Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TELESCOPES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Transit telescope designs optimized for multiple object spectroscopy with fibers

Instruments to simultaneously study the spectra of many objects in the field of view of a telescope can be made using fused silica fibers. The spectrograph at the 2.3m telescope of the University of Arizona has been modified for such operation, and is used routinely to study the dynamics of galaxy clusters. Consideration has been given to how the multifiber technique can best be used to obtain spectra of the many faint objects identified by deep transit survey instruments and new space and radio telescopes. A transit survey such as that planned by McGraw et al. (1980), with CCDs at the focus of a 2m transit telescope, will identify objects down to 24th magnitude, and down to 22nd magnitude will give very complete data on variability and optical energy distribution. A telescope with much larger aperture is required for spectroscopic follow up. It is suggested that large telescopes dedicated to this type of work can be made and operated for only a fraction of the cost of a general-purpose telescope.

Angel, J. R. P.↗

Alignment and phasing of deployable telescopes

The experiences in coaligning and phasing the Multi-Mirror Telescope (MMT), together with studies in setting up radio telescopes, are presented. These experiences are discussed, and on the basis they furnish, schemes are suggested for coaligning and phasing four large future telescopes with complex primary mirror systems. These telescopes are MT2, a 15-m-equivalent MMT, the University of California Ten Meter Telescope, the 10 m sub-mm wave telescope of the University of Arizona and the Max Planck Institute for Radioastronomy, and the Large Deployable Reflector, a future space telescope for far-IR and sub-mm waves.

Woolf, N. J.↗

Very large Arecibo-type telescopes

The Arecibo-type radio telescope, based on a fixed spherical reflector, is a very effective design for a large radio telescope on the Moon. In such telescopes, major structural members are provided by the ground on which they are built, and thus are provided at no cost in materials or transportation. The strong compression members, the tall towers which support the suspended platform, are an expensive part of the Arecibo telescope. The need for such towers can be eliminated if a suitable valley or crater can be found wherein the rim of the depression can be used as the support point for the cables which support the suspended platform. With an Arecibo-type radio telescope on the Moon, there are no changing gravity loads because of the design and no changing wind loads because of the location; therefore, the only source of time variation in the telescope geometry is thermal changes. Calculations show that with conventional materials, such as steel, it should be possible to construct an Arecibo-type telescope with a reflector diameter of some 30 km on the Moon, and with a reflector diameter of some 60 to 90 km if materials of high specific strength are used.

Drake, Frank D.↗

Space astronomical telescopes and instruments; Proceedings of the Meeting, Orlando, FL, Apr. 1-4, 1991

The present volume on space astronomical telescopes and instruments discusses lessons from the HST, telescopes on the moon, future space missions, and mirror fabrication and active control. Attention is given to the in-flight performance of the Goddard high-resolution spectrograph of the HST, the initial performance of the high-speed photometer, results from HST fine-guidance sensors, and reconstruction of the HST mirror figure from out-of-focus stellar images. Topics addressed include system concepts for a large UV/optical/IR telescope on the moon, optical design considerations for next-generation space and lunar telescopes, the implications of lunar dust for astronomical observatories, and lunar liquid-mirror telescopes. Also discussed are space design considerations for the Space Infrared Telescope Facility, the Hubble extrasolar planet interferometer, Si:Ga focal-plane arrays for satellite and ground-based telescopes, microchannel-plate detectors for space-based astronomy, and a method for making ultralight primary mirrors.

Bely, Pierre Y.↗

System concepts for a large UV/optical/IR telescope on the moon

To assess the systems and technological requirements for constructing lunar telescopes in conjunction with the buildup of a lunar base for scientific exploration and as a waypoint for travel to Mars, the NASA Marshall Space Flight Center conducted concept studies of a 16-m-aperture large lunar telescope (LLT) and a 4-m-aperture precursor telescope, both operating in the UV/visible/IR spectral region. The feasibility of constructing a large telescope on the lunar surface is assessed, and its systems and subsystems are analyzed. Telescope site selection, environmental effects, and launch and assembly scenarios are also evaluated. It is argued that key technical drivers for the LLT must be tested in situ by precursor telescopes to evaluate such areas as the operations and long-term reliability of active optics, radiation protection of instruments, lunar dust mitigation, and thermal shielding of the telescope systems. For a manned lunar outpost or an LLT to become a reality, a low-cost dependable transportation system must be developed.

Nein, Max E.↗

System concepts for a series of lunar optical telescopes

The Lunar Telescope Working Group of the Marshall Space Flight Center, NASA, has conducted conceptual studies of an evolutionary family of UV/ optical/IR telescopes to be based on the lunar surface. Included are: (1) the 16-m aperture Large Lunar Telescope; (2) the 4-m aperture precursor Lunar Cluster Telescope Experiment; and (3) the 2-m Lunar Transit Telescope proposed by John McGraw of the Steward Observatory. Development and emplacement of these advanced astronomical facilities would parallel the buildup of an initial lunar exploration site, an early lunar outpost, and a permanent lunar base. The Working Group has examined the feasibility of constructing such telescopes and assessed technology, subsystem, system, transportation, and operations requirements for their development and emplacement. Influences of the lunar environment and site selection on telescope design and operation were also evaluated.

Nein, Max E.↗

Thermal investigation of a large lunar telescope

Recent interest in construction of a large telescope on the lunar surface (Nein and Davis, 1991; Bely, Burrows, and Illingworth, 1989) has prompted this feasibility study of a thermal control system for a 16 meter diameter telescope located near the lunar equator. In addition to detailed analyses for a telescope located in a flat area near the equator, the thermal effect of locating the telescope in a crater, on a hill, and at higher latitude sites is discussed. Because an unprotected telescope experiences a wide range of temperature swings, several thermal protection schemes have been examined, including domes, sunshades, and ground shields to limit the temperature excursions of the primary mirror. Results of these analyses indicate that mirror temperature excursions can be limited to less than 100 Kelvin (K) per lunar cycle with an appropriate passive thermal protection system (dome), and that the telescope primary mirror can be maintained at less than 100 K for at least 7 days of each lunar cycle. However, such a dome precludes observations during the lunar day. Mirror temperature excursions can be reduced by incorporating thermal enclosures or shades in the design or by placing the telescope at a higher latitude.

Walker, Sherry T.↗

Prototype Motor Controllers Demonstrated for the James Webb Space Telescope Cryogenic Environment

NASA is in the process of designing the James Webb Space Telescope. This telescope will investigate images of objects in deep space (stars, galaxies, etc.) by using light in the infrared region of the light spectrum. To make such observations, the telescope must have light sensors that operate at very cold temperatures, near absolute zero. To achieve this low-temperature tolerance, designers must place the light sensors behind a Sun shield that will prevent sunlight, and its heat, from reaching the sensors. In this cold region inside the telescope, electric motors and some motor controls must operate at temperatures near 40 K (40 degrees above absolute zero). These motors will be used to position light filters needed by the telescope. There are motors that operate at the low temperatures, but there is little technology for low-temperature motor-control electronics. The drawing shows how the motors and their controls are positioned behind the Sun shield. Simplified version of the layout of the motor and control electronics that are located, as dictated by mission requirements, in the cold zone of the James Webb Space Telescope. A Sun shield provides protection and isolation of these electronics from the heat of the rays of the sun. Room temperature compoenets (control computer, motor select command, motor phase drive, power supply, parallel to serial, and sun shield) as well as 40-kelvin components (motor select, serial to parallel, and motors) are shown. The Low Temperature Electronics Group at the NASA Glenn Research Center has been working to develop motor control electronics that will operate at a temperature of 40 K. The group conducted tests to determine which electronic components will operate at such very low temperatures. Then, components that were determined to operate successfully at the low temperatures were used to design low-temperature motor-controller circuits. A prototype motor controller circuit was built, evaluated, and demonstrated to operate at 70 K. Next, Glenn researchers plan to determine circuit performance at much colder temperatures--down to 40 K. This low-temperature program was supported by the James Webb Space Telescope Electrical Systems Design Group at the NASA Goddard Space Flight Center and by the NASA Electronic Parts and Packaging Program at NASA Headquarters and the Jet Propulsion Laboratory.

Patterson, Richard L.↗

Hubble Space Telescope First Servicing Mission Prelaunch Mission Operation Report

The Hubble Space Telescope (HST) is a high-performance astronomical telescope system designed to operate in low-Earth orbit. It is approximately 43 feet long, with a diameter of 10 feet at the forward end and 14 feet at the aft end. Weight at launch was approximately 25,000 pounds. In principle, it is no different than the reflecting telescopes in ground-based astronomical observatories. Like ground-based telescopes, the HST was designed as a general-purpose instrument, capable of using a wide variety of scientific instruments at its focal plane. This multi-purpose characteristic allows the HST to be used as a national facility, capable of supporting the astronomical needs of an international user community. The telescope s planned useful operational lifetime is 15 years, during which it will make observations in the ultraviolet, visible, and infrared portions of the spectrum. The extended operational life of the HST is possible by using the capabilities of the Space Transportation System to periodically visit the HST on-orbit to replace failed or degraded components, install instruments with improved capabilities, re-boost the HST to higher altitudes compensating for gravitational effects, and to bring the HST back to Earth when the mission is terminated. The largest ground-based observatories, such as the 200-inch aperture Hale telescope at Palomar Mountain, California, can recognize detail in individual galaxies several billion light years away. However, like all earthbound devices, the Hale telescope is limited because of the blurring effect of the Earth s atmosphere. Further, the wavelength region observable from the Earth s surface is limited by the atmosphere to the visible part of the spectrum. The very important ultraviolet portion of the spectrum is lost. The HST uses a 2.4-meter reflective optics system designed to capture data over a wavelength region that reaches far into the ultraviolet and infrared portions of the spectrum.

Source record↗

Focus determination for the James Webb Space Telescope Science Instruments: A Survey of Methods

The James Webb Space Telescope (JWST) is a segmented deployable telescope that will require on-orbit alignment using the Near Infrared Camera as a wavefront sensor. The telescope will be aligned by adjusting seven degrees of freedom on each of 18 primary mirror segments and five degrees of freedom on the secondary mirror to optimize the performance of the telescope and camera at a wavelength of 2 microns. With the completion of these adjustments, the telescope focus is set and the optical performance of each of the other science instruments should then be optimal without making further telescope focus adjustments for each individual instrument. This alignment approach requires confocality of the instruments after integration and alignment to the composite metering structure, which will be verified during instrument level testing at Goddard Space Flight Center with a telescope optical simulator. In this paper, we present the results from a study of several analytical approaches to determine the focus for each instrument. The goal of the study is to compare the accuracies obtained for each method, and to select the most feasible for use during optical testing.

Davila, Pamela S.↗

A Scanning Hartmann Focus Test for the EUVI Telescopes aboard STEREO

The Solar TErrestrial RElations Observatory (STEREO), the third mission in NASA's Solar Terrestrial Probes program, was launched in 2006 on a two year mission to study solar phenomena. STEREO consists of two nearly identical satellites, each carrying an Extreme Ultraviolet Imager (EUVI) telescope as part of the Sun Earth Connection Coronal and Heliospheric Investigation instrument suite. EUVI is a normal incidence, 98mm diameter, Ritchey-Chretien telescope designed to obtain wide field of view images of the Sun at short wavelengths (17.1-30.4nm) using a CCD detector. The telescope entrance aperture is divided into four quadrants by a mask near the secondary mirror spider veins. A mechanism that rotates another mask allows only one of these sub-apertures to accept light over an exposure. The EUVI contains no focus mechanism. Mechanical models predict a difference in telescope focus between ambient integration conditions and on-orbit operation. We describe an independent check of the ambient, ultraviolet, absolute focus setting of the EUVI telescopes after they were integrated with their respective spacecraft. A scanning Hartmann-like test design resulted from constraints implied by the EUVI aperture select mechanism. This inexpensive test was simultaneously coordinated with other NASA integration and test activities in a high-vibration, clean room environment. The total focus test error was required to be better than +/-0.05 mm. We describe the alignment and test procedure, sources of statistical and systematic error, and then the focus determination results using various algorithms. The results are consistent with other tests of focus alignment and indicate that the EUVI telescopes meet the ambient focus offset requirements. STEREO is functioning well on-orbit and the EUVI telescopes meet their on-orbit image quality requirements.

Ohl, Ray↗

Optical Studies of Orbital Debris at GEO Using Two Telescopes

Beginning in March, 2007, optical observations of debris at geosynchronous orbit (GEO) were commenced using two telescopes simultaneously at the Cerro Tololo Inter-American Observatory (CTIO) in Chile. The University of Michigan's 0.6/0.9-m Schmidt telescope MODEST (for Michigan Orbital DEbris Survey Telescope) was used in survey mode to find objects that potentially could be at GEO. Because GEO objects only appear in this telescope's field of view for an average of 5 minutes, a full six-parameter orbit can not be determined. Interrupting the survey for follow-up observations leads to incompleteness in the survey results. Instead, as objects are detected on MODEST, initial predictions assuming a circular orbit are done for where the object will be for the next hour, and the objects are reacquired as quickly as possible on the CTIO 0.9-m telescope. This second telescope then follows-up during the first night and, if possible, over several more nights to obtain the maximum time arc possible, and the best six parameter orbit. Our goal is to obtain an initial orbit for all detected objects fainter than R = 15th in order to estimate the orbital distribution of objects selected on the basis of two observational criteria: magnitude and angular rate. Objects fainter than 15th are largely uncataloged and have a completely different angular rate distribution than brighter objects. Combining the information obtained for both faint and bright objects yields a more complete picture of the debris environment rather than just concentrating on the faint debris. One objective is to estimate what fraction of objects selected on the basis of angular rate are not at GEO. A second objective is to obtain magnitudes and colors in standard astronomical filters (BVRI) for comparison with reflectance spectra of likely spacecraft materials. This paper reports on results from two 14 night runs with both telescopes: in March and November 2007: (1) A significant fraction of objects fainter than R = 15th have eccentric orbits (e > 0.1) (2) Virtually all objects selected on the basis of angular rate are in the GEO and GTO regimes. (3) Calibrated magnitudes and colors in BVRI were obtained for many objects fainter than R = 15th magnitude. This work is supported by NASA's Orbital Debris Program Office, Johnson Space Center, Houston, Texas, USA.

Seitzer, P.↗

James Webb Space Telescope: Frequently Asked Questions for Scientists and Engineers

JWST will be tested incrementally during its construction, starting with individual mirrors and instruments (including cameras and spectrometers) and building up to the full observatory. JWST's mirrors and the telescope structure are first each tested individually, including optical testing of the mirrors and alignment testing of the structure inside a cold thermal-vacuum chamber. The mirrors are then installed on the telescope structure in a clean room at Goddard Space Flight Center (GSFC). In parallel to the telescope assembly and alignment, the instruments are being built and tested, again first individually, and then as part of an integrated instrument assembly. The integrated instrument assembly will be tested in a thermal-vacuum chamber at GSFC using an optical simulator of the telescope. This testing makes sure the instruments are properly aligned relative to each other and also provides an independent check of the individual tests. After both the telescope and the integrated instrument module are successfully assembled, the integrated instrument module will be installed onto the telescope, and the combined system will be sent to Johnson Space Flight Center (JSC) where it will be optically tested in one of the JSC chambers. The process includes testing the 18 primary mirror segments acting as a single primary mirror, and testing the end-to-end system. The final system test will assure that the combined telescope and instruments are focused and aligned properly, and that the alignment, once in space, will be within the range of the actively controlled optics. In general, the individual optical tests of instruments and mirrors are the most accurate. The final system tests provide a cost-effective check that no major problem has occurred during assembly. In addition, independent optical checks of earlier tests will be made as the full system is assembled, providing confidence that there are no major problems.

Gardner, Jonathan P.↗

Presentation, Analysis, and Simulation of Active Alignment Strategies for the James Webb Space Telescope

This paper presents three characteristics in the simulated active alignment strategy of the James Webb Space Telescope. The first includes the analysis and comparison of a baseline active alignment strategy with a damped least squares strategy. This baseline utilizes prior knowledge by means of direct human operator interaction to engage sets of telescope compensators to target specific aberration signatures. The baseline is compared to a damped least-squares strategy that utilizes simultaneous engagement of all telescope compensators without explicit human operator inter<actiori to achieve a least-squares telescope compensation. Second, we discuss how the active alignment of the JWST is encapsulated in a linear optical model developed at the Space Telescope Science Institute. This linear optical model provides a framework for an efficient and robust description of the optical control properties of the JWST and clearly articulates the necessity for having a multi-instrument multi-field wavefront sensing strategy to overcome control system non independence and the effects of non-common path errors in the main wavefront sensing camera. Finally. we present analytical results that explicitly map the telescope wavefront responses to the telescope control modes, and we present Monte-Carlo optical performance simulation results that demonstrate the efficacy of the damped least-squares active alignment and the prior-knowledge active alignment schemes.

Upton, Robert S.↗

Wavefront Sensing of X-Ray Telescopes

Phase Retrieval analysis of off-axis or defocused focal-plane data from telescope optics has been proven effective in understanding misalignments and optical aberrations in normal incidence telescopes. The approach is used, e.g., in commissioning of the James Webb Space Telescope (JWST) segmented primary mirror. There is a similar need for evaluating low-order figure errors of grazing incidence mirrors and nested telescope assemblies. When implemented in these systems, phase retrieval does not depend on normal incidence access to each mirror (shell) surface and, therefore, provides an effective means for evaluating nested x-ray telescopes during integration and test. We have applied a well-known phase retrieval algorithm to grazing incidence telescopes. The algorithm uses the Levenberg-Marquardt optimization procedure to perform a non-linear least-squares fit of the telescope Point Spread Function (PSF). The algorithm can also retrieve low order figure errors at visible wavelengths where optical diffraction is the dominant defect in the PSF. In this paper we will present the analytical approach and its implementation for grazing incidence mirrors of the International X-Ray Observatory (IXO). We analyze the effects of low order axial surface errors individually, and in combination on the system PSF at 633 nanometers. We demonstrate via modeling that the wavefront sensing algorithm can recover axial errors (of the grazing incidence mirrors) to a small fraction of the known axial figure errors using simulated PSFs as input data to the algorithm.

Saha, Timo↗

Preliminary LISA Telescope Spacer Design

The Laser Interferometric Space Antenna (LISA) mission observes gravitational waves by measuring the separations between freely floating proof masses located 5 million kilometers apart with an accuracy of approximately 10 picometers. The separations are measured interferometrically. The telescope is an afocal Cassegrain style design with a magnification of 80x. The entrance pupil has a 40 cm diameter and will either be centered on-axis or de-centered off-axis to avoid obscurations. Its two main purposes are to transform the small diameter beam used on the optical bench to a diffraction limited collimated beam to efficiently transfer the metrology laser between spacecraft, and to receive the incoming light from the far spacecraft. It transmits and receives simultaneously. The basic optical design and requirements are well understood for a conventional telescope design for imaging applications, but the LISA design is complicated by the additional requirement that the total optical path through the telescope must remain stable at the picometer level over the measurement band during the mission to meet the measurement accuracy. This poster describes the requirements for the telescope and the preliminary work that has been done to understand the materials and mechanical issues associated with the design of a passive metering structure to support the telescope and to maintain the spacing between the primary and secondary mirrors in the LISA on-orbit environment. This includes the requirements flowdown from the science goals, thermal modeling of the spacecraft and telescope to determine the expected temperature distribution,layout options for the telescope including an on- and off-axis design, and plans for fabrication and testing.

Livas, J.↗

LISA Telescope Spacer Design Issues

The LISA mission observes gravitational waves by measuring the separations between freely floating proof masses located 5 million kilometers apart with an accuracy of - 10 picometers. The separations are measured interferometrically. The telescope is an afocal Cassegrain style design with a magnification of 80x. The entrance pupil has a 40 cm diameter and will either be centered on-axis or de-centered off-axis to avoid obscurations. Its two main purposes are to transform the small diameter beam used on the optical bench to a diffraction limited collimated beam to efficiently transfer the metrology laser between spacecraft, and to receive the incoming light from the far spacecraft. It transmits and receives simultaneously. The basic optical design and requirements are well understood for a conventional telescope design for imaging applications, but the LISA design is complicated by the additional requirement that the total optical path through the telescope must remain stable at the picometer level over the measurement band during the mission to meet the measurement accuracy. We describe the mechanical requirements for the telescope and the preliminary work that has been done to understand the materials and mechanical issues associated with the design of a passive metering structure to support the telescope and to maintain the spacing between the primary and secondary mirrors in the LISA on-orbit environment. This includes the requirements flowdown from the science goals, thermal modeling of the spacecraft and telescope to determine the expected temperature distribution, layout options for the telescope including an on- and off-axis design. Plans for fabrication and testing will be outlined.

Livas, Jeff↗

Aligning Astronomical Telescopes via Identification of Stars

A proposed method of automated, precise alignment of a ground-based astronomical telescope would eliminate the need for initial manual alignment. The method, based on automated identification of known stars and other celestial objects in the telescope field of view, would also eliminate the need for an initial estimate of the aiming direction. The method does not require any equipment other than a digital imaging device such as a charge-coupled-device digital imaging camera and control computers of the telescope and camera, all of which are standard components in professional astronomical telescope systems and in high-end amateur astronomical telescope systems. The method could be implemented in software running in the telescope or camera control computer or in an external computer communicating with the telescope pointing mount and camera control computers.

Whorton, Mark↗