Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TESTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

AGR-2 Loose Particle Heating Tests in the Furnace for Irradiated TRISO Testing

A furnace system was developed to thermally expose individual tristructural-isotropic (TRISO) coated particles to expand upon established postirradiation examination (PIE) safety testing that is used to explore particle failures and fission product release from compacts. Two systems were installed in the Irradiated Fuels Examination Facility (IFEL) at Oak Ridge National Laboratory (ORNL). The targeted design was intended to be simple and flexible to allow a range in conditions to be explored. Initial inert atmosphere testing indicated the presence of particle failures, so modifications to the testing approach were implemented to improve the furnace operation. Ultimately, burnback particles were analyzed to provide a direct measurement of fission product release, thus avoiding the complications from integral release that were observed during whole compact testing. Particles were exposed to temperatures ranging 1,150–1,300°C for up to 1,500 h and 1,600°C up to 500 h. No indication of uniform release of fission products such as 106 Ru, 125 Sb, or 154 Eu was observed, however, indication of particle dependent 154 Eu release was suggested for select particles. Exploration of 110m Ag release was limited to 1,150°C and 1,300°C up to 500 h. The analysis indicated that there was nonuniform release of 110m Ag and supports a possible bimodal temperature dependence on silver release.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Summary Report for the Anti-Climb Coating Test Project: Simulated Attack and Skid-Resistance Tests

The Sandia National Laboratories Physical Security Center of Excellence (PSCOE) has been tasked by the Department of State (DOS) Bureau of Diplomatic Security Research and Development branch to investigate the potential anti-climb benefits of newly developed skid-resistant paint coatings - one light base and one dark base. DOS is interested in studying the application of the coatings on passive barriers commonly used at diplomatic facilities. The purpose of the anti-climb coating in this context is to deter and delay adversaries from climbing onto the passive barriers. PSCOE was tasked to perform delay testing that focused on the effectiveness of the coatings on the two DOS perimeter passive barriers - the DS-41 anti-ram fence and a 9 foot high by 1 foot thick reinforced concrete wall intended to mimic the DS-30 anti-ram perimeter wall. PSCOE was also tasked in performing skid-resistance testing using a British Pendulum skid-resistance tester. Delay testing and skid-resistance testing were also performed on two different passive barriers without any anti-climb coating to determine a baseline.

42 ENGINEERING↗

Mechanisms Engineering Test Loop (METL) Operations and Testing Report - FY2019

This report documents the operations and testing that was performed at the Mechanisms Engineering Test Loop (METL) during FY2019. The METL facility had a very successful initial year of operations having logged over 365 days of operations with molten sodium either flowing or static. FY2019 saw the commissioning, insertion, and extraction of the first test assembly in METL. In addition, METL is being prepared to support a second experiment, a thermal hydraulic experiment, called Thermal Hydraulic Experimental Test Article (THETA).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Gear Test Assembly – Experimental Testing and Gear Analysis (FY2021 Year End Report)

The Gear Test Assembly (GTA) is an experimental apparatus designed to test mechanical components used in fuel handling systems of liquid-sodium cooled fast-spectrum nuclear reactors. The performance and lifetime of gears, bearings, and dynamic seals are the primary focus of study. Three experimental campaigns have been completed since the start of operation in 2019, and the GTA is currently assembled and ready to begin the fourth experimental campaign. Sodium operations at the Mechanisms Engineering Test Loop (METL) have been paused while repairs are made to the Building 308 Alkali Metal Scrubber. This work is nearly complete, and once METL is brought back into operation the GTA will begin sodium testing immediately.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Senior Historian Alan Carr presents Lab-wide talk on testing-Nation’s last weapons test marks 30th anniversary

Join Senior Historian Alan Carr as he presents “Introduction to Nuclear Weapons Testing, 1945 to 1992” in commemoration of the 30th anniversary of the nation’s last full-scale nuclear test. Special guest retired Los Alamos test director Ron Cosimi will offer the opening remarks. Attendees will receive an original commemorative poster and can browse a new, temporary Divider test display.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Post-Closure Inspection Report for the Tonopah Test Range and Nevada Test and Training Range, Nevada for Calendar Year 2020 (Rev. 0)

This report provides the results of the annual post-closure use restriction (UR) inspections at corrective action sites (CASs) located on the Tonopah Test Range (TTR) and Nevada Test and Training Range (NTTR). This report covers post-closure UR inspections for calendar year 2020, and includes visual inspections and repair activities completed at the following corrective action units (CAUs): • CAU 407, Roller Coaster RadSafe Area (TTR) • CAU 424, Area 3 Landfill Complexes (TTR) • CAU 453, Area 9 UXO Landfill (TTR) • CAU 487, Thunderwell Site (TTR). Note: CAU 400, Bomblet Pit and Five Points Landfill (TTR) (CASs TA-19-001-05PT, Ordnance Disposal Pit; and TA-55-00-TAB2, Ordnance Disposal Pit) no longer requires inspection and reporting, as described in the Post-Closure Inspection Report for the Tonopah Test Range and Nevada Test and Training Range, Nevada for Calendar Year 2019. Site figures are included in Appendix A. The Post-Closure Inspection Plans and Record of Technical Change modifying the requirements for each UR are included in Appendix B. The Post-Closure Inspection Checklists are included in Appendix C. Field Notes are included in Appendix D. Appendix E, Inspection Photographs, does not include photographs because none were taken during the 2020 post-closure inspections. Appendix F, Post-Closure Vegetation Monitoring Report, does not include any data because vegetation monitoring was not conducted or required at any CAU in 2020. Visual inspections were conducted according to the post-closure requirements outlined in specific CAU and CAS URs, and approved by NDEP. The annual post-closure inspections for CASs associated with CAUs 407, 424, 453, and 487 were conducted on May 20, 2020. No maintenance or repair issues were noted at CAUs 487, or at CASs associated with CAU 424 (except CASs 03-08-002-A304 and 03-08-002-A308). Maintenance items and subsequent repairs include the following: • CAU 407, CAS TA-23-001-TARC (Roller Coaster RadSafe Area): A UR sign was loose and was rehung during the inspection. • CAU 424, CAS 03-08-002-A304 (Landfill Cell A3-4): The northeast monument needed a UR sign. The UR sign was attached to the monument on August 11, 2020. • CAU 424, CAS 03-08-002-A308 (Landfill Cell A3-8): The southeast monument needed additional lava rock. The lava rock was added during the inspection. • CAU 453, CAS 09-55-001-0952 (Area 9 Landfill): Two animal burrows were noted in the western portion of the northern and southern trenches (one burrow per trench). The animal burrows were repaired on August 11, 2020.

54 ENVIRONMENTAL SCIENCES↗

Test Site Verification Team: Optimal and Nominal Nuclear-Testing Programs [Slides]

Objectives of the Optimal and Nominal Nuclear-Testing Programs: Define optimal and nominal nuclear-testing programs; Discuss underground development for nuclear operations; Discuss underground nuclear operations, safety, and health; Compare drift complexes of optimal and nominal testing programs; Compare drift complexes for nuclear testing and commercial production; Discuss a potential future look of underground development and operations.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Coupler in the Fermilab Spoke Test Cryostat

As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and undergo initial cold testing at our collaborating institution, IJCLab in France, utilizing low-power coupler. Subsequently, the cavities are subjected to final qualification at Fermilab, complete with tuner and high-power coupler assemblies. This paper provides an overview of the ongoing efforts dedicated to high-power testing of jacketed SSR2 cavities in the Spoke Test Cryostat (STC) at Fermilab. Performance parameters obtained from these tests are presented, offering valuable insights into the cavities operational characteristics and readiness for integration into the PIP-II cryomodule.

Sukhanov, A.↗

Test Plan for DOE-GENIORS Dyanamic Irradiation Tests

Dynamic irradiation tests will be performed within the DOE-GENIORS collaboration, to be finished by the end of March 2021. These tests will be performed using three different setups, one at INL, one at CEA, and one at CIEMAT. The cis-mTDDGA/PTD chemical system will be used, applying both "extraction" (cis-mTDDGA - n-dodecane/HNO3) and "stripping" (cis-mTDDGA - n-dodecane/PTD - HNO3) conditions. This test plan provides the details and parameters to be used to perform irradiation at the INL using the INL Radiolysis Test Loop.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

OT-$\mu$DTC, a test bench for testing CMS Outer Tracker Phase-2 module prototypes

The Compact Muon Solenoid (CMS) experiment plans to replace its strip tracker system with a completely new Outer Tracker system to cope with the higher luminosity, compared to Run 2 operation, provided by the HL-LHC. This CMS Phase-2 Outer Tracker will be build up from two types of modules both consisting out of two parallel silicon sensors separated by a few millimetres. To read out the two types of modules four Outer Tracker specific custom chips are required. This proceeding introduces the module concept, goes into more detail on the data path, discusses the test system (OT-$\mu$DTC) designed for testing prototypes based on these ASICs and gives examples of test results obtained with this test system.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

SITCOMTN-162: Testing the implementation of Metadetection and Cell-Based Coadds on Abell 360 LSSTComCam data

The purpose of this technote is to test the technical quality of LSSTComCam commissioning data, specifically the Rubin_SV_38_7 field, by utilizing cell-based coadds and Metadetection by measuring the tangential and cross weak lensing shear profiles of the massive cluster Abell 360 (called A360 throughout the technote). The process entails generating the cell-based coadds for Metadetection to run on, identifying and removing cluster member galaxies, applying quality cuts, calibrating the shear measurements, and validation. Cell-based coadds and Metadetection are both currently in the process of being implemented within the LSST Science Pipelines at the time of this technote. There is substantial technical value in attempting a difficult measurement prior to full implementation. Measuring the tangential shear around A360 will showcase the current abilities of these algorithms, as well as highlight where work is still needed. As seen from the resulting shear profile of A360, the cell-based coadds and Metadetection are able to work in tandem to produce a shear catalog and resulting reduced shear profile. This technote is one part of a series studying A360 in order to both stress test the commissioning camera and demonstrate the technical capabilities of the Vera Rubin Observatory. We study the quality of the PSF modeling and impact it can have on cluster WL in [Combet et al., 2025], implementation of cell-based coadds and subsequent use for Metadetect [Sheldon et al., 2023] in this technote, photometric calibration in (in prep), source selection and photometric redshifts in [Adari et al., 2025], use of Anacal [Li et al., 2024] to produce a cluster shear profile in [Li et al., 2025], and background subtraction in this field and Fornax in [Zhou et al., 2025].

79 ASTRONOMY AND ASTROPHYSICS↗

Release of a High Temperature Engineering Test Reactor (HTTR) Steady-State Multiphysics Model to the Virtual Test Bed

The National Reactor Innovation Center (NRIC) accelerates the demonstration and deployment of advanced nuclear energy through inspiring stakeholders and the public, empowering innovators, and delivering successful outcomes. The Virtual Test Bed (VTB) supports this mission by providing an open-source repository of advanced test reactor models for industry, academia, and the public to utilize. During my time at Idaho National Laboratory (INL), I: • Verified the input files of the High Temperature Engineering Test Reactor • Generated computational results • Created user documentation for the HTTR • Uploaded a steady-state HTTR model to the Virtual Test Bed • Authored a conference publication on the model

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Qualifying the Instrument Thimble 11 Test Position in the Advanced Test Reactor Critical

The Advanced Test Reactor (ATR) is a versatile nuclear research reactor located at the Idaho National Laboratory (INL) in Eastern Idaho, United States of America. It is one of the most powerful and flexible research reactors in the world and is primarily used for materials testing, isotope production and basic nuclear science research. The ATR is a light-water-cooled, beryllium-moderated reactor with a nominal thermal power capacity of 250 MW utilizing specially designed fuel, arranged in a serpentine pattern to create 9 flux traps. The special design of ATR allows for the neutron flux within each of the flux traps providing flexibility for experiments, programs and allowing experiments with different dose requirements to be irradiated simultaneously. The Advance Test Reactor Critical (ATRC) is a full-scale replica of the ATR core but is housed in a pool instead of a pressure vessel. ATRC is usually operated at less than 600 watts [1]. There are 12 dry instrument thimbles located around the outside of the core tank where a variety of measurement equipment is housed to facilitate reactor operations. Currently Instrument Thimble 11 (IT-11) is not utilized in ATR or ATRC. A range of measurements is ongoing to qualify IT-11 as a test platform for nuclear instrumentation research, development and further experimentation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Couplers in the Fermilab Spoke Test Cryostat

As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and undergo initial cold testing at our collaborating institution, IJCLab in France, utilizing low-power coupler. Subsequently, the cavities are subjected to final qualification at Fermilab, complete with tuner and high-power coupler assemblies. This paper provides an overview of the ongoing efforts dedicated to high-power testing of jacketed SSR2 cavities in the Spoke Test Cryostat (STC) at Fermilab. Performance parameters obtained from these tests are presented, offering valuable insights into the cavities operational characteristics and readiness for integration into the PIP-II cryomodule.

43 PARTICLE ACCELERATORS↗

High Temperature Test Facility At Scale Testing, Validation, and Demonstration

Theses slides will be used to brief the Tribal DOE and Council Chairman for the project listed below. The High Temperature Test Facility (HTTF) is a demonstration-scale high temperature electrolysis (HTE) system that provides the ability to produce, process, store, and dispense electrolytically produced hydrogen. The system will be designed to accommodate electrolysis systems from various industry partners. The HTTF will be supplied up to 10 MW of power for electrolysis at 5 separate test article locations, each up to 2MW. The system will include post-processing and compression, storage, and capabilities to provide hydrogen for consumption by future end users. The HTTF will also provide the ability to test and demonstrate an HTE system in a configuration that would simulate the use of a nuclear generated steam supply for the high temperature heat source. The HTTF will be located at the Central Facilities Area (CFA) adjacent to CFA-686 on the INL site, 45 miles west of Idaho Falls.

08 HYDROGEN↗

Cone Penetration Tests at the PacWave South Test Site

This ZIP archive contains cone penetration test data from the PacWave South Test Site. The data were collected in September 2023 aboard the ship Seacor Lee operating out of the Port of Newport, OR. The tests were performed by ConeTec using an AP van den Berg ROSON-100. The cone itself was a standard u2-type, 10 cm^2. A total of 22 soundings were performed.

16 TIDAL AND WAVE POWER↗

Annual Performance Testing of Tracer Gas and Tracer Aerosol Detectors for use in Radionuclide NESHAP Compliance Testing

Los Alamos National Laboratory’s (LANL’s) compliance with Radionuclide NESHAP 1 regulations is managed by the Radionuclide Air Emissions Management (RAEM) team, part of LANL’s Compliance Programs group (EPC-CP). One area of the Radionuclide NESHAP addresses requirements for siting a stack sample system. This memo documents the most recent performance tests of the sulfur hexafluoride detectors for use in stack gas mixing tests, as well as the functional trending test on a pair of optical particle counters, comparing results from a non-calibrated instrument to a calibrated instrument.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗