Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Regulatory Compliance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

A model to assess Zircaloy’s mechanical property changes following a transient beyond critical heat flux

Maintaining the integrity of nuclear fuel rods is essential for ensuring public health and safety in nuclear power generation. During reactor operation, this integrity is confirmed by demonstrating compliance with established regulatory acceptance criteria. For moderate-frequency events, such as limiting transients and anticipated operational occurrences (AOOs), the current fuel integrity criterion is based on preventing boiling transition. This criterion assumes that prevention of boiling transition will prevent excessive cladding heating and, thus, fuel failure during normal operations. While conservative, this approach places significant constraints on core design, fuel cycle economics, and a plant’s ability to perform major power uprates, leading to suboptimal fuel utilization and inefficient carbon-free energy production. A more efficient approach could be achieved by revising the failure criterion to a material-specific limit rather than strictly preventing the boiling transition, since boiling transition per se is not a cause of fuel cladding failure. Here, as a result, a new licensing framework based on material properties, termed time-at-temperature (t@T), is needed. This approach would allow for brief periods of post–critical heat flux operation during an AOO without compromising safety. Implementing the t@T licensing strategy requires a robust technical foundation in material properties, which must be established through comprehensive data collection on both unirradiated and irradiated fuel and cladding materials. This foundation would enable the development of a safety basis that ensures safe operation while providing greater flexibility and efficiency for reactor operation. This paper documents a thorough review of the available data to establish a baseline knowledge that can inform the development of cladding mechanical models, as well as identify experimental data gaps that need to be addressed in future research. Machine learning and data informatics were utilized to extract the importance of parameters on the t@T parameter. Industry tools were used to perform baseline analyses to define the relevant transient conditions for data analysis. The subsequent review successfully identified applicable experimental data, as well as sufficient data to evaluate changes in cladding mechanical properties following an AOO transient. Rather than developing new models, this work coupled existing irradiation annealing and recrystallization models to calculate changes in hardness, yield stress, and ultimate tensile stress following an AOO event. The findings from this review were summarized to highlight the experimental data needs required to fill remaining gaps and support the development of future t@T licensing methodologies.

Cladding performance↗

Safety Analysis Report for Packagings – Model 9979 Type AF Shipping Package

This Safety Analysis Report for Packaging (SARP) documents the performance of the Department of Energy (DOE) Model USA/9979/AF-96 shipping package and compliance with the regulatory safety requirements of Title 10 and Title 49 of the Code of Federal Regulations. The SARP is prepared in accordance with U.S. Department of Energy (DOE) Order 460.1D. The Model 9979 Type A Fissile shipping package replaces the Department of Transportation (DOT) UN1A2 Specification Packaging. Formerly, the UN1A2 was authorized under Title 49 of the Code of Federal Regulations, Section 173.417 (2004) for transport of Type A quantities of fissile material over public highways. In accordance with the Federal Register, final rule making issued on January 26, 2004, the Nuclear Regulatory Commission, in a joint effort with the Department of Transportation, initiated a planned phase out of multiple Specification Packagings from 49 CFR 173, the UN1A2 being one. The rulemaking mandated, by law, removal of these specification packagings from service no later than September 30, 2008. The 9979 is a Performance Packaging and replaces the UN1A2 Specification Packaging. The Packaging Technology and Transportation Engineering (PT&TE) organization of the Savannah River National Laboratory (SRNL) is the Design Authority and Design Agency for the 9979.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ultramicro to mesopore frameworks for selective separation and storage of noble gases

Methods and materials for the selective capture and storage of preselected materials from gas streams using metal organic framework (MOF) materials are described. In various embodiments preselected target material gases could include noble gasses such as Kr, Xe, Rn, Arultramicro to mesopore frameworks for selective separation and storage of noble gases, other gasses such as I2 or other particular isotopes either naturally occurring or man-made, or another preselected gas capture material such as a target material for legal, regulatory or treaty compliance, or a preselected material from a particular process such as a cleaning or etching agent from semiconducting or microelectronic manufacture, or a portion of an anesthetic gas such as nitrous oxide, isoflurane, sevoflurane or a fluorinated ethers.

Thallapally, Praveen K.↗

Regulatory Testing of WTP HL W Glasses for Compliance with Delisting Requirements, VSL-03R3780-1, Rev. 1

(Part of the data collected for this work and discussed in this report was subject to data quality and bias issues. All the affected tests have subsequently been repeated, as directed by the Waste Treatment Plant Project, and new statistical analyses have been performed on the revised data set. A subsequently-issued report supercedes this report and describes the revised data, together with the revised composition-property models (Kot et al. 2004). The reader should refer to the new report for discussion of the revised data set and composition-property (TCLP cadmium release) models. None of the data for the spike glasses, designed for Case 1 and Case 2 COPCs testing, were affected by this issue.)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Status Report (FY 2024): Performance Assessment for the Integrated Disposal Facility

The purpose of this Annual Summary Report (ASR) for Fiscal Year (FY) 2024 is to evaluate the continued adequacy of the Integrated Disposal Facility (IDF) Performance Assessment (PA) and Disposal Authorization Statement (DAS). This report consolidates relevant monitoring data, modeling analyses, and regulatory reviews to demonstrate a reasonable expectation that the PA objectives and performance measures will be met, as required under DOE O 435.1. The ASR follows the guidance in DOE-STD-5002-2017, which provides a framework for maintaining the validity of the DAS through periodic assessment of facility performance and compliance with waste disposal requirements. The IDF is a near-surface disposal facility designed to receive and permanently dispose of low-level waste (LLW) and mixed low-level waste (MLLW) generated from Hanford Site operations. The facility consists of two double-lined disposal cells equipped with leak detection and leachates recovery systems to ensure environmental protection. Waste planned for disposal includes vitrified low-activity waste (LAW) and solid secondary waste (SSW) from the Hanford Waste Treatment and Immobilization Plant (WTP). At the end of FY 2024, the IDF had not yet received any waste, as it remains in a pre-operational state. Disposal activities will begin with the hot commissioning of the WTP LAW Vitrification Facility using the Direct-Feed Low-Activity Waste (DFLAW) approach in Calendar Year (CY) 2025. This ASR justifies the continued adequacy of the PA and DAS by reviewing key documents and data sources. these sources are listed in Table A-2 in Appendix A.4): The Operating Disposal Authorization Statement (ODAS) for the IDF (DOE-EM, 2021) remains in effect, with no outstanding conditions or key issues affecting its implementation. Based on the comprehensive review of PA analyses, monitoring data, and regulatory compliance activities, this ASR concludes that the IDF remains in compliance with DOE O 435.1, and there is reasonable assurance that the PA performance objectives will be met once disposal operations commence in CY 2025.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LLNS Request for Variance from 10 CFR 851 for Construction of LLNL Digital Infrastructure Capabilities Expansion Project

Lawrence Livermore National Security, LLC (LLNS) requests variance to 10 CFR 851 (the Rule) for the construction of the Digital Infrastructure Capabilities Expansion (DICE) project. The request isin continued support of the National Nuclear Security Administration (NNSA) “pilot” to streamline the delivery of commercial-like line-item construction projects under $50 million. This pilot is aligned with the approved NA-50 safety approach. Experience gained in the construction of the new Lawrence Livermore National Laboratory (LLNL) Emergency Operations Facility (EOC) under the variance granted in June 2020 is very encouraging. While detailed analysis will be forthcoming after that project is completed, there are strong indicators that a benefit has been realized by the subcontractors executing the work. The variance has permitted local/regional construction businesses contracted to Management & Operation contractor operated facilities and lower tier subcontractors to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the Department of Energy (DOE) Complex. While compliance to standards that are as safe and healthful as those in 10 CFR 851: confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum has been avoided. Safety and health performance on the EOC construction project including the number of inspection and surveillance issues is comparable to other subcontractors and projects at LLNL executed under 10 CFR 851.

99 GENERAL AND MISCELLANEOUS↗

LLNS Request for Variance From 10 CFR 851 for Construction of LLNL Emergency Operations Center

Lawrence Livermore National Security, LLC (LLNS) is submitting the following variance application requesting the use of the State of California’s Occupational Safety and Health Administration (Cal/OSHA) Regulations in lieu of Title 10 Code of Federal Regulations Part 851 (10 CFR 851, the Rule), Worker Safety and Health Program, Subpart B (Program Requirements), Subpart C (Specific Program Requirements), and Appendix A (Worker Safety and Health Functional Areas), solely with respect to the construction of the new Lawrence Livermore National Laboratory (LLNL) Emergency Operations Center (EOC) facility. The request is in support of the National Nuclear Security Administration (NNSA) “pilot” to streamline the delivery of commercial-like line item construction projects under $50 million. This pilot is aligned with the approved NA-50 safety approach for the projects in the pilot. This pilot is to test and demonstrate innovation leading to a reduced cost of construction for building commercial type structures at Department of Energy (DOE)/NNSA facilities. The variance proposes to permit local/regional construction businesses contracted to Management & Operation contractor operated facilities to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the DOE Complex. This will permit compliance to standards that are as safe and healthful as those in 10 CFR 851 without confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum.

99 GENERAL AND MISCELLANEOUS↗

LLNS Request for Permanent Variance from 10 CFR 851 for Construction

Lawrence Livermore National Security, LLC (LLNS) requests variance from 10 CFR 851 (the Rule) for construction work at Lawrence Livermore National Laboratory (LLNL). The request is based upon successful application of similar variances granted to LLNS in continued support of the National Nuclear Security Administration (NNSA) initiative to streamline the delivery of line-item construction projects under $50 million. This request is aligned with the approved NA 50 safety approach. Experience gained in the construction of the new LLNL Emergency Operations Center (EOC) under the variance granted in June 2020 and construction preparations to date on the Digital Infrastructure Capabilities Expansion (DICE) under the variance granted April 2022 is very encouraging. There are strong indicators that a benefit has been realized by both the subcontractors executing the work and the Laboratory. The variance has permitted local/regional construction businesses contracted to Management & Operation Contractor operated facilities and lower tier subcontractors to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the Department of Energy (DOE) Complex. While compliance to standards that are as safe and healthful as those in 10 CFR 851: confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum has been avoided. Safety and health performance on the construction project including the number of inspection and surveillance issues is comparable to other subcontractors and projects at LLNL executed under 10 CFR 851. This variance application was prepared according to the requirements in 10 CFR 851, Subpart D – Variances, § 851.31 Variance Process. This request is limited to subcontractor executed construction at LLNL.

42 ENGINEERING↗

PV Stormwater Management Research and Testing (PV-SMaRT) (Final Technical Report)

The objective of the Photovoltaic Stormwater Management Research and Testing (PV-SMaRT) project was to develop and disseminate research-based, solar-specific resources for estimating stormwater runoff at ground-mounted PV facilities and detail stormwater management and water quality best practices. The intended use of stormwater management and water quality best practices and stormwater runoff estimation resources is to reduce balance of system soft costs associated with stormwater infrastructure requirements and improve water quality through research-tested best practices. Currently, stormwater regulations and guidelines vary by jurisdiction and can lead to regulatory uncertainty and increased compliance costs for managing stormwater runoff at solar sites. To address these concerns, the NREL team and its partners (University of Minnesota, Great Plains Institute, and Fresh Energy) established and engaged an advisory Water Quality Task Force (WQTF); conducted field research on stormwater infiltration and runoff at five ground-mounted PV sites; validated a 3-D hydrologic model to predict water runoff and generate stormwater runoff coefficients for a range of site conditions and PV designs; developed a stormwater management and water quality best practices document; and engaged with local jurisdictions and other stakeholders to disseminate best practices, stormwater runoff coefficients, and other tools. Key outputs of this project were a PV-SMaRT Runoff Calculator developed by University of Minnesota, a webinar detailing project outcomes and how to use the PV-SMaRT runoff calculator, and a document on Best Practices for regulators and developers regarding stormwater runoff at PV sites.

14 SOLAR ENERGY↗

Health Physics Innovations Developed During Cassini for Future Space Applications

The long history of space flight includes missions that used Space Nuclear Auxiliary Power devices, starting with the Transit 4A Spacecraft (1961), continuing through the Apollo, Pioneer, Viking, Voyager, Galileo, Ulysses, Mars Pathfinder, and most recently, Cassini (1997). All Major Radiological Source (MRS) missions were processed at Kennedy Space Center/Cape Canaveral Air Station (KSC/CCAS) Launch Site in full compliance with program and regulatory requirements. The cumulative experience gained supporting these past missions has led to significant innovations which will be useful for benchmarking future MRS mission ground processing. Innovations developed during ground support for the Cassini mission include official declaration of sealed-source classifications, utilization of a mobile analytical laboratory, employment of a computerized dosimetry record management system, and cross-utilization of personnel from related disciplines.

Nickell, Rodney E.↗

Mock Certification Basis for an Unmanned Rotorcraft for Precision Agricultural Spraying

This technical report presents the results of a case study using a hazard-based approach to develop preliminary design and performance criteria for an unmanned agricultural rotorcraft requiring airworthiness certification. This case study is one of the first in the public domain to examine design and performance criteria for an unmanned aircraft system (UAS) in tandem with its concept of operations. The case study results are intended to support development of airworthiness standards that could form a minimum safety baseline for midsize unmanned rotorcraft performing precision agricultural spraying operations under beyond visual line-of-sight conditions in a rural environment. This study investigates the applicability of current methods, processes, and standards for assuring airworthiness of conventionally piloted (manned) aircraft to assuring the airworthiness of UAS. The study started with the development of a detailed concept of operations for precision agricultural spraying with an unmanned rotorcraft (pp. 5-18). The concept of operations in conjunction with a specimen unmanned rotorcraft were used to develop an operational context and a list of relevant hazards (p. 22). Minimum design and performance requirements necessary to mitigate the hazards provide the foundation of a proposed (or mock) type certification basis. A type certification basis specifies the applicable standards an applicant must show compliance with to receive regulatory approval. A detailed analysis of the current airworthiness regulations for normal-category rotorcraft (14 Code of Federal Regulations, Part 27) was performed. Each Part 27 regulation was evaluated to determine whether it mitigated one of the relevant hazards for the specimen UAS. Those regulations that did were included in the initial core of the type certification basis (pp. 26-31) as written or with some simple modifications. Those regulations that did not mitigate a recognized hazard were excluded from the certification basis. The remaining regulations were applicable in intent, but the text could not be easily tailored. Those regulations were addressed in separate issue papers. Exploiting established regulations avoids the difficult task of generating and interpreting novel requirements, through the use of acceptable, standardized language. The rationale for the disposition of the regulations was assessed and captured (pp. 58-115). The core basis was then augmented by generating additional requirements (pp. 38-47) to mitigate hazards for an unmanned sprayer that are not covered in Part 27.

Hayhurst, Kelly J.↗

Regulatory Testing of RPP-WTP HLW Glasses to Support Delisting Compliance, VSL-04R4780-1, Rev. 0 (Sep 2004)

The primary goal of the testing described in this report was to collect data to demonstrate compliance of the immobilized high-level waste (IHLW) glasses with delisting requirements. The collected data will be used to support a petition to delist the IHLW glasses destined for the national disposal facility. The Delisting Data Quality Objectives (DQO) (Cook and Blumenkranz 2003) identified a list of (16) inorganic constituents of potential concern (COPCs) and their associated limits for delisting. These COPCs can be divided into three groups, Cases 1, 2, and 3, based on their Toxicity Characteristic Leaching Procedure (TCLP) responses versus their respective delisting limits. To briefly summarize, Case 1 COPCs are those that, when loaded at their highest expected concentration in Waste Treatment Plant (WTP) glasses, are not expected to leach at their respective delisting limits when the glasses are exposed to the TCLP. Case 2 COPCs may reach the delisting limits in TCLP leachates of WTP glasses if loaded to concentrations near their maximum expected concentrations in glass. Finally, Case 3 COPCs are components that are likely to be present in concentrations sufficient to exceed their respective delisting limits in TCLP leachates of some possible glasses. The test objective was to show that, for (i) the expected range of inorganic contents in the waste feed to the Hanford WTP high level waste (HLW) vitrification facility, (ii) the expected range of glass product compositions, and (iii) the Case 1 and Case 2 COPCs identified by the DQO, the IHLW glasses meet all the relevant requirements for delisting. For Case 3 COPCs (i.e., Cd), the testing was to demonstrate the relationship between glass composition and TCLP cadmium (Cd) release, and then employ the results to develop TCLP-composition response models. During WTP operations, TCLP-composition models can be used to predict, within the required statistical uncertainties, TCLP responses of IHLW production glasses that are within the compositional region used to develop the model.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Examination of the Hydropower Licensing and Federal Authorization Process

Site-permitting and regulation are necessary to ensure hydropower projects (both original and relicensed) comply with statutory requirements and address multiple stakeholder priorities that consider a range of factors, including water quality, species protection, cultural resource impacts, and recreation. However, the time involved in acquiring a license for an individual hydropower project can be highly variable by project, leading to increased project costs, financial risks, and uncertainties. In part, this variability is the result of a regulatory structure that has evolved over time to include multiple approvals and compliance requirements administered by the Federal Energy Regulatory Commission (FERC), U.S. Army Corp of Engineers (USACE), federal land management agencies, federal and state resource agencies, and Indian Tribes. Ultimately, the time, benefits, costs, and risks to developers associated with hydropower regulatory processes and/or the preparation (e.g., studies) required for regulatory agency review are not well documented or synthesized in the public domain, which may increase uncertainty and variability within the process. This report addresses these needs by presenting results of a comprehensive examination of hydropower licensing including quantitative and qualitative analyses of timelines, causal factors, and their combined effect on risk and costs to developers.

13 HYDRO ENERGY↗

Regulatory Spike Testing of RPP-WTP LAW and HLW Glasses for Compliance with Land Disposal Restrictions, VSL-03R3760-1, Rev. 1

The United States Department of Energy’s (DOE’s) Hanford site is the current location of storage of about 50 million gallons of mixed waste. This waste is stored in underground tanks at the Hanford site and is both a listed and characteristic waste, as defined in 40 CFR Part 261, and a dangerous waste according to Chapter 173-303 of the Washington Administrative Code (WAC). The waste is also subject to the Land Disposal Restrictions (LDR) (40 CFR Part 268 and WAC 173-303-140). The River Protection Project - Waste Treatment Plant (RPP-WTP) will provide DOE with a means for treating this waste by vitrification (for subsequent disposal). The tank waste will be partitioned into low and high activity fractions, which will then be vitrified respectively into Immobilized Low Activity Waste (ILAW) and Immobilized High Level Waste (IHLW) products. The ILAW product will be disposed of in an engineered facility on the Hanford site while the IHLW product will be directed to the national deep geological disposal facility for high level nuclear waste. The ILAW and IHLW products must meet a variety of requirements with respect to protection of the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Integrated Energy Systems Prototype Human-System Interface for a Steam Extraction Loop System to Support Joint Electricity-Hydrogen Flexible Operations

Due to increasing economic competition from renewables and combined-cycle natural gas plants, nuclear power plants are looking toward flexible operations to enhance their cost competitiveness. The Integrated Energy Systems project under the Light Water Reactor Sustainability program of the U.S. Department of Energy focuses on joint electricity-hydrogen flexible operations. Joint electricity-hydrogen flexible operations entail the nuclear power plant diverting thermal energy via main steam to a hydrogen production plant located nearby. The steam serves to enhance the efficiency of the hydrogen production. Furthermore, high temperature electrolysis requires a large amount of electricity, which the plant can also provide. The plant provides steam and electricity to the hydrogen plant throughout the day, but during peak demand hours the nuclear power plant returns to solely providing electricity to meet the high demand. Through this flexible concept of operations, the plant can optimize the thermal energy it produces without having to maneuver the power of the plant. This report documents the human factors process to design and develop a prototype human-system interface for the steam extraction loop that serves as the conduit between the nuclear power plant and the adjacent hydrogen plant. The design process followed the human factors guidelines set by NUREG-0711, Human Factors Engineering Program Review Model (O’Hara, Higgins, & Fleger, 2012), and expanded upon by the Guideline for Operational Nuclear Usability and Knowledge Elicitation (GONUKE; Boring, Ulrich, Joe, & Lew, 2015; Boring, Lew, & Ulrich, 2016). The design process entailed operator interviews to determine the concept of operations for the steam extraction loop, a review and adaptation of digital interface design concepts developed by the team in prior projects, an iterative design process, and reviews conducted by both operators and human factors experts. Several versions of the prototype human-system interface were developed. Operators were interviewed to determine what design features they found useful and would like to see in the interface. The design underwent a review by human factors experts against NUREG-0700, Human Interface Design Review Guidelines (U.S. Nuclear Regulatory Commission, 2019), to ensure compliance with the latest human factors standards for digital interfaces in nuclear applications. The design was then prototyped as a functional windows-based application integrated with the Generic Pressurized Water Reactor simulator modified to include the steam extraction loop. The simulation is supported by the Human Systems Simulation Laboratory at Idaho National Laboratory, which supports operator-in-the-loop testing. This is an ongoing project and the next phase of the project entails performing an operator-in-the-loop usability study to evaluate the interface and examine the proposed concept of operations to extraction steam from the nuclear power plant for delivery to the coupled hydrogen production plant.

99 GENERAL AND MISCELLANEOUS↗

Preparation of the Ice Certification of the Dornier 328 Regional Airliner By Numerical Simulation and By Ground Test

The Dornier 328, a new regional airliner, is to be qualified to FAR25/JAR25 requirements for operation into known icing conditions. All lifting surfaces are pneumatically deiced. Impingement limits were determined using a validated computational fluid dynamic (CFD) code. Wind tunnel tests with a model of the whole aircraft and the isolated empennage equipped with artificial ice shapes showed a degradation of handling characteristics due to ice accretion. Extensive two and three dimensional CFD calculations evaluated ice accretion at the deflection elevator horn. Icing tunnel tests were performed with a model of the horizontal tail with icing similitude fulfilled. The Dornier Do328 powerplant air induction system has successfully completed a program of icing tests in support of aircraft certification for operation into known icing conditions. Potential flight icing conditions were extensively analyzed using a CFD potential flow code and 3-D particle tracking routine to identify critical flight icing conditions. The tunnel test program verified the analytically predicted critical ice accretion surfaces of the air induction system, the adequacy of the ice protection provisions and demonstrated compliance with the applicable (JAR25) regulatory material.

D Welte↗

Sludge Removal: Success and Partnership with T Plant - 20510

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) has safely and efficiently managed the removal of highly radioactive sludge from the 105-K West Reactor fuel storage basin (105- KW Basin) near the Columbia River. In mid-September 2019, sludge retrieval was completed after 21 storage containers were safely loaded with highly radioactive sludge and transported approximately 13 miles from the 105-KW Basin to T Plant, located in the 200 West Area on the Central Plateau of the Hanford Site. Sludge removal represents the last major source term reduction necessary before the K West Reactor and fuel storage basin can transition to closure activities in preparation for final deactivation and demolition. The technical complexity of the sludge retrieval process, coupled with the challenging physical and radiological characteristics of the waste, necessitated a methodical and deliberate approach using unique design and operational solutions to safely conduct the work. This challenge was further complicated by the need to plan and conduct the work in two separate facilities, each subject to the controls and requirements of its own nuclear facility safety basis. The project overcame these challenges through creating an integrated team that actively engaged, communicated and coordinated each phase of the project to ensure successful completion. This paper will cover how these key elements of the Sludge Removal Project led to its success: - Integrating project planning and management; - Lessons learned from design and construction; - Preparing for a successful campaign (lessons learned from testing and start-up); - Lessons learned from operating in two separate facilities, transporting sludge containers on the Hanford Site and ensuring compliance with a range of regulatory and safety basis requirements. The establishment of an integrated group spanning two facilities and multiple organizations created a team capable of overcoming the challenges necessary to successfully plan and execute the sludge retrieval mission. Sharing lessons learned from this successful project can enhance the ability of teams across the DOE complex to successfully plan and execute complex projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Acquisition and Implementation of a Comprehensive Environmental Permits Linking Tool at Savannah River Site - 20234

Historically, Savannah River Nuclear Solutions LLC (SRNS) tracked environmental regulatory commitments and the requirements from hundreds of permits at the Savannah River Site (SRS) using several separate methods, making integrated compliance assurance cumbersome and labor-intensive. When SRNS experienced an increase in environmental issues in 2017, SRNS management and U.S. Department of Energy - Savannah River (DOE-SR) management decided a single, proactive approach was needed to capture environmental permit information (including regulations, Consent Orders, DOE Orders, and any other state or federally issued statement of requirements), track the tasks necessary to ensure compliance with these requirements, and thereby mitigate the risk of noncompliance. SRNS developed a list of mandatory objectives that the tool must meet to function as a Comprehensive Environmental Permits Linking Tool (CEPLT). A key requirement was the ability to map Site permits to their governed locations and display the associated requirements at the compliance point (e.g., outfall, stack, waste unit, etc.). Several options included modifying existing onsite resources, building a custom onsite solution, purchasing an off-the-shelf solution, and contracting an offsite developer to build a custom solution. SRNS concluded an off-the-shelf solution with configuration and customization options would provide the flexibility to fit the unique needs of Savannah River Site (SRS) while taking advantage of industry-tested software and providing a reduced deployment timeline. SRNS chose Gensuite{sup R} a, a cloud-based solution that offers numerous a la carte applications in the environmental, health, and safety arenas, as the best candidate. SRNS selected three (3) integrated applications (Compliance Calendar, Permit Manager, and Mapper) to function as the CEPLT. The Compliance Calendar module allows for creation and tracking of regulatory commitment tasks assigned to responsible environmental professionals. Permit Manager organizes permits and other requirement documents, linking the commitments in each to Compliance Calendar tasks and/or implementing procedures. Mapper provides GIS capability for mapping the data from the other two modules to their physical onsite locations. The CEPLT was configured to allow for other SRS Site Tenants to eventually utilize the applications. Additionally, DOE-SR uses the CEPLT to provide an overview of contractor environmental compliance activities and to organize DOE-specific documents and tasks. The CEPLT fulfilled the requirement of meeting current compliance needs as well as providing the ability to grow as new organizations are incorporated and functionality is expanded. SRNS now uses the CEPLT to more effectively manage permit requirements, improve knowledge transfer, and increase the Site's overall protection of the environment, the Site worker, and the public. Possible future uses of the system include integration of mobile applications for timely communication of potential non-compliant conditions and DOE complex-wide deployment allowing for enhanced DOE site and Head Quarters oversight. Implementation of CEPLT will result in cost savings, both in terms of dollars and man-hours. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗