Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

A Microreactor Program Plan for The Department of Energy

The DOE Microreactor Program was established in FY 2019 to support research and development (R&D) of technologies related to the development, demonstration, and deployment of low-power, transportable reactors to provide power and heat for decentralized generation in civilian, industrial, and defense energy sectors. The program conducts both fundamental and applied R&D to de-risk technology performance and manufacturability readiness of microreactors. R&D projects and work packages are selected to support concept-neutral technology maturation. The intent is to ensure those concepts can be licensed and deployed by commercial entities to meet specific use case requirements. At the same time, the program will also support R&D specific to certain reactor technology groups (e.g., heat pipe reactors and gas-cooled reactors) to ensure relevancy and address the technology needs of commercial developers. The program will ensure coordination of work and activities across participating laboratories and universities, establish, and manage stakeholder interactions, and support program meetings. These stakeholders include, but are not limited to, industry developers, the U.S. Nuclear Regulatory Commission, the Department of Energy, policymakers, and end users. This document provides an overview of the overall Microreactor Program, including its vision, key technical objectives, and scope of the current and proposed R&D portfolio. It covers a 5-year rolling currently from Fiscal year 2025 through Fiscal year 2030. This document will be revised at least biennially to reflect changing priorities.

99 - GENERAL AND MISCELLANEOUS↗

Development of Technology Readiness Level (TRL) Metrics and Risk Measures

This is an internal project milestone report to document the CCSI Element 7 team's progress on developing Technology Readiness Level (TRL) metrics and risk measures. In this report, we provide a brief overview of the current technology readiness assessment research, document the development of technology readiness levels (TRLs) specific to carbon capture technologies, describe the risk measures and uncertainty quantification approaches used in our research, and conclude by discussing the next steps that the CCSI Task 7 team aims to accomplish.

carbon capture simulation↗

Using Project Complexity Determinations to Establish Required Levels of Project Rigor

The concepts discussed in this paper 1) focus on using technical competencies and skills in making objective determinations regarding project complexity based on objective scoring criteria and 2) then using the complexity determinations to establish the level of rigor required in initiating, planning, executing, monitoring and controlling, and closing projects to maximize process efficiency. This paper presents a project complexity analysis methodology for defining the levels of project management process rigor a project team needs to employ to maximize project delivery efficiencies without compromising quality and performance. Methods for making project complexity determinations based on project lifecycle size, duration, organizational complexity, requirements, technology readiness, risk, and visibility are discussed. The paper correlates the levels of rigor needed by project management process groups given the determined level of project complexity. Next, the paper presents a graded approach to defining extent of team formation, planning documentation rigor, stakeholder communication rigor, requirements management rigor, acquisition planning, risk management, executing, and monitoring and controlling rigor dependent on project complexity determinations. Methods for integrating and aligning the project complexity determination methods into existing project management procedures and processes are also discussed as well as methods for training personnel in the use of the method and facilitating and monitoring effectiveness of implementation within an organization in which project delivery is a mission focus.

complexity, project, determination, management, tr↗

NorthernStar Zero Energy Ready Homes

This is a repository for all NorthernSTAR Zero Energy Ready certified homes. Amaris Homes Model Home - St. Paul, MN 55110 Description: Model home completed September 2013 The DOE Zero Energy Ready Home Case Study looks to study and eventually design zero net energy homes in cold weather climates. These zero net energy homes are referred to as challenge homes. For this challenge home, Amaris Homes is working with the DOE in St. Paul, Minnesota. The household located at MN 55110 acts as the Amaris Challenge Home Test. The resources include technical drawings including siding, roofing and Windows. Christian Builders Challenge Home - House Count: 1 - Otsego, MN 55374 Need pictures from builder; This home actually narrowly missed certification under DOE Net Zero Energy Ready Homes. Need building plans and project summary from builder. DESIGN AND STRUCTURE - Amaris Homes - House Count: 7 Stillwater, MN 55082; Vadnais Heights, MN 55127; Bloomington, MN 55437; Apple Valley, MN 55124; White Bear Lake, MN 55110; Mounds View, MN 55112; Midland, MI 48642; DOE Zero Energy Ready Homes

Array↗

Lab-Scale Development of a Solid Sorbent for CO 2 Capture Process for Coal-Fired Power Plants

It is increasingly clear that CO 2 capture and sequestration (CCS) must play a critical role in curbing worldwide CO 2 emissions to the atmosphere. Development of these technologies to cost-effectively remove CO 2 from coal-fired power plants is very important to mitigating the impact these power plants have within the world’s power generation portfolio. Currently, conventional CO 2 capture technologies, such as aqueous-monoethanolamine based solvent systems, are prohibitively expensive and if implemented could result in a 75 to 100% increase in the cost of electricity for consumers worldwide. Solid sorbent CO 2 capture processes – such as RTI’s 3rd Generation Solid Sorbent CO 2 Capture Process – are promising alternatives to conventional, liquid solvents. Supported amine sorbents – of the nature RTI has developed – are particularly attractive due to their potential for high CO 2 loadings, excellent stability over multiple cycles, reduced corrosivity/volatility and a potential to reduce the regeneration energy needed to carry out CO 2 capture. The remaining challenges for these sorbent processes have provided the framework for the project team’s research and development and target for advancing the technology beyond lab-scale testing. Previous work in this area has failed to adequately address various technology challenges such as sorbent stability and regenerability, sorbent scale-up, improved physical strength and attrition-resistance, proper heat management and temperature control, proper solids handling, as well as the proper coupling of process engineering advancements that are tailored for a promising sorbent technology. Under a cooperative agreement with the US Department of Energy, and part of NETL’s CO 2 Capture Program, RTI has led an effort to address and mitigate the challenges associated with solid sorbent CO 2 capture. The overall objective of this project was to mitigate the technical and economic risks associated with the performance and scale-up of solid sorbent-based CO 2 capture processes, enabling subsequent larger pilot demonstrations and ultimately commercial deployment. An integrated development approach has been a key focus of this project in which sorbent development, process development, and economic analyses have informed each of the other development processes. Development efforts have focused on developing novel hybrid solids-based CO 2 capture sorbents and improving their performance stability, refining process engineering and design, and evaluating the viability of the technology through detailed economic analyses. Sorbent advancements have led to a next generation, commercially-viable CO 2 capture sorbent exhibiting performance stability in various gas environments and a physically strong fluidizable form. The team has reduced sorbent production costs and optimized the production and scale-up of novel metal-organic framework (MOF) hybrid solids-based CO 2 capture sorbents, fluidizable sorbents. Refinement of the process engineering and design at the lab-scale research unit has demonstrated promising CO 2 capture performance in simulated coal-fired flue gas conditions. Long-term testing has informed the project team on the process conditions needed to operate a solids-based system for optimal performance. Data collected from all phases of testing has been used to develop a detailed techno-economic assessment of RTI’s technology. These detailed analyses show that RTI’s technology has significant economic advantages over current amine scrubbing and potential to achieve the DOE’s Carbon Capture Program’s goal of >90% CO 2 capture rate at a cost of almost $40/tonne CO 2 captured by 2025. Through this integrated technology development approach, the project team has advanced RTI’s 3rd generation CO 2 capture technology to TRL-3, according to the DOE/FE definitions for Technology Readiness Levels. At a broader level, this project has advanced the whole of the solid sorbent CO 2 capture field, with advancements in process engineering and design, technical risk mitigation, sorbent scale-up optimization, and an understanding of the commercial viability and applicability of solid sorbent CO 2 capture technologies for the U.S. existing fleet of coal-fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Technology Solutions for New Homes Case Study: Multifamily Zero Energy Ready Home Analysis

AvalonBay Communities, which is a large multifamily developer, was developing a three-building complex in Elmsford, New York. The buildings were planned to be certified to the ENERGY STAR® Homes Version 3 program. This plan led to AvalonBay partnering with the Advanced Residential Integrated Solutions (ARIES) collaborative, which is a U.S. Department of Energy Building America team. ARIES worked with AvalonBay to redesign the project to comply with Zero Energy Ready Home (ZERH) criteria.

aries↗

California Wave Power Technologies Open Water Demonstration - Budget Period 1 reports

The objective of the project is to advance the Technology Readiness Level (TRL) of the Wave Energy Converter (WEC) developed by CalWave Wave Power Technologies Inc (CalWave) through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstration deployment while continuing to exceed DOE's target ACE threshold of 3m/M$. The outcomes of Budget Period 1 will be a detailed design of the scaled demonstration unit and bench testing of the critical hardware components.

16 TIDAL AND WAVE POWER↗

Oxy-Combustion Burner and Integrated Pollutant Removal Research and Development Test Facility

A high flame temperature oxy-combustion test facility consisting of a 5 MWe equivalent test boiler facility and 20 KWe equivalent IPR® was constructed at the Hammond, Indiana manufacturing site. The test facility was operated natural gas and coal fuels and parametric studies were performed to determine the optimal performance conditions and generated the necessary technical data required to demonstrate the technologies are viable for technical and economic scale-up. Flame temperatures between 4930-6120F were achieved with high flame temperature oxy-natural gas combustion depending on whether additional recirculated flue gases are added to balance the heat transfer. For high flame temperature oxy-coal combustion, flame temperatures in excess of 4500F were achieved and demonstrated to be consistent with computational fluid dynamic modeling of the burner system. The project demonstrated feasibility and effectiveness of the Jupiter Oxygen high flame temperature oxy-combustion process with Integrated Pollutant Removal process for CCS and CCUS. With these technologies total parasitic power requirements for both oxygen production and carbon capture currently are in the range of 20% of the gross power output. The Jupiter Oxygen high flame temperature oxy-combustion process has been demonstrated at a Technology Readiness Level of 6 and is ready for commencement of a demonstration project.

36 MATERIALS SCIENCE↗

Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

The Greenidge Multi-Pollutant Control Project is being conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electrical generating units (EGUs). The multi-pollutant control system includes a hybrid selective non-catalytic reduction (SNCR)/in-duct selective catalytic reduction (SCR) system to reduce NOx emissions by {ge}60%, followed by a Turbosorp{reg_sign} circulating fluidized bed dry scrubber system to reduce emissions of SO{sub 2}, SO{sub 3}, HCl, and HF by {ge}95%. Mercury removal of {ge}90% is also targeted via the co-benefits afforded by the in-duct SCR, dry scrubber, and baghouse and by injection of activated carbon upstream of the scrubber, as required. The technology is particularly well suited, because of its relatively low capital and maintenance costs and small space requirements, to meet the needs of coal-fired units with capacities of 50-300 MWe. There are about 440 such units in the United States that currently are not equipped with SCR, flue gas desulfurization (FGD), or mercury control systems. These smaller units are a valuable part of the nation's energy infrastructure, constituting about 60 GW of installed capacity. However, with the onset of the Clean Air Interstate Rule, Clean Air Mercury Rule, and various state environmental actions requiring deep reductions in emissions of SO{sub 2}, NO{sub x}, and mercury, the continued operation of these units increasingly depends upon the ability to identify viable air pollution control retrofit options for them. The large capital costs and sizable space requirements associated with conventional technologies such as SCR and wet FGD make these technologies unattractive for many smaller units. The Greenidge Project aims to confirm the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

01 COAL, LIGNITE, AND PEAT↗

Interim report on the Global Design Effort Global International Linear Collider (ILC) R&D

The International Linear Collider: A Technical Progress Report marks the halfway point towards the Global Design Effort fulfilling its mandate to follow up the ILC Reference Design Report with a more optimised Technical Design Report (TDR) by the end of 2012. The TDR will be based on much of the work reported here and will contain all the elements needed to propose the ILC to collaborating governments, including a technical design and implementation plan that are realistic and have been better optimised for performance, cost and risk. We are on track to develop detailed plans for the ILC, such that once results from the Large Hadron Collider (LHC) at CERN establish the main science goals and parameters of the next machine, we will be in good position to make a strong proposal for this new major global project in particle physics. The two overriding issues for the ILC R&D programme are to demonstrate that the technical requirements for the accelerator are achievable with practical technologies, and that the ambitious physics goals can be addressed by realistic ILC detectors. This GDE interim report documents the impressive progress on the accelerator technologies that can make the ILC a reality. It highlights results of the technological demonstrations that are giving the community increased confidence that we will be ready to proceed with an ILC project following the TDR. The companion detector and physics report document likewise demonstrates how detector designs can meet the ambitious and detailed physics goals set out by the ILC Steering Committee. LHC results will likely affect the requirements for the machine design and the detectors, and we are monitoring that very closely, intending to adapt our design as those results become available.

43 PARTICLE ACCELERATORS↗

International Linear Collider-A Technical Progress Report

The International Linear Collider: A Technical Progress Report marks the halfway point towards the Global Design Effort fulfilling its mandate to follow up the ILC Reference Design Report with a more optimised Technical Design Report (TDR) by the end of 2012. The TDR will be based on much of the work reported here and will contain all the elements needed to propose the ILC to collaborating governments, including a technical design and implementation plan that are realistic and have been better optimised for performance, cost and risk. We are on track to develop detailed plans for the ILC, such that once results from the Large Hadron Collider (LHC) at CERN establish the main science goals and parameters of the next machine, we will be in good position to make a strong proposal for this new major global project in particle physics. The two overriding issues for the ILC R&D programme are to demonstrate that the technical requirements for the accelerator are achievable with practical technologies, and that the ambitious physics goals can be addressed by realistic ILC detectors. This GDE interim report documents the impressive progress on the accelerator technologies that can make the ILC a reality. It highlights results of the technological demonstrations that are giving the community increased confidence that we will be ready to proceed with an ILC project following the TDR. The companion detector and physics report document likewise demonstrates how detector designs can meet the ambitious and detailed physics goals set out by the ILC Steering Committee. LHC results will likely affect the requirements for the machine design and the detectors, and we are monitoring that very closely, intending to adapt our design as those results become available.

43 PARTICLE ACCELERATORS↗

Well-Controlled Hydro-thermo-chemical Stimulation of a Coso Geothermal Well to Enhance Productivity

The goal of this project was to demonstrate controlled fracturing and permeability increase to enhance resource production and power generation at Coso. It was planned to stimulate at least two intervals in the Well 73-18RD with zonal isolation using advanced high-temperature packer technology. The anticipation was that a hydraulic fracture would form in one zone and in the second zone natural fractures would reopen, shear and extend, thereby increasing fluid communication in the field. In both cases, the intent was to carefully design the stimulation to take advantage of the relative roles of hydraulic pressure, thermal stress and chemical (“hydro-thermo-chemical”) dissolution. The project had planned to use the Welltec Annular Barrier (WAB) system developed as part of another DOE-funded project which was on schedule to be ready for field deployment. If successful, the Coso Operating Company would incorporate this approach into their ongoing well maintenance in other wells increasing the total MWs produced. The project had multiple tasks and the objective of Task 1 was to develop a workover plan, to build a geologic model, to design a stimulation program, and to work with the operating and services companies to develop a detailed budget and obtain the necessary permits and sundry notices. In Phase 2 the workover plan would be implemented, the designed stimulation would be carried out, and subsequently the well would logged and tested to measure the impact of stimulation. Per sponsor request, a Pre-Task 1 activity with a Go/No Go decision point was scheduled in Task 1.

02 PETROLEUM↗

NGNP Risk Management through Assessing Technology Readiness

Throughout the Next Generation Nuclear Plant (NGNP) project life cycle, technical risks are identified, analyzed, and mitigated and decisions are made regarding the design and selection of plant and sub-system configurations, components and their fabrication materials, and operating conditions. Risk resolution and decision making are key elements that help achieve project completion within budget and schedule constraints and desired plant availability. To achieve this objective, a formal decision-making and risk management process was developed for NGNP, based on proven systems engineering principles that have guided aerospace and military applications.

42 ENGINEERING↗

PROJECT FEVER – Fostering Electric Vehicle Expansion in the Rockies

Project FEVER (Fostering Electric Vehicle Expansion in the Rockies) is a part of the Clean Cities Community Readiness and Planning for Plug-in Electric Vehicles and Charging Infrastructure Funding Opportunity funded by the U.S. Department of Energy (DOE) for the state of Colorado. Tasks undertaken in this project include: Electric Vehicle Grid Impact Assessment; Assessment of Electrical Permitting and Inspection for EV/EVSE (electric vehicle/electric vehicle supply equipment); Assessment of Local Ordinances Pertaining to Installation of Publicly Available EVSE;Assessment of Building Codes for EVSE; EV Demand and Energy/Air Quality Impacts Assessment; State and Local Policy Assessment; EV Grid Impact Minimization Efforts; Unification and Streamlining of Electrical Permitting and Inspection for EV/EVSE; Development of BMP for Local EVSE Ordinances; Development of BMP for Building Codes Pertaining to EVSE; Development of Colorado-Specific Assessment for EV/EVSE Energy/Air Quality Impacts; Development of State and Local Policy Best Practices; Create Final EV/EVSE Readiness Plan; Develop Project Marketing and Communications Elements; Plan and Schedule In-person Education and Outreach Opportunities.

33 ADVANCED PROPULSION SYSTEMS↗

Commercialization Effort for 1W Consumer Electronics Power Pack

A commercial ready fuel cell charger has been further developed, demonstrated, and field tested during the three phases of this project. The work performed and demonstrated has shown the commercialization readiness of this future product and underlying technology. The tasks in phase 1 of the project focused on component cost reduction, redesign for manufacturability, performance & reliability testing, and system integration. The end of phase 1 was completed on time and was signified by passing the Go/No-Go checkpoint. As shown in the report all technical metrics have been met or exceeded and the Go/No-Go checkpoint was passed in November of 2009. The tasks in phase 2 focused on tool fabrication and tooled component prove-out in working systems. The end of Phase 2 was the accomplishment of building working systems made almost completely of tooled components. The tasks in phase 3 of the project were preparing for and executing a 75 unit field test of the DMFC charger product developed in Phase 1 and phase 2. This field test demonstrated the functionality of the DMFC in the hands of real users while also providing feedback for potential design improvements. This was the first time a significant number of MTI units were put into the field to test usability and functionality. Feedback from the field test was positive and the units functioned well in the field.

08 HYDROGEN↗

Electrochemical Reduction of Flue Gas Carbon Dioxide to Commercially Viable C2-C4 Products (Final Report)

This is the final scientific/technical report for a DOE project focused on the electrochemical conversion of CO 2 in non-aqueous solvents to novel products. Electrochemical reduction of CO 2 provides an attractive route to produce valuable fuels and chemicals that can simultaneously lower greenhouse gas emissions when powered by renewable electricity. While recent technological advances have shown the feasibility of industrial CO 2 electroreduction, many challenges remain to improve this technology and expand the list of economically viable products. The vast majority of electrochemical CO 2 reduction research has been conducted in aqueous media under neutral to alkaline conditions, leading to commonly reported products including carbon monoxide, formic acid, methane, methanol, ethylene, acetic acid, and ethanol. In comparison, non-aqueous media for CO 2 reduction has been underexplored but represents a possible avenue to yield new products and improved operating conditions. The aim of the project was to convert waste CO 2 in the form of flue gas to a multicarbon C2 - C4 chemical product in a reactor designed to achieve economically competitive values of current density and selectivity. The project strived to advance the technology readiness of an electrochemical CO 2 reduction process in alcohol solvents from the proof-of-concept stage to a device capable of meeting performance metrics for commercial viability. In the initial plan, the University of Louisville researchers were to focus on investigating the electrochemical process and improving the faradaic efficiency for novel C2 – C4 species, while also working on a parallel effort to build a practical electrolysis reactor to markedly increase the CO 2 reduction current density. The reactor development effort also aimed to engineer a dual-electrolyte feed strategy with non-aqueous catholyte and aqueous anolyte to promote water oxidation as the coupling anodic half-reaction to enable a sustainable and economical overall process. At the outset, the University of North Dakota was to investigate the feasibility of operating directly from coal-derived flue gas without separate capture and purification. The research team sought to determine impurity effects and test mitigation strategies, as well as engineer the gaseous feed system for high reactor tolerance to lower CO 2 concentration. In the last half year of the project, the focus was planned to shift to integrating the advances in the catalysis, electrochemical conditions, reactor design, and flue gas compatibility into a fully functional device and improve it for maximum current density and faradaic efficiency for C2 – C4 species. Knowledge of the full system components, constraints, and maximum performance was then to be used as the basis for a thorough technoeconomic analysis (TEA) and life cycle analysis (LCA) at the end of the project.

01 COAL, LIGNITE, AND PEAT↗

Greenidge Multi-Pollutant Control Project

The Greenidge Multi-Pollutant Control Project was conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electric generating units (EGUs). There are about 400 units in the United States with capacities of 50-300 MW that currently are not equipped with selective catalytic reduction (SCR), flue gas desulfurization (FGD), or mercury control systems. Many of these units, which collectively represent more than 55 GW of installed capacity, are difficult to retrofit for deep emission reductions because of space constraints and unfavorable economies of scale, making them increasingly vulnerable to retirement or fuel switching in the face of progressively more stringent environmental regulations. The Greenidge Project sought to confirm the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs by offering a combination of deep emission reductions, low capital costs, small space requirements, applicability to high-sulfur coals, mechanical simplicity, and operational flexibility. The multi-pollutant control system includes a NO{sub x}OUT CASCADE{reg_sign} hybrid selective non-catalytic reduction (SNCR)/in-duct SCR system for NO{sub x} control and a Turbosorp{reg_sign} circulating fluidized bed dry scrubbing system (with a new baghouse) for SO{sub 2}, SO{sub 3}, HCl, HF, and particulate matter control. Mercury removal is provided as a co-benefit of the in-duct SCR, dry scrubber, and baghouse, and by injection of activated carbon upstream of the scrubber, if required. The multi-pollutant control system was installed and tested on the 107-MW{sub e}, 1953-vintage AES Greenidge Unit 4 by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. About 44% of the funding for the project was provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and the remaining 56% was provided by AES Greenidge. Project goals included reducing high-load NO{sub x} emissions to {le} 0.10 lb/mmBtu; reducing SO{sub 2}, SO{sub 3}, HCl, and HF emissions by at least 95%; and reducing Hg emissions by at least 90% while the unit fired 2-4% sulfur eastern U.S. bituminous coal and co-fired up to 10% biomass. This report details the final results from the project. The multi-pollutant control system was constructed in 2006, with a total plant cost of $349/kW and a footprint of 0.4 acre - both substantially less than would have been required to retrofit AES Greenidge Unit 4 with a conventional SCR and wet scrubber. Start-up of the multi-pollutant control system was completed in March 2007, and the performance of the system was then evaluated over an approximately 18-month period of commercial operation. Guarantee tests conducted in March-June 2007 demonstrated attainment of all of the emission reduction goals listed above. Additional tests completed throughout the performance evaluation period showed 96% SO{sub 2} removal, 98% mercury removal (with no activated carbon injection), 95% SO{sub 3} removal, and 97% HCl removal during longer-term operation. Greater than 95% SO{sub 2} removal efficiency was observed even when the unit fired high-sulfur coals containing up to 4.8 lb SO{sub 2}/mmBtu. Particulate matter emissions were reduced by more than 98% relative to the emission rate observed prior to installation of the technology. The performance of the hybrid SNCR/SCR system was affected by problems with large particle ash, ammonia slip, and nonideal combustion characteristics, and high-load NO{sub x} emissions averaged 0.14 lb/mmBtu during long-term operation. Nevertheless, the system has reduced the unit's overall NO{sub x} emissions by 52% on a lb/mmBtu basis. The commercial viability of the multi-pollutant control system was demonstrated at AES Greenidge Unit 4. The system, which remains in service after the conclusion of the project, has enabled the unit to satisfy its permit requirements while continuing to operate profitably. As a result of the success at AES Greenidge Unit 4, three additional deployments of the Turbosorp{reg_sign} technology had been announced by the end of the project.

01 COAL, LIGNITE, AND PEAT↗

Bench-scale Development of an Advanced Solid Sorbent-based CO 2 Capture Process for Coal-fired Power Plants

It is increasingly clear that CO 2 capture and sequestration (CCS) must play a critical role in curbing worldwide CO 2 emissions to the atmosphere. Development of these technologies to cost-effectively remove CO 2 from coal-fired power plants is very important to mitigating the impact these power plants have within the world’s power generation portfolio. Currently, conventional CO 2 capture technologies, such as aqueous-monoethanolamine based solvent systems, are prohibitively expensive and if implemented could result in a 75 to 100% increase in the cost of electricity for consumers worldwide. Solid sorbent CO 2 capture processes – such as RTI’s Advanced Solid Sorbent CO 2 , Capture Process – are promising alternatives to conventional, liquid solvents. Supported amine sorbents – of the nature RTI has developed – are particularly attractive due to their high CO 2 loadings, low heat capacities, reduced corrosivity/volatility and the potential to reduce the regeneration energy needed to carry out CO 2 capture. Previous work in this area has failed to adequately address various technology challenges such as sorbent stability and regenerability, sorbent scale-up, improved physical strength and attrition-resistance, proper heat management and temperature control, proper solids handling and circulation control, as well as the proper coupling of process engineering advancements that are tailored for a promising sorbent technology. The remaining challenges for these sorbent processes have provided the framework for the project team’s research and development and target for advancing the technology beyond lab- and bench-scale testing. Under a cooperative agreement with the US Department of Energy, and part of NETL’s CO 2 Capture Program, RTI has led an effort to address and mitigate the challenges associated with solid sorbent CO 2 capture. The overall objective of this project was to mitigate the technical and economic risks associated with the scale-up of solid sorbent-based CO 2 capture processes, enabling subsequent larger pilot demonstrations and ultimately commercial deployment. An integrated development approach has been a key focus of this project in which process development, sorbent development, and economic analyses have informed each of the other development processes. Development efforts have focused on improving the performance stability of sorbent candidates, refining process engineering and design, and evaluating the viability of the technology through detailed economic analyses. Sorbent advancements have led to a next generation, commercially-viable CO 2 capture sorbent exhibiting performance stability in various gas environments and a physically strong fluidizable form. The team has reduced sorbent production costs and optimized the production process and scale-up of PEI-impregnated, fluidizable sorbents. Refinement of the process engineering and design, as well as the construction and operation of a bench-scale research unit has demonstrated promising CO 2 capture performance under simulated coal-fired flue gas conditions. Parametric testing has shown how CO 2 capture performance is impacted by changing process variables, such as Adsorber temperature, Regenerator temperature, superficial flue gas velocity, solids circulation rate, CO 2 partial pressure in the Regenerator, and many others. Long-term testing has generated data for the project team to set the process conditions needed to operate a solids-based system for optimal performance, with continuous 90% CO 2 capture, and no operational interruptions. Data collected from all phases of testing has been used to develop a detailed techno-economic assessment of RTI’s technology. These detailed analyses show that RTI’s technology has significant economic advantages over current amine scrubbing and potential to achieve the DOE’s Carbon Capture Program’s goal of >90% CO 2 capture rate at a cost of < $40/T-CO 2 captured by 2025. Through this integrated technology development approach, the project team has advanced RTI’s CO 2 capture technology to TRL-4 (nearly TRL-5, with the missing variable being testing on actual, coal-fired flue gas), according to the DOE/FE definitions for Technology Readiness Levels. At a broader level, this project has advanced the whole of the solid sorbent CO 2 capture field, with advancements in process engineering and design, technical risk mitigation, sorbent scale-up optimization, and an understanding of the commercial viability and applicability of solid sorbent CO 2 capture technologies for the U.S. existing fleet of coal-fired power plants.

01 COAL, LIGNITE, AND PEAT↗