At least 145 records · Page 8

Improving Effectiveness of Waste Management Processes with Information and Communications Technology (ICT) - 19524

Improving the effectiveness of waste estimation, tracking, management and disposal processes is a key objective for Waste Management. Project Teams face common challenges producing waste estimates that are accurately accounted for in the project plan, tracking and reporting waste record actuals against the estimate, and communicating the status of waste through the organization. These challenges impact the effectiveness of waste management from a cost and schedule perspective, which can have a significant impact on the bottom line and on future business. By leveraging information and communications technology (ICT) waste management project teams can create a mobile workforce that closes the gaps between creating estimates and tracking actuals against estimates by gathering real time data at each step in the process. This results in significant gains on schedule and cost, improved communication and visibility across the project team, and an improvement in the overall effectiveness of waste processing and disposal procedures. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Activities ONDRAF/NIRAS related to the decommissioning of nuclear facilities

Since 1980, the Agency is responsible by law for the safe management of all radioactive waste produced in Belgium, including decommissioning wastes. By the law of 11 January 1991 and the implementing Royal Decree of 16/10/1991, ONDRAF/NIRAS has been entrusted with a mission concerning the decommissioning of nuclear facilities. This mission involves the collection and assessment of data concerning decommissioning forecasts for nuclear facilities, the approval of facilities' decommissioning programmes, the establishment - in consultation with operators - of financing conditions for decommissioning, as well as the implementation of these programmes on request by the operator, or in the case of its failure to do so. This is the case for the company Best Medical Belgium SA located at Fleurus (MDS Nordion SA, till April 2011), which produced radioisotopes for medical applications and went bankrupt in 2012. These installations have been entrusted to ONDRAF/NIRAS. A plan of action was developed for taking over the operations in the framework of remediation and decommissioning. Steps have been taken to integrate his new role as a nuclear operator. The installations of Best Medical Belgium SA are now referred to as the 'O/N - Site Fleurus.' Nuclear facility operators, or any person requesting to operate a nuclear facility, are obliged to provide ONDRAF/NIRAS, under their responsibility and in due time, with all the necessary information concerning these facilities' decommissioning forecasts, the nature, quantities and dates of transfer of the resulting waste, and the financing conditions for these facilities' decommissioning. In order to make the necessary funds available for decommissioning a nuclear facility when it will be shut down, operators are obliged to establish provisions during the facility's active life. These provisions are calculated in such a way that the total amount established at the time of the final shutdown covers all costs resulting from the facility's final phase, namely the preparation of decommissioning, decontamination, more or less long-term maintenance, dismantling, treatment, conditioning and disposal of waste produced during this phase. In order to face to multiple and repeated evaluation processes, the Agency, already in the early 90's, started with the implementation of its own integrated data processing system, recording the physical and radiological inventories of nuclear facilities, and allowing the evaluation of the quantities of decommissioning materials and wastes as well as of the decommissioning costs of these facilities. The cost evaluations cover all decommissioning activities from final shutdown of the facility until final release from nuclear control, as well as conventional demolition and site restoration if required. Beside the information related to the inventories, the database involves so called auxiliary tables integrating unit prices of the various decontamination and dismantling techniques, unit rates for radioactive waste processing, interim storage and final disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Westinghouse waste simulation and optimization software tool

Applications for dynamic simulation can be found in virtually all areas of process engineering. The tangible benefits of using dynamic simulation can be seen in tighter design, smoother start-ups and optimized operation. Thus, proper implementation of dynamic simulation can deliver substantial benefits. These benefits are typically derived from improved process understanding. Simulation gives confidence in evidence based decisions and enables users to try out lots of 'what if' scenarios until one is sure that a decision is the right one. In radioactive waste treatment tasks different kinds of waste with different volumes and properties have to be treated, e.g. from NPP operation or D and D activities. Finding a commercially and technically optimized waste treatment concept is a time consuming and difficult task. The Westinghouse Waste Simulation and Optimization Software Tool will enable the user to quickly generate reliable simulation models of various process applications based on equipment modules. These modules can be built with ease and be integrated into the simulation model. This capability ensures that this tool is applicable to typical waste treatment tasks. The identified waste streams and the selected treatment methods are the basis of the simulation and optimization software. After implementing suitable equipment data into the model, process requirements and waste treatment data are fed into the simulation to finally generate primary simulation results. A sensitivity analysis of automated optimization features of the software generates the lowest possible lifecycle cost for the simulated waste stream. In combination with proven waste management equipments and integrated waste management solutions, this tool provides reliable qualitative results that lead to an effective planning and minimizes the total project planning risk of any waste management activity. It is thus the ideal tool for designing a waste treatment facility in an optimum manner, taking account of the detailed waste stream and specific requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Microwave Technology for TENORM Waste Treatment - 17377

The sludge and scales generated by the oil and gas industry usually contain radionuclides of the thorium and uranium decay chains, the so-called technologically enhanced, naturally occurring radioactive materials (TENORM) waste. The handling of this waste must consider both the radiation risks presented by those radionuclides and its chemical toxicity, due to the decomposition of oil residues, which may generate hydrogen sulfide and other hazardous compounds. In the case of Brazil, Public Law 10.308 limits the management options for radioactive waste generated by offshore oil production rigs to drumming and storage; it prohibits disposal of any radioactive waste in sea-waters, seabed or oceanic islands. This paper describes the results of the work to develop a treatment process using a specially designed microwave oven, which removes simultaneously water and hydrocarbons from the sludge, thus reducing the volume, the chemical toxicity and the chemical reactivity of the waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Successes and Challenges of the Integrated Waste Treatment Unit's 50-Day Demonstration Run - 20151

The Integrated Waste Treatment Unit (IWTU) has been tasked with using steam reforming technology to treat 3.4 million liters (900,000 gallons) of radioactive sodium-bearing waste (SBW) at the Idaho National Laboratory (INL). The project has been hampered by a number of processing issues associated with process equipment during simulant testing, with the two main issues involving the fluidizing gas distribution system in the main reactor vessel, the denitration mineralization reformer (DMR), and high differential pressures in the main filter vessel, the process gas filter (PGF). Following the replacement of the fluidizing gas distribution system in the DMR, a successful 30-day demonstration run was performed that revealed unacceptable bridging in the filter bundles of the PGF. The bundles were replaced with new ones, and a 50-day demonstration run was performed. The main purpose of this run was to operate the IWTU over a range of operating conditions. Overall, the run was a success; however, there were multiple challenges that arose from the run. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Testing Results from the Low Activity Waste Pretreatment System (LAWPS) Full-Scale Ion Exchange Column Test and Engineering Scale Integrated System Test - 18634

The U.S. Department of Energy (DOE), Office of River Protection's (ORP) primary mission is to retrieve and treat Hanford's tank waste and close the Tank Farms to protect the Columbia River. Mixed radioactive waste is stored in 177 underground tanks at the Hanford Site as reported in DOE/ORP 2003- 02, Environmental Impact Statement for Retrieval, Treatment, and Disposal of Tank Waste and Closure of the Single Shell Tanks at the Hanford Site, Richland WA, Inventory and Source Term Data Package. The 177 underground tanks are estimated to contain about 56 million gallons of waste. The Low Activity Waste Pretreatment System (LAWPS) Project provides for the early production of immobilized low activity waste (ILAW) by feeding LAW directly from Tank Farms to the Hanford Waste Treatment Plant's (WTP's) LAW Facility, bypassing the Pretreatment Facility. Prior to the transfer of feed to the WTP LAW Vitrification Facility, tank supernatant waste will be pretreated in the LAWPS to meet the WTP LAW waste acceptance criteria. The LAWPS will also facilitate the return of secondary liquid wastes from the WTP LAW Vitrification Facility to the Tank Farms. In November of 2015 DOE's Tank Operations Contractor, Washington River Protection Solutions (WRPS), awarded a contract to the AECOM team to design, fabricate and operate two test platforms to generate performance data at two different scales and demonstrate technology maturation. The first platform models the ion exchange (IX) columns at full scale, and the second platform models the integrated flowsheet (cross flow filter (CFF) and IX) at 1/9. scale. Overarching technical objectives of performing the full-scale ion exchange test and the engineering-scale integrated test are to: 1. Test interactions between unit process operations; 2. Test removal of non-radioactive cesium from process stream; 3. Test removal of undissolved solids from process stream; 4. Confirm operational flow rate range and stability; 5. Confirm volumetric throughput of waste stream over flow operating range; 6. Confirm range of process temperatures over planned operating range; 7. Establish system hydraulics and process criteria; 8. Coordinate key control and monitoring components; 9. Establish treated product chemistry meets requirements (cesium, solids, and pH); and 10. Test the hazard control strategy for a no flow condition through the IX column. Data collected during testing will be used by WRPS to validate the preliminary design, inform the final design of the permanent plant equipment, and demonstrate that the critical technology elements have advanced to a technology readiness level of 6 (prototypical system validation in a relevant environment). Testing on both platforms started in fall of 2016 generating NQA-1 data. This paper covers test results from the first five phases of testing on the 1/9. scale integrated test platform. A further three phases of testing are currently being executed, these including a 5.6 M sodium simulant containing foulant, a high viscosity simulant and finally a run performed with a lower Cs concentration (all earlier tests were spiked to 4 x Cs to reduce volume and cost). Results from these tests were not available at the time of writing available. Results are also presented from the full scale IX testing. Eight test were performed covering column loading, elution and regeneration; column loading, elution and regeneration with upflow displacement; IX column loading and gas migration; resin removal; solids accumulation; and IX column emergency recirculation and vent. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing and Testing a New Gas Distribution System for the Fluidized Bed of the Integrated Waste Treatment Unit (IWTU) Steam Reformer - 19219

The Integrated Waste Treatment Unit (IWTU) has been tasked with using steam reforming technology to treat 3.4 million liters of radioactive sodium-bearing waste (SBW) at the INL. Progress in developing steam reforming for SBW treatment has been hampered by numerous processing issues associated with the existing process equipment during simulant testing. The primary issue was high differential temperatures that developed in the fluidized bed of the denitration mineralization reformer (DMR). Based on technical evaluations and computer modeling, it was determined that the primary cause of poor fluidization in the DMR was the existing fluidized gas distributor. This distributor consisted of a combination of a ring header and four removable fluidizing gas rails. The combined ring header/rail system was unable to effectively fluidize the bed at the bottom of the DMR (around and below the ring header). As a result, a decision was made to design and test a new fluidized gas distributor. Conceptual designs focused on three different distributors: a modified design of the current system; a flat plate with bubble caps; and a conical bottom with dual plena. After testing the conceptual prototypes at Hazen Research Inc., the conical bottom distributor was chosen. A 30-day test with simulant SBW feed was then performed with the new distributor. During testing, a temperature differential of less than 2 deg. C was maintained in the DMR fluidized bed. The results supported the conclusion that poor fluidized gas distribution was the primary cause of high temperature differentials in the DMR fluidized bed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of In Situ Acoustic Backscatter Systems to Characterize Spent Nuclear Fuel and its Separation in a Thickener - 19288

To aid in the transportation, dewatering and storage of radioactive UK legacy waste sludges at Sellafield Ltd., the application of an Acoustic Backscatter System (ABS) was investigated in this study, as a method for monitoring suspended solids concentration and consolidation of cohesive and aggregated sludges (that form the basis of many wastes at Sellafield). An ABS represents a particularly promising technology, as they can be used with minimal intrusion, to measure both particle size and concentration depending on prior system knowledge, through inversion of the return echo voltage response of pulse-echo signals in the MHz range. To assess the application for continuous, high concentration (∼30 % v/v) thickened wastes, an ABS was utilised to characterise a pseudo-steady state laboratory thickener over hours, using flocculated calcite as a representative test material. Measurements were taken both horizontally through a consolidated bed using a 1 MHz transducer and vertically downwards with a 2 MHz transducer to measure sediment concentration above the settled bed and track bed height via the interface reflection. Characterisation of flocculated aggregate diameters was initially determined to be ∼510 μm, using an in-line Focussed Beam Reflectance Measurement (FBRM) device. The submerged 2 MHz probe indicated that there were only limited changes to the dispersion concentration or size over time. Changes in settled bed density, due to increasing bed height and changes in the underflow flow rate, were qualitatively measured via differences to the acoustic signal attenuation over time. An initial increase in attenuation with bed height was observed as the bed densified due to local compression. Once an equilibrium bed height was reached, the acoustic attenuation remained fairly constant with time, although the bulk underflow density was reduced with the increase in underflow rate. The solids residence time in the bed, determined from a transitive volume-balance model, was found to be ∼3200 s for pseudo-steady state operation at a maintained bed height of ∼0.175 m. Results of the study highlight the potential the ABS as a remote process monitoring tool for both relatively dilute suspensions and concentrated thickened mineral sludges, with potential applications across waste processing sites at Sellafield. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Management Processing Projects in the PRC - 16551

EnergySolutions continues to provide waste treatment solutions in the Peoples Republic of China (PRC). In 2015 ES had completed installation of systems at two different Nuclear power sites (Haiyang, an AP-1000{sup TM} site and Yangjiang, a CPR1000 site). This paper discusses progress on these two projects, and provides new information regarding the operation of the systems. The Yangjiang project became operational in the fall of 2015 while the Haiyang project will be done is nearly done with commissioning and is waiting for reactor operations. Haiyang Project: In the Shandong Province on China's northeast coast, EnergySolutions, as part of a consortium with China Power Investment (CPI) and Yuanda Environmental Protection Engineering Company (a PRC state-owned company), has designed and constructed the site's Site Rad Waste Treatment Facility (SRTF). The SRTF provides solid waste processing services for up to 8 AP-1000s{sup TM}. The SRTF performs the following functions: 1. Five year storage for HICs containing spent resin and filters from the nuclear power plants' waste liquid systems (WLS); 2. Sorting and Compaction System for solid waste generated from Nuclear Power Plant (NPP) operations. This system implements: a) Real time radiography to screen 200 liter waste drums for prohibited items, b) Pre-compaction, c) High Resolution Gamma Spectrophotometry (HRGS) for waste characterization, d) Supercompaction, e) Solidification of compacted drums inside overpack drums which are filled with 60 MPa compressive strength grout, and f) Automatic drum lidding which crimps the drum lid to the drum body. 3. Laundry services for NPP anti-contamination clothing. 4. At the nuclear islands, EnergySolutions is providing mobile liquid waste processing systems that utilize EnergySolutions Advanced Liquid Processing System ALPS{sup TM}/Advanced Injection Method System AIM{sup TM} processing systems to supplement the NPP's WLS system when radionuclide concentrations exceed release criteria. The spent resins and filters from the nuclear power plants are placed in EnergySolutions supplied HICs, dewatered using EnergySolutions Self Engaging Dewatering System (SEDS{sup TM}), and then placed in EnergySolutions 8-120B Type B cask for the transport of the HIC between the NPP and the SRTF and, ultimately, to a disposal site once it is ready for operations Yangjiang Project: EnergySolutions is providing liquid waste treatment system (TEU) and solid waste treatment system (TES) for Yangjiang units 3 and 4 for the China Nuclear Power Engineering Company (CNPEC). The Yangjiang site is located approximately 300 kilometers west of Hong Kong. The TEU system processes floor drain, chemical drain, and process drain tanks liquids to achieve a release concentration less than 37 Bq/l. The TES system receives spent resin and filters into HIC containers which are dewatered and subsequently transported to the Yangjiang sites QT building where they are stored for a period of up to 5 years or until a disposal site are available. TEU (Liquid waste treatment) consists of the following unit operations: - ALPS{sup TM}/AIM{sup TM} system, which includes two separate 8 vessel water treatment systems that consist of granular activated carbon (GAC), cation, anion ion and mixed bed media ion exchange (IX) columns; and: - A reverse osmosis system for final polishing, - TES (solid waste system), - SEDS (Self Engaging Dewatering System), - Shielding for the loading and storage of HICs, - Shielded transport container for the transfer of HIC to the QT building for storage, - Shielded transfer bell for the transport of spent filters from the NPP operating area to HIC. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New construction of an in-drum drying plant in the central decontamination and water treatment facility (ZDW)

In order to ensure future conditioning of the accumulating radioactive liquid waste during the advancing dismantling of the nuclear power plant Greifswald, GNS provides EWN within the new construction of the ZDW with an in-drum drying plant, including the appropriate infrastructure and media supply. For the in-drum drying plant, GNS has consistently further developed the process of the FAVORIT plant operationally proven for many years. Noteworthy is that for the first time a fully automatic plant of this type has been implemented which requires interventions of the operating personnel only for rounds and for loading and unloading processes of the drum stations. Moreover, components of the vacuum unit were designed according to needs and optimised with regard to installation space and plant engineering. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conducting Industrial Hygiene Exposure Assessments at Scale Using Non-Parametric Upper Tolerance Limits at the Hanford Site - 20439

Chemical vapors are generated in the radioactive waste storage tanks at the Hanford Site due to ongoing chemical and radiological activity. Hanford's Tank Operations Contractor conducts exposure assessments for individual tank farms to identify, evaluate, and recommend controls or other worker protection measures for chemical, physical, and biological hazards present within each tank farm. These exposure assessments conform to the American Industrial Hygiene Association assessment strategy and recommended statistical procedures. The exposure assessment process involved manually processing tens of thousands of records that were collected over several years and entered into a central database. Working with Pacific Northwest National Laboratory, this process has been largely automated, providing a scalable analysis process that reduced processing time by over 90%, while providing defensible results and improved data quality. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pathways towards Valid Data: Assessment of Optimized Packaging Strategies for Core Components - 18158

Every company that runs nuclear power plants needs a strategy for disposal of the radioactive waste and for decommissioning and dismantling of its nuclear reactors. The dismantling progress of several German NPPs is already in an advanced stage. Hence, particularly highly activated core components have to be disposed of as radioactive waste. Nevertheless, this is also an issue during the operating phase due to necessary replacements of highly activated core components such as PWR control elements or RPV heads. The conditioning of waste packages for final disposal in the German repository Konrad requires the core components to be dismantled, packaged and dried. Therefore, a qualified packaging strategy is needed to ensure a reliable compliance with the protection objectives of the repository and an optimized utilization of prescribed contingents. Exemplified by PWR control elements a pathway is drawn how to perform an optimized packaging strategy in compliance with the protection objectives of the repository based on only few relevant radionuclides derived from activation calculations. For these calculations, particularly the influence of trace impurities in the materials has to be considered and their amounts have to be verified or analyzed by sampling. Furthermore, low nuclide activities from contamination cannot simply be neglected because some of them are obliged to be declared or their radiological relevance has not been sufficiently determined. Due to various influence factors, qualified sampling strategies need carefully considered concepts. Therefore, detailed planning facilitates the qualification and approval process and reduces the costs for analyses and the number of containers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using Digital and Web-Based Platforms to Enhance Nuclear Power Plant Knowledge Transfer - 20203

As the workforce ages, the loss of experienced personnel can result in a loss of important knowledge. Updating Electric Power Research Institute (EPRI) research and guidance with the latest technology developments and operating experience is an important method to transfer knowledge between the retiring and incoming workforce. Studies suggest that the incoming workforce is accustomed to using digital and/or internet-based platforms to find information and may have a higher comfort with these types of platforms than they have with static, written reports. Additionally, the ease and speed of updating and delivering content through digital formats may offer an effective method for knowledge transfer and combining information from multiple reports into a single access point. EPRI has recently produced an online Decommissioning Hub available to members and is working on replicating the effort in the area of radioactive waste management called the Radwaste Web References. EPRI has extensive guidance in both disciplines. The Decommissioning Hub uses a wiki format to provide a platform that allows for both the updating of that guidance resulting from new research and new operating experiences, and combining related topical information from multiple reports. It also allows users to access the information based on key words and topical searches, and can be a tool for users to input experience to share with others. The Decommissioning Hub is accessed via a web-based portal and includes topical pages; experience summaries; a question and answer capability; and a smart search function of all EPRI decommissioning reports. Use of a wiki format allows users to input new experiences or modify existing experience summaries to add additional detail. EPRI moderates all content. The experience data base has been initially populated with information available in published EPRI reports and unpublished information currently available within EPRI. Moving forward, population of the database will continue with information available within the open literature, new information developed from current decommissioning projects, and user inputs. The web site became active in late 2017, and a major update will be issued in early 2020. Larger scale updates are planned biannually, and smaller-scale updates will occur continuously. Capturing and applying lessons learned from industry experiences is a hallmark of the global nuclear industry. This is even more important in the decommissioning technology area since very few plant staff have relevant experience and thus there is a steep learning curve. Moreover, decommissioning involves a number of complex, non-routine and specialized tasks. The web-accessible and searchable experience database provides an easy-to-use resource for capturing and disseminating practical experiences from completed and ongoing decommissioning projects. The EPRI Radwaste Web References will build upon the philosophy and objectives of the Radwaste Desk References that were published in the 1990's. The purpose of the original Radwaste Desk References was to provide nuclear power plant professionals with a how-to manual for managing radioactive waste. The Radwaste Web References will adopt this original purpose and will be a wiki type web site that provide fundamental practical and theoretical information, operating experience (OE), and information about advanced technologies and methods. As much as practicable, features that allow for interaction between users to share OE, best practices, and benchmarking will be added. Where they exist and are appropriate, the various EPRI Guidelines documents on radwaste topics will be updated and incorporated into the Radwaste Web References. The first Radwaste Web Reference will be on Low Level Waste Characterization and will build upon the EPRI Low Level Waste Characterization Guidelines (EPRI Report TR-107201, 1996) and will be available in 2020. The next Radwaste Web Reference will be on the topic of liquid radioactive waste processing and management, tentatively set for unveiling in 2021. This paper summarizes the EPRI's previous experiences with web-based platforms and future plans in this area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Flowsheet Definition for the Tank Side Cesium Removal Unit and the Importance of Early Communication - 19142

The U.S. Department of Energy (DOE) tank operations contractor Washington River Protection Solutions, LLC (WRPS) is working toward the start of low-activity waste (LAW) treatment in direct feed mode as soon as 2022. WRPS is responsible for providing the pre-treated feed for this direct feed mode and had originally planned to use the Low Activity Waste Pretreatment System (LAWPS) to supply the initial feed in 2021. In September 2017, in response to a DOE-sponsored LAWPS program review, a new system was proposed to provide the initial feed during direct feed mode until a supplemental pretreatment capability is ready to begin processing feed. This system, known as the Tank Side Cesium Removal (TSCR) system, is based on the Savannah River Tank Closure Cesium Removal (TCCR) system and technology used to separate cesium out of reactor water at Fukushima. A preliminary flowsheet was needed to form the initial basis for future decisions and allow discussions between operations, project management, and the customer. The main goal of the TSCR flowsheet was to form a process flow diagram, process description, and much of the preliminary information to be used to help inform future decisions. When flowsheet development first began, little to no information was readily known and what was known needed to be compiled in one place and digestible by several audiences. The impacts of various parameters on the system also needed a vehicle for clear communication to varying audiences. While a more complicated model was being completed, a model of the process was created using Microsoft Excela which could have several parameters changed while maintaining basic logical requirements (such as treated waste volume cannot exceed the volume of the Interim LAW Storage Tank [ILST], must shutdown for so many days for column changeout, etc.). This program allowed the unit downtime, start dates, treatment rates, and several other variables to be modified and reflect the ILST storage volume as a function of mission progression. The model with several different parameters gathered from the various groups was combined into an early flowsheet of the TSCR process and created one of the first citable documents about TSCR implementation at Hanford. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of the Corrosion Risks to a Double Shell Tank During the Selective Removal of a Cesium-rich Supernate Layer - 20227

The Direct Feed Low Activity Waste (DF-LAW) activity will provide the initial feed to the Waste Treatment and Immobilization Plant at the Hanford Tank Farm facility. Feed preparation for DF-LAW will be carried out in multiple double shell waste tanks (DST) utilizing the Tank Side Cesium Removal (TSCR) process. Tank AP-106 will be an integral part of the TSCR process and hence key to the DFLAW activity. Prior to being utilized for this purpose, the Cs-137 concentration levels in the AP-106 supernate must be reduced significantly. The AP-106 re-purposing process manages normal waste tank addition procedures such that waste acceptance criteria objectives for Cs-137 removal are achieved. As this process was being developed, several concerns regarding tank integrity during and after repurposing of Tank AP-106, and the associated tanks (i.e., AP-102, AN-101, and AP-108), were addressed. The potential corrosion degradation mechanisms identified based on process knowledge included: general and pitting corrosion, caustic stress corrosion cracking, concentration cell corrosion, and microbiologically induced corrosion (MIC). A systematic approach was undertaken to assess the risk of corrosion during the AP-106 re-purposing process. The assessment considered the initial and present condition of the tank, the service history of the tank, the environmental conditions created in each tank during each stage of the process, process timing, and corrosion testing and modeling that approximated tank conditions. Based on this information, recommendations were provided to minimize the exposure of the tank to corrosive conditions. These recommendations included time limits for each stage of the process, staging of corrosion inhibitor solutions should process delays occur, and waste sampling with potential chemistry adjustments at defined steps in the process. Additionally, recommendations for post-process supernate chemistry adjustments and tank inspections were put forth. The greatest risk for this process occurs during the manipulation of large quantities of Columbia River water (i.e., greater than 450,000 gallons) within AP-106, the associated tanks and the supporting infrastructure (i.e., transfer line piping). This risk becomes more pronounced if there is a process upset and the tank walls remain exposed to a corrosive condition longer than intended. As long as the river water is blended into the supernate in a timely fashion, and the waste is adjusted appropriately with corrosion inhibitors, corrosion may be minimized and the final condition of the supernate in AP-106 and the associated tanks is expected to be in compliance with corrosion chemistry requirements. Contingency plans will be made to minimize the impact of a process upset. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Arvia Organics Destruction: An Innovative Treatment Approach for Dioxins, Furans and Other Problematic (Orphan) Organic Wastes - 16262

The safe and efficient disposal of radionuclide-contaminated organic wastes is a key component in the lifecycle of a nuclear power plant. Technologies are available for the processing of some of these wastes although there are a number of waste streams for which the disposition path is not clear or does not exist at all. For example, waste streams such as dioxin, furan and PCB-laden oils and aqueous organic matrices pose an issue for the US Dept. of Energy complex. These wastes present a challenge as they cannot be readily treated using existing treatment technologies because of legislative and material constraints such as gaseous phase radioactivity discharge limits, waste elemental content, by-product generation and waste resistance to thermal decomposition. Alternate methods of organics destruction can circumvent some of these issues by using different mechanisms of organics oxidation. One such innovative method, known as the Arvia organics destruction process, combines adsorption with electrochemical combustion and offers such an alternative. This technology, based on a patented material, Nyex{sup TM} that is able to act as both an adsorbent and as an electrode, allows the electrochemical combustion of adsorbed organics to occur on the material's surface. The result is the destruction of organics whilst the bulk of inorganic and radionuclide components remain in the aqueous phase. These components can subsequently be treated using existing waste processing technologies. This paper outlines recent work conducted on demonstrating the Arvia process against the destruction of dioxin, furan and PCB-laden wastes that demonstrates that the technology successfully removes these target species to below discharge standards in the aqueous phase. Based on these successful trials a test unit has been designed to demonstrate the process on actual radioactive wastes at the DOE Oak Ridge facility. During commissioning at Arvia's facility the unit achieved a destruction rate of over 1.5 ml of 100% organic waste per hour. The unit is currently at a partner laboratory facility based at Oak Ridge National Laboratories and has recently completed a further suite of simulant trials which are reported here. The above work showcases the development, testing and initial application of an innovative technology, first presented to the industry at the Waste Management 2012, as another option for the treatment of challenging wastes with expensive, complex or no current disposal routes. Over the years the technology has gone through a number of proving stages culminating in the testing on real orphan wastes based at the Oak Ridge Facility. The Arvia Organics Destruction Cell technology adds to the portfolio of available treatment technologies and will help facilitate the decommissioning and waste disposal responsibilities of the nuclear industry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Producing Desired Properties From a Broader Spectrum of Compositions - 18167

The U.S. Department of Energy, Office of River Protection has an extensive research program to develop low-activity waste and high-level waste glass compositions for the balance of mission of the Waste Treatment and Immobilization Plant (WTP). The fundamental data stemming from this program will support development of advanced glass formulations, key process control models, and processing strategies to ensure safe and successful operations for both the Low-Activity Waste and High-Level Waste facilities with an appreciation toward reducing overall mission life. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pursuing Cost Effective Tank Waste Characterization at the Savannah River Site - 16172

The U. S. Department of Energy Office of Environmental Management has tasked the Savannah River National Laboratory (SRNL) with developing strategies and technologies to understand, optimize, scale, and speed up tank waste characterization. This scope is part of a multi-year project with the end goal of implementing programmatic changes that accelerate tank waste processing and tank closure schedules, and at the same time reduce characterization costs, while maintaining data integrity. The project is currently in its second year. During the first year of the project, SRNL completed a series of activities focused on understanding the range of current characterization practices, needs, gaps, risks, and potential alternative approaches. Based on the results, conclusions were drawn regarding aspects of the programs that are most costly and time consuming; particular waste constituents that drive costs, schedule, and program risks; alternative characterization approaches (other than sampling and analysis) that are less expensive and more rapid; new laboratory methods holding the greatest promise for reducing characterization costs and schedule; and in whole, the primary areas where current characterization practices can be improved. SRNL's current scope is focusing on three primary activities: 1) development of a technical basis/strategy for improving the cost effectiveness and schedule of SRNL's tank closure characterization program; 2) design/assembly of hardware, plumbing, and software for automating select radiochemical separation and waste removal processes; and 3) development and testing of alternative radiochemical separation protocols most likely to improve high resource demand/time consuming analysis methods (such as Ra-226, Pa-231, Tc-99/I-129, and/or Y/trivalent actinide separations). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗