processing of aluminum precipitation raffinate for REE recovery using oxalic acid at pH 1.5 was investigated. Overall REE recovery was approximately 45%. Unfortunately, elevated calcium content in the PLS significantly impacted the RE-Oxide product grade. Similarly, high calcium content decreased both the product purity and grades of CM products. As such, a new flowsheet was tested with the same initial process schematic but different precipitation stages for REEs and CMs at pH 6.0 and 9.0, respectively. It was noted that the overlapping precipitation behavior of Co, Ni and Zn with REEs limited the applicability of this process schematic. While this change increased the RE-Oxide grade from 36% in the first test to 87%, the loss of critical metals to the REE cake and bypass of the REEs to the CM cake significantly impacted the recovery of both REEs and CMs. Therefore, the modified process flowsheet combined oxalic acid precipitation stage raffinate and redissolved CM cake filtrate to maximize both the recovery and purity of the products. Consequently, a RE-Oxide product with 85% purity and CM cakes with over 19% Co, 38% Ni, 14% Zn and 9% Mn content were generated with significantly higher recoveries. While the modified process flowsheet improved recoveries and grades, elemental losses observed in separate precipitation and redissolution losses inspired the adaptation of a single precipitation stage at pH 9.0 for both REEs and CMs. This change was anticipated to maximize the REE recovery while minimizing the costs associated with separated redissolution and processing stages. As expected, REE recovery in this new circuit arrangement was over 56% with a product grade of over 87% RE-Oxide content. Similarly, Co, Ni, Mn, and Zn recoveries of 54%, 40%, 67%, and 66%, respectively, were achieved. Unfortunately, the elevated calcium content present in the solution due to its precipitation at pH 9.0 caused a decrease in the CM cake quality. Therefore, the final process flowsheet involved the addition of calcium oxalate precipitation following the oxalic acid precipitation stage, which effectively eliminated calcium contamination of the CM products. Finally, the pilot scale experiments conducted using bio-acid achieved comparable REE leaching recoveries to the conventional sulfuric acid leaching. Elevated iron concentration in the solution caused the co-precipitation of REEs with the iron and aluminum cake, resulting in the REE losses. Furthermore, elevated iron content bypassing the iron and aluminum precipitation stages contaminated the metal sulfide and manganese cake, respectively. A techno-economic analysis was performed based on a commercial facility capable of treating 500 tph of coal-based material. The production cost for West Kentucky No. 13 coarse refuse material ranged from approximately $500-$700/kg of total rare earth oxide whereas the lignite source had significantly lower production cost of $100-$300/kg. The significant difference in cost was due to the easier leaching characteristics of the lignite material and the higher feed concentrations. All process scenarios resulted in a negative net present value (NPV). For the lignite feedstock, laboratory REE leach recovery values were about 30% higher than the pilot plant data. Using the lab leach results, a positive net present value was achieved and the production cost decreased from $100-$300 $/kg to less than $150/kg of total REO.

01 COAL, LIGNITE, AND PEAT↗

Laboratory and pilot-scale studies of membrane distillation for desalination of produced water from Permian Basin

Substantial quantities of produced water generated during the extraction of oil and gas from unconventional reservoirs present significant environmental concern and increase the operating cost for this industry. Membrane Distillation (MD) can serve as a potential solution for beneficial reuse of produced water by generating high-quality permeate and reducing the volume of produced water requiring disposal. This study investigated treatment of produced water from Permian Basin in both laboratory and pilot-scale studies. Laboratory tests revealed the potential to successfully recover 50% of produced water although some increase in permeate conductivity was observed due to the passage of ammonia from the feed side. Initial pilot-scale test with filtration of raw produced water as the only pre-treatment step led to precipitation of SrSO 4 , NaCl, and Fe in the system once the solubility limits for these salts were exceeded. However, chemical pretreatment that included pH adjustment, aeration, and barite precipitation, allowed successful steady-state operation of the AGMD pilot system for 5 days where the produced water was concentrated from 127 g/L to 255 g/L (~50% water recovery) while recovering high quality permeate. Overall, greater than 99.7 % salt rejection was achieved with the average permeate flux of 1.86 LMH. Finally, mass balance analysis suggested potential Ba and Ca precipitation in the system but there was no impact on AGMD performance and permeate quality during 5 days of continuous operation in the field.

42 ENGINEERING↗

NREL's Biochemical Conversion Pilot Plant Capabilities

NREL's biochemical conversion plant is a flexible pilot plant for testing a wide range of bio-based technologies for producing renewable fuels and byproducts. The biochemical conversion pilot plant is housed in the Integrated Biorefinery Research Facility located on the National Renewable Energy Laboratory's (NREL's) main campus. The facility provides industry partners the opportunity to test and develop their own biorefining technology using NREL equipment or rental equipment that can be brought into the plant. The pilot plant can process materials up to one dry ton per day in an integrated fashion using a variety of operating modes including batch, fed-batch, and continuous processing.

biochemical↗

Compositional Variation Tests on DuraMelter 100 with LAW Sub-Envelope B1 Feed in Support of the LAW Pilot Melter, VSL-02R62N0-5, Rev. 0 (May 2003)

The principal objective of the DM100 tests was to demonstrate the robustness of the vitrification process with respect to feed and glass compositional changes resulting from variations in the simulant-to-additive ratio. The DM100-WV unit was selected for these tests; this melter was used for all of the Part B 1 tests on LAW Envelopes A, B, and C sulfate incorporation that were used to support the subsequent tests on the Pilot Melter as well as for the more recent LAW Sub-Envelope Al, A2, A3 and Cl tests. The same melter was selected for the present tests in order to maintain comparisons between the data sets. In addition, the somewhat smaller glass volume for the same melt surface area as compared to the DM100-BL melter means that more glass turnovers are achieved for a given test duration. The DM100 tests used nominal feed and feed with a 15% surplus in waste simulant. Previous Pilot Melter tests on Envelope A with 10% variations (but with sulfate removal) showed significant impacts on glass production rates that were ultimately corrected by adjustments in the sugar additions. Consequently, robustness with respect to throughput as well as sulfate tolerance are important motivations for these tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wastewater Recycling Using a Hygroscopic Cooling System

This project by the Energy & Environmental Research Center (EERC), Baltimore Aircoil Company (BAC), and Great River Energy (GRE) evaluated the concept of recycling wastewater at a coal-fired power plant using a hygroscopic cooling system, which is an evaporative cooling technology analogous to conventional cooling towers, except that sparingly soluble dissolved solids are precipitated and removed as waste solids instead of purging them with a liquid blowdown stream. This technology can maximize the use of plant makeup water by obtaining useful evaporative cooling from wastewater while minimizing the volume of wastes needing disposal. Experimental activities were conducted in two phases, a laboratory-based evaluation of the properties of wastewater from the host site, GRE’s Coal Creek Station near Underwood, North Dakota, and a field test of a small pilot hygroscopic cooling system at the host site power plant. Findings from the laboratory study informed the design of the pilot system and the system’s field test performance served as the basis for a techno-economic analysis (TEA) of the hygroscopic recycling concept. At the preferred operating conditions identified during the TEA, the wet-bulb approach temperature of the tower was 7.3°C (13°F) and the volume of blowdown produced by the plant was reduced to 5.4% of its incoming volume. Waste solids produced during field testing were classified as nonhazardous waste based on the measured hazardous element content and evaluation of their leaching potential. However, to qualify as a solid for landfill disposal i.e., as determined by the U.S. Environmental Protection Agency’s paint filter test, it appears that a dewatering step beyond hydrocyclone separation is needed. The baseline levelized cost of wastewater disposal (LCWD) for hygroscopic wastewater recycling was estimated to be $\$ $3.69–$\$ $3.72 per m3 of plant blowdown. Capital cost was estimated to contribute over 54% to the LCWD, and parameters that impact capital cost such as the heat exchange coil material of construction and the tower’s wet-bulb approach temperature were identified as having the greatest impact on overall LCWD. A LCWD estimate prepared for the same application but using thermomechanical brine evaporation was almost 40% higher than that calculated for hygroscopic cooling, despite recovering distilled-quality water for reuse, while the LCWD for disposal-only, deep well injection was estimated to be 30% lower compared to hygroscopic wastewater recycling.

01 COAL, LIGNITE, AND PEAT↗

Sorbent Based Post-Combustion CO 2 Slipstream Testing

TDA Research, Inc. has developed a low-cost sorbent (alkalized alumina) based technology for post-combustion CO 2 capture. The sorbent runs in an isothermal process for adsorption and regeneration. Neither temperature swing nor pressure swing is needed. TDA designed a system which operated 10 fixed beds to simulate a moving bed process. The flow pattern was optimized to minimize the steam usage for regeneration. An excellent sorbent (Batch 1) was also developed with collaboration with our partner. The sorbent degraded after long term operation. We developed a reprocessing procedure, which can be conducted in situ, to restore the sorbent capture capacity as the fresh sorbent after running for about 1250 hours. The reprocessing extended the sorbent longevity significantly. TDA designed a pilot unit (40’ x 32’ x 11.5’), processing flue gas equivalent to 0.5 MW of power generation. It had 10 beds and each bed could hold 1.75 m 3 of sorbent. We worked with Springs Fabrication, Inc. to complete the construction of the pilot unit. It was then shipped and installed at NCCC. The pilot unit was kept running in 24-hour mode when the flue gas and steam were available. It could run automatically without operator on site. Parametric and long-term (2 months) tests were carried out successfully. The results showed that TDA’s process can achieve 90% capture and 95% CO 2 purity for both coal and NG flue gases. For coal flue gas, the system reached performance target when processing up to 0.62 MW flue gas, 24% higher than the design capacity. Thus, capital cost could be saved on the reactors and sorbent. The strip air flow was designed to be 0.25 of that of the flue gas. The test data showed the strip/flue ratio can be reduced to as little as 0.18, which saves the power consumption for the strip air blower. The pressure drop was found to be lower than what the empirical equation calculated. The sorbent still had 91.7% of original capacity after 3-month test. With the data from the pilot test, we updated the TEA. For a 550-MW e supercritical coal fired power plant with CO 2 capture, the capture cost for TDA’s process is $34.9/tonne CO 2 captured, which meets DOE’s goal of $40/tonne and is 17.1% less than the DOE baseline Case 12. Therefore, TDA’s process has a good potential for commercialization.

01 COAL, LIGNITE, AND PEAT↗

Brine Availability Test in Salt, a Heated Borehole Experiment at the Waste Isolation Pilot Plant, New Mexico, USA - 20233

The Brine Availability Tests in Salt is a US Department of Energy Office of Nuclear Energy supported activity as part of the Spent Fuel and Waste Disposition Campaign where we are performing simultaneous heated and control experiments in adjacent horizontal boreholes in the WIPP Salt Disposal Investigation drifts as part of experimental Phase 1. Phase 1a of BATS, a low-cost, small spatial-scale experiment performed in order to design instrumentation and methods for further experimentation in the URL, has been completed (June 2018 - May 2019) and is described elsewhere. In coincidence with multiple physical parameters that will be measured over the duration of the experiment, we will be measuring the liquid and vapor phases of H{sub 2}O as well as its isotopic content (not measured in Phase 1a). Three different forms of water occur in natural salts: as fluid in macro scale (mm size) inclusions, as intergranular free H{sub 2}O and as H{sub 2}O incorporated in hydrous minerals. Each of these forms has potentially different stable isotope signatures and will be influenced differentially by heat induced transport and by interaction with introduced tracers. Continuous measurement of vapor phase H{sub 2}O isotopes during borehole heating will be impacted by several effects: 1) evaporation as liquid brine flows into the borehole and evaporates completely or partially into the dry N{sub 2} stream; 2) steam from dehydration of hydrous minerals, that may enter the borehole; and 3) hydrous minerals that may form in the borehole (preferentially incorporating heavier isotopes). The continuous time series collected over the course of the heating test will be combined with analyses of pre-test and post-test collected samples of test site salt to investigate the contributions of each of the three water types as H{sub 2}O is mobilized due to the effects of heating. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bioelectrochemical reactor to manage anthropogenic sulfate pollution for freshwater ecosystems: Mathematical modeling and experimental validation

Anthropogenic sulfate loading into otherwise low-sulfate freshwater systems can cause significant ecological consequences as a biogeochemical stressor. To address this challenge, in situ bioremediation technologies have been developed to leverage naturally occurring microorganisms that transform sulfate into sulfide rather than implementing resource-intensive physio-chemical processes. However, bioremediation technologies often require the supply of electron donors to facilitate biological sulfate reduction. Bioelectrochemical systems (BES) can be an alternative approach for supplying molecular hydrogen as an electron donor for sulfate-reducing bacteria through water electrolysis. Although the fundamental mechanisms behind BESs have been studied, limited research has evaluated the design and operational parameters of treatment systems when developing BESs on a scale relevant to environmental systems. Further, this study aimed to develop an application-based mathematical model to evaluate the performance of BESs across a range of reactor configurations and operational modes. The model was based on sulfate transformation by hydrogenotrophic sulfate-reducing bacteria coupled with the recovery of solid iron sulfide species formed by the oxidative dissolution of dissolved ferrous iron from a stainless steel anode. Sulfate removal closely corresponded to the rate of electrolytic hydrogen production and hydraulic residence time but was less sensitive to specific microbial rate constants. The mathematical model results were compared to experimental data from a pilot-scale BES tested with nonacidic mine drainage as a case study. The close agreement between the mathematical model and the pilot-scale BES experiment highlights the efficacy of using a mathematical model as a tool to develop a conceptual design of a scaled-up treatment system.

54 ENVIRONMENTAL SCIENCES↗

Scale-up of Next Generation Nano-Enhanced Composite Materials for Longer Lasting Consumer Goods

The objective for this project was to create an industrial-scale manufacturing operation for Vertically Aligned Carbon Nanotube Forests (VACNTs), which make up N12 Technologies’ (N12) NanoStitch® product, a prepreg additive that makes advanced composites tougher, lighter, and more durable. This was achieved using University of Dayton Research Institute’s (UDRI) 60-inch Nano Adaptive Hybrid Fabric (NAHF-X) reactor system. N12 had a unique and effective nanomaterial-based product that they were manufacturing on small-scale 1-inch wide substrate machines in Boston, MA. UDRI had a large-scale 60-inch wide nanomaterial growth reactor available for scaling up 2nd party products in Dayton, OH. Thanks to the successful cooperation between both parties, this project resulted in the world’s first industrial-scale continuous VACNT film pilot plant in Dayton, OH with an increase in VACNT supply production rate of >10X. This scale up enabled market validation via testing programs and pilot manufacturing operations with a number of customers.

36 MATERIALS SCIENCE↗

Compositional Variation Tests on DuraMelter 100 with LAW Sub-Envelope C1 Feed (LAWC22) Glass in Support of the LAW Pilot Melter (Final Report)

The Vitreous State Laboratory at The Catholic University of America (VSL) is developing and testing glass formulations for RPP-WTP waste envelopes to provide data to meet the RPP-WTP contract requirements and to support system design activities. That work is based upon small-scale batch melts (“crucible melts”) using waste envelope simulants. Selected formulations have also been tested in small-scale continuously-fed joule-heated melters (DM10 and DM100 systems) and, ultimately, in the LAW Pilot Melter. Such melter tests provide information on key process factors such as feed processing behavior, dynamic effects during processing, sulfate incorporation, processing rates, off-gas amounts and compositions, foaming control, etc., that cannot be reliably obtained from crucible melts. This sequential scale-up approach in the vitrification testing program ensures that maximum benefit is obtained from the more costly pilot-scale tests and that the most effective use is made of that resource. The principal objective of the work described in this report was to collect the necessary small-scale melter test data with a LAW Sub-Envelope C1 waste simulant in order to support the next series of tests with the same melter feed on the LAW Pilot Melter. This work was conducted under a corresponding Test Specification and Test Plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Novel High‐Performance Electrolyte for Extreme Fast Charging in Pilot Scale Lithium‐Ion Pouch Cells

Realizing extreme fast charging (XFC) in lithium-ion batteries for electric vehicles is still challenging due to the insufficient lithium-ion transport kinetics, especially in the electrolyte. Herein, a novel high-performance electrolyte (HPE) consisting of lithium bis(fluorosulfonyl)imide (LiFSI), lithium hexafluorophosphate (LiPF 6 ) and carbonates is proposed and tested in pilot-scale, 2-Ah pouch cells. Moreover, the origin of improved electrochemical performance is comprehensively studied via various characterizations, suggesting that the proposed HPE exhibits high ionic conductivity and excellent electrochemical stability at high charging rate of 6-C. Furthermore, the HPE-based pouch cells deliver improved discharge specific capacity and excellent long-term cyclability up to 1500 cycles under XFC conditions, which is superior to the conventional state-of-the-art baseline electrolyte.

25 ENERGY STORAGE↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗