Measurement Acceptance Region (MAR) Assessment Results Based on Confirmation Sample Sludge Batch 10 Projections

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, 26F, 40H (heel only), and Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In October 2022, SRMC System Planning provided an updated SB10 Tank 40H blend baseline projection based on the Tank 51 confirmation sample results. Due to the reduced Na concentration relative to previous SB10 projections, two additional projections based on the addition of 7,000 gallons of caustic were provided in November 2022.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the 0.65 Weight Percent Sulfate Solubility Limit for Sludge Batch 10 Based on November 2022 Projections

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, 26F, 40H (heel only), and Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System glass property models and their associated Measurement Acceptance Region constraints. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In October 2022, SRMC System Planning provided an updated SB10 Tank 40H blend baseline projection based on the Tank 51 confirmation sample results. Due to the reduced Na concentration relative to previous SB10 projections, two additional projections based on the addition of 7,000 gallons of caustic were provided in November 2022.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Savannah River Site FY22 Salt Waste Qualification Data

The Savannah River National Laboratory analyzed samples from Savannah River Site Waste Tank 41H, 21H and 42H to support qualification of Salt Waste Processing Facility (SWPF) Waste Batches 5, 6, and 7 for processing (the FY22 Salt Batch Qualification samples). None of the samples displayed any unusual or unexpected characteristics such as large amounts of solids, floating solids, or unusual color. Characterization of these samples confirmed similar chemical composition and characteristics to previous salt waste batches. These results were initially provided to Savannah River Mission Completion (Liquid Waste Operations subcontractor) as External Sample Results LIMS Reports and the Tank 41H (Salt Batch 5 sample) was also summarized in two separate technical reports. The analytical results (both rapid and long term) are now summarized and discussed in this technical report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of Process Chemical Modeling to Optimize Radioactive Waste Disposal at the Savannah River Site - 24242

The Technical Optimization Model (TOM) is used by Savannah River Mission Completion (SRMC) to carry out facility-wide material balance and validate chemistrydependent processes for the purpose of their System Plan.The TOM simulates material movement and chemical reactions at the Tank Farm (TF), Salt Waste Processing Facility (SWPF) and Defense Waste Processing Facility (DWPF).

Georgiou, Andreas↗

Plutonium Solubility and Supernate Concentration for Neutralized Fast Critical Assembly Discards to Savannah River Site Tank Waste

The Savannah River Site (SRS) plans to dissolve non-irradiated stainless steel (SS)-clad bundles of Fast Critical Assembly (FCA) materials in eighteen batches.1 FCA dissolution is currently underway in the 6.3D dissolver by simultaneous chemical and electrolytic dissolution, which is required to generate the harsh conditions necessary for dissolution of metal-oxide (MOX) and non-aluminum spent nuclear fuels (NASNFs).2 Nitric acid and potassium fluoride are used to promote chemical dissolution.2 Gadolinium will be added during processing as a thermal neutron poison for criticality control. There are no plans for recovering plutonium from this waste stream. After FCA dissolution, the acidic (HNO3/KF) “discards” containing the dissolved metals will be neutralized by addition of 50 wt% sodium hydroxide to a final free hydroxide concentration of 1.2 M.1 Neutralization will precipitate a slurry of insoluble solids, predominantly metal oxides/hydroxides of plutonium, uranium, and SS components. Small fractions of the SS components, Pu, U, and Gd will remain dissolved in the supernate. The neutralized slurry will be composited to existing radioactive waste storage tanks within the SRS Concentration, Storage, and Transfer Facilities (CSTF) containing other similar sludge batch (SB) materials.1 The fate of soluble plutonium and freshly-precipitated, colloidal plutonium from this process are of concern since the total Pu can challenge the waste acceptance criteria (WAC) at the downstream SRS Liquid Waste (LW) facility. Supernate decants including the neutralized FCA discards (nFCAd) within the CSTF will be composited with salt batch (StB) materials and transferred to the SRS Salt Waste Processing Facility (SWPF), where total plutonium is also of concern.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual Model Testing Related to SDU 6 Drainwell Observations

From its inception in the early 1950s through the end of the Cold War in the early 1990s, the Savannah River Site (SRS) produced nuclear materials for national defense in five reactors. Additionally, irradiated reactor fuel and target tubes were dissolved in nitric acid to recover plutonium and uranium using the PUREX (Plutonium Uranium Reduction EXtraction) process. Liquid waste from these chemical separations processes was then stored onsite in 51 underground tanks. Eight waste storage tanks have been operationally closed (i.e. cleaned and grouted) and the remaining tanks hold a mixture of liquids, insoluble solids, and precipitated salts (SRMC-LWP-2022-00001), the latter generated by evaporating water from the liquid waste. Waste is currently being retrieved from tanks and separated into 1) high-radioactivity, low-volume, and 2) low-radioactivity, high-volume components, principally through the Salt Waste Processing Facility (SWPF) (SRMC-LWP-2023-00001). The former waste stream is vitrified in the Defense Waste Processing Facility (DWPF), stored onsite, and destined for offsite disposal in a deep geologic repository. The latter stream is mixed with dry cementitious materials in the Saltstone Production Facility (SPF) and the wet slurry placed in onsite Saltstone Disposal Units (SDUs) within the Saltstone Disposal Facility (SDF), where it hardens into a cement waste form termed saltstone. A low-infiltration surface cover system will be placed over the SDF at closure, where SDUs will then be in the subsurface post-closure (SRR-CWDA-2019-00001).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low Purge and Mercury Recovery Testing with Sludge Batch 10 Tank 40 Simulant

Researchers at the Savannah River National Laboratory (SRNL) have completed testing as requested by Savannah River Mission Completion (SRMC) to perform experiments to determine the impact of using a lower or inert purge in Sludge Batch (SB) 10 processing under the Nitric-Glycolic Acid (NGA) flowsheet. A key objective of this testing was also to determine the mercury speciation and recovery during each experiment. The testing was performed as part of the SB10 Technical Task Request (TTR) and Task Technical and Quality Assurance Plan (TTQAP). Two sets of tests were performed, and a Run Plan was approved prior to each set of experiments to document the planned testing. Three initial experiments were completed to determine whether a low air purge would be beneficial to CPC processing at higher acid stoichiometry (110%) based on the Koopman minimum acid (KMA) equation (116% Hsu). One of the tests, an inert nitrogen purge experiment, was also completed to demonstrate that excluding oxygen did not introduce any new hazards. The experiments were designed to be identical except for the change in purge gas and purge flowrate from run to run. After reviewing the results from the initial three experiments, six additional tests were proposed by SRNL to support the lower purge study and to look for processing alternatives for improving mercury recovery. These additional six tests were all completed at a very low acid stoichiometry to mimic the pH experienced during processing in DWPF (~7). DWPF is processing SB10 sludge at an acid stoichiometry of 90% based on the Hsu equation. The additional SRNL experiments were performed at an acid stoichiometry of 62.5% KMA stoichiometry (66.3% Hsu) to produce a Sludge Receipt and Adjustment Tank (SRAT) product with a pH of about 7. All experiments used simulants of both SWPF streams, although no entrained solvent was added during any of the experiments

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Tank Mapping Method Improves Waste Removal Process

Savannah River Mission Completion is the Liquid Waste (LW) contractor at the Savannah River Site (SRS). The LW mission is tasked with treating and disposing of legacy nuclear waste. There are multiple facilities involved in this work, including the Concentration, Storage, and Transfer Facilities (CSTF), the Defense Waste Processing Facility (DWPF), the Salt Waste Processing Facility (SWPF), and the Saltstone Production Facility (SPF). The CSTF includes 43 underground waste tanks used to store and support processing of radioactive liquid waste. Waste removal activities, such as salt dissolution campaigns and sludge agitation, are conducted within the CSTF waste tanks to convert the waste into a form that allows for downstream processing at other LW facilities. While performing these waste removal campaigns, camera inspections are performed to assess the quantity and distribution of the remaining waste within the waste tank (i.e. saltcake or sludge). Understanding the quantity and distribution of the salt/sludge within the waste tanks allows for improved waste removal strategies (e.g. mixing pump operation) and refined safety controls. Typically, several camera inspections are performed during a waste removal transfer to verify the elevation of the visible salt/sludge mounds against the known elevation of the liquid surface. The camera inspection footage must then be interpreted by a trained engineer who will develop a 2-D map that depicts the waste distribution at various elevations within the waste tank. This tank mapping is then used in conjunction with conservative assumptions to evaluate the volume of saltcake or sludge that is present within the waste tank.

Mini, Melany↗

Evaluating Liquid Waste Transfers and their Impacts to the SRS Tank Farms to Support Operations and Closure

BACKGROUND • SRMC mission critical milestones – 34 million liters (9 million gallons) Salt Waste Processing Facility (SWPF) Processing Rate – Accelerated Waste Tank Closures • Results in an increase in Tank Farm transfers • Barriers – Equipment failures, replacements, and adjustments – Weather – Procedure development – Outside facility changes How has the Tank Farm adapted to meet these milestones? By improving the transfer evaluation process

ISOPAR L RELEASE RATES FROM SALTSTONE USING SIMULATED SALT SOLUTIONS

The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) and the Salt Waste Processing Facility (SWPF) will produce a Decontaminated Salt Solution (DSS) that will go to the Saltstone Production Facility (SPF). Recent information indicates that solvent entrainment in the DSS is larger than expected. The main concern is with Isopar{reg_sign} L, the diluent in the solvent mixture, and its flammability in the saltstone vault. If it is assumed that all the Isopar{reg_sign} L is released instantaneously into the vault from the curing grout before each subsequent pour, the Isopar{reg_sign} L in the vault headspace is well mixed, and each pour displaces an equivalent volume of headspace, the maximum concentration of Isopar{reg_sign} L in the DSS to assure 25% of the lower flammable limit is not exceeded has been determined to be about 4 ppm. The amount allowed would be higher if the release from grout were significantly less. The Savannah River National Laboratory was tasked with determining the release of Isopar{reg_sign} L from saltstone prepared with a simulated DSS with Isopar{reg_sign} L concentrations ranging from 50 to 200 mg/L in the salt fraction and with test temperatures ranging from ambient to 95 C. The results from the curing of the saltstone showed that the amount of Isopar{reg_sign} L released versus time can be treated as a percentage of initial amount present; there was no statistically significant dependence of the release rate on the initial concentration. The majority of the Isopar{reg_sign} L that was released over the test duration was released in the first few days. The release of Isopar{reg_sign} L begins immediately and the rate of release decreases over time. At higher temperatures the immediate release rate is larger than at lower temperatures. Initial curing temperature was found to be very important as slight variations during the first few hours or days had a significant effect on the amount of Isopar{reg_sign} L released. Short scoping tests at 95 C with solvent containing all components (Isopar{reg_sign} L, suppressor trioctylamine (TOA), and modifier Cs-7SB) except the BOBCalixC6 extractant released less Isopar{reg_sign} L than the tests run with Isopar{reg_sign} L/TOA. Based on these scoping tests, the Isopar{reg_sign} L releases reported herein are conservative. Isopar{reg_sign} L release was studied for a two-month period and average cumulative release rates were determined from three sets of tests each at 95 and 75 C and at ambient conditions. The overall average releases at were estimated for each temperature. For the 95 and 75 C data, at a 5% significance level, the hypothesis that the three test sets at each temperature had the same average percent release can be rejected, suggesting that there was a statistically significant difference among the three averages seen in the three experimental tests conducted. An upper confidence limit on the mean percent release required incorporation of variation from two sources: test-to-test variation as well as the variation within a test. An analysis of variance that relies on a random effects model was used to estimate the two variance components. The test-to-test variance and the within test (or residual) variance were both calculated. There is no indication of a statistically significant linear correlation between the percent Isopar{reg_sign} L release and the Isopar{reg_sign} L initial concentration. From the analysis of variance, upper confidence limits at confidences of 80-95% were calculated for the data at 95 and 75 C. The mean Isopar{reg_sign} L percent releases were 67.33% and 13.17% at 95 and 75 C, respectively.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HYDRAULIC AND PHYSICAL PROPERTIES OF SALTSTONE GROUTS AND VAULT CONCRETES

The Saltstone Disposal Facility (SDF), located in the Z-Area of the Savannah River Site (SRS), is used for the disposal of low-level radioactive salt solution. The SDF currently contains two vaults: Vault 1 (6 cells) and Vault 4 (12 cells). Additional disposal cells are currently in the design phase. The individual cells of the saltstone facility are filled with saltstone. Saltstone is produced by mixing the low-level radioactive salt solution, with blast furnace slag, fly ash, and cement (dry premix) to form a dense, micro-porous, monolithic, low-level radioactive waste form. The saltstone is pumped into the disposal cells where it subsequently solidifies. Significant effort has been undertaken to accurately model the movement of water and contaminants through the facility. Key to this effort is an accurate understanding of the hydraulic and physical properties of the solidified saltstone. To date, limited testing has been conducted to characterize the saltstone. The primary focus of this task was to estimate the hydraulic and physical properties of three types of saltstone and two vault concretes. The saltstone formulations included saltstone premix batched with (1) Deliquification, Dissolution, and Adjustment (DDA) salt simulant (w/pm 0.60), (2) Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) salt simulant (w/pm 0.60), and (3) Salt Waste Processing Facility (SWPF) salt simulant (w/pm 0.60). The vault concrete formulations tested included the Vault 1/4 concrete and two variations of the Vault 2 concrete (Mix 1 and Mix 2). Wet properties measured for the saltstone formulations included yield stress, plastic viscosity, wet unit weight, bleed water volume, gel time, set time, and heat of hydration. Hydraulic and physical properties measured on the cured saltstone and concrete samples included saturated hydraulic conductivity, moisture retention, compressive strength, porosity, particle density, and dry bulk density. These properties were determined following a minimum 28 day curing period. Additional testing of the three saltstone formulations was conducted following a minimum 90 day curing period. The compressive strength of each saltstone and concrete material was measured at approximately 14, 28, 56, and 90 days. Recommended hydraulic property values for each saltstone grout and the vault concretes are provided. The hydraulic properties provided for each material include the saturated hydraulic conductivity, dry bulk density, particle density, and porosity. In addition, water retention data are presented for each material along with the van Genuchten transport parameters as determined using the RETC code.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of the Next-Generation Caustic-Side Solvent Extraction (NG-CSSX) Process for Cesium Removal from High-Level Tank Waste

This paper describes the chemical performance of the Next-Generation Caustic-Side Solvent Extraction (NG-CSSX) process in its current state of development for removal of cesium from the alkaline high-level tank wastes at the Savannah River Site (SRS) in the US Department of Energy (USDOE) complex. Overall, motivation for seeking a major enhancement in performance for the currently deployed CSSX process stems from needs for accelerating the cleanup schedule and reducing the cost of salt-waste disposition. The primary target of the NG-CSSX development campaign in the past year has been to formulate a solvent system and to design a corresponding flowsheet that boosts the performance of the SRS Modular CSSX Unit (MCU) from a current minimum decontamination factor of 12 to 40,000. The chemical approach entails use of a more soluble calixarene-crown ether, called MaxCalix, allowing the attainment of much higher cesium distribution ratios (DCs) on extraction. Concurrently decreasing the Cs-7SB modifier concentration is anticipated to promote better hydraulics. A new stripping chemistry has been devised using a vitrification-friendly aqueous boric acid strip solution and a guanidine suppressor in the solvent, resulting in sharply decreased DCs on stripping. Results are reported herein on solvent phase behavior and batch Cs distribution for waste simulants and real waste together with a preliminary flowsheet applicable for implementation in the MCU. The new solvent will enable MCU to process a much wider range of salt feeds and thereby extend its service lifetime beyond its design life of three years. Other potential benefits of NG-CSSX include increased throughput of the SRS Salt Waste Processing Facility (SWPF), currently under construction, and an alternative modular near-tank application at Hanford.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

STATUS OF THE DEVELOPMENT OF IN-TANK/AT-TANK SEPARATIONS TECHNOLOGIES FOR FOR HIGH-LEVEL WASTE PROCESSING FOR THE U.S. DEPARTMENT OF ENERGY

Within the U.S. Department of Energy's (DOE) Office of Technology Innovation and Development, the Office of Waste Processing manages a research and development program related to the treatment and disposition of radioactive waste. At the Savannah River (South Carolina) and Hanford (Washington) Sites, approximately 90 million gallons of waste are distributed among 226 storage tanks (grouped or collocated in 'tank farms'). This waste may be considered to contain mixed and stratified high activity and low activity constituent waste liquids, salts and sludges that are collectively managed as high level waste (HLW). A large majority of these wastes and associated facilities are unique to the DOE, meaning many of the programs to treat these materials are 'first-of-a-kind' and unprecedented in scope and complexity. As a result, the technologies required to disposition these wastes must be developed from basic principles, or require significant re-engineering to adapt to DOE's specific applications. Of particular interest recently, the development of In-tank or At-Tank separation processes have the potential to treat waste with high returns on financial investment. The primary objective associated with In-Tank or At-Tank separation processes is to accelerate waste processing. Insertion of the technologies will (1) maximize available tank space to efficiently support permanent waste disposition including vitrification; (2) treat problematic waste prior to transfer to the primary processing facilities at either site (i.e., Hanford's Waste Treatment and Immobilization Plant (WTP) or Savannah River's Salt Waste Processing Facility (SWPF)); and (3) create a parallel treatment process to shorten the overall treatment duration. This paper will review the status of several of the R&D projects being developed by the U.S. DOE including insertion of the ion exchange (IX) technologies, such as Small Column Ion Exchange (SCIX) at Savannah River. This has the potential to align the salt and sludge processing life cycle, thereby reducing the Defense Waste Processing Facility (DWPF) mission by 7 years. Additionally at the Hanford site, problematic waste streams, such as high boehmite and phosphate wastes, could be treated prior to receipt by WTP and thus dramatically improve the capacity of the facility to process HLW. Treatment of boehmite by continuous sludge leaching (CSL) before receipt by WTP will dramatically reduce the process cycle time for the WTP pretreatment facility, while treatment of phosphate will significantly reduce the number of HLW borosilicate glass canisters produced at the WTP. These and other promising technologies will be discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ANALYSIS OF THE LEACHING EFFICIENCY OF INHIBITED WATER AND TANK SIMULANT IN REMOVING RESIDUES ON THERMOWELL PIPES

A key component for the accelerated implementation and operation of the Salt Waste Processing Facility (SWPF) is the recovery of Tank 48H. Tank 48H is a type IIIA tank with a maximum capacity of 1.3 million gallons. Video inspection of the tank showed that a film of solid material adhered to the tank internal walls and structures between 69 inch and 150 inch levels. From the video inspection, the solid film thickness was estimated to be 1mm, which corresponds to {approx}33 kg of TPB salts (as 20 wt% insoluble solids) (1). This film material is expected to be easily removed by single-rinse, slurry pump operation during Tank 48H TPB disposition via aggregation processing. A similar success was achieved for Tank 49H TPB dispositioning, with slurry pumps operating almost continuously for approximately 6 months, after which time the tank was inspected and the film was found to be removed. The major components of the Tank 49H film were soluble solids - Na{sub 3}H(CO{sub 3}){sub 2} (Hydrated Sodium Carbonate, aka: Trona), Al(OH){sub 3} (Aluminum Hydroxide, aka: Gibbsite), NaTPB (Sodium Tetraphenylborate), NaNO{sub 3} (Sodium Nitrate) and NaNO{sub 2} (Sodium Nitrite) (2). Although the Tank 48H film is expected to be primarily soluble solids, it may not behave the same as the Tank 49H film. There is a risk that material on the internal surfaces of Tank 48H could not be easily removed. As a risk mitigation activity, the chemical composition and leachability of the Tank 48H film are being evaluated prior to initiating tank aggregation. This task investigated the dissolution characteristics of Tank 48H solid film deposits in inhibited water and DWPF recycle. To this end, SRNL received four separate 23-inch long thermowell-conductivity pipe samples which were removed from the tank 48H D2 risers in order to determine: (1) the thickness of the solid film deposit, (2) the chemical composition of the film deposits, and (3) the leaching behavior of the solid film deposit in inhibited water (IW) and in DWPF recycle simulant (3).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IMPACT OF THE SMALL COLUMN ION EXCHANGE PROCESS ON THE DEFENSE WASTE PROCESSING FACILITY - 12112

The Savannah River Site (SRS) is investigating the deployment of a parallel technology to the Salt Waste Processing Facility (SWPF, presently under construction) to accelerate high activity salt waste processing. The proposed technology combines large waste tank strikes of monosodium titanate (MST) to sorb strontium and actinides with two ion exchange columns packed with crystalline silicotitanate (CST) resin to sorb cesium. The new process was designated Small Column Ion Exchange (SCIX), since the ion exchange columns were sized to fit within a waste storage tank riser. Loaded resins are to be combined with high activity sludge waste and fed to the Defense Waste Processing Facility (DWPF) for incorporation into the current glass waste form. Decontaminated salt solution produced by SCIX will be fed to the SRS Saltstone Facility for on-site immobilization as a grout waste form. Determining the potential impact of SCIX resins on DWPF processing was the basis for this study. Accelerated salt waste treatment is projected to produce a significant savings in the overall life cycle cost of waste treatment at SRS.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IMPACT OF URANIUM AND THORIUM ON HIGH TIO2 CONCENTRATION NUCLEAR WASTE GLASSES

This study focused on the potential impacts of the addition of Crystalline Silicotitanate (CST) and Monosodium Titanate (MST) from the Small Column Ion Exchange (SCIX) process on the Defense Waste Processing Facility (DWPF) glass waste form and the applicability of the DWPF process control models. MST from the Salt Waste Processing Facility (SWPF) is also considered in the study. The KT08-series of glasses was designed to evaluate any impacts of the inclusion of uranium and thorium in glasses containing the SCIX components. All but one of the study glasses were found to be amorphous by X-ray diffraction (XRD). One of the slowly cooled glasses contained a small amount of trevorite, which is typically found in DWPF-type glasses and had no practical impact on the durability of the glass. The measured Product Consistency Test (PCT) responses for the study glasses and the viscosities of the glasses were well predicted by the current DWPF models. No unexpected issues were encountered when uranium and thorium were added to the glasses with SCIX components.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deployment of large tank monosodium titanate strike to increase salt processing at the Savannah river site - 15115

The treatment of high level waste (HLW) salt solutions using the Actinide Removal Process (ARP) and Modular Caustic Side Solvent Extraction Unit (MCU) began at Savannah River Site (SRS) in 2008. Since that time, over 6 million gallons of liquid HLW have been treated and the resulting low level waste (LLW) effluent immobilized in cementitious grout at salt-stone. In addition to the continued stabilization of liquid HLW, operating experience from the ARP/MCU facilities has also been valuable in considering the design and construction of the Salt Waste Processing Facility (SWPF) which will utilize similar unit operations on a much larger scale. ARP removes actinides by contacting waste with monosodium titanate (MST) which is a solid adsorbent for soluble strontium and actinides. Once the sorption reaction is complete, the MST solids are separated from salt solution via ultrafiltration through a crossflow filter. The throughput of initial operations of ARP/MCU was limited by the flowrate through the extraction process. However, after the implementation of a new solvent flowsheet, filtration of MST will be the rate limiting step in salt processing. For the entirety of ARP/MCU operation, Savannah River Remediation (SRR) has sought to improve process efficiency and performance through optimization and modification of the original facility design. These efforts have resulted in a best-single-year throughput of 4.9 million liters of decontaminated salt solution. In keeping with these practices, SRR recently initiated a project to improve filtration throughput by relocating the MST strike from small batches immediately upstream of the filtration unit to the underground waste tank used to batch and store salt solution feed for ARP/MCU. This process change will allow the bulk of MST solids to decant in the waste tank prior to filtration which should improve both the nominal operational filter flux as well as the achieved utility of filter operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applying lean management to aging infrastructure - 15416

Currently the Savannah River Site liquid waste system consists of 51 waste tanks, two operating evaporators, a salt processing pilot plant, the DWPF vitrification facility, the salt-stone Processing Facility and an Effluent Treatment Plant. Six of the waste tanks have been grouted and closed and the full scale Salt Waste Processing Facility (SWPF) is under construction. Some of the waste tanks and associated infrastructure were placed into operation as early as 1954 and DWPF went into operation in 1996. Due to this long history of operation, the SRS liquid waste system is being challenged by aging infrastructure issues and the stored radioactive liquid waste has been identified by regulators as the highest environmental risk in the state. Much of the DOE complex faces similar infrastructure issues. Remedies that can mitigate the impact of those issues are needed all across the complex. At SRS, Lean Management has been adopted as a business process to help address some of the impacts. Lean Management got its start decades ago in the manufacturing sector and has its roots in the work of W. Edwards Deming and his contemporaries. In more recent years the process has matured in the Toyota Production System and migrated into fields as diverse as services industries, health care, and now the DOE complex. Lean Management has a 'secret sauce' that must be correct to avoid becoming the 'flavor of the month'. The easy part is the talking. The hard part is the doing. The payoff is in the doing. Obviously as facilities and equipment age, more and more funds are needed to maintain, refurbish, and replace them. Funding of course is tight for all our sites. Lean management generates work efficiency so a given set of resources can produce more. It must be noted that this isn't by working harder but rather by focusing scarce resources on the few activities that truly add value. A positive aspect for companies that have been on this journey is employees feel less stress and higher motivation. The work they do matters and they have fewer outside impediments to distract and sap their energy. SRR has used the Lean process to streamline both work planning and control and the supply chain to improve maintenance efficiency and reduce the Corrective Maintenance backlog. This paper explains how this was done, the challenges encountered, and how organizations can use this methodology for their own improvements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗