Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Program verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Destructive analysis capabilities for plutonium and uranium characterization at Los Alamos National Laboratory

Los Alamos National Laboratory's (LANL) Actinide Analytical Chemistry (AAC) group has been in existence since the Manhattan Project. It maintains a complete set of analytical capabilities for performing complete characterization (elemental assay, isotopic, metallic and non metallic trace impurities) of uranium and plutonium samples in different forms. For a majority of the customers there are strong quality assurance (QA) and quality control (QC) objectives including highest accuracy and precision with well defined uncertainties associated with the analytical results. Los Alamos participates in various international and national programs such as the Plutonium Metal Exchange Program, New Brunswick Laboratory's (NBL' s) Safeguards Measurement Evaluation Program (SME) and several other inter-laboratory round robin exercises to monitor and evaluate the data quality generated by AAC. These programs also provide independent verification of analytical measurement capabilities, and allow any technical problems with analytical measurements to be identified and corrected. This presentation will focus on key analytical capabilities for destructive analysis in AAC and also comparative data between LANL and peer groups for Pu assay and isotopic analysis.

36 MATERIALS SCIENCE↗

Nuclear Forensics at Los Alamos National Laboratory

The overview of this presentation is: (1) Introduction to nonproliferation efforts; (2) Scope of activities at Los Alamos National Laboratory; (3) Facilities for radioanalytical work at LANL; (4) Radiochemical characterization capabilities; and (5) Bulk chemical and materials analysis capabilities. Some conclusions are: (1) Analytical chemistry measurements on plutonium and uranium matrices are critical to numerous defense and non-defense programs including safeguards accountancy verification measurements; (2) Los Alamos National Laboratory operates capable actinide analytical chemistry and material science laboratories suitable for nuclear material forensic characterization; (3) Actinide analytical chemistry uses numerous means to validate and independently verify that measurement data quality objectives are met; and (4) Numerous LANL nuclear facilities support the nuclear material handling, preparation, and analysis capabilities necessary to evaluate samples containing nearly any mass of an actinide (attogram to kilogram levels).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Status of R&D on Mitigating the Effects of Pressure Waves for the Spallation Neutron Source Mercury Target

The Spallation Neutron Source (SNS) at the Oak Ridge National Laboratory has been conducting R&D on mitigating the effects of pressure waves in mercury spallation targets since 2001. More precisely, cavitation damage of the target vessel caused by the short beam pulse threatens to limit its lifetime more severely than radiation damage as well as limit its ultimate power capacity and hence its neutron intensity performance. The R&D program has moved from verification of the beam-induced damage phenomena to study of material and surface treatments for damage resistance to the current emphasis on gas injection techniques for damage mitigation. Two techniques are being worked on: injection of small dispersed gas bubbles that mitigate the pressure waves volumetrically; and protective gas walls that isolate the vessel from the damaging effects of collapsing cavitation bubbles. The latter has demonstrated good damage mitigation during in-beam testing with limited pulses, and adequate gas wall coverage at the beam entrance window has been demonstrated with the SNS mercury target flow configuration using a full scale mercury test loop. A question on the required area coverage remains which depends on results from SNS target post irradiation examination. The small gas bubble technique has been less effective during past in-beam tests but those results were with un-optimized and un-verified bubble populations. Another round of in-beam tests with small gas bubbles is planned for 2011. The first SNS target was removed from service in mid 2009 and samples were cut from two locations at the target s beam entrance window. Through-wall damage was observed at the innermost mercury vessel wall (not a containment wall). The damage pattern suggested correlation with the local mercury flow condition which is nearly stagnant at the peak damage location. Detailed post irradiation examination of the samples is under way that will assess the erosion and measure irradiation-induced changes in mechanical properties. Similar samples were cut from the second SNS target after it was removed from service in mid 2010. More extensive damage was observed on the target inner wall but damage to the containment wall was minimal.

cavitation↗

Statistical physics of networks, information and complex systems

In this project we explore the mathematical methods and concepts of statistical physics that are fmding abundant applications across the scientific and technological spectrum from soft condensed matter systems and bio-infonnatics to economic and social systems. Our approach exploits the considerable similarity of concepts between statistical physics and computer science, allowing for a powerful multi-disciplinary approach that draws its strength from cross-fertilization and mUltiple interactions of researchers with different backgrounds. The work on this project takes advantage of the newly appreciated connection between computer science and statistics and addresses important problems in data storage, decoding, optimization, the infonnation processing properties of the brain, the interface between quantum and classical infonnation science, the verification of large software programs, modeling of complex systems including disease epidemiology, resource distribution issues, and the nature of highly fluctuating complex systems. Common themes that the project has been emphasizing are (i) neural computation, (ii) network theory and its applications, and (iii) a statistical physics approach to infonnation theory. The project's efforts focus on the general problem of optimization and variational techniques, algorithm development and infonnation theoretic approaches to quantum systems. These efforts are responsible for fruitful collaborations and the nucleation of science efforts that span multiple divisions such as EES, CCS, 0 , T, ISR and P. This project supports the DOE mission in Energy Security and Nuclear Non-Proliferation by developing novel infonnation science tools for communication, sensing, and interacting complex networks such as the internet or energy distribution system. The work also supports programs in Threat Reduction and Homeland Security.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Software Synthesis for High Productivity Exascale Computing

Over the three years of our project, we accomplished three key milestones: We demonstrated how ideas from generative programming and software synthesis can help support the development of bulk-synchronous distributed memory kernels. These ideas are realized in a new language called MSL, a C-like language that combines synthesis features with high level notations for array manipulation and bulk-synchronous parallelism to simplify the semantic analysis required for synthesis. We also demonstrated that these high level notations map easily to low level C code and show that the performance of this generated code matches that of handwritten Fortran. Second, we introduced the idea of solver-aided domain-specific languages (SDSLs), which are an emerging class of computer-aided programming systems. SDSLs ease the construction of programs by automating tasks such as verification, debugging, synthesis, and non-deterministic execution. SDSLs are implemented by translating the DSL program into logical constraints. Next, we developed a symbolic virtual machine called Rosette, which simplifies the construction of such SDSLs and their compilers. We have used Rosette to build SynthCL, a subset of OpenCL that supports synthesis. Third, we developed novel numeric algorithms that move as little data as possible, either between levels of a memory hierarchy or between parallel processors over a network. We achieved progress in three aspects of this problem. First we determined lower bounds on communication. Second, we compared these lower bounds to widely used versions of these algorithms, and noted that these widely used algorithms usually communicate asymptotically more than is necessary. Third, we identified or invented new algorithms for most linear algebra problems that do attain these lower bounds, and demonstrated large speed-ups in theory and practice.

97 MATHEMATICS AND COMPUTING↗

The overview in safety review of human factors engineering and control room design in chinese AP1000 nuclear power plant - 174

The first AP1000 nuclear power plant is constructed in Sanmen county in Zhejiang Province in China, which has creative and distinctive design characteristics. Human factors engineering disciplines are applied to the design of the AP1000. In addition to the elements of the program review model(including human factors engineering program management, operating experience review, functional requirements analysis and allocation, task analysis, staffing, integration of human reliability analysis with human factors engineering, human system interface design, procedure development, training program development, human system interface verification and validation, design implementation, human performance monitoring),the minimum inventory of controls, displays, and alarms present in the main control room and at the remote shutdown workstation. These contents mentioned above are reviewed according to standards, rules and regulations. This article introduces review process, and several important issues during the reviewing are described in detail. These issues include many elements, such as operating experience review, task analysis, human system interface design, verification and validation,and so on. This paper emphasizes on the main control room design(including environment and layout). Background noise in the actual main control room may exceed too much to design value. Another important issue is about main control room habitability systems(VES) changes to satisfy post-actuation performance requirements in AP1000 design change proposal. All the wall panel displays will be closed in this design change proposal. Review process and proposal are described in the paper. Since the AP1000 unit in China is the first constructed all over the world, verification and validation are especially important and necessary. The plan of verification and validation, the results summary report of verification and validation, the report of human engineering discrepancies are focus attention. Verification and validation in human factors engineering include HSI task support verification, HFE design verification and integrated system validation. This paper introduces the review process of verification and validation, the issues found in verification and validation. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Compiler verification meets cross-language linking via data abstraction

Many real programs are written in multiple different programming languages, and supporting this pattern creates challenges for formal compiler verification. We describe our Coq verification of a compiler for a high-level language, such that the compiler correctness theorem allows us to derive partial-correctness Hoare-logic theorems for programs built by linking the assembly code output by our compiler and assembly code produced by other means. Our compiler supports such tricky features as storable cross-language function pointers, without giving up the usual benefits of being able to verify different compiler phases (including, in our case, two classic optimizations) independently. Here, the key technical innovation is a mixed operational and axiomatic semantics for the source language, with a built-in notion of abstract data types, such that compiled code interfaces with other languages only through axiomatically specified methods that mutate encapsulated private data, represented in whatever formats are most natural for those languages.

97 MATHEMATICS AND COMPUTING↗

Supporting the President's Arms Control and Nonproliferation Agenda: Transparency and Verification for Nuclear Arms Reductions

The President's arms control and nonproliferation agenda is still evolving and the details of initiatives supporting it remain undefined. This means that DOE, NNSA, NA-20, NA-24 and the national laboratories can help define the agenda, and the policies and the initiatives to support it. This will require effective internal and interagency coordination. The arms control and nonproliferation agenda is broad and includes the path-breaking goal of creating conditions for the elimination of nuclear weapons. Responsibility for various elements of the agenda will be widely scattered across the interagency. Therefore an interagency mapping exercise should be performed to identify the key points of engagement within NNSA and other agencies for creating effective policy coordination mechanisms. These can include informal networks, working groups, coordinating committees, interagency task forces, etc. It will be important for NA-20 and NA-24 to get a seat at the table and a functional role in many of these coordinating bodies. The arms control and nonproliferation agenda comprises both mature and developing policy initiatives. The more mature elements such as CTBT ratification and a follow-on strategic nuclear arms treaty with Russia have defined milestones. However, recent press reports indicate that even the START follow-on strategic arms pact that is planned to be complete by the end of 2009 may take significantly longer and be more expansive in scope. The Russians called for proposals to count non-deployed as well as deployed warheads. Other elements of the agenda such as FMCT, future bilateral nuclear arms reductions following a START follow-on treaty, nuclear posture changes, preparations for an international nuclear security summit, strengthened international safeguards and multilateral verification are in much earlier stages of development. For this reason any survey of arms control capabilities within the USG should be structured to address potential needs across the near-term (1-4) years and longer-term (5-10) years planning horizons. Some final observations include acknowledging the enduring nature of several key objectives on the Obama Administration's arms control and nonproliferation agenda. The CTBT, FMCT, bilateral nuclear arms reductions and strengthening the NPT have been sought by successive U.S. Administrations for nearly thirty years. Efforts towards negotiated arms control, although de-emphasized by the G.W. Bush Administration, have remained a pillar of U.S. national security strategy for decades and are likely to be of enduring if not increasing importance for decades to come. Therefore revitalization and expansion of USG capabilities in this area can be a positive legacy no matter what near-term arms control goals are achieved over the next four years. This is why it is important to reconstruct integrated bureaucratic, legislative, budgetary and diplomatic strategies to sustain the arms control and nonproliferation agenda. In this endeavor some past lessons must be taken to heart to avoid bureaucratic overkill and keep interagency policy-making and implementation structures lean and effective. On the Technical side a serious, sustained multilateral program to develop, down select and performance test nuclear weapons dismantlement verification technologies and procedures should be immediately initiated. In order to make this happen the United States and Russia should join with the UK and other interested states in creating a sustained, full-scale research and development program for verification at their respective nuc1ear weapons and defense establishments. The goals include development of effective technologies and procedures for: (1) Attribute measurement systems to certify nuclear warheads and military fissile materials; (2) Chain-of-custody methods to track items after they are authenticated and enter accountability; (3) Transportation monitoring; (4) Storage monitoring; (5) Fissile materials conversion verification. The remainder of this paper focuses on transparency and verification for nuclear arms and fissile material reductions.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Putting Data to Work: Using Building Energy Performance Data to Expand the Market for Energy Efficiency in Buildings

An increasing number of state and local jurisdictions are implementing building performance reporting laws, which generate large quantities of useful data on the characteristics and resource consumption of the building stock. Yet, to realize the potential of these policies, the data must not only be disclosed, but put to work to drive energy savings. Under a three-year pilot, Washington DC (DC), New York City (NYC) and their partners are pioneering the use of data from building performance reporting in energy efficiency programs. To minimize the administrative burden of managing, combining, and sharing these data sets, the cities are utilizing the U.S. Department of Energy’s (DOE) open-source Standard Energy Efficiency Data (SEED) Platform. The Putting Data to Work project team is working with efficiency program administrators to develop and implement new and innovative ways in which the data collected through benchmarking, energy audits, and related policies can be used to improve energy policies and planning, unlock data directly for market use, scale-up the market for energy efficiency services, drive competition, better target utility incentive programs, and inform measurement and verification. This paper details achievements and key findings in DC and NYC to date, including the importance of high compliance, data quality, and data cleansing in using the information collected; methods that the cities are using to apply data to drive maximum energy efficiency; and the importance of inter- and intra-agency collaboration in program success. We also outline the path forward and detail expected outcomes and scalability of project activities.

Beddingfield, Erin↗

OpenMP 4.5 Validation and Verification Suite

OpenMP, a directive-based programming API, introduce directives for accelerator devices that programmers are starting to use more frequently in production codes. To make sure OpenMP directives work correctly across architectures, it is critical to have a mechanism that tests for an implementation's conformance to the OpenMP standard. This testing process can uncover ambiguities in the OpenMP specification, which helps compiler developers and users make a better use of the standard. We fill this gap through our validation and verification test suite that focuses on the offload directives available in OpenMP 4.5.

Pophale, SwaroopS↗

Verified! How Performance-Based Procurement Can Boost New Construction Program Savings and Empower Building Owners

Most utility new construction programs depend on modeled projections and deemed savings based on individual technologies. The industry has established ways to evaluate these programs based on the promise - not the actual performance - of these buildings post- occupancy. Deeper savings from a more integrated design with continuous performance monitoring are left on the table, locking out the higher performance for the lifetime of the building. This paper will demonstrate how performance-based procurement can empower utility incentive offerings to drive deep energy savings and reduce administrative costs. The key is to incentivize a change in the building owner's procurement process and reward actual building energy performance rather than incentivizing specific measures. The paper looks at strategies to transition new construction programs from technology-based verification to actual measurement of performance outcomes. Accelerate Performance, a U.S. Department of Energy (DOE) funded initiative, changes the building procurement approach, which spurs innovation and motivates the design and contracting industry to achieve deep energy savings in new construction - in the case of DOE's National Renewable Energy Laboratory Research Support Facility (NREL) in Golden, CO, 50% without increasing initial costs. Utility programs in three states, Illinois, Minnesota, and Connecticut, are actively piloting the approach with leading-edge owners. The paper will share savings results and lessons learned from the three different utility pilot programs. The paper provides practical guidance for utility program managers about how to apply the Accelerate Performance approach to supplement their current new construction program offerings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Future NTP Development Synergy Leveraged from Current J-2X Engine Development

This paper is a discussion of how the many long-lead development elements required for the realization of a future nuclear thermal propulsion (NTP) system can be effectively leveraged from the ongoing work being conducted on the J-2X engine program for the Constellation Program. Development studies conducted to date for NTP forward planning have identified a number of technical areas that will require advancement to acceptable technology readiness levels (TRLs) before they can be utilized in NTP system development. These include high-temperature, high-area ratio nozzle extension; long-life, low-NPSP turbomachinery; and low-boiloff propellant management, and a qualified nuclear fuel element. The current J-2X program is working many of these areas that can be leveraged to support NTP development in a highly compatible and synergistic fashion. In addition to supporting technical development, there are other programmatic issues being worked in the J-2X program that can be leveraged by a future NTP development program. These include compliance with recently-evolved space system requirements such as human-rating, fault tolerance and fracture control. These and other similar mandatory system requirements have been adopted by NASA and can result in a significant technical impact beyond elevation of the root technologies required by NTP. Finally, the exploitation of experience, methodologies, and procedures developed by the J-2X program in the areas of verification, qualification, certification, altitude simulation testing, and facility definition will be especially applicable to a future NTP system. The similarities in system mission (in-space propulsion) and operational environment (vacuum, zero-gee) between J-2X and NTP make this highly synergistic. Thus, it can be shown that the collective benefit of leveraging experience and technologies developed during the J-2X program can result in significant savings in development cost and schedule for NTP.

42 ENGINEERING↗

MO-G-BRE-04: Automatic Verification of Daily Treatment Deliveries and Generation of Daily Treatment Reports for a MR Image-Guided Treatment Machine

Purpose: Two aims of this work were to develop a method to automatically verify treatment delivery accuracy immediately after patient treatment and to develop a comprehensive daily treatment report to provide all required information for daily MR-IGRT review. Methods: After systematically analyzing the requirements for treatment delivery verification and understanding the available information from a novel MR-IGRT treatment machine, we designed a method to use 1) treatment plan files, 2) delivery log files, and 3) dosimetric calibration information to verify the accuracy and completeness of daily treatment deliveries. The method verifies the correctness of delivered treatment plans and beams, beam segments, and for each segment, the beam-on time and MLC leaf positions. Composite primary fluence maps are calculated from the MLC leaf positions and the beam-on time. Error statistics are calculated on the fluence difference maps between the plan and the delivery. We also designed the daily treatment delivery report by including all required information for MR-IGRT and physics weekly review - the plan and treatment fraction information, dose verification information, daily patient setup screen captures, and the treatment delivery verification results. Results: The parameters in the log files (e.g. MLC positions) were independently verified and deemed accurate and trustable. A computer program was developed to implement the automatic delivery verification and daily report generation. The program was tested and clinically commissioned with sufficient IMRT and 3D treatment delivery data. The final version has been integrated into a commercial MR-IGRT treatment delivery system. Conclusion: A method was developed to automatically verify MR-IGRT treatment deliveries and generate daily treatment reports. Already in clinical use since December 2013, the system is able to facilitate delivery error detection, and expedite physician daily IGRT review and physicist weekly chart review.

60 APPLIED LIFE SCIENCES↗

GALE 3.2 Verification Report

This report is documentation of the verification activities that have been performed on GALE-3.2 to ensure that the codes meet the requirements and specifications set forth by NRC and that the code meets its intended purpose. These activities are done in accordance with the GALE Software Quality Assurance Plan (PNNL-24249) and the GALE Configuration Management & Maintenance Plan (PNNL-24250). These two plans meet the requirements set for by both PNNL software quality assurance requirements and the NRC’s Software Quality Assurance Program and Guidelines (NUREG/BR-0167). The verification activities are documented to conform to Level 2 requirements of NUREG/BR-0167. Verifications were performed for both GALE-3.2 BWR and GALE-3.2 PWR Codes. The GALE 3.2 BWR and PWR codes are computerized mathematical models for calculating the releases of radioactive material in gaseous and liquid effluents. These computer codes are tools which can be used to determine conformance with the requirements of Appendix I to Title 10, Part 50 of the Code of Federal Regulations (10 CFR 50).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

GALE 3.1 Verification Report

This report is documentation of the verification activities that have been performed on GALE-3.1 to ensure that the codes meet the requirements and specifications set forth by NRC and that the code meets its intended purpose. Additional benchmark tests for GALE-3.1 are documented in Appendix A of NUREG-0016, Revision 2 for GALE-BWR 3.1 and Appendix A of NUREG-0017, Revision 2 for GALE-PWR 3.1. These activities are done in accordance with the GALE Software Quality Assurance Plan (PNNL-24249) and the GALE Configuration Management & Maintenance Plan (PNNL-24250). These two plans meet the requirements set for by both PNNL software quality assurance requirements and the NRC’s Software Quality Assurance Program and Guidelines (NUREG/BR-0167). The verification activities are documented to conform to Level 2 requirements of NUREG/BR-0167. Verifications were performed for both GALE-3.1 BWR and GALE-3.1 PWR Codes. The GALE 3.1 BWR and PWR codes are computerized mathematical models for calculating the releases of radioactive material in gaseous and liquid effluents. These computer codes are tools which can be used to determine conformance with the requirements of Appendix I to Title 10, Part 50 of the Code of Federal Regulations (10 CFR 50).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Dosimetric Verification of Intensity Modulated Radiation Therapy of 172 Patients Treated for Various Disease Sites: Comparison of EBT Film Dosimetry, Ion Chamber Measurements, and Independent MU Calculations

Three independent dose verification methods for intensity modulated radiation therapy (IMRT) were evaluated. Planar IMRT dose distributions were delivered to EBT film and scanned with the Epson Expression 1680 flatbed scanner. The measured dose distributions were then compared to those calculated with a Pinnacle treatment planning system. The IMRT treatments consisted of 7 to 9 6-MV beams for different treatment sites. The films were analyzed using FilmQA (3cognition LLC, Great Neck, NY) software. Comparisons between measured and calculated dose distributions are reported as dose difference (DD) (pixels within {+-} 5%), distance to agreement (DTA) (3 mm), as well as gamma values ({gamma}) (dose = {+-} 3%, distance = 2 mm). Point dose measurements with an ion chamber at isocenter were compared to dose calculated at that point. An independent monitor units (MUs) calculation program was also used for verification. For the film dose distributions, DD values varied from 92% to 97%, with head-and-neck and lung treatments showing lower values. Gamma varied from 93% to 98%, and DTA was well above 99%. The isocenter dose measurements deviated from 0.008 to 0.028 from the calculated dose. The larger deviations were attributed to high-dose gradients at the isocenter. RadCalc MU calculations gave differences from 0.027 to 0.079. The larger differences observed were for beams crossing large areas of heterogeneous tissue and were attributed to the limitations of the simple path-length correction method employed in RadCalc. In conclusion, the 3 independent verification methods for each IMRT patient at our institution demonstrated very good agreement between measurements and calculations and gave us the confidence that our IMRT treatments are delivered accurately.

61 RADIATION PROTECTION AND DOSIMETRY↗

Experimental Verification of Solidification Stress Theory

A research program is being conducted to develop a crack-free ceramic waste form (CWF) to be used for long term encasement of fission products and actinides resulting from processing spent nuclear fuel. Cracking usually occurs in the cooldown phase of the glass or ceramic formations. A crack-free formation should have more resistance to leaching than one with many cracks. In the research leading up to producing a CWF, a model was developed that proposes a permanent stress develops when the melt solidifies and that this stress can cause failure as the CWF nears room temperature. This paper reports on how the formation, CWF2, confirms the existence of this stress. The solidification stress is in addition to and of opposite sign of the thermal stress. Its derivation is reported on in Ref. 1. Cracking of the CWF would occur at low temperatures if solidification stress exists but at high temperatures if it doesn’t. If solidification stress occurs, then the cooldown rate during solidification should be reduced. If not, it should be reduced when the thermal stresses are highest. Recording cracking sounds confirm the existence of this solidification stress since cracking occurred during the low temperature phase of the cooldown. As a side purpose of this paper, a cooldown rate is proposed that should eliminate cracking in the next experiment, CWF3. CWF2 is a prototype vertical ceramic waste cylinder formed over a period of 10 days by heating a mixture of 75% zeolite, 25% glass frit in an argon atmosphere furnace through melting to 925 C and then cooling through solidification to room temperature. It is approximately 1 m high, 0.5 m in diameter, weighs about 400 kg, and is formed in a stainless steel can 0.5 cm thick. This cylinder developed many cracks on cooldown. At least 15 loud cracks were recorded over a period of 4 days at the end of cooldown when the temperatures were below 400 C. The CWF2 surface and centerline temperatures at mid height were measured which allowed the stress to be calculated. The timing of the cracks was compared to the time the calculated total stress exceeded the tensile stress limit and verified that the cause of the cracking was solidification stress and not thermal stress. Since the CWF is encased in a can in a furnace, the cracks cannot be easily observed but can be detected with sound measurements. Similarly, the stress cannot be measured but only estimated with analysis. Destructive examination of the CWF after cooldown was used to determine the pattern of the cracking which appeared to be initiated mainly in the inner region which is evidence the cracking is due to solidification stress.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗