Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SITE APPROVALS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Fluxnet Synthesis Dataset Collaboration Infrastructure

The Fluxnet synthesis dataset originally compiled for the La Thuile workshop contained approximately 600 site years. Since the workshop, several additional site years have been added and the dataset now contains over 920 site years from over 240 sites. A data refresh update is expected to increase those numbers in the next few months. The ancillary data describing the sites continues to evolve as well. There are on the order of 120 site contacts and 60proposals have been approved to use thedata. These proposals involve around 120 researchers. The size and complexity of the dataset and collaboration has led to a new approach to providing access to the data and collaboration support and the support team attended the workshop and worked closely with the attendees and the Fluxnet project office to define the requirements for the support infrastructure. As a result of this effort, a new website (http://www.fluxdata.org) has been created to provide access to the Fluxnet synthesis dataset. This new web site is based on a scientific data server which enables browsing of the data on-line, data download, and version tracking. We leverage database and data analysis tools such as OLAP data cubes and web reports to enable browser and Excel pivot table access to the data.

54 ENVIRONMENTAL SCIENCES↗

Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington

The U.S. Department of Energy (DOE) manuals for radioactive waste management, DOE M 435.1-1 Chg 2 and DOE-STD-5002-2017, require that the Hanford Site maintain site performance assessments and composite analyses (CAs). This document describes the plan for maintaining the CA that supports waste disposal and remedial actions for the Hanford Site. An initial CA of the site was issued in 1998, conditionally approved in 1999, received further analysis to satisfy conditions in an addendum in 2001, and was approved in 2002. This document meets the maintenance plan requirements described in DOE M 435.1-1 Chg 2 and DOE-STD-5002-2017 and implements the requirements of the disposal authorization related to the CA for the U.S. Department of Energy, Richland Operations Office, the responsible field Office, and its contractors. In addition to providing current plans for revisions to the CA, this maintenance plan describes the work expected to be completed for ongoing reviews of new information; data related to residual sources of radioactive material, land use, and monitoring; and research and development related activities being conducted at the Hanford Site and within other U.S. Department of Energy programs. The main emphasis of this maintenance plan is to identify additional data and information to support the next revision of the Hanford Site CA. Improvements are expected regarding the knowledge of waste characterization and inventory, site-specific geotechnical data, and final disposition of major disposal facilities and waste sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

March-April 2007 monitoring results for Morrill, Kansas.

In September 2005, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) initiated periodic sampling of groundwater in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Morrill, Kansas. The sampling at Morrill is being performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE), to monitor levels of carbon tetrachloride contamination identified in the groundwater at this site (Argonne 2004, 2005a). Under the KDHE-approved Monitoring Plan (Argonne 2005b), the groundwater is being sampled twice yearly for a recommended period of two years. The samples are analyzed for volatile organic compounds (VOCs), as well as for selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation (reductive dechlorination) processes in the subsurface environment. The sampling is presently conducted in a network of 12 monitoring wells and 3 private wells (Argonne 2006a; Figure 1.1), at locations approved by the KDHE.

54 ENVIRONMENTAL SCIENCES↗

October 2007 monitoring results for Morrill, Kansas.

In September 2005, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) initiated periodic sampling of groundwater in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Morrill, Kansas. On the basis of available information, the CCC/USDA believes that one or more third parties operated this facility after termination of the CCC/USDA's lease in 1971. The sampling at Morrill is being performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE), to monitor levels of carbon tetrachloride contamination identified in the groundwater at this site (Argonne 2004, 2005a). Under the KDHE-approved monitoring plan (Argonne 2005b), the groundwater has been sampled twice yearly for a recommended period of two years. The samples are analyzed for volatile organic compounds (VOCs), as well as for selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation (reductive dechlorination) processes in the subsurface environment. The sampling is presently conducted in a network of 12 monitoring wells and 3 private wells (Figure 1.1), at locations approved by the KDHE. The scope of the originally approved monitoring has been expanded to include vegetation sampling (initiated in October 2006) and surface water and stream bed sediment sampling (initiated in March 2007). The analytical results for groundwater sampling events at Morrill in September 2005, March 2006, September 2006, and March 2007 were documented previously (Argonne 2006a, 2007c,e). The results have demonstrated the presence of carbon tetrachloride contamination, at levels exceeding the KDHE Tier 2 Risk-Based Screening Level (5.0 {micro}g/L) for this compound, in a groundwater plume extending generally south-southeastward from the former CCC/USDA facility, toward Terrapin Creek at the south edge of the town. Little clear pattern of change in the concentrations observed at the individual monitoring points and little plume migration have been observed in previous monitoring events. Low levels ({le} 1.3 {micro}g/L) of carbon tetrachloride have persistently been detected at monitoring well MW8S, however, along an intermittent tributary to Terrapin Creek. This observation suggests a possible risk of contamination of the surface waters of the creek. In light of these findings, in 2006 the CCC/USDA recommended expansion of the approved monitoring program to include the collection and analysis of surface water samples along Terrapin Creek (Argonne 2007e). At the request of the KDHE (KDHE 2007a), locations for both surface water and shallow sediment sampling were discussed with the KDHE in January 2007. An addendum to the existing monitoring plan and a standard operating procedure (SOP AGEM-15) for sediment sampling were submitted to the KDHE on the basis of these discussions (Argonne 2007a,b). This report presents the results of groundwater, surface water, and sediment sampling performed at Morrill in October 2007, in accord with the monitoring plan (Argonne 2005b) and the addendum to that plan (Argonne 2007a). To supplement these studies, Argonne also sampled natural vegetation along Terrapin Creek in October 2006, April 2007, and July 2007 for analyses for VOCs. The results of the plant tissue analyses are included in this report. The October 2007 groundwater sampling at Morrill represents the fifth and final monitoring event performed under the recommended two-year monitoring program approved by the KDHE.

54 ENVIRONMENTAL SCIENCES↗

Development of a Technical Standard for Radiological Characterization of DAW - 19552

Since the Manhattan Project, the U.S. Department of Energy (DOE) and its predecessor agencies have performed a wide mission involving nuclear materials and weapons development, production, testing, and modernization. While the initial mission components relied heavily upon reactor physics and chemistry, the environmental programs have increasingly relied upon development of more accurate and effective measurement methodologies to determine the radiological and chemical properties of the unique waste streams that were generated during the weapons production and testing mission. During the ongoing site cleanup program, the DOE laboratories and former production sites have developed a wide range of site-specific processes and procedures for conducting radiological characterization of dry active waste (DAW) that is managed as low-level radioactive waste. This has resulted in a Complex-wide variability among sites with respect to the methodologies and instrumentation used to characterize individual waste streams. The DAW-type waste was selected for development of a characterization standard since it is a simple, voluminous, and repetitive waste stream with a substantial knowledge base, established experience history at multiple site locations, and the potential for realization of programmatic benefits though standardization. Implementation of a consistent, standardized approach to DAW characterization will take advantage of multiple applications for a technology that is both mature and stable. The DAW characterization process is repetitive and lends itself to implementation at a wide range of operating locations - resulting in economies of scale, compliance with regulatory requirements, and consistent implementation of procedures which support design, operations, maintenance, and management of facilities, activities and environmental restoration programs. In response to a request from DOE, the Energy Facility Contractors Group (EFCOG) Waste Management Working Group (WMWG) is supporting the development of a new DOE Technical Standard for Radiological Characterization of DAW. The purpose of the proposed new standard is to provide a technical resource that integrates and enhances the utilization of current site-specific methodologies and processes. An EFCOG/WMWG technical team has prepared a Technical Basis Document (TBD) to support the development and utilization of the new standard. The TBD provides detailed reference information for use by site personnel when implementing the guidance to be provided in the standard. It also provides the rationale for and details concerning the recommended technical approaches for radiological characterization of representative DAW-type waste streams. The TBD is an essential resource and will be included as an appendix to the proposed standard. Formulation of the new standard will draw upon the information contained in the TBD in order to integrate and improve the utilization of current site-specific methodologies and processes. It will also include a comparison of current radiological characterization methodologies to determine which ones are most reliable and effective in producing relevant and valid data. In view of the long history and participation by several agencies in the regulation of nuclear programs, existing Voluntary Consensus Standards have also been identified in the TBD and will be referenced for relevancy and applicability to the new proposed standard. A Project Justification Statement (PJS) was also developed by the EFCOG/WMWG Team. Following internal Team review and approval by EFCOG, the draft PJS was submitted through Argonne National Laboratory (ANL) and the DOE Argonne Site Office Technical Standards Managers for review and approval by the DOE Argonne Site Office Manager. After resolution of comments and approval by the Manager, the PJS will be submitted to the DOE/HQ Technical Standards Program Manager (TSPM) for formal coordination. Following resolution of technical comments received during the PJS coordination process and receipt of a technical standards project number assigned by the TSPM, the Team will confirm the overall preparation schedule and develop an Internal Draft Technical Standard for coordination with the DOE Argonne Site Office. Following comment resolution, the Team will then prepare a Coordination Draft for submittal to the DOE Technical Standards RevCom review process and will respond to comments generated during this Complex-wide review. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Site Investigation Results, 2009-2011, Inman, Kansas (Final Report)

The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility at the southern edge of the city of Inman, Kansas, from 1954 to 1965. During this time, commercial grain fumigants containing carbon tetrachloride were in common use by the grain storage industry to preserve grain in their facilities. In 1997, trace to low levels of carbon tetrachloride (below the maximum contamination level [MCL] of 5.0 µg/L) were detected in three private wells near the former grain storage facility at Inman, as part of a statewide USDA private well sampling program that was implemented by the Kansas Department of Health and Environment (KDHE) near former CCC/USDA facilities. No public water supply wells were identified in 1998 by the KDHE within 1 mi of the town. Carbon tetrachloride is the contaminant of primary concern at sites associated with grain storage operations. To determine whether the former CCC/USDA facility at Inman is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA agreed to conduct investigations at Inman. The investigations were performed by the Environmental Science Division of Argonne National Laboratory in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the USDA. Argonne, on behalf of the CCC/USDA, developed a Work Plan (Argonne 2007) and subsequently a Summary of Investigation Results and Proposed Work Plan (Appendix A) for a phased site investigation. The proposed work was approved by the KDHE (2007, 2011). The investigations were conducted from November 2009 to September 2011, as proposed in the two work plans. This report presents the findings of the 2009-2011 investigations at Inman.

54 ENVIRONMENTAL SCIENCES↗

FInal Report: Site Investigation Results, 2009-2011, at Inman, Kansas

The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility at the southern edge of the city of Inman, Kansas, from 1954 to 1965. During this time, commercial grain fumigants containing carbon tetrachloride were in common use by the grain storage industry to preserve grain in their facilities. In 1997, trace to low levels of carbon tetrachloride (below the maximum contamination level [MCL] of 5.0 μg/L) were detected in three private wells near the former grain storage facility at Inman, as part of a statewide USDA private well sampling program that was implemented by the Kansas Department of Health and Environment (KDHE) near former CCC/USDA facilities. No public water supply wells were identified in 1998 by the KDHE within 1 mi of the town. Carbon tetrachloride is the contaminant of primary concern at sites associated with grain storage operations. To determine whether the former CCC/USDA facility at Inman is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA agreed to conduct investigations at Inman. The investigations were performed by the Environmental Science Division of Argonne National Laboratory in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the USDA. Argonne, on behalf of the CCC/USDA, developed a Work Plan (Argonne 2007) and subsequently a Summary of Investigation Results and Proposed Work Plan (Appendix A) for a phased site investigation. The proposed work was approved by the KDHE (2007, 2011). The investigations were conducted from November 2009 to September 2011, as proposed in the two work plans. This report presents the findings of the 2009-2011 investigations at Inman.

54 ENVIRONMENTAL SCIENCES↗

Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington.

The U.S. Department of Energy (DOE) manuals for radioactive waste management, DOE M 435.1-1 Chg 21 and DOE-STD-5002-2017, require that the Hanford Site maintain site performance assessments and composite analyses (CAs). This document describes the plan for maintaining the CA that supports waste disposal and remedial actions for the Hanford Site. An initial CA of the site was issued in 1998, conditionally approved in 1999, received further analysis to satisfy conditions in an addendum in 2001, and was approved in 2002. This document meets the maintenance plan requirements described in DOE M 435.1-1 Chg 2 and DOE-STD-5002-2017 and implements the requirements of the disposal authorization related to the CA for the U.S. Department of Energy, Richland Operations Office, the responsible field office, and its contractors.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Addendum to Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada

This addendum to the CR for CAU 98, Frenchman Flat, NNSS, Nevada (compiled in DOE/EMNV, 2019) defines the long-term monitoring approach after a five-year evaluation of water sampling results, water-level measurements, and trends in water-level measurements. The approach was developed by Navarro and discussed in the report Corrective Action Unit 98: Frenchman Flat Five-Year Evaluation Nevada National Security Site, Nevada (DOE/EMNV, 2022), which was approved by NDEP. Sections 4.0 and 5.0 of the CR were rewritten to reflect the approach discussed in the five-year evaluation. Appendix C contains well construction diagrams that have been updated since the original CR was published. Appendix D contains updated Use Restriction (UR) forms and maps. NDEP requested an addendum instead of a complete revision to the Frenchman Flat CR so the history of the CR would not be lost.

54 ENVIRONMENTAL SCIENCES↗

Sensitivity Analysis of Irradiated Fueled Experiments using the MOOSE Framework [Slides]

Modeling and simulation (M&S) methods are able to predict uncertainties in experimental parameters (e.g., power and fission density) during irradiation. A shortfall exists in predicting how sensitive some of the parameters will behave during the experimental process. Sensitivity and Uncertainty Quantification (SUQ) is critical in support of qualification and licensing reactor fuels. The application of a method to quantify the uncertainty in these experiments is critical to the prediction of their performance. In this work, we propose the use of a polynomial chaos expansion (PCE) method to quantify the sensitive parameters in these simulations and, in an extension, their experimental surrogates. We propose to perform M&S using PCE uncertainty quantification on a previously irradiated fueled experiment in order to provide a validation case for Griffin and expand its use as a verification and validation (V&V) tool for experiments with a neutronics component. Griffin is an advanced, deterministic neutronics analysis code built using the MOOSE (multiphysics object-oriented simulation environment) framework which can provide state-of-the-art neutronic analysis on M&S of experiments. We will use the stochastic tools module (STM) in MOOSE to provide PCE uncertainty quantification on the proposed experimental setup. Idaho National Laboratory (INL) does not yet have an in-house developed code with V&V approval for experiments performed on-site; this work would provide a necessary addition of support for experiments performed at INL. The Nuclear Regulatory Commission (NRC) has explicitly requested uncertainties in calculated values such as fuel power and burnup, and the development of this capability would benefit the relationship between INL and the NRC.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Design of an AIM Network for Monitoring Carbon Storage Projects

Conference poster presented at Carbon Capture, Utilization, and Storage (CCUS) Conference 2024, Houston, Texas, March 11–13, 2024. The Energy & Environmental Research Center (EERC) is researching novel carbon storage-monitoring techniques at an approved North Dakota geologic carbon storage site. One of the research objectives is to design an autonomous, integrated, and modular (AIM) monitoring network that is compliant with monitoring requirements across multiple carbon capture and storage (CCS) policy frameworks, such as the U.S. Environmental Protection Agency’s (EPA) underground injection control (UIC) Class VI permitting program.

02 PETROLEUM↗

The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124

The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should be implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste legislation to the floor of the Senate, overcoming existing House support for Yucca Mountain; 3. Change the longstanding focus of Congress from disposal to storage; 4. Change the funding concepts embodied in the Nuclear Waste Policy Act to allow the Nuclear Waste fund to be used to pay for interim storage; 5. Reverse the Congressional policy not to give states or tribes veto or consent authority, and to reserve to Congress the authority to override a state or tribal disapproval; 6. Promulgate interim storage facility siting regulations to reflect the new policies after such changes to policy and law; 7. Complete already underway changes to storage and transportation regulations, possibly incorporating changes to reflect changes to waste disposal law; 8. Promulgate new repository siting regulations if the interim storage facility is to support repository development; 9. Identify volunteer sites, negotiate agreements, and get Congressional approval for negotiated benefits packages; 10. Design, License and develop the interim storage facility. The time required to accomplish these ten items depends on many factors. The estimate developed assumes that certain of the items must be completed before other items are started; given past criticisms of the current program, such an assumption appears appropriate. Estimated times for completion of individual items are based on historical precedent. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Siting Radioactive Waste Management Facilities: Successes and Failures - 16392

Our assessment in 2015 of 39 attempts to site nuclear waste facilities in democratic countries over the past 40 years identified common inherent threads of both success and failure. In the successes, including those efforts still ongoing, the common threads include a) providing the host communities the opportunity to withdraw at any point, b) the physical presence of a significant project team in the host community, and c) the establishment of credibility and trust in the project team, the regulator and, where possible, a neutral commenting party. In the failures, two dominant causes are present. The first is the failure to properly address the legitimate concerns of indigenous people. This has caused failures in the US and Australia. The second and more common cause is lack of political consensus amongst the host community. In nearly every case when the facility proponent selects the site and attempts to gain host approval, the effort has failed. Within the failed cases, two topics appear to be common. The first is that the definition of 'host community' is initially too narrow by the proponents. In many situations, the very local community is supportive of radioactive waste projects but the larger community is not. The second factor is a failure on the part of the proponent to accurately communicate the risks associated with the project, driven significantly by differences in the manner in which the general public and experts process risk communications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Canonsburg, Pennsylvania, UMTRCA Title I Disposal Site 35 Years Postclosure (1985-2020) - 20288

The DOE Office of Legacy Management (LM) Canonsburg, Pennsylvania, Disposal Site is a former uranium ore-processing site located in the borough of Canonsburg and an important part of US history. For 46 years (1911-1957), the site processed ore, for vanadium, radium and then uranium. Soils and groundwater beneath the site were contaminated by the milling operations. The 15-hectare (37-acre) site is owned by the US government and managed by LM, which serves as the federal land manager and steward of cultural, historical, and natural resources at Cold War legacy sites that have been successfully cleaned up to remedial standards. In 1978 Congress directed DOE to remediate 22 inactive uranium-ore processing sites under the Uranium Mill Tailings Radiation Control Act (UMTRCA), in accordance with standards promulgated by the US Environmental Protection Agency in Title 40 CFR Part 192 (40 (CFR 192). Subpart B of 40 CFR 192 regulates the cleanup of contaminated groundwater at the processing sites. The radioactive materials were encapsulated in US Nuclear Regulatory Commission (NRC)-approved disposal cells, and the NRC general license for UMTRCA Title I sites is established in 10 CFR 40.27. Canonsburg was the first site to be remediated under UMTRCA. From 1983 to 1985, the Canonsburg site underwent cleanup under this US law that provides for the safe and environmentally sound disposal, long-term stabilization, and control of uranium mill tailings in a manner that minimizes or eliminates radiation health hazards to the public. The site is unique in that it is one of only two UMTRCA Title I sites in the eastern half of the United States, the other site being the Burrell, Pennsylvania, Title I Disposal Site, a vicinity property to the Canonsburg site. It has been 35 years since the disposal cell at the Canonsburg site was completed. This paper discusses the many efforts that have been taken to maintain the site and presents some of the lessons learned concerning the long-term care of the site. The discussion includes but is not limited to the following: (1) Preserving site history so the community can better appreciate and understand the site. (2) Community outreach efforts, and the importance of maintaining transparency of environmental monitoring results with the community. (3) Pursuing reuse opportunities that offer the potential for improving the community. (4) Remaining engaged with the local community. (5) Remaining proactive in the long-term care of the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dani Sleight Intern Poster

The NRDS Portal is a login-based data storage solution and science data gateway for researchers to centralize and analyze data before publication. Users can upload, edit, review, and approve their own datasets within the site to eventually be published for public use on the main NRDS site. More development was needed to extend NRDS Portal with new Artificial Intelligence features.

99 - GENERAL AND MISCELLANEOUS↗

Summary Analysis Hanford Site Composite (Analysis Update)

This Summary Analysis has three primary purposes: (1) Define the overall technical scope and approach for conducting the Hanford Site CA update; (2) Define the approach for complying with modeling requirements in the Williams (2012) memorandum; and (3) Serve as the mechanism for the Groundwater Vadose Zone Executive Council to review and approve the overall modeling approach for the Hanford Site CA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AP1000{sup R} licensing and deployment in the United States

In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two new nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed towards deployment. AP1000 Design Certification and COL deployment, and management of the plant construction in accordance with the conditions within these approvals, remain as significant site and corporate responsibilities. These licensing-construction integrated activities must now focus on identifying and resolving 'as-built' departures from the standardized design as assessed against the certified AP1000 technical and licensing basis. Within this paper, significant aspects of the AP1000 U.S. licensing will be discussed, including identifying systems and processes used in ensuring compliance while deploying the standardized design. Critical licensing steps, licensing deployment actions as plant construction progresses and defining the road forward to a successful completion of licensing actions will be addressed. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Final Status Survey Report for Corrective Action Unit 117 - Pluto Disassembly Facility, Building 2201, Nevada National Security Site, Nevada

This document contains the process knowledge, radiological data and subsequent statistical methodology and analysis to support approval for the radiological release of Corrective Action Unit (CAU) 117 – Pluto Disassembly Facility, Building 2201 located in Area 26 of the Nevada National Security Site (NNSS). Preparations for release of the building began in 2009 and followed the methodology described in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). MARSSIM is the DOE approved process for release of Real Property (buildings and landmasses) to a set of established criteria or authorized limits. The pre-approved authorized limits for surface contamination values and corresponding assumptions were established by DOE O 5400.5. The release criteria coincide with the acceptance criteria of the U10C landfill permit. The U10C landfill is the proposed location to dispose of the radiologically non-impacted, or “clean,” building rubble following demolition. However, other disposition options that include the building and/or waste remaining at the NNSS may be considered providing that the same release limits apply. The Final Status Survey was designed following MARSSIM guidance by reviewing historical documentation and radiological survey data. Following this review a formal radiological characterization survey was performed in two phases. The characterization revealed multiple areas of residual radioactivity above the release criteria. These locations were remediated (decontaminated) and then the surface activity was verified to be less than the release criteria. Once remediation efforts had been successfully completed, a Final Status Survey Plan (10-015, “Final Status Survey Plan for Corrective Action Unit 117 – Pluto Disassembly Facility, Building 2201”) was developed and implemented to complete the final step in the MARSSIM process, the Final Status Survey. The Final Status Survey Plan consisted of categorizing each individual room into one of three categories: Class 1, Class 2 or Class 3 (a fourth category is a “Non-Impacted Class” which in the case of Building 2201 only pertained to exterior surfaces of the building.) The majority of the rooms were determined to fall in the less restrictive Class 3 category, however, Rooms 102, 104, 106, and 107 were identified as containing Class 1 and 2 areas. Building 2201 was divided into “survey units” and surveyed following the requirements of the Final Status Survey Plan for each particular class. As each survey unit was completed and documented, the survey results were evaluated. Each sample (static measurement) with units of counts per minute (cpm) was corrected for the appropriate background and converted to a value with units of dpm/100 cm2. With a surface contamination value in the appropriate units, it was compared to the surface contamination limits, or in this case the derived concentration guideline level (DCGLw). The appropriate statistical test (sign test) was then performed. If the survey unit was statistically determined to be below the DCGLw, then the survey unit passed and the null hypothesis (that the survey unit is above limits) was rejected. If the survey unit was equal to or below the critical value in the sign test, the null hypothesis was not rejected. This process was performed for all survey units within Building 2201. A total of thirty-three “Class 1,” four “Class 2,” and one “Class 3” survey units were developed, surveyed, and evaluated. All survey units successfully passed the statistical test. Building 2201 meets the release criteria commensurate with the Waste Acceptance Criteria (for radiological purposes) of the U10C landfill permit residing within NNSS boundaries. Based on the thorough statistical sampling and scanning of the building’s interior, Building 2201 may be considered radiologically “clean,” or free of contamination.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗