Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Science Definition Team”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Gateway Payload Users Guide

This Gateway Payload Users Guide is provided as an introduction to science operations on the Gateway for potential Payload Developer (PD) teams. It is not intended to be a comprehensive guide that answers detailed questions that may arise. More detailed information and resources will be provided as PD teams work toward launch and flight operations. This document does not contain payload or system requirements. Payload requirements are contained in GP-10037: Gateway Payload Interface Definition Document. Applicable requirements from GP-10037 will be derived into payload-specific requirements documents.

utilization↗

A preliminary study of Mars rover/sample return missions

The Solar System Exploration Committee (SSEC) of the NASA Advisory Council recommends that a Mars Sample Return mission be undertaken before the year 2000. Comprehensive studies of a Mars Sample Return mission have been ongoing since 1984. The initial focus of these studies was an integrated mission concept with the surface rover and sample return vehicle elements delivered to Mars on a single launch and landed together. This approach, to be carried out as a unilateral U.S. initiative, is still a high priority goal in an Augmented Program of exploration, as the SSEC recommendation clearly states. With this background of a well-understood mission concept, NASA decided to focus its 1986 study effort on a potential opportunity not previously examined; namely, a Mars Rover/Sample Return (MRSR) mission which would involve a significant aspect of international cooperation. As envisioned, responsibility for the various mission operations and hardware elements would be divided in a logical manner with clearly defined and acceptable interfaces. The U.S. and its international partner would carry out separately launched but coordinated missions with the overall goal of accomplishing in situ science and returning several kilograms of surface samples from Mars. Important considerations for implementation of such a plan are minimum technology transfer, maximum sharing of scientific results, and independent credibility of each mission role. Under the guidance and oversight of a Mars Exploration Strategy Advisory Group organized by NASA, a study team was formed in the fall of 1986 to develop a preliminary definition of a flight-separable, cooperative mission. The selected concept assumes that the U.S. would undertake the rover mission with its sample collection operations and our international partner would return the samples to Earth. Although the inverse of these roles is also possible, this study report focuses on the rover functions of MRSR because rover operations have not been studied in as much detail as the sample return functions of the mission.

Source record↗

Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challenge

The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), manages the project and is responsible for flight operation; Orbital Sciences Corporation (OSC), is the spacecraft builder and is responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), is responsible for science planning and operations. As a cost-capped mission, one of Dawn's implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL's ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL's GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project's commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to fundamental systems engineering practices: decomposition of the project request into manageable requirements; integration of multiple ground disciplines and experts into a focused team effort; definition of a structured yet flexible development process; definition of an in-process risk reduction plan; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.

Ground Data System (GDS)↗

A Data-Driven Approach to Real-World Degradation of Backsheets

The objectives of this project are as follows: • The population behavior of fielded modules in various conditions of use • Predictions of materials in specific climatic zones • Understanding of a module’s local environment in the field on its degradation It aims to understand how and what backsheet materials of photovoltaic modules degrade in the real world field. • Field Survey Protocol This project is started from the protocol, because all the data, information, domain knowledge are from experience of the real world field surveys, which is based on the protocol. The Protocol is explored from the experience of the field survey observations. With the increasing of the field surveys, it is refined for three versions, which are Task 1.0 (Section 3.1), Task 6.0 (Section 3.6), Task 10.0 (Section 3.10) respectively. It includes a document and a training video, which is able to direct other teams to follow the same procedure with the sites surveyed during this project. The documents include the detailed information but is not limited to the terminology definition, instruments SOP, preparation items for the surveys, form for the data collections, the order of the information collection. The final version of the protocol can be found at Appendix A, see Section 5. Additional, It can also be found at Open Science Framework (OSF), see Section 3.18 for detail. • Written Waiver Request Before staring the field surveys, the request of the waiver for international surveys is completed, because the limitation of climate zone in the United States, see Appendix B in Section 6 for the request documents. Unfortunately, only 1 international site from Taiwan, China can be finished, due to the COVID-19. • Field Survey According to the protocol we built in Section 3.1, 3.6 and 3.10, 41 sites have been surveyed across seven different climate zones (Cfa, Csa, Csb, BSk, Dfa, Dfb, Am). A variety of materials, including Polyethylene Naphthalate (PEN), Polyethylene Terephthalate (PET), Polyvinyl Fluoride (PVF), Polyvinylidene Fluoride (PVDF), Acrylic PVDF, Fluoroethylene Vinyl Ether (FEVE), and Glass, were identified. These sites are located in various states including California, South Carolina, New Mexico, Maryland, Ohio, Tennessee, Florida, Massachusetts, Illinois, Minnesota, Oregon, Colorado, and Taiwan, Republic of China. The ages of the sites ranged from 2 - 38 years in service and the field size varied from 1 MW - 25 MW. All requirements for the modeling have been satisfied. Some observations like ’Edge Effect’ for the rows and Junction box heating will also be a useful knowledge to build the model. Section 3.7 provides detailed information on the sites visited during this reporting period.

14 SOLAR ENERGY↗

Design definition of the Laser Atmospheric Wind Sounder (LAWS), phase 2. Volume 2: Final report

Lockheed personnel, along with team member subcontractors and consultants, have performed a preliminary design for the LAWS Instrument. Breadboarding and testing of a LAWS class laser have also been performed. These efforts have demonstrated that LAWS is a feasible Instrument and can be developed with existing state-of-the-art technology. Only a commitment to fund the instrument development and deployment is required to place LAWS in orbit and obtain the anticipated science and operational forecasting benefits. The LAWS Science Team was selected in 1988-89 as were the competing LAWS phase 1/2 contractor teams. The LAWS Science Team developed requirements for the LAWS Instrument, and the NASA/LAWS project office defined launch vehicle and platform design constraints. From these requirements and constraints, the lockheed team developed LAWS Instrument concepts and configurations. A system designed to meet these requirements and constraints is outlined. The LAWS primary subsystem and interfaces - laser, optical, and receiver/processor - required to assemble a lidar are identified. Also identified are the support subsystems required for the lidar to function from space: structures and mechanical, thermal, electrical, and command and data management. The Lockheed team has developed a preliminary design of a LAWS Instrument System consisting of these subsystems and interfaces which will meet the requirements and objectives of the Science Team. This final report provides a summary of the systems engineering analyses and trades of the LAWS. Summaries of the configuration, preliminary designs of the subsystems, testing recommendations, and performance analysis are presented. Environmental considerations associated with deployment of LAWS are discussed. Finally, the successful LAWS laser breadboard effort is discussed along with the requirements and test results.

Wilson, D. J.↗

Deep Space Gateway Science Opportunities

The NASA Life Sciences Research Capabilities Team (LSRCT) has been discussing deep space research needs for the last two years. NASA's programs conducting life sciences studies - the Human Research Program, Space Biology, Astrobiology, and Planetary Protection - see the Deep Space Gateway (DSG) as affording enormous opportunities to investigate biological organisms in a unique environment that cannot be replicated in Earth-based laboratories or on Low Earth Orbit science platforms. These investigations may provide in many cases the definitive answers to risks associated with exploration and living outside Earth's protective magnetic field. Unlike Low Earth Orbit or terrestrial locations, the Gateway location will be subjected to the true deep space spectrum and influence of both galactic cosmic and solar particle radiation and thus presents an opportunity to investigate their long-term exposure effects. The question of how a community of biological organisms change over time within the harsh environment of space flight outside of the magnetic field protection can be investigated. The biological response to the absence of Earth's geomagnetic field can be studied for the first time. Will organisms change in new and unique ways under these new conditions? This may be specifically true on investigations of microbial communities. The Gateway provides a platform for microbiology experiments both inside, to improve understanding of interactions between microbes and human habitats, and outside, to improve understanding of microbe-hardware interactions exposed to the space environment.

Quincy, C. D.↗

Large-Scale Spacecraft Fire Safety Experiments in ISS Resupply Vehicles

Our understanding of the fire safety risk in manned spacecraft has been limited by the small scale of the testing we have been able to conduct in low-gravity. Fire growth and spread cannot be expected to scale linearly with sample size so we cannot make accurate predictions of the behavior of realistic scale fires in spacecraft based on the limited low-g testing to date. As a result, spacecraft fire safety protocols are necessarily very conservative and costly. Future crewed missions are expected to be longer in duration than previous exploration missions outside of low-earth orbit and accordingly, more complex in terms of operations, logistics, and safety. This will increase the challenge of ensuring a fire-safe environment for the crew throughout the mission. Based on our fundamental uncertainty of the behavior of fires in low-gravity, the need for realistic scale testing at reduced gravity has been demonstrated. To address this concern, a spacecraft fire safety research project is underway to reduce the uncertainty and risk in the design of spacecraft fire safety systems by testing at nearly full scale in low-gravity. This project is supported by the NASA Advanced Exploration Systems Program Office in the Human Exploration and Operations Mission Directorate. The activity of this project is supported by an international topical team of fire experts from other space agencies to maximize the utility of the data and to ensure the widest possible scrutiny of the concept. The large-scale space flight experiment will be conducted on three missions; each in an Orbital Sciences Corporation Cygnus vehicle after it has deberthed from the ISS. Although the experiment will need to meet rigorous safety requirements to ensure the carrier vehicle does not sustain damage, the absence of a crew allows the fire products to be released into the cabin. The tests will be fully automated with the data downlinked at the conclusion of the test before the Cygnus vehicle reenters the atmosphere. The international topical team is collaborating with the NASA team in the definition of the experiment requirements and performing supporting analysis, experimentation and technology development.

Combustion↗

Magnetometer instrument team studies for the definition phase of the outer planets grand tour

The objectives of magnetic field investigations on missions to the outer planets were defined as well as an instrumentation system, a program of studies and instrument development tasks was proposed for the mission definition phase of the Outer Planets Grand Tour project. A report on the status of this program is given. Requirements were also established for the spacecraft and the mission which would insure their compatibility with the magnetic field investigation proposed for the outer planets missions and developed figures of merit for encounter trajectories. The spacecraft-instrumentation interface and the on-board data handling system were defined in various reports by the Project Team and in the reports by the Science Steering Group. The defining program for exploring the outer planets within the more restrictive constraints of the Mariner Jupiter-Saturn project included defining a limited magnetic field investigation.

Coleman, P. J., Jr.↗

Work on Planetary Atmospheres and Planetary Atmosphere Probes

A summary final report of work accomplished is presented. Work was performed in the following areas: (1) Galileo Probe science analysis, (2) Galileo probe Atmosphere Structure Instrument, (3) Mars Pathfinder Atmosphere Structure/Meteorology instrument, (4) Mars Pathfinder data analysis, (5) Science Definition for future Mars missions, (6) Viking Lander data analysis, (7) winds in Mars atmosphere Venus atmospheric dynamics, (8) Pioneer Venus Probe data analysis, (9) Pioneer Venus anomaly analysis, (10) Discovery Venus Probe Titan probe instrument design, and (11) laboratory studies of Titan probe impact phenomena. The work has resulted in more than 10 articles published in archive journals, 2 encyclopedia articles, and many working papers. This final report is organized around the four planets on which there was activity, Jupiter, Mars, Venus, and Titan, with a closing section on Miscellaneous Activities. A major objective was to complete the fabrication, test, and evaluation of the atmosphere structure experiment on the Galileo probe, and to receive, analyze and interpret data received from the spacecraft. The instrument was launched on April 14, 1989. Calibration data were taken for all experiment sensors. The data were analyzed, fitted with algorithms, and summarized in a calibration report for use in analyzing and interpreting data returned from Jupiter's atmosphere. The sensors included were the primary science pressure, temperature and acceleration sensors, and the supporting engineering temperature sensors. Computer programs were written to decode the Experiment Data Record and convert the digital numbers to physical quantities, i.e., temperatures, pressures, and accelerations. The project office agreed to obtain telemetry of checkout data from the probe. Work to extend programs written for use on the Pioneer Venus project included: (1) massive heat shield ablation leading to important mass loss during entry; and (2) rapid planet rotation, which introduced terms of motion not needed on Venus. When the Galileo Probe encountered Jupiter, analysis and interpretation of data commenced. The early contributions of the experiment were to define (1) the basic structure of the deep atmosphere, (2) the stability of the atmosphere, (3) the upper atmospheric profiles of density, pressure, and temperature. The next major task in the Galileo Probe project was to refine, verify and extend the analysis of the data. It was the verified, and corrected data, which indicated a dry abiabatic atmosphere within measurement accuracy. Temperature in the thermosphere was measured at 900 K. Participation in the Mars atmospheric research included: (1) work as a team member of the Mars Atmosphere Working Group, (2) contribution to the Mars Exobiology Instrument workshop, (3) asssistance in planning the Mars global network and (4) assitance in planning the Soviet-French Mars mission in 1994. This included a return to the Viking Lander parachute data to refine and improve the definition of winds between 1.5 and 4 kilometer altitude at the two entry sites. The variability of the structure of Mars atmosphere was addressed, which is known to vary with season, latitude, hemisphere and dust loading of the atmosphere. This led to work on the Pathfinder project. The probe had a deployable meteorology mast that had three temperature sensors, and a wind sensor at the tip of the mast. Work on the Titan atmospheric probe was also accomplished. This included developing an experiment proposal to the European Space Agency (ESA), which was not selected. However, as an advisor in the design and preparation of the selected experiment the researcher interacted with scientist on the Huygens Probe Atmosphere Structure Experiment. The researcher also participated in the planning for the Venus Chemical Probe. The science objectives of the probe were to resolve unanswered questions concerning the minor species chemistry of Venus' atmosphere that control cloud formation, greenhouse effectiveness, and the thermal structure. The researcher also reviewed problems with the Pioneer Venus Probe, that caused anomalies which occurred on the Probes at and below 12.5 km level of the Venus' atmosphere. He convened and participated in a workshop that concluded the most likely hardware cause was insulation failure in the electrical harness outside the Probes' pressure vessels. It was discovered that the shrink tubing material failed at 600K. This failure could explain the anomalies experienced by the probes. The descent data of the Pioneer probes, and the Soviet Vega Lander was analyzed to evaluate the presence of small scale gravity waves in and below the Venus cloud layer.

Lester, Peter↗

Scientific management of Space Telescope

A historical summay is given on the science management of the Space Telescope, the inception of which began in 1962, when scientists and engineers first recommended the development of a nearly diffraction limited substantial-size optical telescope. Phase A, the feasibility requirements generation phase, began in 1971 and consisted largely of NASA scientists and a NASA design. Phase B, the preliminary design phase, established a tiered structure of scientists, led by the Large Space Telescope operations and Management Work Group. A Mission Operations Working Group headed six instrument definition teams to develop the essential instrument definitions. Many changes took place during Phase B, before design and development, which began in 1978 and still continues today.

Odell, C. R.↗

Report of the Organic Contamination Science Steering Group

The exploration of the possible emergence and duration of life on Mars from landed platforms requires attention to the quality of measurements that address these objectives. In particular, the potential impact of terrestrial contamination on the measurement of reduced carbon with sensitive in situ instruments must be addressed in order to reach definitive conclusions regarding the source of organic molecules. Following the recommendation of the Mars Exploration Program Analysis Group (MEPAG) at its September 2003 meeting [MEPAG, 2003], the Mars Program Office at NASA Headquarters chartered the Organic Contamination Science Steering Group (OCSSG) to address this issue. The full report of the six week study of the OCSSG can be found on the MEPAG web site [1]. The study was intended to define the contamination problem and to begin to suggest solutions that could provide direction to the engineering teams that design and produce the Mars landed systems. Requirements set by the Planetary Protection Policy in effect for any specific mission do not directly address this question of the potential interference from terrestrial contaminants during in situ measurements.

Mahaffy, P. R.↗

Development of Large-Scale Spacecraft Fire Safety Experiments

The status is presented of a spacecraft fire safety research project that is under development to reduce the uncertainty and risk in the design of spacecraft fire safety systems by testing at nearly full scale in low-gravity. Future crewed missions are expected to be more complex and longer in duration than previous exploration missions outside of low-earth orbit. This will increase the challenge of ensuring a fire-safe environment for the crew throughout the mission. Based on our fundamental uncertainty of the behavior of fires in low-gravity, the need for realistic scale testing at reduced gravity has been demonstrated. To address this gap in knowledge, a project has been established under the NASA Advanced Exploration Systems Program under the Human Exploration and Operations Mission directorate with the goal of substantially advancing our understanding of the spacecraft fire safety risk. Associated with the project is an international topical team of fire experts from other space agencies who conduct research that is integrated into the overall experiment design. The experiments are under development to be conducted in an Orbital Science Corporation Cygnus vehicle after it has undocked from the ISS. Although the experiment will need to meet rigorous safety requirements to ensure the carrier vehicle does not sustain damage, the absence of a crew removes the need for strict containment of combustion products. The tests will be fully automated with the data downlinked at the conclusion of the test before the Cygnus vehicle reenters the atmosphere. A computer modeling effort will complement the experimental effort. The international topical team is collaborating with the NASA team in the definition of the experiment requirements and performing supporting analysis, experimentation and technology development. The status of the overall experiment and the associated international technology development efforts are summarized.

Life Support↗

Asteroid Exploration with Autonomic Systems

NASA is studying advanced technologies for a future robotic exploration mission to the asteroid belt. The prospective ANTS (Autonomous Nano Technology Swarm) mission comprises autonomous agents including worker agents (small spacecra3) designed to cooperate in asteroid exploration under the overall authoriq of at least one ruler agent (a larger spacecraft) whose goal is to cause science data to be returned to Earth. The ANTS team (ruler plus workers and messenger agents), but not necessarily any individual on the team, will exhibit behaviors that qualify it as an autonomic system, where an autonomic system is defined as a system that self-reconfigures, self-optimizes, self-heals, and self-protects. Autonomic system concepts lead naturally to realistic, scalable architectures rich in capabilities and behaviors. In-depth consideration of a major mission like ANTS in terms of autonomic systems brings new insights into alternative definitions of autonomic behavior. This paper gives an overview of the ANTS mission and discusses the autonomic properties of the mission.

Truszkowski, Walt↗

Space experiment development process

Described is a process for developing space experiments utilizing the Space Shuttle. The role of the Principal Investigator is described as well as the Principal Investigator's relation with the project development team. Described also is the sequence of events from an early definition phase through the steps of hardware development. The major interactions between the hardware development program and the Shuttle integration and safety activities are also shown. The presentation is directed to people with limited Shuttle experiment experience. The objective is to summarize the development process, discuss the roles of major participants, and list some lessons learned. Two points should be made at the outset. First, no two projects are the same so the process varies from case to case. Second, the emphasis here is on Code EN/Microgravity Science and Applications Division (MSAD).

Depauw, James F.↗

Water Observations of Flow/No-Flow for the East-Taylor Watershed, Colorado (June-July 2025 and 2026)

This dataset provides multi-year, ground-truth visual observations of surface water flow/no-flow conditions within the East-Taylor Watershed, Colorado, collected during June and July of 2025 and 2026. In June and July 2025, on-the-ground visual observations of flow/no-flow were collected as part of the Watershed Function Scientific Focus Area (SFA) and Rocky Mountain Biological Laboratory (RMBL) Colorado Headwaters Ecological Spectroscopy Study (CHESS) campaign (further details are provided within the CHESS Project Description). We obtained 377 water observations of flow/no-flow within the East-Taylor Watershed, Colorado. These ground-truth observations were collected to validate classification maps from remote sensing data and model results within the East-Taylor Watershed. In 2025, flow/no-flow measurements were collected using a field-based app for the CHESS Campaign (Zerion iForm). Within the field app, a water observation form was created to collect coordinates and metadata about the observation. Information collected for the water observation points included information about visually-assessed streamflow presence/absence (standard question obtained from Colorado State University’s StreamTracker project), flow estimate, stream or ponded area width, canopy cover, manganese films, iron seeps, and beaver activity. For 2025 water observations, this dataset contains: (1) a data file with the water observations and coordinates (2025_Water_Observations.csv); (2) a Keyhole Markup Language Zipped (KMZ) with the water observation locations and metadata (2025_Water_Observations_Locations.kmz); (3) photos (.jpg and .jpeg) of the water observation points, organized by location, contained within 2025_Water_Observations_FieldPhotographs.zip file; and (4) water observation protocols and figures (2025_Water_Observation_Protocols.pdf). In June and July 2026, on-the-ground visual observations of flow/no-flow were collected as part of the Watershed Function SFA project. We obtained 365 water observations of flow/no-flow within the East-Taylor Watershed, Colorado. The 2026 observations focused on collecting repeat measurements at the 2025 flow/no-flow observation locations conducted as part of the CHESS campaign. These ground-truth observations were collected to understand differences in flow/no-flow in 2026, given the unprecedented 2026 drought in Colorado. In 2026, flow/no-flow measurements were collected using ArcGIS (Geographic Information System) Survey123. Within the field app, a water observation form was created to collect coordinates and metadata about the observation. Information collected for the water observation points included repeat information from the 2025 water observation effort, including visually-assessed streamflow presence/absence (standard question obtained from Colorado State University’s StreamTracker project), flow estimate, stream or ponded area width, canopy cover, manganese films, iron seeps, beaver activity, and a new metadata component of estimated stream depth (for select locations). For 2026 water observations, this dataset contains: (1) a data file with the water observations and coordinates (2026_Water_Observations.csv); (2) a Keyhole Markup Language Zipped (KMZ) with the water observation locations and metadata (2026_Water_Observations_Locations.kmz); (3) photos (.jpg) of the water observation points, organized by location, contained within 2026_Water_Observations_FieldPhotographs.zip file; and (4) water observation protocols and figures (2026_Water_Observation_Protocols.pdf). For 2025 and 2026 water observations, this dataset contains: (1) a location metadata file (locations.csv); (6) a file-level metadata (flmd.csv) file that lists each file contained in the dataset with associated metadata; and (7) a data dictionary (dd.csv) file that contains column/row headers used throughout the files along with a definition, units, and data type. CHESS Project Description: The Colorado Headwaters Ecological Spectroscopy Study (CHESS) comprised a multi-week airborne remote sensing and field observation campaign in the Upper Gunnison Basin, Colorado, conducted in June and July of 2025. Airborne remote sensing was conducted by the National Ecological Observatory Network Airborne Observation Platform (NEON AOP), concurrent with a field campaign run by the Rocky Mountain Biological Laboratory (RMBL), the Lawrence Berkeley National Laboratory (LBNL) and SLAC National Accelerator Laboratory Watershed Function Science Focus Area (SFA), and NASA-JPL (Jet Propulsion Laboratory) Earth Surface Mineral Dust Source Investigation (EMIT) program. Between June 10 and July 18, 2025, the NEON AOP flight team collected high-resolution aerial imaging spectroscopy and Light Detection and Ranging (LiDAR) data over three domains: the Upper East River (CRBU), Almont Triangle (ALMO), and the Upper Taylor Basin (UPTA). In coordination with the flights, a field campaign acquired ground-truth observations, including observations of vegetation composition, foliar traits, forest demography, and subsurface properties in 18 core sampling areas within the domains. Additional surface water observations were taken at over 380 point locations. All CHESS campaign datasets can be found within the CHESS ESS-DIVE data portal: https://data.ess-dive.lbl.gov/portals/chess. This work was supported by the Watershed Function Science Focus Area at Lawrence Berkeley National Laboratory funded by the US Department of Energy, Office of Science, Biological and Environmental Research under Contract No. DE-AC02-05CH11231. 2026-09-02: This dataset was updated to include 2026 water observation measurements. The 2025 observation files were also updated to ensure a consistent file naming convention across water observation years.

2018 NEON and 2025 CHESS Campaigns↗

Mission Analysis for the Don Quijote Phase-A Study

The Don Quijote Phase-A study is a definition study funded by ESA and devoted to the analysis of the possibilities to deflect a Near Earth Object (NEO) in the range of 300-800 m diameter. DEIMOS Space S.L. and EADS Astrium have teamed up within this study to form one of the three consortia that have analyzed these aspects for ESA. Target asteroids for the mission are 1989 ML, 2002 AT4 and Apophis. This paper presents the mission analysis activities within the consortium providing: low-thrust interplanetary rendezvous Orbiter trajectories to the target asteroids, ballistic interplanetary trajectories for the Impactor, Orbiter arrival description at the asteroids, Orbiter stable orbits characterization at the asteroid, deflection determination by means of a Radio Science Experiment (RSE) as well as the mission timelines and overall mission scenarios.

Cano, Juan L.↗

Thermal Design and Analysis of an ISS Science Payload - SAGE III on ISS

The Stratospheric Aerosol and Gas Experiment III (SAGE III) instrument is the fifth in a series of instruments developed for monitoring aerosols and gaseous constituents in the stratosphere and troposphere. SAGE III will be launched in the SpaceX Dragon vehicle in 2017 and mounted to an external stowage platform on the International Space Station (ISS) to begin its three-year mission. The SAGE III thermal team at NASA Langley Research Center (LaRC) worked with ISS thermal engineers to ensure that SAGE III, as an ISS payload, would meet requirements specific to ISS and the Dragon vehicle. This document presents an overview of the SAGE III thermal design and analysis efforts, focusing on aspects that are relevant for future ISS payload developers. This includes development of detailed and reduced Thermal Desktop (TD) models integrated with the ISS and launch vehicle models, definition of analysis cases necessary to verify thermal requirements considering all mission phases from launch through installation and operation on-orbit, and challenges associated with thermal hardware selection including heaters, multi-layer insulation (MLI) blankets, and thermal tapes.

Liles, Kaitlin, A. K.↗

Development of Analytical Protocols For Organics and Isotopes Analysis on the 2009 MARS Science Laboratory.

The Mars Science Laboratory, under development for launch in 2009, is designed explore and quantitatively asses a local region on Mars as a potential habitat for present or past life. Its ambitious goals are to (1) assess the past or present biological potential of the target environment, (2) to characterize the geology and geochemistry at the MSL landing site, and (3) to investigate planetary processes that influence habitability. The planned capabilities of the rover payload will enable a comprehensive search for organic molecules, a determination of definitive mineralogy of sampled rocks and fines, chemical and isotopic analysis of both atmospheric and solid samples, and precision isotope measurements of several volatile elements. A range of contact and remote surface and subsurface survey tools will establish context for these measurements and will facilitate sample identification and selection. The Sample Analysis at Mars (SAM) suite of MSL addresses several of the mission's core measurement goals. It includes a gas chromatograph, a mass spectrometer, and a tunable laser spectrometer. These instruments will be designed to analyze either atmospheric samples or gases extracted from solid phase samples such as rocks and fines. We will describe the range of measurement protocols under development and study by the SAM engineering and science teams for use on the surface of Mars.

Mahaffy, P. R.↗