Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Substations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Modeling DNP3 Traffic Characteristics of Field Devices in SCADA Systems of the Smart Grid

In the generation, transmission, and distribution sectors of the smart grid, intelligence of field devices is realized by programmable logic controllers (PLCs). Many smart-grid subsystems are essentially cyber-physical energy systems (CPES): For instance, the power system process (i.e., the physical part) within a substation is monitored and controlled by a SCADA network with hosts running miscellaneous applications (i.e., the cyber part). To study the interactions between the cyber and physical components of a CPES, several co-simulation platforms have been proposed. However, the network simulators/emulators of these platforms do not include a detailed traffic model that takes into account the impacts of the execution model of PLCs on traffic characteristics. As a result, network traces generated by co-simulation only reveal the impacts of the physical process on the contents of the traffic generated by SCADA hosts, whereas the distinction between PLCs and computing nodes (e.g., a hardened computer running a process visualization application) has been overlooked. To generate realistic network traces using co-simulation for the design and evaluation of applications relying on accurate traffic profiles, it is necessary to establish a traffic model for PLCs. In this work, we propose a parameterized model for PLCs that can be incorporated into existing co-simulation platforms. We focus on the DNP3 subsystem of slave PLCs, which automates the processing of packets from the DNP3 master. To validate our approach, we extract model parameters from both the configuration and network traces of real PLCs. Simulated network traces are generated and compared against those from PLCs. Our evaluation shows that our proposed model captures the essential traffic characteristics of DNP3 slave PLCs, which can be used to extend existing co-simulation platforms and gain further insights into the behaviors of CPES.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Extremum Seeking Control of Smart Inverters for VAR Compensation

Reactive power compensation is used by utilities to ensure customer voltages are within pre-defined tolerances and reduce system resistive losses. While much attention has been paid to model-based control algorithms for reactive power support and Volt Var Optimization (VVO), these strategies typically require relatively large communications capabilities and accurate models. In this work, a non-model-based control strategy for smart inverters is considered for VAR compensation. An Extremum Seeking control algorithm is applied to modulate the reactive power output of inverters based on real power information from the feeder substation, without an explicit feeder model. Simulation results using utility demand information confirm the ability of the control algorithm to inject VARs to minimize feeder head real power consumption. In addition, we show that the algorithm is capable of improving feeder voltage profiles and reducing reactive power supplied by the distribution substation.

Arnold, Daniel↗

Performance Evaluation of Peer-to-Peer Distributed Microgrids Coordination for Voltage Regulation

This paper presents the performance evaluation of a peer-to-peer microgrids coordination algorithm for sub-transmission systems. As distributed energy resources (DERs) in distribution system start to show negative impact to the bulk power system, a paradigm shift is needed for transmission planning and operation. Because distribution substations are located far from the sub-transmission system, and it is hard to use traditional centralized control for real-time control and coordination. Thus, distributed control is a natural choice because it requires less communication and central computation. In this paper, each distribution substation is treated as a microgrid, and the peer-to-peer distributed microgrids control is formulated as a real-time optimal power flow problem to reduce the negative impact in sub-transmission systems. A distributed primal-dual optimization algorithm is adopted to solve the problem. Validation of the peer-to-peer algorithm is performed through the simulation of a real-world sub-transmission system composing of many distribution systems with high renewable penetration. Simulation results show that the peer-to-peer algorithm can achieve satisfactory performance (e.g., voltage regulation) in sub-transmission system by coordinating and controlling DERs in distribution systems.

distributed control↗

The Impact of Behind-the-Meter Heterogeneous Distributed Energy Resources on Distribution Grids

The increasing integration of distributed energy resources (DERs) on the electric grid brings new challenges and opportunities for utility grid operations. With the rapid deployment of DERs, there is emerging interest in integrating these controllable devices with utility operations at all levels for monitoring and management. To understand the challenges with increasing behind-the-meter (BTM) DERs and to identify the needs in deploying advanced controls, a comprehensive grid impact study is indispensable. This paper presents the analysis which help visualize the DER impact on the grid, identify the challenges and provides an insight into the new distribution management and control needs to enable reliable and resilient grid operations.

behind-the-meter↗

Three-Phase Unbalanced Transient Dynamics and Powerflow for Modeling Distribution Systems With Synchronous Machines

Unlike transmission systems, distribution feeders in North America operate under unbalanced conditions at all times, and generally have a single strong voltage source. When a distribution feeder is connected to a strong substation source, the system is dynamically very stable, even for large transients. However if a distribution feeder, or part of the feeder, is separated from the substation and begins to operate as an islanded microgrid, transient dynamics become more of an issue. To assess the impact of transient dynamics at the distribution level, it is not appropriate to use traditional transmission solvers, which generally assume transposed lines and balanced loads. Full electromagnetic solvers capture a high level of detail, but it is difficult to model large systems because of the required detail. This paper proposes an electromechanical transient model of synchronous machine for distribution-level modeling and microgrids. This approach includes not only the machine model, but also its interface with an unbalanced network solver, and a powerflow method to solve unbalanced conditions without a strong reference bus. The presented method is validated against a full electromagnetic transient simulation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-Timescale Three-Phase Unbalanced Distribution System Operation With Variable Renewable Generations

This paper proposes a multi-timescale operational approach for a three-phase unbalanced distribution system, which contains hourly scheduling at substation level and minutes power flow operation at feeder level. In the substation scheduling model, the objective is to minimize the system cost with variable renewable generations. The given error distribution model of renewable generation is formulated as a chance constraint, and derived into a deterministic form by Gaussian mixture model (GMM) with genetic algorithm-based expectation-maximization (GAEM). In the feeder scheduling model, the system cost is further reduced with the optimal power flow (OPF) at a timescale of minutes. Considering the nonconvexity of the three-phase unbalanced OPF problem in distribution systems, the semidefinite programming (SDP) is used to relax the problem into a convex problem, and a distributed computation approach is built based on alternating direction method of multiplier (ADMM). The IEEE 123-bus distribution system, DU (University of Denver) campus distribution system, and the IEEE 8500-bus distribution system are used as the test bench for the proposed approach. And the numerical results demonstrate the effectiveness and validity of the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated, Automated Distributed Generation Technologies Demonstration

The purpose of the NETL Project was to develop a diverse combination of distributed renewable generation technologies and controls and demonstrate how the renewable generation could help manage substation peak demand at the ATK Promontory plant site. The Promontory plant site is located in the northwestern Utah desert approximately 25 miles west of Brigham City, Utah. The plant encompasses 20,000 acres and has over 500 buildings. The ATK Promontory plant primarily manufactures solid propellant rocket motors for both commercial and government launch systems. The original project objectives focused on distributed generation; a 100 kW (kilowatt) wind turbine, a 100 kW new technology waste heat generation unit, a 500 kW energy storage system, and an intelligent system-wide automation system to monitor and control the renewable energy devices then release the stored energy during the peak demand time. The original goal was to reduce peak demand from the electrical utility company, Rocky Mountain Power (RMP), by 3.4%. For a period of time we also sought to integrate our energy storage requirements with a flywheel storage system (500 kW) proposed for the Promontory/RMP Substation. Ultimately the flywheel storage system could not meet our project timetable, so the storage requirement was switched to a battery storage system (300 kW.) A secondary objective was to design/install a bi-directional customer/utility gateway application for real-time visibility and communications between RMP, and ATK. This objective was not achieved because of technical issues with RMP, ATK Information Technology Department’s stringent requirements based on being a rocket motor manufacturing facility, and budget constraints. Of the original objectives, the following were achieved: • Installation of a 100 kW wind turbine. • Installation of a 300 kW battery storage system. • Integrated control system installed to offset electrical demand by releasing stored energy from renewable sources during peak hours of the day. Control system also monitors the wind turbine and battery storage system health, power output, and issues critical alarms. Of the original objectives, the following were not achieved: • 100 kW new technology waste heat generation unit. • Bi-directional customer/utility gateway for real time visibility and communications between RMP and ATK. • 3.4% reduction in peak demand. 1.7% reduction in peak demand was realized instead.

17 WIND ENERGY↗

Power grid reliability and security

This project has led to the development of a real-time simulation platform for electric power grids called Grid Simulator or GridSim for simulating the dynamic and information network interactions of large- scale power systems. The platform consists of physical models of power system components including synchronous generators, loads and control, which are simulated using a modified commercial power simulator namely Transient Stability Analysis Tool (TSAT) [1] together with data cleanup components, as well as an emulated substation level and wide-area power analysis components. The platform also includes realistic representations of communication network middleware that can emulate the real-time information flow back and forth between substations and control centers in wide-area power systems. The platform has been validated on a realistic 6000-bus model of the western American power system. The simulator GridSim developed in this project is the first of its kind in its ability to simulate real-time response of large-scale power grids, and serves as a cost effective real-time stability and control simulation platform for power industry.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Renewable Energy Zones for Balancing Siting Trade-offs in India

India’s targets of 175 GW of renewable energy capacity by 2022, and 40% generation capacity from non-fossil fuel sources by 2030 will require a rapid and dramatic increase in solar and wind capacity deployment and overcoming its associated economic, siting, and power system challenges. The objective of this study was to spatially identify the amount and quality of wind and utility-scale solar resource potential in India, and the possible siting-related constraints and opportunities for development of renewable resources. Using the Multi-criteria Analysis for Planning Renewable Energy (MapRE) methodological framework, we estimated several criteria valuable for the selection of sites for development for each identified potential "zone", such as the levelized cost of electricity, distance to nearest substation, capacity value (or the temporal matching of renewable energy generation to demand), and the type of land cover. We find that high quality resources are spatially heterogeneous across India, with most wind and solar resources concentrated in the southern and western states, and the northern state of Rajasthan. Assuming India's Central Electricity Regulatory Commission's norms, we find that the range of levelized costs of generation of wind and solar PV resources overlap, but concentrated solar power (CSP) resources can be approximately twice as expensive. Further, the levelized costs of generation vary much more across wind zones than those across solar zones because of greater heterogeneity in the quality of wind resources compared to that of solar resources. When considering transmission accessibility, we find that about half of all wind zones (47%) and two-thirds of all solar PV zones (66%) are more than 25 km from existing 220 kV and above substations, suggesting potential constraints in access to high voltage transmission infrastructure and opportunities for preemptive transmission planning to scale up RE development. Additionally and importantly, we find that about 84% of all wind zones are on agricultural land, which provide opportunities for multiple-uses of land but may also impose constraints on land availability. We find that only 29% of suitable solar PV sites and 15% of CSP sites are within 10 km of a surface water body suggesting water availability as a significant siting constraint for solar plants. Availability of groundwater resources was not analyzed as part of this study. Lastly, given the possible economic benefits of transmission extensions or upgrades that serve both wind and solar generators, we quantified the co-location opportunities between the two technologies and find that about a quarter (28%) of all solar PV zones overlap with wind zones. Using the planning tools made available as part of this study, these multiple siting constraints and opportunities can be systematically compared and weighted to prioritize development that achieves a particular technology target. Our results are limited by the uncertainties associated with the input datasets, in particular the geospatial wind and solar resource, transmission, and land use land cover datasets. As input datasets get updated and improved, the methodology and tools developed through this study can be easily adapted and applied to these new datasets to improve upon the results presented in this study. India is on a path to significantly decarbonize its electricity grid through wind and solar development. A stakeholder-driven, systematic, and integrated planning approach using data and tools such as those highlighted in this study is essential to not only meet the country's RE targets, but to meet them in a cost-effective, and socially and environmentally sustainable way.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lessons Learned "Establishing an Electrically Safe Work Condition" Specifically related to Racking Electrical Breakers

During low voltage electrical equipment maintenance, a bad breaker was identified. The breaker was racked out from the substation cubicle without following the hazardous energy control process identified in the Integrated Work Document (IWD). The IWD required the substation to be in an electrically safe work condition prior to racking the breaker. Per NFPA 70E requirements, electrical equipment shall be put into an electrically safe work condition before an employee performs work on or interacts with equipment in a manner that increases the likelihood of creating an arc flash. Racking in or out a breaker on an energized bus may increase the likelihood of creating an arc flash dependent on equipment conditions. A thorough risk assessment must be performed prior to performing such a task. The risk assessment determines the risk control measures to be put in place prior to performing the work. Electrical Safety Officers (ESO) can assist in performing risk assessments and incorporating risk control measures.

30 DIRECT ENERGY CONVERSION↗

Transactive System Program Communication System Cost Model

Transactive energy is an economics and controls technique that aims to dynamically manage the generation and consumption of electricity within the power system. Much research has been done in the area of demonstrating the capability and performance of transactive systems, as well as valuing the benefits a transactive system can provide. Significantly less research has been done in the area of estimating the costs of a transactive system. This work aimed to build a model that would estimate the costs of the communications system that would be necessary to support a transactive system and be realized by a local utility. Dynamic pricing, and a customer’s response to this pricing, is a key aspect of a transactive system; this would require a two-way communication system between utilities and customers. Since the system will vary based on many factors, the cost model was consequently designed for use in a wide variety of applications. The cost model requires some basic user inputs regarding the system being analyzed, such as location and size. The user also identifies one or more generic circuit models that best represent the system. Additionally, a user can, but is not required to, change assumed equipment and installation costs and equipment lifetime within the model. These inputs will result in 20 year cost estimates for three different communication technologies that are capable of supporting the bandwidth needs of a transactive energy system. The three communication systems included in the model are cellular, fiber optic and wireless mesh. Each vary significantly from one another and offer unique advantages and barriers. A cellular network avoids high upfront costs, but is limited to areas where there is coverage by the service provider and subject to the ongoing rate established with the service provider. A fiber optic system requires a large up-front cost, but it will provide a reliable system to areas where cellular and mesh may be unable to do so. Additionally, fiber provides more bandwidth than necessary for transactive systems and can offer additional business opportunities. A mesh system can be installed for less upfront costs than fiber and offers enough bandwidth to support a transactive system, but the ability to model this technology is done with less certainty than the other two options. The estimated costs include the communication system that connects the customers to their nearest substation, in addition to the smart meter and radio that would be required for each customer. The communications from the substation to the utility are not included in estimates, as the need for upgrading that system would be assessed on a case-by-case basis. Although the cost of the smart meter and radio is included, no other appliance specific cost is included in the estimate provided by the model. The communication system is a key aspect of the development of a transactive system. This work resulted in easily being able to estimate the costs of a communication system specific to the system being studied. This cost model will aid ongoing valuation and simulation work in the field of transactive energy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Applied Resiliency for More Trustworthy Grid Operation (ARMORE) (Final Technical Report)

Applied Resiliency for More Trustworthy Grid Operation (ARMORE) is an open-source software system that can perform inspection of network packets and alarm on communication that does not comply with the specified ARMORE policy. ARMORE can be configured to take action to block network traffic based on deep inspection of common substation communications protocols, such as the Distributed Network Protocol (DNP3). After validation for compliance with policy, ARMORE can encapsulate and encrypt legacy communications and resiliently transmit this information among ARMORE nodes (such as between the substation and the control center). Through this peer-based framework for secure information exchange, ARMORE provides the functionality to push secure, fault-tolerant real-time communication capabilities deeper into critical utility networks

24 POWER TRANSMISSION AND DISTRIBUTION↗

Alliance Project: Secure Control Systems for the Energy Sector

The Alliance Project addresses Area of Interest 4: Secure Remote Access for the Energy Sector, by combining physical and cyber access under one cybersecurity access system. The Alliance Project built on the successful completion of the Lemnos and Padlock Project (DOE-Funded Project started in 2007 and 2010) and researched and developed a solution for an Ethernet Security Gateway with the functionality required to integrate the physical access control cyber system and interface with legacy and new proximity card readers used for physical access requests. This project focused on securing and enhancing the cyber system the physical access control system operates on. The team tested and demonstrated the system solution on the SEL campus. Currently the physical access cyber system is completely separate from the cyber access control cyber system. With a single system industry benefits include: (1) Single system to learn and teach employees; (2) Single system that collects and alerts on logs and events simplifying incident response plans and NERC CIP compliance; (3) Unifies trust management to a single system reducing the potential errors in privilege escalation or revocation; (4) Provides a stronger cybersecurity platform the physical access control system operates on. Today they are mostly plain text protocols and little cyber awareness; (5) Integration of physical access awareness allows the cyber system to react and adjust. In some cases, the cyber access can be enhanced with authorized physical access and other cases the cyber access can be more restricted with unauthorized physical access; and (6) Enables the utility to establish as large or as small a physical access control system as they require. One example would be when a utility shares a substation with a neighbor utility and can’t rely on the substation door for the physical access control. The Alliance technology enables them to lock equipment racks simply with no scalability issues because it stands on the cyber security infrastructure which is already highly scalable.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Effect of GPS Manipulation to Traditional and Next Generation Relay Protection

This project’s objective is to test the effect of GPS timing variations on relay protection algorithms to determine vulnerabilities and the associated hazards to the electric grid. This will focus on differential protection which utilizes peer to peer communication between substations to determine if the current is not equivalent. This requires the use of GPS to sync the two substations and can be vulnerable to GPS manipulation. However, the effects of GPS manipulation are not a commonly known risk. Therefore, this LDRD will address the risks of GPS manipulation for such a widely implemented technology. For differential protection a GPS resilient architecture was implemented and tested for differential protective relays through a direct serial fiber connection between the two relays. This allows for one relay to be the master and provide synchronization outside of timestamp for differential protection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Broadband Characterization and Circuit Model Development of Transmission-Scale Transformers

This report describes broadband measurements of transmission-scale transformers typical in the electric power grid. This work was performed as part of the EMP Resilient Grid LDRD project at Sandia National Laboratories to generate circuit models that can be used for high-altitude electromagnetic pulse (HEMP) coupling simulations and response predictions. The objective of the work was to obtain characterization data of substation yard equipment across a frequency range relevant to HEMP. Vector network analyzer measurements up to 100 MHz were performed on two power transformers at ABB-Hitachi and a single ITEC potential transformer. Custom cable breakouts were designed to interface with the transformer terminals and provide ground connections to the chassis at the base of the transformer bushings. The three-phase terminals of the power transformers were measured as a common mode impedance using a parallel resistive splitter, and the single-phase terminals of the potential transformer were measured directly. A vector fitting algorithm was used to empirically fit circuit models to the resulting two-port networks and input impedances of the measured objects. Simplified circuit representations of the input impedances were also generated to assess the degree of precision needed for high-altitude electromagnetic pulse response predictions, which were performed in Sandia's XYCE circuit simulator platform. HEMP coupling simulations using the transformer models showed significant reduction in the voltage peak and broadening in the pulse width seen at the power transformer compared to the traveling wave voltage. This indicated the importance of the load condition when defining the coupled insult in an electric power substation. Simplified circuit models showed a similar voltage at the transformer with a smoothed waveform. The presence of potential transformers in the simulation did not significantly change the simulated voltage at the power transformer. Single-port input impedance models were also developed to define load conditions when transfer characteristics were not necessary.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fork Union EPC Installation Observation Report

On June 22nd and 23rd, a representative from Savannah River National Lab (SRNL) traveled to the Fork Union substation in Fork Union, Virginia (owned and operated by Dominion Energy) to observe the installation, calibration, and commissioning of three Electric Phenomena Cluster (EPC) sensors. The installation in its entirety included the physical securing of the EPC sensors by Dominion Energy, fiber optic cable (furnished by SmartSenseComm) being run in conduits and cable trays from the EPC sensor to the Optical Processing Unit (OPU) located in the substation switch house. The location of the EPC sensors, OPU, and cable routing can be seen in the figures included.

47 OTHER INSTRUMENTATION↗

Cyber Resilient Flexible Alternating Current Transmission Systems (XFACTS)

This report summarizes the activities conducted under the DOE-OE funded project DEOE0000897, Cyber Attack Resilient Flexible AC Systems – XFACTS. Hitachi Energy (HE), in collaboration with ABB Inc. (ABB), Bonneville Power Administration (BPA), University of Illinois at Urbana-Champaign (UIUC), Iowa State University (ISU), and University of Idaho (UI) pursued the development of a system of defense for Flexible Alternating current Transmission Systems against cyber-attacks (XFACTS). A FACTS substation enhanced with XFACTS defense mechanisms will be capable of mitigating cyberattacks especially those that seek to control electrical parameters like voltage or current and interrupt the power flow in AC lines. It empowers existing FACTS controllers and associated intelligent electronic devices to detect and mitigate malicious intents to depress system voltages, destabilize power flows, trip AC circuit breakers, corrupt currents, and voltages, even if the malicious commands and the measurements have correct syntax. The XFACTS functions utilize the physics of active power electronic systems, control and protection, electric power engineering principles, and state estimation to bring more in-depth cyber defense closer to the protected FACTS substation devices.

24 POWER TRANSMISSION AND DISTRIBUTION↗