Technical and Policy Challenges in Deep Vadose Zone Remediation of Metals and Radionuclides - 12025

Deep vadose zone contamination is a significant issue facing the U.S. Department of Energy's (DOE) Office of Environmental Management (EM). Contamination in the deep vadose zone is isolated from exposure such that direct contact is not a factor in risk to human health and the environment. Transport of deep vadose zone contamination and discharge to the groundwater creates the potential for exposure and risk to receptors, so limiting flux to groundwater is key for protection of groundwater resources. Remediation approaches for the deep vadose zone need to be considered within the regulatory context, targeted at mitigating the source of contamination and reducing contaminant flux to groundwater. Processes for deep vadose zone metal and radionuclide remediation are discussed, as well as challenges and opportunities for implementation. It may be useful to consider the risk and challenges with leaving contaminants in place as part of a flux-control remedy in comparison with risks associated with contaminant removal and final disposition elsewhere. Understanding and quantifying the ramifications of contaminant removal and disposition options are therefore warranted. While this review suggests that some additional development work is needed for deep vadose zone remediation techniques, the benefits of applying vadose zone remediation for groundwater protection are compelling and worthy of continued development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oppenheimer's Box of Chocolates: Remediation of the Manhattan Project Landfill at Los Alamos National Laboratory - 12283

Material Disposal Area B (MDA B) is the oldest radioactive waste disposal facility at Los Alamos National Laboratory. Operated from 1944-48, MDA B was the disposal facility for the Manhattan Project. Recognized as one of the most challenging environmental remediation projects at Los Alamos, the excavation of MDA B received $110 million from the American Recovery and Reinvestment Act of 2009 to accelerate this complex remediation work. Several factors combined to create significant challenges to remediating the landfill known in the 1940's as the 'contaminated dump'. The secrecy surrounding the Manhattan Project meant that no records were kept of radiological materials and chemicals disposed or of the landfill design. An extensive review of historical documents and interviews with early laboratory personnel resulted in a list of hundreds of hazardous chemicals that could have been buried in MDA B. Also, historical reports of MDA B spontaneously combusting on three occasions -with 50-foot flames and pink smoke spewing across the mesa during the last incident in 1948-indicated that hazardous materials were likely present in MDA B. To complicate matters further, though MDA B was located on an isolated mesa in the 1940's, the landfill has since been surrounded by a Los Alamos commercial district. The local newspaper, hardware store and a number of other businesses are located directly across the street from MDA B. This close proximity to the public and the potential for hazardous materials in MDA B necessitated conducting remediation work within protective enclosures. Potential chemical hazards and radiological inventory were better defined using a minimally intrusive sampling method called direct push technology (DPT) prior to excavation. Even with extensive sampling and planning the project team encountered many surprises and challenges during the project. The one area where planning did not fail to meet reality was safety. There were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals were released and radiological dose to the public was within administrative limits. More than three years of effort by the LANL project team went into the planning for remediation of Material Disposal Area B. Hundreds of historical documents were reviewed; retired personnel were extensively interviewed and noninvasive techniques were used to characterize the site. The information collected was incorporated into the safety requirements, cost estimate, schedule and primary execution plan for the project. Ultimately the waste volume managed by the project approached 40000 m{sup 3}, more than double the original project estimate. This increase had a major impact on both project cost and schedule. Nuclear safety requirements for the project were based on an estimated MDA B radionuclide inventory of 12 PE-Ci. When excavation was complete over 123 PE-Ci had been removed from the trenches. The radionuclide inventory at MDA B was an order of magnitude higher than estimated. Work at MDA B could not have proceeded without the safety basis exemption from DOE-HQ. The one area where planning did not fail to meet reality was safety. There were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals were released and radiological dose to the public was within administrative limits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Waste Inventory and License Limits at the Perma-Fix Northwest Facility to Meet CH2M Hill Plateau Remediation Company (CHPRC) American Recovery and Reinvestment Act (ARRA) Deliverables - 12335

CH2M Hill Plateau Remediation Company (CHRPC) is a prime contractor to the U.S. Department of Energy (DOE) focused on the largest ongoing environmental remediation project in the world at the DOE Hanford Site Central Plateau, i.e. the DOE Hanford Plateau Remediation Contract. The East Tennessee Materials and Energy Corporation (M and EC); a wholly owned subsidiary of Perma-Fix Environmental Services, Inc. (PESI), is a small business team member to CHPRC. Our scope includes project management; operation and maintenance of on-site storage, repackaging, treatment, and disposal facilities; and on-site waste management including waste receipt from generators and delivery to on-site and off-site treatment, storage, and disposal facilities. As part of this scope, M and EC staffs the centralized Waste Support Services organization responsible for all waste characterization and acceptance required to support CHPRC and waste generators across the Hanford Site. At the time of the CHPRC contract award (August 2008) slightly more than 9,000 cubic meters (m{sup 3}) of legacy waste was defined as 'no-path-forward waste'. A significant portion of this waste (7,650 m{sup 3}) comprised wastes with up to 50 grams of special nuclear materials (SNM) in oversized packages recovered during retrieval operations and large glove boxes removed from the Plutonium Finishing Plant (PFP). Through a collaborative effort between the DOE, CHPRC, and Perma-Fix Environmental Services, Inc. (PESI), pathways for these problematic wastes were developed that took advantage of commercial treatment capabilities at a nearby vendor facility, Perma-Fix Northwest (PFNW). In the spring of 2009, CHPRC initiated a pilot program under which they began shipping large package, low gram suspect TRU (<15 g SNM per container), and large package contact and remote handled MLLW to the off-site PFNW facility for treatment. PFNW is restricted by the SNM limits set for the total quantity of SNM allowed at the facility in accordance with the facility's radioactive materials license(s) (RML). While both CHPRC and PFNW maintain waste databases to track all waste movements, it became evident early in the process that a tool was needed that married the two systems to better track SNM inventories and sequence waste from the point of generation, through the PFNW facility, and back to the Hanford site for final disposition. This tool, known as the Treatment Integration and Planning Tool (TIPT), has become a robust planning tool that provides real-time data to support compliant and efficient waste generation, transportation, treatment, and disposition. TIPT is developing into the next generation tool that will change the way in which legacy wastes, retrieval wastes and decontamination and decommissioning operations are conducted on the Plateau Remediation Contract (PRC). The real value of the TIPT is its predictive capability. It allows the W and FMP to map out optimal windows for processing waste through the PFNW facility, or through any process that is in some way resource limited. It allows project managers to identify and focus on problem areas before shipments are affected. It has been modified for use in broader applications to predict turnaround times and identify windows of opportunity for processing higher gram wastes through PFNW and to allow waste generators, site-wide, to accurately predict scope, cost, and schedule for waste generation to optimize processing and eliminate storage, double handling, and related costs and unnecessary safety risks. The TIPT addresses the years old problem of how to effectively predict not only what needs to be done, but when. 'When' is the key planning parameter that has been ignored by the generator and processor for many years, but has proven to be the most important parameter for both parties. While further refinement is a natural part of any development process, the current improvements on the TIPT have shown that prediction is a powerful consideration. Even in lean times expected for the foreseeable future, the improved TIPT continues to play a central role in managing our way through those times to assure facilities remain viable and available. It is recommended that other major remediation projects and waste processing facilities incorporate a tool such as TIPT to improve customer-commercial supplier communications and better optimization of resources. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decision Analyses Related to Groundwater Remediation - 17051

Traditional decision analyses of groundwater remediation scenarios frequently fail because the probability of adverse, unanticipated events occurring is often high. This is driven by many factors including that (1) the models developed to represent the flow and transport in contaminated aquifers are typically simpler than reality and do not account for all the important governing processes, (2) probability distributions are assigned to critical performance parameters (such as model inputs or characteristics of the engineered remediation systems) even though some of these parameters might be unknown or not be very well constrained. However, there is a novel decision analysis methodology and a computational tool based on Bayesian Information-Gap Decision Theory (BIG-DT) that are designed to mitigate the shortcomings of the models and probabilistic decision analyses by leveraging a non-probabilistic decision theory -- information-gap decision theory. The new decision analysis methodology considers possible models that have not been explicitly enumerated and does not require us to commit to a particular probability distribution for model and remediation-design parameters. Both the set of possible models and the set of possible probability distributions grow as the degree of uncertainty increases. The fundamental question that BIG-DT asks is 'How large can these sets be before a particular decision results in an undesirable outcome?'. The decision that allows these sets to be the largest is considered to be the best option. In this way, BIG-DT enables robust decision-support for groundwater remediation problems. Here, we apply BIG-DT to a representative groundwater remediation scenario where different options for hydraulic containment and pump and treat are being considered. BIG-DT requires many model runs and high-performance computing resources are needed when complex models are used. We demonstrate the BIG-DT analyses on a series of synthetic problems that are designed to be consistent with real-world problems such as Los Alamos National Laboratory (LANL) contamination sites. We also discuss a general framework for how the BIG-DT analyses will be carried out at the chromium groundwater contamination site at LANL. BIG-DT is implemented in Julia (a high-level, high-performance dynamic programming language for technical computing) and is part of the MADS framework (http://mads.lanl.gov and http://madsjulia.github.io/Mads.jl). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Benefits of less intrusive remediation alternatives; A review of case studies in Oak Ridge, Tennessee - 15482

Various alternative cleanup strategies have been utilized at Department of Energy facilities in Oak Ridge, Tennessee to avoid costly and potentially ineffective removal of contaminants in soil and sediments, transportation by truck, and long-term storage in landfills. One such example is a remedial decision in the 1990's to not conduct large-scale removal of PCB-contaminated sediments from a large downstream reservoir, and instead implement sediment disturbance controls and monitoring requirements. Monitoring results suggest the decision was a good one with PCB concentrations in fish decreasing substantially over the last 20 years, presumably due to recent cleaner sediments overlying historical sediment layers. At the East Tennessee Technology Park an innovative remediation strategy was developed to reduce human and ecological risks associated with a PCB-contaminated pond, while also enhancing the site's natural resources. Termed the 'Ecological Management and Enhancement' strategy, this remediation option provided an alternative approach to more conventional pond remediation options like sediment and soil removal, draining and capping, and point source/discharge actions. The basic premise of this option is that ecological management, including fish and wildlife management and vegetation management, can interrupt the contaminant exposure pathways that lead to ecological or human receptors. Recent monitoring results have demonstrated both risk reduction and increased natural resource value. Currently under investigation is the use of watershed management approaches that may help ameliorate mercury methylation and bioaccumulation in East Fork Poplar Creek. There is increased recognition that mercury source reduction alone will not achieve the human health risk target level in fish in the downstream environment, where water chemistry and ecological processes are conducive to mercury methylation. Additionally, significant losses in natural resource values are anticipated if major soil and sediment source removal activities are implemented. The Oak Ridge experience suggests that alternative approaches to the conventional 'muck and truck' options to sediment contamination are worth pursuing in some cases. Taking advantage of natural attenuation processes and/or implementing less intrusive water and ecological manipulations could be especially advantageous at contaminated sites where there are multiple or complex sources that are difficult to remediate, conventional source removal is costly, the contaminant of concern is highly bio-accumulative, or where natural resource values could be preserved or enhanced. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization and Remediation of the Hanford 618-10 Burial Ground Steel-pipe Vertical Pipe Units - 18238

The 618-10 Burial Ground is approximately 485 feet by 470 feet and consisted of 12 trenches and 94 VPUs. It is located approximately 5 miles north of Richland, Washington in the 600 Area of the Hanford Site. The 618-10 Burial Ground received low- to high-activity waste (e.g., fission products and some plutonium-contaminated waste). Most of the waste originated at the 300 Area laboratory facilities. Lower activity radioactive material and shielded drums were disposed in trenches, while laboratory wastes with higher levels of radiation were disposed in Vertical Pipe Units (VPUs). The 618-10 Burial Ground contained approximately 94 VPUs (uncertain mix of first and second generation). There are different variants of VPUs. The first generation of VPUs was simply corrugated culverts or standard pipes, 14-in diameter and 10- to 15-ft long, buried vertically. The second generation of VPUs was 22-in diameter, 15-ft long waste receptacles constructed by welding five 55-gallon bottomless drums together end-to-end and burying them vertically, separated by approximately 10 feet on center in rows approximately 25 feet apart. A subset of the first generation VPUs consisted of the steel pipe VPUs represented by carbon-steel pipes, 10 to 24 in. in diameter with various wall thicknesses. This paper will present the remediation of the steel-pipe VPUs, which were the last of the VPUs remediated in this project. The remediation process developed for steel pipe VPUs included exposing a section of the VPU within an excavated trench, placing a mix box around the VPU, filling the mix box with grout, shearing the VPU and contents, and then removing the grout waste mixture into a waste box for disposal at the Hanford Environmental Restoration Disposal Facility (ERDF). Prior the start of remedial activities extensive mock-ups were performed on surrogate steel-pipe VPUs to ensure the effectiveness of the process before introducing the hazards of radioactive VPU waste. The critical steps in the process of size reducing steel-pipe VPUs and mixing the contents with grout was successfully demonstrated. This process was completed for each steel-pipe VPU in successive lifts until the entire set of steel-pipe VPUs were mixed in grout and removed from the excavation. The remediation of the steel-pipe VPUs proved be successful in that all the VPUs were removed and transported to ERDF without a release to the local environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MY EXES and EDM for Automated Remediation Data Quality Assessments - 19053

MY Electronic data exchange and Evaluation System (EXES) is a new web-based technology providing external admin access and full control to the Web-based EXES tool developed by GD for EPA for automated environmental remediation data quality assessments. EXES replaces most manual assessment processes, reducing remediation data review time and costs and ensuring that data are of known and documented quality. This tool is available from EPA to federal agencies and remediation firms and has successfully been used to support over 190 site investigations, 105 Remedial investigations and over 20 compliance monitoring efforts. The new MY EXES functionality has been developed for project managers and decision makers to setup projects, track receipt of environmental remediation monitoring data, assess data quality, and manage data. It is designed to be flexible and configurable to meet any government agency's data review and data management needs. It is accessible 24/7 through a secure portal. MY EXES efficiently evaluates analytical data regardless of the underlying method and data reporting requirements. It is a centralized project and data assessment tool that is scalable, flexible and configurable; improving data quality while reducing cost through the following: - Provides users with the ability to create a project and to specify the analytical methods corresponding to the data that will be submitted for that project. A project can be modified and managed anytime during the project's life cycle. - Allows users to manage a library of analytical methods that can be made available for association to their projects. - Users can specify the automated tests and assessment that needs to be performed on the analytical data deliverables based on specific requirements in the project's Quality Assurance Project Plan (QAPP). - Users specify: - The format of the incoming data deliverables from the laboratory; - The type and level of review services to be performed; - The assessment deliverables to be generated - output spreadsheets and reports; - Project owner sets up system access and permissions for members of the project team. - A faster (600%) and less expensive (85%) process than the traditional data usability/validation. The EXES Data Manager application (EDM) provides a centralized data repository to view and retrieve generated reports, spreadsheets, and other data deliverables as defined by the client, eliminating the need for data transfer between project team members. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 11: Featured Country Canada - Remediation of Contaminated Sites

Canada has several unique sites requiring environmental remediation of radiological contaminants. This panel was designed to outline the remediation of contaminated sites across Canada from several perspectives. Remote legacy uranium mining operations, small scale residential locations, and large impacted soil sites all pose different challenges, however there are some common solutions and keys to success. This panel addressed several of those challenges and provided lessons learned on how to successfully plan and execute large scale environmental remediation in both remote and residential locations. This panel focused on the cleaning up several contaminated sites in Canada and monitoring the long-term performance of sites that have already been remediated. Panelists addressed the technical and social challenges associated with various cleanup initiatives North of the 49. Parallel and the solutions that have been adopted to enable these projects to move forward. The panel offered the perspectives of owners, contractors and regulators on current projects and how they are leveraging past experience and learning from others to ensure future undertakings are successful. Presentations proposed include: 1 - Regulating Environmental Remediation in Canada (Michael Rinker, Canadian Nuclear Safety Commission (Canada)); 2 - Integration of Local Knowledge and Engagement/Capacity Building Legacy Uranium Mine Sites (Joe Muldoon, Saskatchewan Research Council (Canada)); 3 - The Path to Institutional Control - Safe, Secure and Stable (R. Liam Mooney, Cameco Corporation (Canada)); 4 - Port Hope Area Initiative: Project Challenges (Scott Parnell, Canadian Nuclear Laboratories (Canada))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Colonie, New York, FUSRAP Site: Pathway from Remediation to Redevelopment - 19465

The Colonie, New York, Formerly Utilized Sites Remedial Action Program (FUSRAP) Site consists of a 4.5-hectare (11.2-acre) US Department of Energy (DOE)-owned vacant property (Main Site) and 56 commercial and residential vicinity properties (VPs). The site was owned and operated by National Lead Industries (NL) from 1937 to 1984. The Main Site was used for manufacturing fuel and weapons components using uranium and thorium. Depleted uranium dust was emitted from exhaust stacks that contaminated the site and the VPs. NL also filled in portions of the site with industrial waste and released contaminants to groundwater. The state court shut the plant down in 1984. The site was acquired by DOE in 1985, which remediated the VPs and began to remediate the Main Site up to 1997. The US Army Corps of Engineers (USACE) undertook remedial actions beginning in 1997. The site has three Operable Units (Main Site, Groundwater, and VPs). The Main Site soil was remediated to residential standards except for three small easement areas. The soils in the easement areas are safe for exposure to workers. There is a groundwater plume beneath the site that will require the use of monitoring and temporary land use controls until cleanup standards are met. The VPs require no further action. A 2-year transition period from USACE to the DOE Office of Legacy Management (LM) began on June 18, 2018, with the receipt of the Site Closeout Report from USACE. LM has determined that the 4.5-hectare site is excess to its mission needs and intends to pursue sale of the property for redevelopment. There are several processes required before the disposal can occur. Organizations with similar sites that are federally owned and ready for private redevelopment may benefit from reviewing the Colonie site disposition processes. This paper will discuss (1) Determining disposal alternatives for the Colonie, New York, site. (2) Describing the federal requirements for the disposal of excess real property. (3) Communicating to stakeholders that the site is ready for disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Life-Cycle Baseline Customization for the Formerly Utilized Sites Remedial Action Program - 20304

One of the responsibilities of the federal government is to estimate sound and defensible life-cycle baseline costs for use in federal budget estimates and to meet federal financial reporting requirements. To accomplish this, the US Department of Energy (DOE) Office of Legacy Management (LM) and the US Army Corps of Engineers (USACE) have partnered together to ensure that the liabilities documented in each Formerly Utilized Sites Remedial Action Program (FUSRAP) site's life-cycle baseline are specifically tailored. FUSRAP was created in the mid-1970's to clean up radiological contamination resulting from the early development of nuclear weapons. DOE was responsible for FUSRAP until October 1997, when Congress transferred the administration and execution of FUSRAP site cleanups to USACE. By 1997, DOE had completed the cleanup of 25 of the 46 sites that were active within the program and had begun cleanup at 13 additional sites. USACE was assigned responsibility for the cleanup of the 21 remaining FUSRAP sites, and at 8 additional sites that had since been referred for cleanup. The LM mission for the FUSRAP sites is to perform long-term surveillance and maintenance (LTS and M). Currently, LM provides long-term stewardship for 34 completed FUSRAP sites. Another 20 sites are under active remediation by USACE. Within the last 5 years, USACE has completed the cleanup at five FUSRAP sites and the LTS and M responsibility has been transferred to LM. By 2029, USACE will compete remediation at eight additional sites and LTS and M for those sites will transfer to LM. Because responsibilities for the FUSRAP sites transfer between USACE and LM upon completion of remedial actions, both agencies maintain life-cycle baselines for different stages of the project and both must have a strong understanding of the needs and requirements for each site. This understanding ensures that the life-cycle baselines form a complete and accurate picture of what is required for the site and for the FUSRAP program. LM focuses on several things when customizing the life-cycle baseline estimates for the FUSRAP sites, including (1) Understanding the unique requirements for each site. By reviewing site-specific documents prepared by USACE, such as Feasibility Studies and Records of Decision, and partnering with USACE to gain additional insight about site conditions and requirements for stewardship, as well as potential risks, LM can better develop the life-cycle baselines. (2) Developing site-specific labor breakdowns. This ensures the required labor mix is baselined for specific activities by comparing the labor mix required to perform activities at (a) other LM-managed FUSRAP sites and (b) non-FUSRAP LM sites and (c) by USACE at active FUSRAP sites. (3) Taking a tiered approach to life-cycle baseline planning. Estimates for sites transferring to LM in the near term (5 years) are more definitive than for sites transferring in the out-year period. Remedial actions at the near-term sites are at or near completion, providing LM a strong understanding of the LTS and M requirements and remaining liabilities. This in turn allows for site-specific customization of the baseline. (4) Using a robust risk management approach to ensure that liabilities specific to each site are identified, evaluated by probability and severity, and documented in relation to the impact to cost or schedule. To ensure the most accuracy within all the baselines, the FUSRAP life-cycle baselines are updated as needed to support program, project, and contract management needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from the First Year of Property Remediation - 20475

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste (LLRW) in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL) on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The larger of the two PHAI scopes of work - the Port Hope Project - involves the cleanup of approximately 1.2 million cubic metres of historic LLRW from 18 major sites in Port Hope, the construction of an engineered aboveground mound where the waste will be safely contained and the long-term maintenance and monitoring of the facility. Construction of the waste water treatment plant, the first three of four cells in the mound and supporting infrastructure is complete, with construction of the fourth cell in progress. In 2017 with the movement of on-site waste at this facility began and is now complete. Waste excavation and transportation from off-site locations within the community began in 2018; the cleanup of four temporary storage sites is now complete and remediation at several other major sites is underway. The Port Hope Project also includes a survey of the interior and exterior investigation of approximately 4,800 properties, primarily residential, in the urban area of Port Hope for the presence or absence of historic LLRW. The current projection is that approximately 1,250 privately owned residential and commercial properties known as Small-Scale Sites (SSS) will be identified as having waste exceeding the PHAI clean-up criteria. This paper will outline some of the challenges and lessons learned from the first year of SSS remediation including contractual, data and design issues; interaction with and managing expectations of stakeholders; weather, site and structure conditions as well as municipal permitting, resourcing, transportation and remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dispersal Limitations on Fish Community Recovery Following Long-term Water Quality Remediation

Holistic restoration approaches, such as water quality remediation, are likely to meet conservation objectives because they are typically implemented at watershed scales, as opposed to individual stream reaches. However, habitat fragmentation may impose constraints on the ecological effectiveness of holistic restoration strategies by limiting colonization following remediation. We questioned the importance of dispersal limitations to fish community recovery following long-term water quality remediation and species reintroductions across the White Oak Creek (WOC) watershed near Oak Ridge, Tennessee (USA). Long-term (26 years) responses in fish species richness and biomass to water quality remediation were evaluated in light of habitat fragmentation and population isolation from instream barriers, which varied in their passage potential. In addition, ordination techniques were used to determine the relative importance of habitat connectivity and water quality, in explaining variation fish communities relative to environmental fluctuations, i.e. streamflow. Ecological recovery (changes in richness) at each site was negatively related to barrier index, a measure of community isolation by barriers relative to stream distance. Following species reintroductions, dispersal by fish species was consistently in the downstream direction and upstream passage above barriers was non-existent. The importance of barrier index in explaining variation in fish communities was stronger during higher flow conditions, but decreased over time an indication of increasing community stability and loss of seasonal migrants. Compared to habitat fragmentation, existing water quality concerns (i.e., outfalls, point source discharges) were unrelated to ecological recovery, but explained relatively high variation in community dynamics. Our results suggest that habitat fragmentation limited the ecological effectiveness of intensive water quality remediation efforts and fish reintroduction efforts by impeding recolonization at isolated stream reaches.

54 ENVIRONMENTAL SCIENCES↗

Correlation between DNAPL distribution area and dissolved concentration in surfactant enhanced aquifer remediation effluent: a two-dimensional flow cell study

During the process of surfactant enhanced aquifer remediation (SEAR), free phase dense non-aqueous phase liquid (DNAPL) may be mobilized and spread. The understanding of the impact of DNAPL spreading on the SEAR remediation is not sufficient with its positive effect infrequently mentioned. To evaluate the correlation between DNAPL spreading and remediation efficiency, a two-dimensional sandbox apparatus was used to simulate the migration and dissolution process of 1,2-DCA (1,2-dichloroethane) DNAPL in SEAR. Distribution area of DNAPL in the sandbox was determined by digital image analysis and correlated with effluent DNAPL concentration. The results showed that the effluent DNAPL concentration has significant positive linear correlation with the DNAPL distribution area, indicating the mobilization of DNAPL could improve remediation efficiency by enlarging total NAPL-water interfacial area for mass transfer. Meanwhile, the vertical migration of 1,2-DCA was limited within the boundary of aquifer in all experiments, implying that by manipulating injection parameters in SEAR, optimal remediation efficiency can be reached while the risk of DNAPL vertical migration is minimized. This study provides a convenient visible and quantitative method for the optimization of parameters for SEAR project, and an approach of rapid predicting the extent of DNAPL contaminant distribution based on the dissolved DNAPL concentration in the extraction well.

Wu, Bin↗

Electrothermal mineralization of per- and polyfluoroalkyl substances for soil remediation

Abstract Per- and polyfluoroalkyl substances (PFAS) are persistent and bioaccumulative pollutants that can easily accumulate in soil, posing a threat to environment and human health. Current PFAS degradation processes often suffer from low efficiency, high energy and water consumption, or lack of generality. Here, we develop a rapid electrothermal mineralization (REM) process to remediate PFAS-contaminated soil. With environmentally compatible biochar as the conductive additive, the soil temperature increases to >1000 °C within seconds by current pulse input, converting PFAS to calcium fluoride with inherent calcium compounds in soil. This process is applicable for remediating various PFAS contaminants in soil, with high removal efficiencies ( >99%) and mineralization ratios ( >90%). While retaining soil particle size, composition, water infiltration rate, and cation exchange capacity, REM facilitates an increase of exchangeable nutrient supply and arthropod survival in soil, rendering it superior to the time-consuming calcination approach that severely degrades soil properties. REM is scaled up to remediate soil at two kilograms per batch and promising for large-scale, on-site soil remediation. Life-cycle assessment and techno-economic analysis demonstrate REM as an environmentally friendly and economic process, with a significant reduction of energy consumption, greenhouse gas emission, water consumption, and operation cost, when compared to existing soil remediation practices.

Science & Technology - Other Topics↗

Phosphate-Mediated Remediation of Metals and Radionuclides

Worldwide industrialization activities create vast amounts of organic and inorganic waste streams that frequently result in significant soil and groundwater contamination. Metals and radionuclides are of particular concern due to their mobility and long-term persistence in aquatic and terrestrial environments. As the global population increases, the demand for safe, contaminant-free soil and groundwater will increase as will the need for effective and inexpensive remediation strategies. Remediation strategies that include physical and chemical methods (i.e., abiotic) or biological activities have been shown to impede the migration of radionuclide and metal contaminants within soil and groundwater. However, abiotic remediation methods are often too costly owing to the quantities and volumes of soils and/or groundwater requiring treatment. The in situ sequestration of metals and radionuclides mediated by biological activities associated with microbial phosphorus metabolism is a promising and less costly addition to our existing remediation methods. This review highlights the current strategies for abiotic and microbial phosphate-mediated techniques for uranium and metal remediation.

Martinez, Robert J.↗

Decommissioning of the Remediation Systems at Waverly, Nebraska, in 2011-2012

The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility in Waverly, Nebraska, from 1952 to 1974. During this time, the grain fumigant '80/20' (carbon tetrachloride/carbon disulfide) was used to preserve stored grain. In 1982, sampling by the U.S. Environmental Protection Agency (EPA) found carbon tetrachloride contamination in the town's groundwater. After an investigation of the contaminant distribution, the site was placed on the National Priority List (NPL) in 1986, and the CCC/USDA accepted responsibility for the contamination. An Interagency Compliance Agreement between the EPA and the CCC/USDA was finalized in May 1988 (EPA 1990). The EPA (Woodward-Clyde Consultants, contractor) started immediate cleanup efforts in 1987 with the installation of an air stripper, a soil vapor extraction system, a groundwater extraction well, and groundwater and soil gas monitoring wells (Woodward-Clyde 1986, 1988a,b). After the EPA issued its Record of Decision (ROD; EPA 1990), the CCC/USDA (Argonne National Laboratory, contractor) took over operation of the treatment systems. The CCC/USDA conducted a site investigation (Argonne 1991, 1992a,b), during which a carbon tetrachloride plume in groundwater was discovered northeast of the former facility. This plume was not being captured by the existing groundwater extraction system. The remediation system was modified in 1994 (Argonne 1993) with the installation of a second groundwater extraction well to contain the contamination further. Subsequently, a detailed evaluation of the system resulted in a recommendation to pump only the second well to conserve water in the aquifer (Argonne 1995). Sampling and analysis after implementation of this recommendation showed continued decreases in the extent and concentrations of the contamination with only one well pumping (Argonne 1999). The CCC/USDA issued quarterly monitoring reports from 1988 to 2009. Complete documentation of the CCC/USDA characterization and remediation efforts, including the quarterly monitoring reports, is on the compact disc inside the back cover of this report. The EPA reported on the progress of the remediation systems in a series of five-year reviews (EPA 1993, 1999, 2004, 2009). These reports and other EPA documentation are also on the compact disc inside the back cover of this report, along with the Woodward-Clyde (1986, 1988a,b) documentation cited. Starting in 2006, the analytical results for groundwater (the only medium still being monitored) showed no carbon tetrachloride concentrations above the maximum contaminant level (MCL) of 5.0 g/L. Because the cleanup goals specified in the ROD (EPA 1990) had been met, the EPA removed the site from the NPL in November 2006 (Appendix A). In 2008 the National Pollutant Discharge Elimination System (NPDES) permit for the remediation system was deactivated, and a year later the EPA released its fourth and final five-year report (EPA 2009), indicating that no further action was required for the site and that the site was ready for unlimited use. In 2011-2012, the CCC/USDA decommissioned the remediation systems at Waverly. This report documents the decommission process and closure of the site.

54 ENVIRONMENTAL SCIENCES↗

Post-Remediation Radiological Dose Assessment, Linde Site, Tonawanda, New York

A post-remediation radiological dose assessment was conducted for the Formerly Utilized Sites Remedial Action Program (FUSRAP) Linde Site by using the measured residual concentrations of the radionuclides of concern following the completion of the soils remedial action. The site’s FUSRAP-related contaminants of concern (COCs) are radionuclides associated with uranium processing activities conducted by the Manhattan Engineer District (MED) in support of the Nation’s early atomic energy and weapons program and include radium-226 (Ra-226), thorium-230 (Th-230), and total uranium (Utotal). Remedial actions to address Linde Site soils and structures were conducted in accordance with the Record of Decision for the Linde Site, Tonawanda, New York (ROD) (USACE 2000a). In the ROD, the U.S. Army Corps of Engineers (USACE) determined that the cleanup standards found in Title 40, Part 192 of the Code of Federal Regulations (40 CFR Part 192), the standards for cleanup of uranium mill sites designated under the Uranium Mill Tailings Radiation Control Act (UMTRCA), and the Nuclear Regulatory Commission (NRC) standards for decommissioning of licensed uranium and thorium mills, found in 10 CFR Part 40, Appendix A, Criterion 6(6), are Applicable or Relevant and Appropriate Requirements (ARARs) for cleanup of MED-related contamination at the Linde Site. The major elements of this remedy will involve excavation of the soils with COCs above soil cleanup levels and placement of clean materials to meet the other criteria of 40 CFR Part 192.

61 RADIATION PROTECTION AND DOSIMETRY↗

Identification of Promising Remediation Technologies for Iodine in the UP-1 Operable Unit

Iodine-129 (129I) generated at the U.S. Department of Energy (DOE) Hanford Site during plutonium production was released to the subsurface, resulting in several large, though dilute, plumes in the groundwater, including the plume in the 200-UP-1 operable unit (OU). Because 129I is an uncommon contaminant, relevant remediation experience and scientific literature are limited, though work is under way to better understand the fate and transport of 129I in the environment and the effectiveness of potential remediation technologies. The recent UP-1 Evaluation Plan for Iodine and report on the Conceptual Model of Iodine Behavior in the Subsurface at the Hanford Site provide information on the history of contamination in the 200-UP-1 OU, relevant controlling processes (biological and geochemical), risk, the conceptual site model, and potential remedial options, which provided a foundation for this study. In this study, available information was compiled and used to categorize potential remediation technologies, culminating in a recommendation of promising technologies for further evaluation. Approaches to improve the technical information about promising technologies are also recommended in this study so that a subsequent evaluation of potential remediation alternatives can assess these technologies.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗