Risk assessment of wellbore leakage during underground hydrogen storage

The expansion of renewable energy sources would require large-scale energy storage options to overcome the intermittent nature of these sources. Underground hydrogen storage (UHS) in depleted hydrocarbon reservoirs offers a scalable and practical energy storage solution. These reservoirs are chosen for their availability and large capacity, but the unique properties of hydrogen raise concerns about potential leakage pathways, particularly through wellbores. In this study, we develop and apply, for the first time, reduced-order models (ROMs) specifically designed for efficient leakage risk prediction in UHS systems operating in depleted hydrocarbon reservoirs. Using 3,000 high-fidelity simulation scenarios, we examine the influence of 11 key parameters, including reservoir and aquifer depths, wellbore permeability and porosity, initial saturations of water, oil and gas fractions (hydrogen, light, intermediate, and heavy hydrocarbons), reservoir pressure multiplier, and the aquifer-to-reservoir volume ratio, to simulate leakage behavior over a 1,000-year timescale. We train ROMs using a two-step classification-regression approach, achieving R 2 values exceeding 99 % across all targets. These ROMs effectively capture the leakage evolution and identify critical controls of leakage, guiding the design of mitigation strategies. Results indicate that gas leakage occurs in about 27 % of scenarios as early as five years post-operation, reaching volumes of up to 106 ft3. Oil leakage is less frequent (~17 %) and typically begins decades later. Our findings also show that hydrogen often migrates first, owing to its smaller molecular size and higher buoyancy, followed by heavier hydrocarbons. Over time, these heavier components contribute significantly to the total leaked volume, reinforcing the need for targeted monitoring and remediation strategies. Our analysis highlights that deeper storage reservoirs, shallower aquifers, and low-permeability wellbores significantly reduce leakage risks. In conclusion, this work offers a robust framework for risk-informed UHS deployment, supporting energy security through reliable large-scale hydrogen storage while safeguarding environmental integrity.

08 HYDROGEN↗

Development of Dry Cask Risk Tools

The Nuclear Regulatory Commission (NRC) has repeatedly expressed a desire to increase the use of risk in its decision-making. The Probabilistic Risk Assessment (PRA) Policy Statement published in 1995 formalized the Commission’s commitment to risk-informed regulation through the expanded use of PRA. While a great deal of work has been done to incorporate risk insights into the regulatory framework for at-power nuclear reactors. Far less progress has been made to risk inform the dry-casks and nuclear waste transportation areas of the nuclear fuel cycle. INL was tasked with incorporating the information from the two completed dry cask PRAs as well as any additional available information into a tool that helps the NRC use those insights to identify levels of risk at various stages in the nuclear waste cycle. The first task was to address the License Amendment Request (LAR) Process for Dry Cask storage, the second task is for the incorporate transportation into the tool, and the third and final task will be incorporate any additional regulatory applications for dry cask storage. This report covers the first task of the tool and will eventually incorporate the remaining two tasks may be completed in the future and built off the model described here. Task 1 specifically asked to incorporate the risk insights into the process for determining and prioritizing review of license amendment changes related to storage applications by outlining a resource allocation strategy and defining recommendations of for the depth and breadth of the LAR review. It was requested that the tool be similar in design to the SDP notebooks/worksheets and contain quantitative, qualitative, or semi-quantitative approaches to assessing the risk of the change. The final tool that was selected by INL to be developed was a flowchart and associated rationale document that allows the reviewer to quickly assess potential LAR changes and their associated risks as well as the rationale behind the risk categorization. This risk categorization will lead to specific actionable recommendations to expect from a change of that specific category. This allows for a more consistent review process as well as improving the overall efficiency of the review itself.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Application of Point Precipitation Frequency Estimates to Watersheds

This report documents work sponsored by the U.S. Nuclear Regulatory Commission (NRC) at the Oak Ridge National Laboratory (ORNL) as part of the RES project, “Application of Point Precipitation Frequency Estimates to Watersheds.” This project was implemented as part of the Probabilistic Flood Hazard Assessment (PFHA) Research Program. The objective of the PFHA Research Program is to develop tools and guidance on the use of PFHA methods to risk-inform NRC’s licensing of new facilities as well as licensing and oversight of currently operating facilities as they relate to flooding hazards. Many nuclear power plants (NPPs) are located on or near rivers so riverine flooding hazards need to be considered in their design and operation. Probabilistic riverine flood models are important tools for realistic assessment of flooding risks. However, these models require areal estimates of the depth, duration, and frequency of rainfall distributed over the watershed, which are not often available. Point precipitation frequency estimates are more widely available. For example, the National Oceanic and Atmospheric Administration (NOAA) has published NOAA Atlas 14, which provides point precipitation frequency estimates for 5-minute through 60-day durations at average recurrence intervals of 1-year through 1,000-year. The research documented in this report addresses areal reduction factors (ARFs), which can be used to convert the widely available point precipitation frequency estimates, to estimates of areal precipitation frequency over a watershed. The most widely used ARF source is Technical Paper 29 (TP-29) published by the then U.S. Weather Bureau in 1958. However, both the methods and the underlying precipitation data used to produce TP-29 are seriously out of date. For example, due to the small gauge network available at the time of TP-29’s compilation, ARF estimates developed are only for watersheds smaller than about 400 square miles. Due to the relatively short record lengths of precipitation data available, frequency considerations could not be accurately determined. Other factors such as regional climate and seasonality were not addressed. Several newer methods have been published since TP-29 was developed and both the type and quantity of precipitation data have increased significantly, along with computational resources and analytical tools such as geographic information systems. This report reviewed and assessed the available precipitation products and methods for conducting ARF analysis. The work applied up-to-date precipitation data products and analysis methods with a novel watershed-based approach to investigate how ARF estimates vary across different methods, data sources, geographical locations, return periods, and seasons. The overall findings reported here regarding basic ARF trends are in line with other recent studies showing that ARFs decrease with increasing area, increase with increasing duration, and decrease with increasing return period. This study found significant differences among the available ARF methods. This work also found a strong geographical variability across different US hydrologic regions, suggesting that the ARF are specific to regional climate patterns and geographical characteristics and should not be applied arbitrarily to other locations. The results also reveal the importance of data record length, especially for high return level ARFs. The work reported in NUREG/CR-7271 will assist NRC staff in assessing different classes of ARF methods in conjunction with available rainfall data sets. It will also support the development of guidance for application of point precipitation data in PFHAs. It should be noted that the ARF values presented in this report for any location or region were developed for the purposes of comparing methods and investigating the factors that influence ARFs. They should not be considered official and should not be used in leu of a site-specific analysis.

54 ENVIRONMENTAL SCIENCES↗

Technical Specification Surveillance Interval Extension Using Self-Diagnostics

As part of the Light Water Reactor Sustainability program, an ongoing research effort is being conducted on technical specifications surveillance interval extension of digital equipment in nuclear power plants. The research team is led by Idaho National Laboratory and includes Pacific Northwest National Laboratory, Technology Resources, and Oak Ridge National Laboratory. This research focuses on developing methods for applying the U.S. Nuclear Regulatory Commission (NRC)–approved guidance to implement a licensee-controlled, risk-informed surveillance frequency change program in digital instrumentation and control (I&C) systems that include self-diagnostics and online monitoring (OLM) capabilities. Although approved methods exist for extending technical specifications (TS) surveillance test intervals (STIs) for general equipment, including analog I&C equipment, gaps remain in technology and guidance on crediting newer digital equipment’s internal self-diagnostics and OLM characteristics. Previous research described a general methodology for crediting internal self-diagnostics for extending surveillance test intervals. The methodology used self-diagnostics to detect—and credited recovery from—failure. Self-diagnostics were also applied for performance monitoring during the extended surveillance interval. This report discusses the status of recent activities to evaluate the previously developed methodology using a pilot study. Although both a utility partner for a pilot study and a specific digital asset were identified in FY2020, delays in obtaining proprietary information resulted in a limited ability to fully evaluate the methodology, and further interactions were complicated by the COVID pandemic. Therefore, at that time, the use of public-domain information—along with current processes for surveillance interval extension through a surveillance frequency control program—identified the need to fully assess diagnostic coverage as part of the pilot study. Furthermore, self-diagnostics were also identified as a potential option to replace the drift analyses conducted as part of current STI extension procedures. In FY2022, the project was reconstituted with the industry partner, and information and data were made available by the industry partner to the research team for review. The shared information included failure event descriptions and data for a digital I&C system since its implementation, as well as recent STI extension interval reports developed by the utility partner on that digital I&C system. This report presents an evaluation of this information and data and describes an application of the proposed methodology cited above. The methodology seeks to take advantage of the self-diagnostics and OLM capabilities to reduce risk or reduce the level of qualitative monitoring assessment needed to perform a risk-informed STI extension using existing NRC approved guidance or both. Addressing these issues of STI extension by crediting self-diagnostics is likely to result in benefits for current and future nuclear power plant (NPP) operations, including lowering the barriers to adoption of digital I&C systems and increasing cost savings by deferring or eliminating unneeded preventive maintenance (tasks or checks or activities). Specifically, self-diagnostic and OLM capabilities of newer digital equipment being installed in non-safety and safety applications are designed to detect failures, provide early warning of potential failures, and notify plant operators to take appropriate action to reduce out of service (OOS) time thus protecting safety margins. Moreover, the equipment is expected to provide information that time-related operational degradation is identified early to ensure timely and planned corrective actions instead of a reactive and unplanned approach ahead of an extended-surveillance interval.

42 ENGINEERING↗

Idaho National Laboratory Integrated Multisite SSHAC Level 3: Probabilistic Volcanic Hazards Assessment

The Idaho National Laboratory (INL) resides on the eastern Snake River Plain (ESRP), part of the Snake River Plain (SRP) with a complex origin and geologic history of volcanism. Much of the Quaternary (last 2.58 million years) volcanism within 400 km of INL is genetically associated with a major thermal anomaly referred to as the Yellowstone hotspot, which is currently located more than 180 km northeast of INL. Near INL, local volcanic sources include silicic domes near its southern border, and numerous dike-fed basaltic vents of the ESRP, some of which are near or within the INL boundaries. Quantitative probabilistic assessments of screened-in volcanic hazardous phenomena for nine different facility complexes at the INL are presented for a Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 (SL3) study. The comprehensive, integrated multisite SSHAC study consists of a single regional Probabilistic Volcanic Hazards Assessment (PVHA) that pertains to all nine INL facility complexes, with site-specific information developed at each respective area of interest (AOI), referred to as the "INL facility AOI" (Figure ES-1). Hazard products are generated for specified INL facility AOIs for use by multiple stakeholders from different agencies in risk-informed decision-making regarding site selection, operations, and design of nuclear facilities at INL, consistent with U.S. Department of Energy (DOE) and U.S. Nuclear Regulatory Commission (NRC) regulatory guidance. The study also serves as the basis for future periodic safety assessments required for existing DOE facilities, such as 10-year evaluations of natural-phenomena hazards. Elements of the INL PVHA including initial characterization, screening, quantitative assessments of eruption and hazard potential, and consideration of facility needs are conducted using the three phases of the SSHAC process: evaluation, integration, and documentation. As per regulatory guidance, the SSHAC framework provided the necessary processes and procedures for the PVHA Technical Integration (TI) team, at three workshops, five formal working meetings and many TI team remote meetings, to conduct initial characterization, screen the volcanic hazards, create PVHA model inputs, exercise those models in the PVHA, consider facility-specific volcanic hazard needs, and perform final hazard calculations. The Participatory Peer Review Panel (PPRP) provided independent oversight and performed process and technical reviews of the PVHA throughout its duration. The study included an extensive New Data Collection and Analyses (NDCA) program developed by the PVHA TI team to reduce uncertainties in hazard-significant elements in the PVHA model. NDCA activities generated 20 reports providing important contributory datasets and results to the project database for characterizing the ESRP. For example, a report compiling the dimensions of ESRP shield volcanoes and lava fields was used to construct volcanic footprints (areas of impact), was compared with data from INL subsurface cores, and was used to validate the results of lava-flow inundation modeling on the contemporary terrain. Another example is the acquisition of aeromagnetic data over INL and its surrounding area, with maps of buried magmatic features (e.g., subsurface volcanoes and swarms of feeder dikes) that informed the PVHA conceptual model of volcanism. The SSHAC evaluation process was used to conduct all elements of the PVHA including initial characterization and screening. Existing data and NDCA activities provided the foundation to develop the tectonomagmatic conceptual model of volcanism for the region of geographical interest in the SRP and Yellowstone hotspot volcanic system, and for considering volcanoes in the western US. Considering Quaternary volcanic sources active during this period, the screening approach identified and evaluated magma compositions, types of eruptive and intrusive phenomena, types of hazardous phenomena, and proximity of sources to INL. The PVHA TI team evaluated 18 types of magmatic sources in terms of 20 potentially hazardous phenomena, resulting in 360 screening decisions. The screening process resulted in 140 screened-in hazardous volcanic phenomena for Quaternary volcanic sources 1) proximal to INL facility complexes in the ESRP (64 basaltic and 54 silicic), 2) regional sources associated with the Yellowstone caldera system and Blackfoot Reservoir volcanic field (7), and 3) more distal sources from thirteen Cascade volcanoes and two volcanoes at Long Valley caldera (CA).

58 GEOSCIENCES↗

ARCADE Analysis Methods & Validation Pathway

The Advanced Reactor Cyber Analysis and Development Environment (ARCADE) provides an automated analysis system which supports risk-informed performance based (RIPB) evaluations of nuclear control systems. Every possible cyber threat which could lead to consequence is identified by simulating the unsafe control action sequences which transform digital harm into physical harm. Eliminating the simulation of complex digital cyber attack chains cuts out unnecessary computational overhead and focuses directly on the physics of cyber-physical attacks. This focus enables designers to make informed decisions which can entirely eliminate categories of cyber threats against advanced reactors through the physical nature of the plant design. This narrowing of cyber threat against nuclear power plants through the physics of the system is intended to make any remaining threat management and cost efficient. This is the goal of the Tiered Cyber Analysis (TCA) outlined in NRC Draft Regulation Guide (RG) 5.96, which provides a RIPB cybersecurity approach for new reactors. ARCADE has been custom developed to meet the demands of the rigorous analysis required in Tier 1 of the TCA, which forms the foundation of the TCA process. Currently, ARCADE is still under development, but has made significant leaps in capability. A pilot analysis on the opensource Asherah simulator was performed which demonstrated key functionality goals. The next stage of ARCADE development involves improvements to the applications which support the analysis system, and enabling the analysis system to utilize the full suite of unsafe control action simulations. Since the analysis method’s core functions are complete, validation of the analysis method will be started concurrent to the next development stages. The automated analysis ARCADE will provide can radically change the cybersecurity design process for advanced reactors, reducing the cost of security implementation while enhancing cyber resilience. The pathway for ARCADE’s development to this goal has become much clearer. The majority of technical hurdles have been cleared, and the remaining development needs have been solidified. ARCADE is now capable of assisting the advanced reactor design process and directly support advanced reactor industry RIPB practices.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Achieving a Risk-Informed Decision-Making Environment at NASA: The Emphasis of NASA's Risk Management Policy

This slide presentation reviews the evolution of risk management (RM) at NASA. The aim of the RM approach at NASA is to promote an approach that is heuristic, proactive, and coherent across all of NASA. Risk Informed Decision Making (RIDM) is a decision making process that uses a diverse set of performance measures along with other considerations within a deliberative process to inform decision making. RIDM is invoked for key decisions such as architecture and design decisions, make-buy decisions, and budget reallocation. The RIDM process and how it relates to the continuous Risk Management (CRM) process is reviewed.

Dezfuli, Homayoon↗

A Proactive and Top-Down Approach to Managing Risk at NASA

Our ultimate goal is to manage risk in a holistic and coherent fashion across the Agency: a) The RIDM process is intended to risk-inform direction-setting decisions. c) The CRM process is intended to manage risk associated with the implementation of baseline performance requirements. Currently we are working on: a) Enhancements to the CRM process. b) Better integration of the RIDM and CRM processes. c) Better integration of institutional risk considerations into RM framework.

Dezfuli, Homayoon↗

NASA Accident Precursor Analysis Handbook, Version 1.0

Catastrophic accidents are usually preceded by precursory events that, although observable, are not recognized as harbingers of a tragedy until after the fact. In the nuclear industry, the Three Mile Island accident was preceded by at least two events portending the potential for severe consequences from an underappreciated causal mechanism. Anomalies whose failure mechanisms were integral to the losses of Space Transportation Systems (STS) Challenger and Columbia had been occurring within the STS fleet prior to those accidents. Both the Rogers Commission Report and the Columbia Accident Investigation Board report found that processes in place at the time did not respond to the prior anomalies in a way that shed light on their true risk implications. This includes the concern that, in the words of the NASA Aerospace Safety Advisory Panel (ASAP), "no process addresses the need to update a hazard analysis when anomalies occur" At a broader level, the ASAP noted in 2007 that NASA "could better gauge the likelihood of losses by developing leading indicators, rather than continue to depend on lagging indicators". These observations suggest a need to revalidate prior assumptions and conclusions of existing safety (and reliability) analyses, as well as to consider the potential for previously unrecognized accident scenarios, when unexpected or otherwise undesired behaviors of the system are observed. This need is also discussed in NASA's system safety handbook, which advocates a view of safety assurance as driving a program to take steps that are necessary to establish and maintain a valid and credible argument for the safety of its missions. It is the premise of this handbook that making cases for safety more experience-based allows NASA to be better informed about the safety performance of its systems, and will ultimately help it to manage safety in a more effective manner. The APA process described in this handbook provides a systematic means of analyzing candidate accident precursors by evaluating anomaly occurrences for their system safety implications and, through both analytical and deliberative methods used to project to other circumstances, identifying those that portend more serious consequences to come if effective corrective action is not taken. APA builds upon existing safety analysis processes currently in practice within NASA, leveraging their results to provide an improved understanding of overall system risk. As such, APA represents an important dimension of safety evaluation; as operational experience is acquired, precursor information is generated such that it can be fed back into system safety analyses to risk-inform safety improvements. Importantly, APA utilizes anomaly data to predict risk whereas standard reliability and PRA approaches utilize failure data which often is limited and rare.

Groen, Frank↗

Sustaining a Mature Risk Management Process: Ensuring the International Space Station for a Vibrant Future

The International Space Station (ISS) risk management methodology is an example of a mature and sustainable process. Risk management is a systematic approach used to proactively identify, analyze, plan, track, control, communicate, and document risks to help management make risk-informed decisions that increase the likelihood of achieving program objectives. The ISS has been operating in space for over 14 years and permanently crewed for over 12 years. It is the longest surviving habitable vehicle in low Earth orbit history. Without a mature and proven risk management plan, it would be increasingly difficult to achieve mission success throughout the life of the ISS Program. A successful risk management process must be able to adapt to a dynamic program. As ISS program-level decision processes have evolved, so too has the ISS risk management process continued to innovate, improve, and adapt. Constant adaptation of risk management tools and an ever-improving process is essential to the continued success of the ISS Program. Above all, sustained support from program management is vital to risk management continued effectiveness. Risk management is valued and stressed as an important process by the ISS Program.

Raftery, Michael↗

Considering Risk and Resilience in Decision-Making

This paper examines the concepts of decision-making, risk analysis, uncertainty and resilience analysis. The relation between risk, vulnerability, and resilience is analyzed. The paper describes how complexity, uncertainty, and ambiguity are the most critical factors in the definition of the approach and criteria for decision-making. Uncertainty in its various forms is what limits our ability to offer definitive answers to questions about the outcomes of alternatives in a decision-making process. It is shown that, although resilience-informed decision-making would seem fundamentally different from risk-informed decision-making, this is not the case as resilience-analysis can be easily incorporated within existing analytic-deliberative decision-making frameworks.

Torres-Pomales, Wilfredo↗

Comparative Analysis of Static and Dynamic Probabilistic Risk Assessment

Implementation of risk-informed design allows the design team to thoroughly explore the risks of a system while iterating the operations concept, design, and requirements until the system meets mission objects and is achievable within constraints. To arrive at a space system design that is likely to meet all constraints placed upon mass, cost, performance and risk, the system requirements must be understood and traded against each other as early as the conceptual design phase. Depending on the project phase and the goals of the risk analysis, various PRA methodologies could be used to produce quantitative risk estimates to enable such a process. In order to better understand the applicability, advantages, and limitations of various PRA methodologies, a comparative analysis of three bottom-up, component-based PRA approaches was performed. The three methods examined are a traditional static fault tree, a fault tree hybrid, and a dynamic Monte Carlo simulation. Each approach was used to assess a generic reaction control system (RCS) thruster pod and mission. The methods are assessed in terms of the process of modeling a system, the actionable information produced for the design team, and the overall fidelity of the quantitative risk evaluation generated. The paper also discusses the applicability of each methodology to the different phases of system development.

Probablistic↗

Habitability Assessments And Lessons-learned From 3-day And 11-day Enriched Oxygen Hypobaric Chamber Tests At NASA Johnson Space Center

INTRODUCTION: Decompression sickness (DCS) is a risk to the health and performance of astronauts and high-altitude aircrew. Tolerance to flammability, hypoxia, prebreathe duration, and DCS risk varies across different organizations, vehicles, suits, and destinations, necessitating a variety of DCS risk mitigation approaches. Existing models of altitude DCS risk are often insufficient to enable accurate risk-informed decisions during hardware development, mission planning, and flight operations. METHODS: NASA completed outfitting of a dedicated facility at Johnson Space Center to support testing of up to eight human subjects for multiple days in hypobaric and enriched oxygen atmospheres. The primary purpose of the testing capability is validation of DCS risk mitigation protocols for Artemis missions to the Moon; however, it will also support development and validation of a generalizable altitude DCS risk estimation tool. A 3-day and an 11-day prebreathe validation test were completed in 2022, each with 8 human subjects living at 56.5 kPa (8.2 psia), 34% O2, 66% N2, with 5 simulated EVAs performed on masks at 29.6 kPa (4.3 psi), 85% O2, 15% N2. Facility and organizational lessons-learned and process improvements were recorded during and following the tests, and subjective habitability ratings were recorded daily during the 11-day test. Hypoxia and DCS-related physiological and cognitive outcome measures were recorded during both tests and are reported in companion presentations. RESULTS & DISCUSSION: All subjects completed each of the tests. Primary habitability issues related to mask discomfort during simulated EVAs and poor sleep quality due to thin mattresses. Polybenzimidazole (PBI) clothing was worn by all subjects due to the increased fire risk and may be required for Artemis missions; clothing was found to be acceptable overall with the worst ratings being due to poor fit and inelasticity. Chamber O2 and CO2 sensor inconsistency was observed that did not result in test termination but required post-test follow-up. Forward plans include additional hypobaric testing and integration of existing and future physiological outcome data into an open-source Aerospace Estimation Tool for Hypobaric Exposure Risk (AETHER). NASA is also working to make the testing capability available to commercial companies.

Andrew F J Abercromby↗

Exploring Digital Transformation for NASA Nuclear Flight Safety

The U.S. National Aeronautics and Space Administration’s (NASA)’s Nuclear Flight Safety discipline is exploring opportunities to combine incremental advancements in many contributing areas in a way that produces a transformative change for how work is performed. More specifically, after providing some general NASA and space nuclear policy background, the authors will describe concepts and efforts that enable: (i) the use of objectives-d riven approaches (in concert with internal and external constraints) to establish a mission risk posture; (ii) the use of that risk posture in the planning process to risk-inform the selection of Safety and Mission Success (S&MS) methods and models; (iii) use of model-based and machine-assisted techniques to manage the complex and ponderous amount of information and interfaces that typify spaceflight efforts; (iv ) the means by which that infrastructure can directly feed an assurance case (including use of systems modelling language, ontological formulation, and semantic web technology) so as to address known weaknesses in our ability to communicate and manage that complexity; and (v) use of that case-assured framework to demonstrate that one did the adequate and sufficient S&MS work and that the S&MS work was done competently.

Donald Helton↗

Habitability Assessments And Lessons-learned From 3-day And 11-day Enriched Oxygen Hypobaric Chamber Tests At NASA Johnson Space Center

INTRODUCTION: Decompression sickness (DCS) is a risk to the health and performance of astronauts and high-altitude aircrew. Tolerance to flammability, hypoxia, prebreathe duration, and DCS risk varies across different organizations, vehicles, suits, and destinations, necessitating a variety of DCS risk mitigation approaches. Existing models of altitude DCS risk are often insufficient to enable accurate risk-informed decisions during hardware development, mission planning, and flight operations. METHODS: NASA completed outfitting of a dedicated facility at Johnson Space Center to support testing of up to eight human subjects for multiple days in hypobaric and enriched oxygen atmospheres. The primary purpose of the testing capability is validation of DCS risk mitigation protocols for Artemis missions to the Moon; however, it will also support development and validation of a generalizable altitude DCS risk estimation tool. A 3-day and an 11-day prebreathe validation test were completed in 2022, each with 8 human subjects living at 56.5 kPa (8.2 psia), 34% O2, 66% N2, with 5 simulated EVAs performed on masks at 29.6 kPa (4.3 psi), 85% O2, 15% N2. Facility and organizational lessons-learned and process improvements were recorded during and following the tests, and subjective habitability ratings were recorded daily during the 11-day test. Hypoxia and DCS-related physiological and cognitive outcome measures were recorded during both tests and are reported in companion presentations. RESULTS & DISCUSSION: All subjects completed each of the tests. Primary habitability issues related to mask discomfort during simulated EVAs and poor sleep quality due to thin mattresses. Polybenzimidazole (PBI) clothing was worn by all subjects due to the increased fire risk and may be required for Artemis missions; clothing was found to be acceptable overall with the worst ratings being due to poor fit and inelasticity. Chamber O2 and CO2 sensor inconsistency was observed that did not result in test termination but required post-test follow-up. Forward plans include additional hypobaric testing and integration of existing and future physiological outcome data into an open-source Aerospace Estimation Tool for Hypobaric Exposure Risk (AETHER). NASA is also working to make the testing capability available to commercial companies.

Andrew Abercromby↗

Hydrogen Component Leak Rate Quantification for System Risk and Reliability Assessment through QRA and PHM Frameworks: Preprint

The National Renewable Energy Laboratory's (NREL) Hydrogen Safety Research and Development (HSR&D) program in collaboration with the University of Maryland's Systems Risk and Reliability Analysis Laboratory (SyRRA) are working to improve reliability and reduce risk in hydrogen systems. This approach strives to use quantitative data on component leaks and failures, together with Prognosis and Health Management (PHM), and Quantitative Risk Assessment (QRA) to identify at-risk components, reduce component failures and downtime, and predict when components require maintenance. Hydrogen component failures increase facility maintenance cost, facility downtime, and reduce public acceptance of hydrogen technologies, ultimately increasing facility size and cost because of potentially overly conservative requirements. Leaks are a predominant failure mode for hydrogen components. However, uncertainties in the amount of hydrogen emitted from leaking components and the frequency of those failure events limit the understanding of the risks that they present under real-world operational conditions. NREL has deployed a test fixture, the Leak Rate Quantification Apparatus (LRQA), to quantify the mass flow rate of leaking gases from medium and high-pressure components that have failed while in service. Quantitative hydrogen leak rate data from this system could ultimately be used to better inform risk assessment and Regulation Codes and Standards (RCS). Parallel activity explores the use of PHM and QRA techniques to assess and reduce risk, thereby improving safety and reliability of hydrogen systems. The results of QRAs could further provide a systematic and science-based foundation for the design and implementation of RCS, as in the latest versions of the NFPA 2 code for gaseous hydrogen stations. Alternatively, data-driven techniques of PHM could provide new damage diagnosis and health-state prognosis tools. This research will help end users, station owners and operators, and regulatory bodies move towards risk-informed preventative maintenance versus emergency corrective maintenance, reducing cost and improving reliability. Predictive modelling of failures could improve safety and affect RCS requirements such as setback distances at liquid refuelling sites. The combination of leak rate quantification research, PHM, and QRA can lead to better informed models enabling data-based decision to be made for hydrogen system safety improvements.

codes and standards↗

Quantitative Risk Analysis of High Safety Significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants using IRADIC Technology

This report documents the activities performed by Idaho National Laboratory (INL) during fiscal year (FY) 2021 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) Risk Assessment project. In FY-2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems (IRADIC technology) was proposed for this strategy, which aims to (1) provide a best-estimate risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the High Safety Significant Safety-related (HSSSR) DI&C systems, (2) develop an advanced risk assessment technology to support transition from analog to DI&C technologies for nuclear industry, (3) assure the long-term safety and reliability of vital HSSSR DI&C systems, (4) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the IRADIC technology is instructive for nuclear vendors and utilities to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify responding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the individual level, system level, and plant level, (4) providing insights and suggestions on designs to manage the risks; thus, to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). In this report, an approach for performing software CCF analysis, given limited data, is developed and demonstrated using a case study of a highly redundant digital reactor trip system. Consequence analysis is also performed based on different accident scenarios. Results indicate that plant modernization including the improvement of HSSSR DI&C systems will make great benefits to plant safety by providing more safety margins to accident management. In addition, a novel approach is proposed in this report for the quantification of software hazards when sufficient operational and testing data available. The method incorporates software development quality as well as strong analysis techniques to identify and link software defects to potential failure modes. The approach includes both semantic and test-based analysis to detect failures that can exist in different stages of the software development life cycle. This method is applied to an advanced human system interface relevant to reactor trip safety developed from the APR 1400 design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Accelerated Materials Deployment in Advanced Nuclear Power Plants

The purpose of this report is to begin the development of a maximally efficient process for licensing and deploying new materials in Advanced Non-Light-Water Reactors (ANLWRs). Some new materials that are to be used in some new plants are seen as possibly introducing risks, because our understanding of those new materials’ behavior in the conditions generated by some novel plant designs is less complete than our understanding of the behavior of materials with long use histories in existing designs. In these cases, an approved code/standard or a code case to support the use of these materials in the novel design’s safety case may not exist for the regulator to utilize as part of the licensing determination. This circumstance creates the potential for an extremely long licensing process for new designs using new materials. The present strategy is to show how to manage these risks proactively, in such a way as to permit licensing decisions to be made in a timely manner, based on this risk management process. The present report outlines the gaps in the current codes to support deployment and use of novel materials and begins the development of the necessary risk management framework that is focused on the subject materials issues; it is based on risk-informed in-service surveillance practices, carried out in such a way as to compensate for current limitations in our state of knowledge. This development will enable licensing and deployment of the subject materials, conditional on the proactive surveillance process to be established. While this report is occasioned by limitations in our knowledge of certain materials issues that may arise in advanced designs, in-service surveillance is always done in order to compensate for a lack of knowledge: if we knew that components were not already failed and not trending toward failure, we would not perform surveillance, even in current-generation plants (except that prescriptive requirements would force us to do so). What is different about the surveillance program discussed here is that the issues are newer and the relevant experience base is less complete, so the surveillance presently contemplated may need to measure new things and/or measure them more often than has been traditional for surveillance coupons. The present report is devoted to the risk management framework and applies American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Division [1] to establish the structure of a protocol for carrying out the necessary surveillance. These documents are generic: they do not tell us how often to surveille, or what to surveille, or what to measure, but rather how to determine those things, given certain technical inputs. The Regulatory Development R&D Program [2] is currently developing the companion supporting technical basis for the materials surveillance technology that, when completed and validated, can be used by owner/operator and NRC to implement a materials degradation management program for ANLWRs. This report also outlines salient points of discussion, positive potential outcomes, and potential concerns from industry and the USNRC. These aspects of the report intend to inform future work to develop a proposed technical process for adoption by the industry and endorsement by the USNRC to allow developers to propose a risk informed and conservative approach for the use of materials where operating experience/data and codes and standards may not exist for use of a novel material in an operating reactor environment. Additionally, such a technology could be leveraged to potentially reduce part of the upfront materials data requirements from ongoing long-term materials testing so that early action on license application could be undertaken by NRC, in parallel with the continuation of long-term data collection. This could accelerate the schedule for a first-of-a-kind ANLWR deployment or a nth-of-a-kind new materials insertion for established ANLWR designs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗