Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Scheduling and planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Assessment of Scheduling and Plan Execution of Apollo 14 Lunar Surface Operations

Although over forty years have passed since first landing on the Moon, there is not yet a comprehensive, quantitative assessment of Apollo extravehicular activities (EVAs). Quantitatively evaluating lunar EVAs will provide a better understanding of the challenges involved with surface operations. This first evaluation of a surface EVA centers on comparing the planned and the as-ran timeline, specifically collecting data on discrepancies between durations that were estimated versus executed. Differences were summarized by task categories in order to gain insight as to the type of surface operation activities that were most challenging. One Apollo 14 EVA was assessed utilizing the described methodology. Selected metrics and task categorizations were effective, and limitations to this process were identified.

Marquez, Jessica J.↗

Integrating Human Performance Measures into Space Operations: Beyond Our Scheduling Capabilities?

Current planning and scheduling software tools for International Space Station (ISS) support different flight controller teams as they plan daily space operations. Planning and scheduling tools capabilities include integrating digitized ISS state inputs, evaluating their expected future states, and propagating them over time. Extensive, custom-made computational models of operations, of objectives, and of operational constraints help ISS flight controllers identify where scheduled events violate constraints. Based on the current capabilities of these tools, this paper proposes how human performance measures could be better integrated into planning and scheduling tools for space mission operations. Future integration of human performance measures could be applied to state inputs (in this case, the astronaut’s state) and to modeling human performance operational constraints & operational objectives (i.e., assigned activities) with parameters that are relevant to human performance measures. Gaps between the state-of-the-art for human performance modeling and planning tools for future exploration missions are identified.

space operations↗

Future applications of artificial intelligence to Mission Control Centers

Future applications of artificial intelligence to Mission Control Centers are presented in the form of the viewgraphs. The following subject areas are covered: basic objectives of the NASA-wide AI program; inhouse research program; constraint-based scheduling; learning and performance improvement for scheduling; GEMPLAN multi-agent planner; planning, scheduling, and control; Bayesian learning; efficient learning algorithms; ICARUS (an integrated architecture for learning); design knowledge acquisition and retention; computer-integrated documentation; and some speculation on future applications.

Friedland, Peter↗

Software Schedules Missions, Aids Project Management

NASA missions require advanced planning, scheduling, and management, and the Space Agency has worked extensively to develop the programs and software suites necessary to facilitate these complex missions. These enormously intricate undertakings have hundreds of active components that need constant management and monitoring. It is no surprise, then, that the software developed for these tasks is often applicable in other high-stress, complex environments, like in government or industrial settings. NASA work over the past few years has resulted in a handful of new scheduling, knowledge-management, and research tools developed under contract with one of NASA s partners. These tools have the unique responsibility of supporting NASA missions, but they are also finding uses outside of the Space Program.

Source record↗

A Generalized Timeline Representation, Services, and Interface for Automating Space Mission Operations

Numerous automated and semi-automated planning & scheduling systems have been developed for space applications. Most of these systems are model-based in that they encode domain knowledge necessary to predict spacecraft state and resources based on initial conditions and a proposed activity plan. The spacecraft state and resources as often modeled as a series of timelines, with a timeline or set of timelines to represent a state or resource key in the operations of the spacecraft. In this paper, we first describe a basic timeline representation that can represent a set of state, resource, timing, and transition constraints. We describe a number of planning and scheduling systems designed for space applications (and in many cases deployed for use of ongoing missions) and describe how they do and do not map onto this timeline model.

Chien, Steve A.↗

Alaska SAR Facility Mission planning software - An interactive mission planning system

The Alaska Synthetic Aperture Radar (SAR) Facility Mission Planning Subsystem is an interactive mission planning software system on the VAXStation 2000. This system has the capability to generate satellite ephemerides and mission parameters related to synthetic aperture radar missions. The mission data can be viewed as overlays on the world map in various projections and zooms. The system also provides schedule planning capabilities, using the INGRES DBMS to keep track of the various plans and schedules generated by the mission planner.

Lo, Martin W.↗

Expert mission planning and replanning scheduling system for NASA KSC payload operations

EMPRESS (Expert Mission Planning and REplanning Scheduling System) is an expert system created to assist payload mission planners at Kennedy in the long range planning and scheduling of horizontal payloads for space shuttle flights. Using the current flight manifest, these planners develop mission and payload schedules detailing all processing to be performed in the Operations and Checkout building at Kennedy. With the EMPRESS system, schedules are generated quickly using standard flows that represent the tasks and resources required to process a specific horizontal carrier. Resources can be tracked and resource conflicts can be determined and resolved interactively. Constraint relationships between tasks are maintained and can be enforced when a task is moved or rescheduled. The domain, structure, and functionality of the EMPRESS system is briefly designed. The limitations of the EMPRESS system are described as well as improvements expected with the EMPRESS-2 development.

Pierce, Roger↗

Development of shuttle payloads

The development of payloads for the Shuttle is described in terms of two activities - one is oriented towards development of payload hardware, while the other is oriented towards the development of payload/Space Transportation System (STS) planning, scheduling, and integration techniques. This second activity is called STS Utilization Planning (SUP). In addition to describing the major aspects of SUP, a discussion of development activities on three payloads that typify direct Shuttle placement missions is included. These payloads are the First Spacelab Mission, the Atmospheric, Magnetospheric, and Plasmas in Space (AMPS) payload, and the Large Space Telescope (LST).

Murphy, J. T.↗

Using virtual reality for science mission planning: A Mars Pathfinder case

NASA's Mars Pathfinder Project requires a Ground Data System (GDS) that supports both engineering and scientific payloads with reduced mission operations staffing, and short planning schedules. Also, successful surface operation of the lander camera requires efficient mission planning and accurate pointing of the camera. To meet these challenges, a new software strategy that integrates virtual reality technology with existing navigational ancillary information and image processing capabilities. The result is an interactive workstation based applications software that provides a high resolution, 3-dimensial, stereo display of Mars as if it were viewed through the lander camera. The design, implementation strategy and parametric specification phases for the development of this software were completed, and the prototype tested. When completed, the software will allow scientists and mission planners to access simulated and actual scenes of Mars' surface. The perspective from the lander camera will enable scientists to plan activities more accurately and completely. The application will also support the sequence and command generation process and will allow testing and verification of camera pointing commands via simulation.

Kim, Jacqueline H.↗

Activity Planning for the Mars Exploration Rovers

Operating the Mars Exploration Rovers is a challenging, time-pressured task. Each day, the operations team must generate a new plan describing the rover activities for the next day. These plans must abide by resource limitations, safety rules, and temporal constraints. The objective is to achieve as much science as possible, choosing from a set of observation requests that oversubscribe rover resources. In order to accomplish this objective, given the short amount of planning time available, the MAPGEN (Mixed-initiative Activity Plan GENerator) system was made a mission-critical part of the ground operations system. MAPGEN is a mixed-initiative system that employs automated constraint-based planning, scheduling, and temporal reasoning to assist operations staff in generating the daily activity plans. This paper describes the adaptation of constraint-based planning and temporal reasoning to a mixed-initiative setting and the key technical solutions developed for the mission deployment of MAPGEN.

Bresina, John L.↗

Mission and science activity scheduling language

To support the distributed and complex operational scheduling required for future National Aeronautics and Space Administration (NASA) missions, a formal, textual language, the Scheduling Applications Interface Language (SAIL), has been developed. Increased geographic dispersion of investigators is leading to distributed mission and science activity planning, scheduling, and operations. SAIL is an innovation which supports the effective and efficient communication of scheduling information among physically dispersed applications in distributed scheduling environments. SAIL offers a clear, concise, unambiguous expression of scheduling information in a readable, hardware independent format. The language concept, syntax, and semantics incorporate language features found useful during five years of research and prototyping with scheduling languages in physically distributed environments. SAIL allows concise specification of mission and science activity plans in a format which promotes repetition and reuse.

Hull, Larry G.↗

Scheduling and Airport Taxiway Path Planning Under Uncertainty

Congestion and uncertainty on the airport surface are major constraints to the available capacity of the air transport system. This project is to study the problem of planning and scheduling airport surface movement at large airports. Specifically, we focus on the departure time scheduling and taxiway path planning of multiple aircraft under uncertainty. We also developed a simulation tool that is capable of simulating aircraft movement along the taxiway and possible uncertainty during the movement.

Li, Jiaoyang↗

Scheduling Nonconsumable Resources

Users manual describes computer program SWITCH that schedules use of resources - by appliances switched on and off and use resources while they are on. Plans schedules according to predetermined goals; revises schedules when new goals imposed. Program works by depth-first searching with strict chronological back-tracking. Proceeds to evaluate alternatives as necessary, sometimes interacting with user.

Porta, Harry J.↗

Range and mission scheduling automation using combined AI and operations research techniques

Ground-based systems for Satellite Command, Control, and Communications (C3) operations require a method for planning, scheduling and assigning the range resources such as: antenna systems scattered around the world, communications systems, and personnel. The method must accommodate user priorities, last minute changes, maintenance requirements, and exceptions from nominal requirements. Described are computer programs which solve 24 hour scheduling problems, using heuristic algorithms and a real time interactive scheduling process.

Arbabi, Mansur↗